Leaminton Spa Presentation

10
Chiltern Railways Leamington Spa Station: Phase 1 – Power Upgrade & Associated Works Thursday 15 th January 2015

Transcript of Leaminton Spa Presentation

Page 1: Leaminton Spa Presentation

Chiltern RailwaysLeamington Spa Station: Phase 1 – Power Upgrade & Associated Works

Thursday 15th January 2015

Page 2: Leaminton Spa Presentation

• Company Brief

• Accreditation

• Company Structure

• Our Services

• Our Solutions

• Experience

CONTENTS

Page 3: Leaminton Spa Presentation

• Date Of Incorporation: 13th December 2000.• Managing Director: Simon Winson. • Offices: St Bartholomew’s Church.• Company Registration No: 4123907• VAT Registration No: 927367006

COMPANY BRIEF

Page 4: Leaminton Spa Presentation

RES have an integrated management system which ensures full compliance with the rail industries stringent safety, health, environmental and quality (SHEQ) requirements and are accredited with the following;

• RISQS Certificate No: 094280

• NIC EIC Enrolment No: 029036

• UKAS accredited for: Quality ISO 9001:2008 Certificate No:12417-QMS-001Occupational Health and Safety - OHSAS 18001 Certificate No: 12417-HAS-001Environmental - ISO 14001 Certificate No: 12417-EMS-001

ACCREDITATION

Page 5: Leaminton Spa Presentation

COMPANY STRUCTURE

Simon WinsonManaging Director

Projects DirectorArron Simpson

Project ManagerAdam Farnsworth

Project EngineerPaul Claridge

Project ManagerScott Kendrick

Project EngineerJosh Parker

Project EngineerDan Clarke

Design ManagerPaul Pinches

Design EngineerNick White

Design EngineerMichael Morris

Design EngineerDavid Hudson

CommercialJonathan Watson

Quantity Surveyor

SHEQ AdvisorsFPA Consulting

DirectorTBA

Office ManagerLyndsey Lee

Admin AsstSamantha Rigley

Financial ControllerVerity Lamb

Finance AsstJade Price

Business Development Manager

Bryan Blareau

EstimatorTony Owens

Marketing AsstAlannah Dunnachie

Page 6: Leaminton Spa Presentation

OUR SERVICES

Design Mechanical Engineering

Civil Engineering Electrical Engineer

Electrical Testing Maintenance & Support

Consultancy, Surveying & Project Management

Page 7: Leaminton Spa Presentation

OUR SOLUTIONS

Point Heating Stations & Platforms

Lighting Installations Civil Works

DNO Signalling Supplies

Earthing & Bonding Level Crossings

Cable Installation UPS Installation

Page 8: Leaminton Spa Presentation

EXPERIENCE

Finsbury Park & Alexander Palace Stations Capacity EnhancementClient: Balfour Beatty RailValue: £470KDesign & Build

• Intrusive survey, Form B specification, drawings, calculations, assessments.• New mains, sub mains switchgear & lighting control.• Reconfiguration of existing sub mains & cabling.• Installation of mains, sub mains cabling & CMS.• Platform, canopy, subway & station buildings lighting.• Lift power supplies.• Lift motor rooms fit out small power, lighting ventilation & heating.• New fire alarm & security system.• OLE traction bonding.• New water supply & mechanical fit out to station buildings.• Reconfiguration of existing & new DOO equipment.• Contract Responsible Engineer Duties

Page 9: Leaminton Spa Presentation

EXPERIENCE

Peterborough Station M&E / E&P WorksClient: Carillion Value: £1.1M Refurbishment

• Reconfiguration of sub mains equipment & cabling.• Cable management systems.• Lighting control equipment.• R&L column, bulkhead & bollard lighting.• Fire alarm system modifications & extensions.• Point heating.• Water supply across bridge & sub-metered to retail units.• Retail telecoms re-configuration.

Page 10: Leaminton Spa Presentation

TECHNICAL