LEADER WP3 Conceptual Design Status

14
LEADER WP3 Conceptual Design Status KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 Luigi Mansani [email protected]

description

LEADER WP3 Conceptual Design Status. KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012. Luigi Mansani [email protected]. WP3 Tasks. Task 3.1 - Reference plant configuration of a LFR ( ANSALDO , CIRTEN, EA, JRC-IE, SRS) - PowerPoint PPT Presentation

Transcript of LEADER WP3 Conceptual Design Status

Page 1: LEADER WP3 Conceptual Design Status

LEADER WP3 Conceptual DesignStatus

KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012

Luigi Mansani

[email protected]

Page 2: LEADER WP3 Conceptual Design Status

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 2

WP3 Tasks

• Task 3.1 - Reference plant configuration of a LFR (ANSALDO, CIRTEN, EA, JRC-IE, SRS)

• Task 3.2 - SG damping pressure waves system design (MERIVUS, CIRTEN, ENEA)

• Task 3.3 - Primary system conceptual design of the ETDR (SCK•CEN, ANSALDO, EA, SRS)

• Task 3.4 - Secondary system conceptual design of the ETDR (EA, ANSALDO)

• Task 3.5 - DHR system conceptual design of the ETDR (ANSALDO, SCK•CEN)

• Task 3.6 - Plant layout of the ETDR (EA, ANSALDO)• Task 3.7 - Feasibility study of the flat-spiral-tube bundle steam generator

with integrated primary pump (MERIVUS)

Page 3: LEADER WP3 Conceptual Design Status

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 3

Task 3.1 Status

Design changes of the ELSY configuration identified ELFR configuration defined and used as a reference for ALFRED Contractual deliverable D03 “Review and justification of the main design

options of the LFR reference plant” issued The following Mechanical Drawings have been issued:

LEADER 31 DMBX 024 Rev. 0 Reactor Block General Assembly LEADER 31 DMBX 025 Rev. 0 Fuel assembly outline LEADER 31 DMBX 026 Rev. 0 Inner vessel outline LEADER 31 DMBX 008 Rev. 0 Core lower grid outline LEADER 31 DMBX 009 Rev. 0 Core upper grid outline LEADER 31 DMBX 027 Rev. 0 Reactor vessel outline LEADER 31 DMBX 028 Rev. 0 Reactor cover outline LEADER 31 DMBX 029 Rev. 0 Steam generator outline LEADER 31 DMBX 030Rev. 0 Vessel support outline LEADER 31 DMBX 023 Rev. 0 DHR deep cooler outline

Technical DOC T51 has been included and merged in D03 Contractual deliverable D31 ELFR Summary Report to be issued at M36

Page 4: LEADER WP3 Conceptual Design Status

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 4

Task 3.1: ELFR - Reactor Configuration

Page 5: LEADER WP3 Conceptual Design Status

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 5

Task3.2: Status of the activity

Task Accomplished

T52 - Conceptual design of the SG damping pressure wave system and test mock-up has been issued

Page 6: LEADER WP3 Conceptual Design Status

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 6

Task 3.3: Status

Design changes of the ELSY configuration identified ALFRED configuration (300 MWth) defined The following Mechanical Drawings have been issued:

LEADER 33 DMBX 013 Rev 0 Reactor Block General Assembly LEADER 33 DMMX 014 Rev 0 Fuel assembly outline LEADER 33 DMMX 015 Rev 0 Inner vessel outline LEADER 33 DMMX 016 Rev 0 Core lower grid outline LEADER 33 DMMX 017 Rev 0 Core upper grid outline LEADER 33 DMMX 018 Rev 0 Reactor vessel outline LEADER 33 DMMX 019 Rev 0 Reactor cover outline LEADER 33 DMMX 020_001 Rev 0 Steam generator outline LEADER 33 DMMX 020_002 Rev 0 Steam generator outline LEADER 33 DMMX 021 Rev 0 Vessel support outline LEADER 35 DMBX 036 Rev 0 Isolation Condenser outline

Technical document T57 drafted Contractual deliverable D32 (Summary Report) and Technical document

T66 /Main components thermo-mechanical sizing) to be issued at M36

Page 7: LEADER WP3 Conceptual Design Status

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 7

Task 3.3: ALFRED - Reactor Configuration

Page 8: LEADER WP3 Conceptual Design Status

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 8

Task 3.4: Status of the activity

Task Accomplished

Contractual deliverable DEL09 “Secondary cooling concepts & feasibility study of heat recovery of the ETDR” issued

Page 9: LEADER WP3 Conceptual Design Status

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 9

Task Accomplished Contractual deliverable DEL10 “Conceptual design of the DHR system of

the ETDR (ALFRED)” issued

Task 3.5: Status of the activity

Page 10: LEADER WP3 Conceptual Design Status

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 10

Technical document T53 “Seismic Response Spectra of the Reactor building of the ETDR (ALFRED) to be issued at M18

Contractual deliverable D13 “Plant layout and description of the containment system of the ETDR (ALFRED)” to be issued M30

Task 3.6: Status of the activity

Page 11: LEADER WP3 Conceptual Design Status

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 11

The new partner M.E.Rivus is now officially in the project

New task “Feasibility study of the flat-spiral-tube bundle steam generator with integrated primary pump” in-kind to MERivus has been added to the project

Contractual deliverable D39 “Feasibility study of the flat-spiral-tube bundle steam generator with integrated primary pump” to be issued at M36

Task 3.7: Status of the activity

Page 12: LEADER WP3 Conceptual Design Status

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 12

Del/Doc Title Task Responsible Date

D03 Review and justification of the main design options of the LFR reference plant 3.1 ANSALDO Issued

D09 Secondary cooling concepts & feasibility study of heat recovery of the ETDR 3.4 EA Issued

D10 Conceptual design of the DHR system of the ETDR 3.5 ANSALDO Issued

D13 Plant layout and description of the containment system of the ETDR 3.6 EA M30

D31 Reactor Design Summary Report of the reference LFR, further development recommendations 3.1 ANSALDO M36

D32 Reactor Design Summary Report of the ETDR, further development recommendations 3.3 SCK•CEN M36

D39 Feasibility study of the flat-spiral-tube bundle steam generator with integrated primary pump 3.7 MERIVUS M36

T51 Description, functional sizing and drawings of the main components of the LFR plant 3.1 ANSALDO Included in

D3

T52 Conceptual design of the SG dumping pressure wave system and test mock-up 3.2 MERIVUS Issued

T53 Seismic Response Spectra of the Reactor building of the ETDR 3.6 EA M18

T57 Description, functional sizing and drawings of the main components of the ETDR 3.3 SCK•CEN Drafted

M24

T66 Main components thermo-mechanical sizing of the ETDR 3.3 SCK•CEN M36

WP3 Deliverables & Technical Documents

Page 13: LEADER WP3 Conceptual Design Status

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 13

WP3 Milestone & Planning

Milestone Title Task Date Verification

M01 LFR updated reference configuration 3.1 Issued Report – T01

M04 ETDR reference configuration 3.3 Drafted M24 Report – D09, T57

M11 Reactor Design Summary Report of the reference LFR and the ETDR All M36 Report – D31, D32

November 2012

CompletedCompleted

Completed

Page 14: LEADER WP3 Conceptual Design Status

LEADER WP3 Technical Meeting, KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, 20-11 2012 14

Thank you for your attention