LEA Associates South Asia Pvt. Ltd. Independent Engineer...

42
LEA Associates South Asia Pvt. Ltd. A LEA Group Company Independent Engineer for Mahua-Jaipur O&M Project Office: Consulting Engineers & Planners "Laxmi Puram", Collector Chauraha, Main NH-ll, Dausa (Rajasthan) Tel: + 91-1427-223951, Fax:- +91-1427-223841 E-mail: [email protected] LASA/Highway /0&M/73398 /Mahua-Jaipur /2014/1320 The Project Director, Project Implementation Unit, (Dausa) National Highway Authority of India, A-2, Ingra Colony, (Opp. Roadways Bus Depot) Dausa - 303303, Rajasthan Dated: 29.05.2014 Subject:-Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2-Lane Road and Widening to 4-lane of Divided Highway of Mahua-Jaipur Section of National Highway - 11 from Km. 120.000 to 228.000 in the State of Rajasthan on Build, Operate and Transfer (BOT) Basis Under NHDP PHASE-lIlA: Request for Conciliation Meeting with Chairman of NHAI to Amicably Resolve Dispute under Article 39.1 (b) of the Concession Agreement. Reference: 1. JMTPL letter no. JMTPL/HQ/NHAIj2014-15/44 dated 23.04.2014 2. PIU letter no. 18065/14/PIU/DAU/Dispute/2574 dated 07.05.2014 Dear Sir, The point wise reply of the issues raised by the Concessionaire in his letter referenced 1 above is submitted as below. Dispute item no. 1: Release of O&M erant 1) As per the provisions of clause 23.1 of Concession Agreement, NHAI agrees to provide to the Concessionaire cash support by way of an outright grant aggregating Rs. 99.00 crores (Rs. Ninety Nine Crore only) during the concession period. During construction period grant to be paid was Rs. 39.60 Crores and during O&M period the grant to be paid was Rs. 59.40 Crores. The yearly grant to be paid to the Concessionaire during operations period is Rs. 14.85 crores for 4 years. The grant amounting to Rs. 39.60 crores of construction period has already been released. The quarterly O&M grants from 1 st to 14 th have been recommended by the IC and the NHAI has released 1 st to 13 th quarterly grants amounting to Rs. 48,26,25,000/- to the Concessionaire. The 14th grant is yet to be released by NHAI. The 15 th and 16 th quarterly grants have not been recommended by the IC due to non-completion of 5 th year periodic renewal from Km 120.012 to 174.741(Mile Stone-i) by the Concessionaire so far. This was supposed to be completed by 30.03.2013. Corporate Office: B-1/E-27, Mohan Co -operative Industrial Estate, Mathura Road, New Delhi- 110044 India Tel: +91-11-2697 3950-52, 4167 8150 (8 Lines), Fax : +91-11-4167 8659,26971062 E-mail:[email protected], Website: www.lasaindia.com / www.lea.ca Overseas Registered Offices: LEA dership in Engineering & Planning Solutions

Transcript of LEA Associates South Asia Pvt. Ltd. Independent Engineer...

LEA Associates South Asia Pvt. Ltd.

A LEA Group Company

Independent Engineer for Mahua-Jaipur O&M Project Office:

Consulting Engineers & Planners

"Laxmi Puram", Collector Chauraha, Main NH-ll, Dausa (Rajasthan) Tel: + 91-1427-223951, Fax:- +91-1427-223841

E-mail: [email protected]

LASA/Highway /0&M/73398 /Mahua-Jaipur /2014/1320

The Project Director,

Project Implementation Unit, (Dausa)

National Highway Authority of India,

A-2, Ingra Colony, (Opp. Roadways Bus Depot)

Dausa - 303303, Rajasthan

Dated: 29.05.2014

Subject:-Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2-Lane Road and Widening to 4-lane of Divided Highway of Mahua-Jaipur Section of National Highway - 11 from Km. 120.000 to 228.000 in the State of

Rajasthan on Build, Operate and Transfer (BOT) Basis Under NHDP PHASE-lIlA: Request for Conciliation Meeting with Chairman of NHAI to Amicably Resolve Dispute under Article 39.1 (b) of the Concession Agreement.

Reference: 1. JMTPL letter no. JMTPL/HQ/NHAIj2014-15/44 dated 23.04.2014

2. PIU letter no. 18065/14/PIU/DAU/Dispute/2574 dated 07.05.2014

Dear Sir,

The point wise reply of the issues raised by the Concessionaire in his letter referenced 1 above

is submitted as below.

Dispute item no. 1: Release of O&M erant

1) As per the provisions of clause 23.1 of Concession Agreement, NHAI agrees to provide

to the Concessionaire cash support by way of an outright grant aggregating Rs. 99.00

crores (Rs. Ninety Nine Crore only) during the concession period. During construction

period grant to be paid was Rs. 39.60 Crores and during O&M period the grant to be

paid was Rs. 59.40 Crores. The yearly grant to be paid to the Concessionaire during

operations period is Rs. 14.85 crores for 4 years.

The grant amounting to Rs. 39.60 crores of construction period has already been

released. The quarterly O&M grants from 1st to 14th have been recommended by the IC

and the NHAI has released 1st to 13th quarterly grants amounting to Rs. 48,26,25,000/­

to the Concessionaire. The 14th grant is yet to be released by NHAI. The 15th and 16th

quarterly grants have not been recommended by the IC due to non-completion of 5th

year periodic renewal from Km 120.012 to 174.741(Mile Stone-i) by the

Concessionaire so far. This was supposed to be completed by 30.03.2013.

Corporate Office: B-1/E-27, Mohan Co-operative Industrial Estate, Mathura Road, New Delhi- 110044 India Tel : +91-11-2697 3950-52, 4167 8150 (8 Lines), Fax: +91-11-4167 8659,26971062 E-mail:lasa@lasaindia .com, Website: www.lasaindia.com / www.lea.ca

Overseas Registered Offices: LEA dership in Engineering

& Planning Solutions

LEA Associates South Asia Pvt. Ltd. - 2-

The status of quarterly grants to the Concessionaire is as under:-

Operational Grant due Grant Amount of Remark Grant date Applied on Grant

I Qr. Grant 26.10.2009 26.09.2009 3,71,25000 Grant Released

II Qr. Grant 26.01.2010 26.12.2009 3,71,25000 Grant Released

III Qr. Grant 26.04.2010 29.03.2 010 3,71,25000 Grant Released

IV Qr. Grant 26.07.2010 09.07.2010 3,71,25000 Grant Released

V Qr. Grant 26.10.2010 26.09.2010 3,71,25000 Grant Released

VI Qr. Grant 26.01.2011 24.12.2010 3,71,25000 Grant Released

VII Qr. Grant 26.04.2011 25.03.2011 3,71,25000 Grant Released

VIII Qr. Grant 26.07.2011 23.06.2011 3,71,25000 Grant Released

IX Qr. Grant 26.10.2011 23.09.2011 3,71,25000 Grant Released

X Qr. Grant 26.01.2012 21.12.2011 3,71,25000 Grant Released

XI Qr. Grant 26.04.2012 21.03.2012 3,71,25000 Grant Released

XII ~r. Grant 26.07.2012 25.06.2012 3,71,25000 Grant Released

XIII Qr. Grant 26.10.2012 24.09.2012 3,71,25000 Grant Released

XIV Qr. Grant 26.01.2013 24.12.2012 3,71,25000 Recommended by Ie.

To be released by NHAI

,

Not recommended by the IC XV Qr. Grant 26.04.2013 25.03.2013 3,71,25000 due to non-completion of 5th

year periodic renewal work from Km 120.012 to

XVI Qr. Grant 26.07.2013 27.06.2013 3,71,25000 174.741 eMS-i)

The grants are released by NHAI. Therefore reply on this issue may please be furnished by

NHAI.

Corporate Office: B-1/E-27, Mohan Co-operative Industrial Estate, Mathura Road, New Delhi- 110044 India Tel: +91-11-26973950-52, 4167 8150 (8 Lines), Fax: +91-11-4167 8659, 2697 1062 E-mail :[email protected], Website:www,lasaindia,com/ www.lea, ca

Overseas Registered Offices: 'Addis Ababa (Ethiopia) ' Kampala (Uganda) 'Oman)

LEA dership in Engineering

& planning solutions

LEA Associates South Asia Pvt. Ltd. - 3-

Dispute item no. 2 : Amount deposited in NHAI Damaee Payment Sub Account of the

Escrow Account

As per the provisions of the CA, the appointed date of the Project was 20.03.2006 and

Scheduled Project Completion date 20.03.2009.

The first Provisional Completion Certificate (PCC) was issued to the Concessionaire on

30.03.2008 for the continuous stretch Km. 119.567 to Km. 174.296 (54.729 Km completed

stretch) (Annexure 'A') and finally the Project Highway was completed on 25.09.2009

(Annexure '8').

On recommendation by the predecessor IC Mjs ICT, the variation committee of NHAI granted

EaT upto 06.05.2009 (47 days) to the Concessionaire vide letter no.138 dated 17.06.2009

(Annexure 'C'). The Concessionaire could not complete the work in extended period (Le. upto

06.05.2009).

The Clause 6.1 of the CA provides that in case the Concessionaire defaults in completing the

construction work of the entire Project Highway within the stipulated Construction Period,

any fee notification issued earlier authorizing levy of user fee on part completion of the

Project Highway shall be de-notified and a fresh notification authorizing the Concessionaire to

collect user fee shall be issued only after completion of the entire Project Highway.

Concessionaire made representation to NHAI for extension of construction period and

requested for consideration of EaT for the balance work.

The variation committee of NHAI decided to continue the toll collection in the interest of the

project so the Concessionaire, subject to the condition that the Concessionaire should deposit

the collected toll beyond 06.05.2009 to NHAI till it achieves COD for the entire project reach.

The expenses towards the toll collection as per prevailing norms shall be retained by the

Concessionaire from the toll collection. The NHAI also decided that a supplementary

agreement should be signed with the Concessionaire (Annexure 'C'). In view of the decision of

NHAI a supplementary agreement was signed between NHAI and Concessionaire Mjs JMTPL

on 09.09.2009 (Annexure 'D').

The toll amount of Rs. 9,12,45,311j- collected form 07.05.2009 to 25.09.2009 has been

deposited in NHAI Damage Payment Sub Account of the Escrow Account. Subsequently the

Concessionaire applied for Extension of Time for the period from 07.05.2009 to 25.09.2009.

The final time extension for project completion has been recommended by predecessor IC Mjs

Corporat~ Office: B-1/E-27, Mohan Co-operative Industrial Estate, Mathura Road, New Delhi- 110044 India Tel: +91-11-26973950-52, 4167 8150 (8 Lines), Fax: +91-11-4167 8659, 2697 1062 E·mail:[email protected], Website :www.lasaindia.com/ www.lea .ca

Overseas Registered Offices: -Addis Ababa (Ethiopia) -Kampala (Uganda) -Oman)

LEA dership in Engineering

& planning solutions

LEA Associates South Asia Pvt. Ltd. -4-

ICT up to 25.09.2009 vide his letter no. 4520 dated 02.11.2010 (Annexure 'E'). The EOT is

under consideration with NHAI.

The release of amount is subject to issue of completion certificate and Extension of Time

(EOT) ~n merits of the case and which is to be decided by the Competent Authority of NHAI as

per the condition of supplementary agreement.

Dispute item no. 3: Payment of Utilities Shiftine.

As per the policy of NHAI, the utilities on BOT projects were got shifted by the Concessionaire

under the supervision of concerned utility department. The expenditure towards shifting of

utility was to be borne by NHAI and supervision charges were deposited to concerned utility

departments.

NHAI incurred an expenditure of Rs. 15.09 crores on shifting of utilities of Jaipur - Mahua

section of NH-11, out of which Rs. 7.77 crores has been paid to Concessionaire. The

Conces?ionaire has claimed payment of Rs. 7.32 Cr. towards the final bill of shifting of utilities.

During the discussion with PD PIU it has been gathered that the balance amount has been

withheld due to conflicting view of CAG Audit team that the shifting of utilities is the

responsibility of the Concessionaire at its own cost and expenses. It has been learnt that PIU

has referred the observation of the CAG Audit team to the 3 CGM Technical Interpretation

Committee constituted by NHAI HQ regarding interpretation of conflicting provisions of

Conces!>ion Agreement.

Dispute item no. 4: COD of the Project Hiehway

The Concessionaire has claimed that the COD of the project highway is 26.09.2009 and the

consultant letter LASA/Highway/O&M/73398/Mahua-Jaipur/2014/1259 dated 15.04.2014

(Annexure 'F') regarding likely damages for delay in completing the periodic renewal work

from Km 120.012 to 174.741 should be withdrawn.

In fact the provisional completion certificate from Km 119.567 to 174.296 was issued on

30.03.2008 (Annexure 'A') and the provisional completion certificate from Km 174.741 to

229.100 was issued on 26.09.2009 (Annexure 'B') in compliance of Sub Clause 16.5 of the

Concession Agreement. The collection of toll in the above mentioned reaches was started on

31.03.2008 and 26.09.2009 respectively.

It is clear from above that two different provisional ~ertificates have been issued for the two

different reaches. The provisional completion certificate issued on 26.09.2009 is for the reach

Cor.porate Office: B-1/E-27, Mohan Co-operative Industrial Estate, Mathura Road, New Delhi- 110044 India Tel: +91-1).-26973950-52, 4167 8150 (8 Lines), Fax: +91-11-4167 8659, 2697 1062 E-mail:[email protected], Website:www.lasaindia.com/ www.lea.ca

Overseas Registered Offices: .Addis Ababa (Ethiopia) .Kampala (Uganda) 'Oman)

LEA dership in Engineering

& planning solutions

LEA Associates South Asia Pvt. Ltd. - 5 -

from Km 174.741 to 229.100 (Mile Stone-2) and not for the entire reach from Km 120.000 to

228.000 as stated by the Concessionaire. Therefore the periodic maintenance (Overlay work)

from Km 120.012 to 174.741 (Mile Stone -1) is to be taken up every 5th year from COD in

accordance with the provision of Clause 3.3.7 of Schedule 'L' of the Concession Agreement.

Accordingly the work should have been completed by 30.03.2013 but the Concessionaire has

not completed it so far.

Dispute item no. 5: Reimbursement of expenditure on shiftin!: of Govt. Buildin!:s.

There were various Govt. Buildings existed in the ROW which were hampering the 4 laning

work of project highway during construction phase. The matter was taken up at the highest

level o~ Govt. of Rajasthan for relocation of Govt. Buildings. The Govt. of Rajasthan was of the

view that the Govt. Buildings which are located within existing ROW shall not to be considered

as encroachments and for relocation of such Govt. Buildings, NHAI will first construct new

structure in consultation with PWD and only then existing structures will be dismantled.

The Concessionaire has constructed Govt. Buildings which were coming in the way of 4 laning

of the project highway and handed over to respective departments.

The replacement cost the structures constructed by Concessionaire is Rs. 68,78,183.00 which

has been recommended by the predecessor IC Mis ICT to NHAI vide letter no. 4659 dated

12.03.2011 (Annexure 'G') for payment. The proposal was recommended by RO Jaipur to

NHAI HQ for approval. NHAI, HQ vide letter no.3389 dated 13.02.2013 has informed that NHAI

is not agreed to the estimates towards construction of Govt. Buildings falling within existing

ROW (Annexure 'H'). The matter may be decided as per the extent of NHAI policy.

Dispute item no. 6: Payment towards Avenue Plantation

As per the conditions of Forest Clearance under FCA, 1980 the Concessionaire is required to

plant twice the number of trees felled in the project stretch. There were 24,000 numbers trees

to be cut and accordingly Concessionaire was obligated to plant and maintain 48,000 numbers

of trees.

The Concessionaire has planted trees but not maintaining the avenue plantation. The IC

during the inspection of the project has notified the Concessionaire deficiencies in maintaining

the avenue plantation from time to time. The IC has recommended damages for shortfall in

number of trees as per the provisions of Concession Agreement. The damages have been

Corporate Office: B-l/E-27, Mohan Co-operative Industrial Estate, Mathura Road, New Delhi- 110044 India Tel : +91-11-26973950-52, 4167 8150 (8 Lines). Fax: +91-11-4167 8659, 2697 1062 E-mail:lasa@lasaindia .com, Website:www.lasaindia.com/ www.lea.ca

Overseas Registered Offices: ·Addis Ababa (Ethiopia) • Kampala (Uganda) .Oman)

& planning solutions

LEA Associates South Asia Pvt. Ltd. - 6-

recovered from the Concessionaire and the Concessionaire in its claim is asking for refund of

damages which is not tenable.

The Concessionaire claims that land for avenue plantation is not available. The Concessionaire

claim regarding availability ofland is not correct.

The Concessionaire himself has completed plantation of required number of trees in the

month 'of September 2012 on the available land. The Concessionaire has informed vide his

letter dated 10.04.2012 (Annexure '1') that 43645 trees have been planted by them. The IC

vide his letter no. 394 dated 10.04.2012 (Annexure T) informed to the Concessionaire that

42984 trees have been planted and the balance plantation to be done is 5016 nos. Accordingly

the Concessionaire submitted work programme for the balance avenue plantation vide their

letters slated 23.06.2012, 19.07.2012 and 31.08.2012 (Annexure 'K', 'L" & 'M'). There were no

damages from September 2012 to December 2012 on this account as the Concessionaire had

planted 48,000 trees. This has been confirmed by IC vide his letter dated 01.10.2012

(Annexure'N'). Due to non-availability of protection of plants and inadequate measures for

maintenance of the avenue plantation, the plant mortality is high. Therefore the damages have

been levied against the Concessionaire for non-maintaining the avenue· plantation which is

obligation of the Concessionaire.

The Concessionaire has disputed the damage amounting Rs. 72.10 lacs levied for the period

11.12.2012 to 10.10.2013 in the Delhi High Court vide OMP no. 438 of 2014. The Hon'ble

Delhi High Court has directed to maintain the status quo on recovery of damages. The next

date of hearing in the matter is 03.09.2014.

Submitted for your information and further needful action please.

With regards,

Yours faithfully, for LEA Associates South Asia Pvt. Ltd.

~ (Rajendra Mathur) Team Leader

Encl.:- As above

cc: 1. Mr. A.K Sharma, LASA-H.O., New Delhi

Corporate Office: B-1/E-27, Mohan Co-operative Industrial Estate, Mathura Road, New Delhi- 110044 India Tel : +91-11-26973950-52, 4167 8150 (8 Lines), Fax: +91-11-4167 8659, 2697 1062 E-mail:[email protected], Website:www.lasaindia.com/ www.lea.ca

Overseas Registered Offices: 'Addis Ababa (Ethiopia) 'Kampala (Uganda) .Oman)

LEA dership in Engineering

& planning solutions

r

J ~j"'=. . L 'y. :.j and Technocrats Pvt.

Site Office

L.AX i\,l , p URAr·,r Ccocsitc i'...1H ~ .. iclc~s N~:F S ·"',T,"~ ! h Chat:ra r:d ~ . ~Jsa - jC~3C ~

i= te F3 X - 'J14272233: G 7,,!e: J;4 27-2 23810

224638 Email ictdausa@hotma il.com

ANNEXURE _ ' A 1

:- ... : .. .. _ .,:, '

SI:'-:CH:\j\; l.-\ 1f3' P,\RT:'-: ERS

indepencenl COl/sui/ane}' SelVices for -1; 6 ianim;,' c f Ji),{;(;r-MiJhuiJ 80 T Pr(lJec~ Oli NH-11 'lnder NHCP Phase ill .)!. ill tile Stall: ci .Rajas/han

Our Ref - ICT/459/RC :MKS! 2 4 S 2.

To,

National Highway Authority of India (NHAI), G-5 & G-6 , Sector 10, Dwarka, New Delhi - 110075 Tel:- 011-25074100/25074200 Fax: - 011-25093507 I 25093514 (Extn. 2223/2318/2468/2553)

Kind Attn:- Mr. S.K. Nirmal , General Manager (BOT)-ilA

Date ~ (' . l' -:--;. (j~ ,

To,

MIs Jaipur Mahua Tollway Pvt. Ltd. Opp. Navodaya Vidhyalaya, ViiI. - Khedli , Agra Road , P.O. - Bhandarej - 303501 District Dausa. (Raj.)

Kind Attn:- Mr. Hooi Chew Heng, Sr. General Manager (Operations)

Sub: - Improvement. Operation . Maintenance. Rehabi li ta tion and Strengthening of existing 2 Lane Read and widening to four lane divided highway from Km 120+000 to Km 228+000 of NH-1 1 (Jaipur - Mahua Section ):- Issuance of Provisional Completion Certificate .

Dear Sir, Pursuant to sub clause 16.5 of Concession Agreemen t the Provisional Completion Certificate dated 301

"

March 2008 (with Punch List attached) is hereby issued.

With regards.

Yours faithfully. for ICT Pvt. ltd & Associate

~1: .;_.'_Ci .. L~ii~u·-'v\1 __ (Rakesh Chaudhary) i

Team Leader

Enel:- 1. Provisional Completion Certificate 2 Punch List = 40 Pages 3 CAR Reg ister::: 2 Pages 4. ePN Register = 1 Page

C.C.: - 1. PD. PIU. NHAI . Dausa as per your letter no. 2 Mr. A D Narain. Executive Director, HQ. ICT Pvt. Ltd. New Delhi

.-Itl~.j Ci~ic8 .1 ., ~""e:?f' :- t:~<

"~e · ... Se!!'" ·,· ':~ ' -: ~J :;'!

t-rr.a il r·c ~,:o" lr. :cp'

:r:ter :-: etT!.. :CCR IJP ' '::; ,- . 'j :: /\, D S· i

-:t~J ,:,'/t.\-.V ; :::~r"I':t' C:Wll

" ,r;,

~I~.b' / I ~c 1- Imercontinental Consu ltants ,/ ~~ and Technocrats Pvt Ltd.

/ Independent Consultancy Servtces for 4/6/aning of jalpur-Mahua 80:-PrOjea on NH-l! under NHDP Phase III-A JI7 the , State of RaJasthan

PROVISIONAL COMPLETION CERTIFICATE

We, Mis Intercontinental Consultants and Technocrats Pvt. Ltd. in association with Me

Consulting Engineers (P) Ltd. and Singhania & Partners and Shri Kushalsuri Engineering

Services Pvt. Ltd. acting as Independent Consultant on the Project Improvement,

. Operation, Maintenance, Rehabilitation and Strengthening of existing 2 Lane Road and

. widening to four lane divided highway from Km 120+000 to Km 228+000 of NH-l1 BOT

Basis through the Concessionaire Mis Jaipur - Mahua Tollway Pvt. Ltd. hereby issue this

provisional certificate of completion in terms of sub clause 16.5 of Concession

Agreement dated 23rd September 2005 between the said Concessionaire and NHAI.

On the request of the said Concessionaire dated 21.03.08 this Provisional Completion ~

. Certificate is issueCl 'Subject to the appended Punch List containing a list of outstanding

items since the tests stipulated in schedule "J" have been successfully carried out and all

parts of this 54.729 Kms i.e. (Km. 119+567 to Km. 174+296) section of project highway

can be legally, safely and reliably placed in commercial operations though certain works

and things forming part thereof are not yet complete as indicated in the said Punch List.

All the items of the said Punch List shall be completed by the said Concessionaire within

120 days (one hundred twenty) of the date of issue of th is Provisional Certificate of

Completion.

Dated '30 - 03 - 2(02)

(Date of issue)

o ~. i \~~tldLW<--L:

IndependentConsu/~nt

TEAM LEADER JAf~Ui\·~!AM!'!j\ eo j FR,)JEcr

CONSULTANCY PACKAGE No. Ie/Ph. IJIAlNH-/IlRAJJOO2

ANNEXURE ~ E:> 1

v -;.. . .. ,~ ?3) ., ,/ I ~CE IntderTcontinental Consultants -~~,~ an echnocrats Pvt. ltd.

in @ Shri Kushalsuri Eng ineering Services as,ce;al;on S b

with Pvt. Ltd.

Site Office

lAXMI PURAM' Op'posite MH Motors, Near Somnath Chauraha, Dausa - 303303 Tele Fax - 01427223810 Tele: 01427·223810

224638 ,223820 Email [email protected] ict dausa@ictonline,com

111;'OC Me Consu lting Engineers (P) Ltd. J __ _ ._

SI NpIAN IA f(glPAR'rNERS

-\

Independent Consultancy Services for 4/ 6 faning of Jaipur-Mahua BOT Project on NH· tt under NHOP Phase III·A in the State of Raj asthan

Our Ref: - ICT/459/RC: HKS/3946

To,

.,/ National Highway Authority 0f.lndia, G-5 & G-6, Sector 10, Dwarka, New Delhi -110075 Tel: 011- 25074100/25074200 Fax: 011-25093507/25093514 (Extn.2223/2318/2468/2553)

Date: 250909

MIs Jaipur Mahua Tollway Pvt. Ltd. Opp. Navodaya Vidhyalaya, ViiI. - Khedli, Agra Road, P,O. - Bhandarej - 303501 District Dausa. (Raj.)

Kind Attn :- L.P. Padhy, General Manager (BOT)

Kind Attn:- Mr. S.P. Nagarkar Sr. General Manager

Sub: - Improvement. Operation, Maintenance, Rehabilitation and Strengthening of existing 2 Lane , .

Road and widening to four lane divided highway from Km 120+000 to Km 228+000 of NH-11 -

(J aipur-Mahua Section): - Issuance of Provisional Completion Certificate.

Dear Sir,

Pursuan t to sub cia use 16.5 of Concession Agreemen t the Provisional Completion Certificate dated 261h

Sept. 2009 (With Punch List attached) is hereby issued .

With regards,

.. Yours tru ly, for ICT Pvt. Ltd & Associate

(Ra~­Team Leader

Encl :- 1. Provisional Completion Certificate 2. Punch List = 40 Pages 3. CAR Register = 1 Page 4. NCPN Regis ter = 1 Page

C.C: - 1. PO, PIU, NHAI, Dausa 2. Mr. A.D. Narain, President, HQ, !CT Pvt. Ltd. New Delhi ~(

,-- . blc.. . P .C.C

H93dQlfice l\.a,Gi een ;Jerk, ~ewOe r- i -' ~ 001€ . I"JO ·.A

TA IRphone Fax No.

9'- " ·2686 3000.2 (;5230" 5. g' . 11 ·26855252 26565290.255594 I a

E-I'T'.a ll info~clC!rine c:Jm

Inlern.t TUCOR I S.01 .071 iND S2 99 httpJfJI'HW.l c:cnline.c::Yn

1" ,

l

Intercontinental Consultants and Technocrats Pvt. Ltd.

Independent Consultancy Services for 4/ 6 iamng of Jaipur-Nahua BOr Project on NH-l1 under NHDP Phase Ill-A in t'le State of Rajasthan

PROVISIONAL COMPLETION CERTIFICA TE

We, Mis Intercontinental Consultants and Technocrats Pvt. Ltd . in association with

MC Consulting Engineers (P) Ltd. and Singhania & Partners and Shr; Kushalsuri

Engineering Services Pvt. Ltd . acting as Independent consultant on the Project

Improvement, Operation, Maintenance, Rehabilitation and Strengthening of existing

2 Lane Road and Widening to four lane divided highway for Km 120+000 to Km

228+000 of NH-11 BOT Basis through the Concessiona ire Mis Jaipur - Mahua

• Tollway Pvt. Ltd . hereby issue this provisional certificate of completion in terms of

sub clause 16.5 of Concession Agreement dated 23th September 2005 between the

said Concessionaire and NHAI.

~.

On the request .of the said Concessionaire dated 11 .09.2009 this Provisional

Completion Certificate is issued subject to the appended Punch List containing a list

of outstanding items since the tests stipulated in schedule "J" have been

successfully carried out and all parts of this 54 .359 Km . i.e. (Km. 174+741 to

229+100) section of Project highway can be legally, safely and reliably placed in

commercial operations though certain works and things forming part there of are not

yet complete as indicated in the said Punch List.

All the items of the said Punch List shall be completed by the said Concessionaire

within 120 days (one hundred twenty) of the date of issue of this Provisional

Certificate of completion .

Dated 26 . 09 . 0 q

(Date of issue)

~ Independent Consultant

RAKESH CHAUDHARY TEAM LEADER JAIPtJR-MAHUA BOT PROJECT

ANNEXURE _ ( C J

t"'- ~ r'~ l'IF(\11lOl {I ICf {1\ili01PT ~1I~Cf)~VI r=rro ~, ~ ~ ;in: ~~)

National Highways · Authority of India (Ministry of Shipping. Road Transport and Highways)

~ IPhone : 91-11·-25074100125074200

~ IFax: 91-11-25093507 I 25093514

~. I Extn.: 2223 / 2318 I 2468 / 2553

~-5 ~ 6, ~-10. mqiT, ~ ~-110 075 G-5 & 6, Sector-1 0. Dwarka, New Defhi-1 10075

NHAIIBOT/1l019/S/2003/1.J8 · 17th June 2009

To, Project Director, Project Implementation Unit, C/o Mr. Ramesh Khandelwal, Plot A-2, Indra Colony, Dausa, - 303 303 Rajasthan.

. -

v Sub: Improvement, Operation, Maintenance of Rehabilitation and Strengthening

Sir,

of existing 2-lane road and widening to 4-lane divided highway of Mahuwa . - Jaipur section of NH-ll from km 120.000 to 228.000 in the s~te of . Rajasthan on BOT basis llilder NHDP Phase III A- Grant of EOT reg.

-This is in reference to your letter no. 8250 dated 2114/2009 regarding ·

subject cited above.

2. The matter was deliberated in the Variation Committee meeting heHon 11th June 2009 and approval is accorded for the extension oftime proposal for 47 days '. as recommended by IC (13 days over and above 34 days approved by NHAI under Forc~ Majeure event), i.e. upto 06.05.2009. As far as the Gazette Notification· authorizing the Concessionaire for toll collection has been issued w.e.f. J1I3/2008 is concerned, it was decided by the committee to allow the Concessionaire to continue the toll collection in the interest of the project subject to the condition tl)at the Concessionaire should deposit the collected toll beyond 06.05.2009 to NHAI till it achieves COD for the entire project stretch. However. the expenses towards the toll collection as per prevailing norms of NHAI shall be retained by the Concessionaire f~~m the toll collection. The committee has also decided that a supplementary agreement should be signed with the Concessionaire to this .effect and in case Concessionaire do not agree with this arrangement the toll col1ection may _be got discontinued by the Concessionaire with immediate effect as per prov ision in the concession agreement and penalty imposed.

J. A copy of minutes of meeting of the variation committee is also enclosed for rcady refere nce .

,

\ .)

~12.

--

4. In view of above, you are requested to take further necessary action in tlle matter immediately in order to protect NHAI's interest.

Yours faithfully,

L,J' (L.P. Padhy)~.

General Manager (DKIBOT -II)

Ericl: As above. Copy for infonnation and further necessary action to:

(i) Mis. rCT Pvt. Ltd., A-8, Green Park, New Delhi-l 10 016. (ii) Team Leader) Mis . leT Pvt. Ltd., Laxmi Puram, Opposite MH Motors,

Near Sornila~ Chauraha, Dausa-303303 - Fax: -01427-223810. .

)

Intercontinental Consultants and Technocrats Pvt.-Ltd.

associat!On ~ h In • Shri Kushalsuri Engineering Services

Wl th Pvt. Ltd. \~ \

Site Office

LAXMI PURAM" Opposite MH Motors, Near Sontnath Chauraha, Dausa - 303303 -rele Fax-01427223810 Te!e: 01427-223810

- 224638,223820 Email [email protected] iet [email protected]

Inne MC Consulting Eng~neers (?) Ltd.

Sm§BANIAf~fPARfNEB~ -J '")....J

ANNEXURE • ..J..J

Independent CQnsultancy Services for 4/6 laning of Jaipur-Mahua BOT Project on NH-11 under NHDP Phase /II-A in the State of Raja."tf1an

Our Ref: -ICT/459/RC: HKS/39y/

MIs Jaipur Mahua Tollway Pvt. Ltd.

Opp. Navodaya Vidhyalaya, Viii. - Khedli,

Agra Road, P.O. - Bhandarej - 303501

District Dausa. (Raj.)

SUb:- Improvement, Operation, Maintenance, Rehabilitati_on and Strengthening of exis,ting 2 Lane

Road and widening to four lane divided highway from Km 120+000 to Km 228+000 of NH-11

(Jaipur- M~hua Section): - Supplementary Agreement

Ref:- 1. NHAlletter No. NHAIIBOT/11019/5/2003/272 dated 10th Sept. 2009 2. PD endorsement No. 18040/9189 dated 15.09.2009

Dear Sir,

With reference to above cited letters, Kindly ffnd enclosed herewith the signed copy of Supplementary

Agreement of subject project for further necessary action at your end.

This is for your kind information and record please.

Yours truly,

For ICT Pvt. Ltd & Associate

.(R~ Team Leader

Enel :- As above

C.C.: - 1. Head Office, New Delhi

2. HE

Head Office Telephone Fax No. A-S, Green ParI<, 91- 11-26863000. 26523036. 91-11-26855252 elM--OeIAJ....1..tOO-1 6.--lNQLA-~ - -----<26565-290;--265&94-1

E-mail inroGlctonlne.com

Internet TUCOR 15.01.07I1ND S2 102 http1}N'hW.idon~n8.com

.... ,, ". ",' . .. ......... ~--. .... : .' - .'

~ I {dt£l . :Z1t{J:q {[\i1+i)Oll SnfuCfi{UI ~~, ~ ~ ~ (l"iililrT~)

National-Highways Authority of India (Ministry of Shipping. Road Transport and Highways)

-:it-s ~ 6, ~-10. ~. ~ ~-110 075 G-S &6, Sector-i0, Dwari<a. New Delhi-11 0075

~ I Phone : 91 -11-25074100125074200

~ IFax : 91-11 -25093507 I 25093514

~_ !Extn.: 2223 I 23.18 I 2468 I 2553

N rIA r/ BOT /11019 /5/2003 / ~1l- 1 Olh September 2009

To, Project Dir~ctor, NHAl, Project implementation Unit, C/o Mr. Ramcsh Khandeh .... ::l; Plot A-2, Indra Colony, Dausa, - 303 303 Rajasthan.

Sub: Improvement, Operation, Maintenance of Rehabilitation and Slrcngthcnin~ of existing 2-lane road and widening to 4-lane divided highway of MahuWil -]aipur section of NH-ll from km 120.000 to 228.000 in the state of Rajasthall on BOT basis under NHDP Phase III A -Signing of supplementary agreement reg.

Sir, Kindly find en~losed hereWith the signed copy of Supplementary Agreement

of subject projeCt for further necessary action at your end .

Encl_: As above

You rs f~lilh f Ll f f ,i,

~\\~\rf (Radha Kishan)

DGM (BOT) .- II 1\2

kejl DELHI H 577755

SUPPLEMENTARY AGREEMENT

~ This Agreement is being executed at New Delhi on this O'fl~ day of ~ Septenlber, 2009 at Delhi.

~ . National Highways Authority of India, having its corporate office at G~5

.. h 6, Sector -10, Dwarka, New Delhi - 110 075 (hereinafter referred to as . I( mAr', which expressi<?n shall unless repugmmt to the context or

meaning thereof, mean and inClude its successors in title and assigns)

AND

§ l'v:t/s. Jaipur-Mahua Tollway Pvt. Ltd., a company incorporated under the S Companies Act, 1956, and having its registered office at Plot No. 646-A,

Road No~ 36, Hi-Tee City Road, Jubilee Hills, Hyderabad-500033 ~ (hereinafter referred to as lithe Concessiona.ire" -whieh expression shall

unless repugnant to the context or meaning thereof, n1ean and include its ~ successor in title, substitutes and assigns)

Page 10f5

I The NHAI and the Concessionaire are hereinafter individually referred to as a "Party" and collectively referred to as the "Parties".

'WHEREAS the parties had executed a Concession Agreement dated 23rd

September, 2005 in respect of Improvement, Operation, Maintenance, Rehabilitation and Strengthening of existing 2 lane road and widening to 4 lane divided highway of Mahuwa - Jaipur section of NH-11 from Km. 120.00 to 228.00 in the State of Rajasthan on BOT basis under NHDP Phase­IliA.

AND WHEREAS the Concession Agreement under Clause 6.1 stipulates that the Concessionaire shall be entitled for collection of user fee upon completion of continuous homogenous stretch of 50 Km.

AND WHEREAS the Concessionaire . had completed construction of continuous stretch of 54.739 Km (from design Chainage of 120.012 to 174.741) on 31.3.2008 as confirmed by the Independent Consultant vid~ its letter-dated 30.3.2008. .

AND WHEREAS. i=l.ccordingly, the NHAI had allowed the Concessionaire to collect user fee in respect of the said stretch of 54.739 Km of the Project Highway and a Notification no. S.O. 128 (E) dated 22.1.2008 auths>rizing the Concessionaire to collect user fee had· also been got issl!-ed by the NHAI through the Government of India.

Ai'\[[) . WHEREAS in terms of . the Concession Agreement, the Concessionaire was required to complete the entire stretch of the Project

(,: '" Highway within the stipulated Construction Period Le. within 36 months , ~_ from the Commencement date of 21.03.2006.

AND WHEREAS the Concessionaire could not complete the Construction ::~ as aforesaid within the stipulated period .

AND WHEREAS the Concessionaire submitted an application for extension of time on various grounds and the Independent Consultant recommended for extension of time to the National Highway Authority of India for a period of 47 days.

AND WHEREAS on account of variolls factors, the NHAl has so far granted extension of 47 days to the Concessionaire to the stipula ted Construction Period (i.e. upto 6.05.2009), including an extension of 34 days

Page 2 of 5

to the Concession Period after -considering the recommendations of Independent Consultants. However, the Concessionaire could not complete the construction even within this extended period.

AND vVHEREAS Clause 6.1 of the Concession Agreement provides that in case the Concessionaire def~ults in completing the construction work of the entire Project Highway within the stipulated Construction Period, any user fee notification issued earlier authorizing levy of user fee on part completion of the Project Highway shall be denotified and a fresh notification authorizing the Concessionaire to collect user fee shall be issued only after completion of the entire Project Highway. .

AND WHEREAS the Concession Agreement further stipulates that in case of failure of the Concessionair.e to complete the Construction works within

~ ~. the stipulated Construction Period, the Concessionaire shall further be " ' liable to pay damages to the NHAI, V'(ithout prejudice to any other rights ~ of the NHAI under the Concession Agreement.

AND WHEREAS the Concessionaire has made representation to the Independent Consultant for a review of the duration of 47 days granted as extension of time en various grounds and has requested the NHAI not to impose any penalty / damages for further delay in completion of construction works pending the resolution of the review of extension 6£ time.

:~...,-NOW -iN=CONSIDERA fraN of>MUruArcovENANr' BEREAFrEit' PROVIDED; PARTIES HERETO AGREE AS UNDER:

1. That the action for de-notification as provided under Clause 6.1 of the Concession Agreement shall be deferred pending

''''-. consideration by NHAI on Concessionaire's request for grant of further extension of time . . However, the Concessionaire shall deposit all the toll collected by it w.e.f. -·OTOS.2009 in NHAI Damages Payment Sub-Account of the existing Escrow Account.

2. Notwithstanding any thing contained in . this Agreement, the amount so deposited in to the said NHAI Sub-account pursuant to clause 1 hereof, shall not be construed to mean damages as defined under the Concession Agreement.

3. That the amount collected for the period from 7.05.2009 till the date of this Supplementary Agreement shall be deposited (after retaining the expenses towards collection of user fee referred to in

Page 3 of5

Clause 4) in the ' said NH AI Sub-accoun t within 10 days of the execution of this Supplemen tary Agreement and thereafter .on a daily 'basis until the Provisional Completion Certificate is issued. The amount so deposited in the said NHAI Sub-account l.s irrev9_c~ble by th~ Concessionaire and·will be dealt or1y as per the written direction of NHAI.

. 4. That the Concessionaire shall be entitled to retain the expenses towards the collection of user fee as per the nOrIns of NHAI from daily toll collection a'nd the balance toll collection amount shall be deposited in the NHAI Damages Payment Sub-account of the Escrow Account in terms of Clause 1.

5. That upon the issue of the Provisional Compietion Certificate for entire project highway by the. Independent Consultant, the rights of the Concessionare in respect of the Conceesion Agr~ment shall be restored and the provision under Gause 1 above ·.requiring the Concessionare to deposit the amount of toll collection in the NHAI Damages Paym~t Sub-A.ccouct shall cease with immediate effect

. and the amount of toll collected for the entire stretch of the proj~ct . highway shall be retained by the Concessionare.

6. The amount accumulated in the NHAI Damage Payment ~ub­account shan be appropriated in accordance to 'any further extension of time beyond 6th May 2009 granted by NHAI. ~

7. That in the· event the Concession.ab:-e is able to cbtain Provisional Completion Certificate within the extended period granted by

" C:"~"==~=' '-"NHA±,~ilie~an1m1nt...dep1JsitacLl~)L.Jh~ ~~9Il~~S9i~IlaP.:.~ .. in ' ~ Dcu;nages Payment Sub-Account pursuant to Gause 1 here above shall be restored to the Concessionaire Without any further liability on NHAI on any account whatsoever.

8.

Without prejudice to the rights of either Party under Clause. XXXIX of the Concession Agreement, it is acknowledged by the Parnes , hereto that NHAI has the discret:ion to grant apy further extension of tiine. -'

That, in. addition to its any other obligation under the Concession Agreement, the Concessionaire undertakes to submit on weekly basis details of the vehicles passing through the user fee plaza which has to be confirmed by the Statutory Auditor on a monthly basis. _. '

" . .;~.

Page4of5

, . ---- ~

,

That the Concessionaire agrees that any leakage in user fee collection due to any act of the Concessionaire or for any reason attributable to the Concessionaire and/or any discrepancy between actual collection of user fee. and the amount deposited with NHAI Damages Payment Sub-account shall made good by the Concessionaire and deposit the difference in the said Sub­account.

10. This Agreement is in furtherance to and not in derogation of the Concession Agreement dated September 23,2005. ' "

IN WITNESS WHEREOF THE P ARTIES HAVE PUT 1HEIR SIGNATURE & STAMP THE DAY AND YEAR FIRST HEREINABOVE WRITTEN IN

. >--- THE PRESENCE OF \~ .

'---Signed, Sealed and Delivered

For & on behalf of

National Highways A,uthority of India By

~=~~In the presence of :

1. ~~~ r:zo.J.~ -Kf 0 ha\l\, .n ~('f'J J NI! Pr-)

2 ~:

1,.

R. . K Pi-).. ~ e-rt R IJ-f/ err '. Sf"{IPL.

..

.,

.. -

I }

ANNEXURE. E

~I em Intercontinental c~nsult~_nts LL~ -and-Technocrats Pvt. Lta.

Site Office

LAXMI PURAM" Opposite MH Motors, Near Somnath Chauraha, Dausa - 303303 Tele Fax - 01427223810 Tele: 01427-223810

224638 ict_dausa@fctonline,com [email protected]

auociallon II In G Shrl Kushalsuri.Enginaerlrig Services

wilh Pvt· Ltd.

!rOC Me Consulting Engineers (P) Ltd.

SINGHANIA f~i PARTNERS

Independent Consultancy S8fVices for 416 laning of Jaipur-Mahua BOT Project on NH- f f under NHDP Phase III-A in the Stale of Rajasthan

Our Ref: - ICT/459/RC: HKSI 45":Ltl

The Project Director, Project Implementation Unit, National Highway Authority of India, 156, Gimar Colony, Gandhi Path, Vaishali Nagar, Jaipur-302021

Kind Attention: Sri Rakesh Gupta, Project Director

Date: O'2..tni'2.01D

Sub:- Improvement, Operation , Maintenance, Rehabilitation and Strengthening of existing 2 Lane Road and widening to four lane divided highway from Km 120+000 to Km 228+000 of NH-11 :kequest for EOT in Construction Period and Gazette Notification dated 23.01.2008

Ref. ~ Concessionaire letter No. JMTPUICEl1766/10/2010 dated 09,10.2010 2) Our letter No. ICT/459/RC: HKS/4431 dated: 21 .08.2010 ~ NHAI's letter No. 18040/1/06-DausalEOT/10610 dated 17.08.2010 4). Our letter No. ICT/459/RC: HKS/4335 dated 07.06.2010 '{} Our letter No. ICTl459/RC: HKS!4279 dated 04.05.2010 ~. Our I~tter No. ICT!459/RC: HKS/4225 dated 24.03.2010 I'f" Our letter No. ICT/459/RC: HKS/4161 dated 11 .02.2010 8) Our letter No. ICT/459/RC: HKS/4068 dated 23.12.2009 9) . Date of Signing of Supplementary Agreement on 09.09.2009 10) OUf letter No. ICT/459/RC: HKS/3848 dated 07.09.2009 11) Concessionaire letter No. JMTPUICEf1550/09/2009 Dated 02.09.2009 12) Concessionaire letter No. JMTPUICE/1546/09/2009 Dated 01 .09.2009 13) Concessionaire letter No. JMTPUHQ/NHAI/2009 Dated 10.08.2009 14) Concessionaire letter No. JMTPUICE/451/07/2Q09 Dated 29.07.2009 15) Con~essionaire letter.No. JMTPUICEf444/07/2009 Dated 07.07.2009 16) NHAl's letter No. NHAIIBOT/1 .1 019/5/2003/138 dated 17.06.2009 17) Our letter No. ICT/459/RC: HKS/3502 dated 15,04.2009 18) Concessionaire letter No. JMTPUICEf400104/2009 pated 14.04.2009 19) Concessionaire letter No. JMTPUICEl1433/04/2009 Dated 09.04.2009 20) Concessionaire letter No. JMTPUICE/1427/03/2009 Dated 31 .03,2009 21) NHAI's letter No. 18040/1/06-DSAlFM/8045 dated 23,03.2009 22) NHAI's letter No, 18040/1/06-DSNFM/8004 dated 17.03.2009 . 23) Our letter No. ICT/459/RC: HKS/3413 dated 17.03.2009 24) Concessionaire's letter' No. JMTPUHQ/ICT/2009 dated 22.02.2009

Innovative, Creative & Technologically Sustainable Infrastructure Solutions E:ITLICorr. up to 01 .04.07 H •• dOflico Tolophon. FIX No. E-mail . Intornol NO Sl 190 A.a, Gre." Pa..... 9 t·1 1· 26863OCO, 26523036. 91· 11·26855252 infc0clonfne c¢m htlpl ........... ictolloln • . com Ne ... Delhi-I tOOI6. INDIA 26565290.26569418

c

Intercontinental Consultants and TechnocratsPvt. Ltd.

association In • S~rl Kushalsuri engineering Services

with 'Pvt. Ltd.

Site Office

lAXMI PURAM" Opposite MH Motors, Near Somnalh Chauraha, Dausa - 303303 Tele Fax - 01427223810 Tete: 01427-223810

224638 [email protected] [email protected]

IflTK: MC Consulting EngIneers (P) Ltd.

SINGHANIA f~1 PARTNERS

Independent Consultancy Services for4i6laning of Jaipur-Mahua BOT Project on NH-11 under NHDP Phase III-A in the State of Rajasthan

Dear Sir,

Please refer to Concessionaire's above cited letters in connection with "Extension of Time" for the project. As per our letter at serial no.13, we had recommended an EOT of 47 days as an interim measure for events such as Gujjar Agitation 1(29\1) May 2007 to 5th June 2007), Gujjar Agitation 11(24th May 2008 to 18th June 2010) and Trucker's Strik~(5th January 2009 to 12th January 2009) . Accordingly, the Project Completion Date got shifted to 06.05.2009 from the scheduled completion date of 20.03.2009 as per CA.

The above matter was deliberated in the Variation Committee meeting held on 11th June 2009 on the subject of interim extension of time for this project and the Variatipn Committee had accorded approval to the extension of time for 47 days, as recommended by IC (13 days over and above 34 days under Force majeure) i.e. up to 06.05.2009.

Vide letter at serial no.3, NHAI had requested us to re-examine the issue of EOT and re-submit our recommendations. We have examined the issue as per the provision of the Concession Agreement and after reconsideration, our comments are given below:

Delays due to Land Acquisition and physical possession of land for construction

There were failures on the part of the Competent Authorities to acquire land because of various reasons such as court cases, stay orders, dispute among beneficiaries, and non acceptance of compen"Sation amount by the benefiCiary, law and order problems, mutations, delay by government agencies including delay in forcible acquisition, removal of encumbrances, VIP references, etc.

On account of the above, the Concessionaire was interrupted in carrying out his obligation, due to which the following activities got affected in construction of, 4-Lan ing of the Project Highway:

Event No.1: Construction of Underpass & SelVice RO'ad at Ch 219+800.

The CA(LA) i.e. a government agency in charge of land acquisition could not procure the required land and hand it over as per schedule due to a Status Quo order from Hon'ble High Court of Rajasthan on the particular land under acquisition . l-'ience, the construction of the Underpass & Service Road was delayed.

The Status Quo order was vacated on 22.07.2008 but CA(LA) could give physical possession of the said land only on 26.08.2008 under police protection. !

Therefore, the Concessionaire could not take up the Construction work immediately after vacation of Stay Order.

Based on the assessment of work programme, we have recommended 337 days for construction of the underpass and the approaches from the date the land was made available to the Concessionaire i.e. 26.0S.2008. This comes to 83 days from 06.05.09 (Extended date of project completion) which is 28.07.2009. The details of the said issue have already been submitted vide our letter no 3848 dated 7th

Sep 2009.

Innovative, Creative & Technologically Sustainable Infrastructure Solutions E:ITLICorr. up to 01.04.07 Int.rnot NO 51 191 Head Olfle.

.... 8. Green Pork. New Delhi- ll0016. INOIA

T.lephono 91.11.26863000. 26523036. 26565290. 25569418

FuNo, 91·11· 26855252

~·m.1I Ir.foG'ctor>ne.eom htU>l,""",Jdonlne.eom

r ..

..

(

Intercontinental Consultants and Technocrats Pvt. Ltd.

Site 6ffice

LAXMI PURAM" Opposite MH Motors. Near Somnath Chauraha. Oausa - 303303 Tele Fax - 01427223810 Tele: 01427-223810

224638 [email protected] [email protected]

association & In • Shri Kushalsuri Engineering Services

witn pyt Ltd.

[J11'lC MC Consulting Engineers (P) Ltd.

SINGHANIA f~1 PARTNERS

Independent Consultancy Services for 4/6 laning of Jaipur-Mahua BOT Project on NH-11 under NHDP Phase III-A in the State of Rajasthan

In our view, this delay comes under Clause 15.4 of CA.

The proposed EOT of 83 days ' starting from 06.05.2009 shall be limited to Extension of Construction period only and no Damages for the delay need be imposed on the Concessionaire as per Clause 15.4 ofCA.

Event No.2: Delay in physical possession of land at Kanota ;and Pa/cli M~na for construction­

Concessionaire has demonstrated delay in obtaining physical possession of land resulting in delay in construction of 4-lanin9 of Highway at Kanota from Ch 220+100 to Ch 221+000(B/S) and Paldi Meena (Ch 225+400 to Ch 225+650 LHS). The details of the said issue have already been submitted vide our letter no 3848 dated 7th Sep 2009 . . The delay is on account of the fact that the land free from encumbrances as per Schedule 'H' of CA could not be handed over by CA (LA) before 15.06.2009. Hence, the date of handing over is considered to be 15th June 2009.

The Independent Consultant has recommended the extension of time for 93 days for completing the four lane carriageway from the date of possession! handing over of the land .

This delay is on account of an event beyond the reasonable control of the Concessionaire, as CA (LA) Jaipur i.e. a Govemment Agency failed to handover the land: In our view, this delay comes under Clause 15.4 of CA.

The Concessionaire is, therefore, entitled for an EOT of 93 days starting from 15.06.2009 for completing the four lane carriageway. This EOT is applicable to the construction period only and no Damages for , delay need be imposed on the Conc~ss ionaire as per Clause 15.4 of CA for this extended period. (t b . '1 . 01 Approval of PCC (Period from 16.09.2009 to 25.09 2009) :

IC has recommended vide letter no 4279 dated 04.05.2010 that the delay from 16.09.09 to 25.09.2009 in obtaining PCC by the Concessionaire is not attributed to Concessionaire since the issue of PCC was under process at NHAI HQ and recommended that the Concessionaire be granted EOT up to 25.09.2009. Under the circumstance, Concessionaire is not liable to pay Damages as per clause 15.4 of Concession agreement.

Conclusion: -

For Event No.1, the Concessionaire is entitled for 83 days of extension from 06.05.2006 (date of EOT already granted). Therefore extended date of completion would get shifted to 28.07.2009 and

For Event No.2, the Concessionaire is entitled for 93 days of extension from 15.06.2009. Hence the extended date of completion would get shifted to 15.09.2009 for completion of four lane carriageway.

The delay in the period from 16.09.2009 to 25.09.2009 is not attributable to the Concessionaire as the issue of PCC was under process at NHAI HQ during that period. Hence the Concessionaire is entitled for EOT till 25.09.2009 and is not liable to pay any camages as stipulated in clause 15.4 of CA.

Innovative, Creative & Technologically Sustainable Infrastructure Solutions E;\TLICorr. up to 01.0-\.07 HudOlfiCB Tt!.phon. Fu Nc. E-mail Internet NO 51 192 A-8.Green Park. 91-1 1. 2€ 863ooo, 26523036. 9~· 1 1·268S52!12 infoGictonl ne.com hltp}/wwH,c1onine.com New Delhi·l1001S. ;NOIA 26$5=. 26569418

f I

I I I

......... . ,.-..

.Inie.fc.ontinental Consultants and Technocrats Pvt, Ltd.

Site Office

LAXMI PURAM' Opposite MH Motors. Near Somnath Chauraha, Dausa - 303303 Tele Fax- 01427223810 Tele: 01427-223810

224638 icCdausa@ictonline_com [email protected]

as,~UoIl In • Shri Kushalsuri Engineering Services

willl 'Pvt. Ltd.

l1lY1C MC Consulting Engineers (F) Ltd.

SINGHANlA f431 PARTNERS

Independent Consultancy Services for 4~ laning of Jaipur-Mahua aOT Project on NH-1l under NHDP Phase III-A in the State of Rajasthan

In view of above, the extended date of completion is recommended to be shifted from 06.05.2009 to 25.09.2009. Since, the project completion has not been achieved by the Scheduled Project Completion Date for reasons not attributable to the Concessionaire; NHAI need not impose Damages stipulated under Clause 15.4 of the Concession Agreement till the extended date of completion , i.e. 25.9.2009.

Submitted for favour of consideration.

~;1' Yours truly,

For ICT Pvt. Ltd. & Associate

(R~ Team leader

Enel: - As above

Cc: 1. Mr. L.P. Padhy GM (BOT) IlA (NHAI). New Delhi 2. Head Office, ICT Pvt. Ltd- New Delhi 3. Concessionaire MIs JMTPL

\ ·1 ; ('.{ C

Innovative, Creative & Technologically Sustainable Infrastructure Solutions E;\TLlCorr. up to 01.04.07 Ha1.dOfliCI ""'8. Green Park. N .... 0et/li·ll0016. INDIA

Tllephone 91-1 t· 26863ooo. 2657.l036. 26565290. 26569418

F.n No. 9 1.1 1·26855252

".mall Intern.t ND 51 193 infoQllclonln8.com hl1p1t1owW lC1onin • . com

• • AN~ E URE ] f=" I

lEA Associates South ASia Pvt. t . Independent Engineer for Mahua-Jaipur O&M

Project Office; "Laxmi Puram", Collector Chauraha, Main NH-l1, Dausa (Rajasthan)

Tel; + 91-1427-223951, Fax;- +91-1427-223841 E-mail; [email protected]

A LEA Group Company Consulting Engineers & Planners

LASAlHighway!O&M/73398/Mahua-Jaipur/2014/125 '9 Authorised Signatory, MIs Jaipur Mahua Tollway, Pvt. Ltd. Rajadhok Toll Plaza, Village - Rajadhok VIA Banskho. Post Office - Jhar, District - Jaipur RAJASTHAN , Pin Code: 303305

Dated: 15.04_2014

Subject:-Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2-Lane Road and Widening to 4-lane of Divided Highway of Mahua-Jaipur Section of National Highway-11 from Km. 120.000 to 228.000 in the s tate of Rajasthan on Build, Operate and Transfer (BOT) Basis Under NHDP PHASE-IliA: - Periodic Maintenance in MS-1.

Reference 1) -Your letter no_ JMTPUICE/2108/01/2013 dated 10.01.2013 2) Our letter no, LASAlHighway/O&M/733981Mahua-Jaipur/2013/817 dated: 01.05.2013

~ 3) Our letter no. LASAlHighway/O&M/73398/Mahua-Jaipur/2013f882 dated: 27.06.2013 4) Your letter no. JMTPUICE/219S/06/2013 dated 30.06.2013 5) Our letter no. LASAlHighway/O&M/73398/Mahua-Jaipur/2013/974 dated: 18.09.2013 6) Our letter no. LASAlHlghway/O&M/73398JMahua-Jaipur/2013/1 027 dated: 18.10.2.013 7) Our letter no. LASAlHighway/O&M/73398/Mahua-Jaipur/2013/1058 dated: 18.11.2013 8) Your letter no. JMTPLlICEf226411 1/2013 dated 28.11.2013

Dear Sir, It is to inform you that in accordance with the provisions of Clause 3.3.7 of Schedule 'L' of the Concession Agreement, the Concessionaire is obligated to carry out the work of Periodic Maintenance of the carriageway once every 5th year (from COD) and in the last year of Concession period. The Commercial Operations for of MS-1 was achieved on 30.03.2008 and accordingly the work of Periodic Maintenance of the carriageway in MS-1 should have been completed by 30.03.2013. You had submitted the work programme for the over lay work vide your tetter referenced-i. The said work was scheduled to be completed by the end of June 2013 as per the programme. Thereafter you had informed vide your letter referenced 4 that the work will be completed by December 2013 after the monsoons. Then you had again informed us vide your letter referenced- 8 that "Due to some unavoidable circumstances, the work of MS-1 could not be completed by the specified date and the work is in progress & we are trying our besf to complete at an early date. In this regard please refer our letters referenced- 2 3, 5, 6 and 7 by which we had requested to complete the proposed over lay work at the earliest. This is to mention herewlth that the work of periodic maintenance is not yet completed. Hence you have failed to fulfil your contractual obligations and have become liable for damages under Clause 18.12118.13 of the Concession Agreement. The cost of the remaining work shall be verified and the damages shall be intimated to you accordingly_ You are therefore once again requested to complete the oVer lay work of MS· 1 at the earliest so that subsequent levy of damages could be avoided. Yours faithfully, for LEA Assocjat~s South Asia Pvt. Ltd.

~(JA: (RaJendra Mathur) Team Lea.der CC; 1. PD, PIU - Dausa for kind information

2_ Mr. A.K Sharma, LASA H.O. New Delhi

Corporate Office; 8-1/E-27, Mohan Co-operatlve Industrial Estate, Mathura Road, New Oelhi-110 044 India Tel: +91-1.1-26973950-52,41678150 (8 lines), Fax; +91-11-4167 8659, 2697 1062 E-mall:([email protected], WebsIte: www.lasaindia.com / www.lea.ca Overseas Registered Offices:

LEA dership in Engineering

& Plonnlng Solvtions .

( , ANNEXURE - Gi ~~~=·~-- l \

~ r -,~ ': . ... .:. ..

. ,. '. SIt-orne.·

~~.~ .. ~.. . Weafsom:nalffietraU~

. ! ··. ri_.;.~·'·' . r.efJat:;....;O.~~3AtO

, ' Teiko'iA2t:223&,1¢ ,,22.4538; 1et.1~I~~~ . ' '.

________ i :

,. ',. >., ~~~~.:'t~~~~~$~4~~~QI;J,~IJ(~iI~'BOT~q~ fM-11.:tmdfiiHffDFPh~~IJ~itt_~~l~ fi:.~a;sttran

{JorR?f: ~1<CJ/45,~tRC!i,ijKsr4659 ea~: ttfll.20'1t

" J~,p'r,Rle9tOI~CfQr.~ , ' Pi:oje:Cit.j ropt •. m.n\a~: lhl~ts J

, N~ti~,ttarHtBhway).uthOri'tibll"cila, .1S,~,(i1w;a:r:~~19~~~nghlP:~l!!r~'(~1s..llaJU!~gaj'j . Jall ' lIT~:02'Q2'f ,'-'- ~~> -,-- .. - ." -~'-

,:Sub:~ · ~T~p'(Q)Je~~eRt~ . gp:e@tl:o!t: ',M~lntertan.ce, R.lihab1JftatiQ.!', ,a!1d ~~~"Ji:th,~!lln~ , of 'e~!$~mt 2 ~~n~ :~oad: aRt; wtd$.l)fijjo:"eUr-~tane~ dlvlffed,Hlghway'f'rQ)n,'1Qli 1l.O"f,oro ~QJ(iti _ ~~tOOQ 6,fiN~1l: 'A~p;o~t ft5 ~e$tlmat~ ,!O[ r~locat[()n ' QY~Y,t '&Wt~g~ tn E'jj£tlrig, ~OW~n~ '~u~t: for " r~fea'sa ;of.Jiay.m~)jtfQt!lijildlnj1§~rl4 ,$.1~ct4t~[e.~o~titdfor -an :ama,unto bf_ Rs~ 68,

~7'~~':~~~,~~~~If~~r.t:.Ei-oncY'QrAriIf::X\"an<f:Cf. ,a;1(X1v1 ..: .. ~ .

R;i¥.f~..t.JMT~L'leUet -NO:JMWtil~Tl{n3J12J.20tOtfat~d oa.f2'~2O:fO ¥ , ~;j~ -@1t~t:NO! ~ijtfqt~t/}7~1i2~1'1 ~~J~;,z5,1~M1lC~l?y~f}cl~t '-,3:t~~U(~f)q9i$¢~_~t~ff~r ~¢~18M~f;1!1Q"tP$;NQQIl,l,~q!.@ng{1t{}21d~itep',O~ 12.2410 · 4Lt>.l.!r ~tte~:~Q.i J9.'T(4§.9.lRC;_~JSS[-492't-dat~d::,O~02;2011 '

'A: ·¥.'9~tte~~JN'9.: l8.Pt1'fflOO·OSIYWq~1127.1~dat~26.f)22,(1.1-1

Oea,.~Slr; , t(i11~'=p'~itr~~~,oi~::@~e.r~~J~~~~tt.~~~q1$ ,9h -~~ ~~!O~~gSUpt~~~ Vg1:e:\bi$ )~Uet we b,'avebeefl : a::W~:. tdd'':itirrlate~ lne:~)jetifle;.~fere~ 'fO'tM-tlat:l~'~fCA Oi'lQ'er:y;hiattti*tptt>posal sobm]ted Vide-

I .9\[fif€tter:itatedrr'~02,~2attW~$';exa:mlri~-arido(ec.omm.eooed,-'-./ In>thiS:i:es' , ci~iOs.,to0bnf.i ',io ; our kijjdnQticefhaHtfe~'cta'tlseahdt rovtsloris~t CA unOerwt1itb 100

.~ .. ~«t~if.~.a~~!~~u:a~= . _t()'J~PL. a~-!eq':J,~~:q~tlfi~ID ~dedetters·,a9~p~:~t~~9t9ana~~,Pt~01:t,~~~ ,~, JJ)a~~" ltlmPlies

...." ,:tnal '~~fe)1l~:'tQ<~ cralt$~ailQPt~vlS:1Qtis; otCA-~mentfooed: by JMTPL. At!", tff&s~We(.e' ~rnenlrdnedlrr IhiiSUb ofourtetter~ " , ., .

• • .~ ." ." .." .• -:: ••• ,,.'" • .i _"' ••

,.:;.

{1bivc~~~; agaIn ~qrmrrrt~_~l ttf.~Je'que.s.t ;Qf JMIP-LwW~~~a,rornefJ!Jna~t 9rali~~ tQ~~1{~v)·l)H~~and .p-;~f'~yt~!~~}:~~3 :,,'\~t,~ ~X' :PJC:A; 1:h~ we Wgy of ceteva.bf protectferl"ofthe5e'proviSlons. ,ot :CA.·::::

_ . '-'tep~.ao:ce(fr;:akti.'l':;; , ; ~ ... . ;.a\' ,~\r;S~'1u. i(~i:'{*h~Jw~~ ~"~HAI asrees to ,ooServe.;oomply andpeifortntt)e'folrOwiQ~; .' :-n~\~;.t;t :t¥~iJb$'aJUeXi!f~g,~e§;?,~ ,~ qemapdMt ~l$ed1)y--the: oon~,ed' g9vemr.tl!~'1I-()(qf!1ercOf1cameP

' :\X:S~~ " ~9ioctas-iJJH$.s~~ ¢f:e.nv.i.ftl{lmentat¢l$~nce:~At~?)~Qt!Ii)g, :dJn;tPf'osatory aftor:e_s~,tiof:J~5hifiin90f . " , ,,,, ~ < -~E~~j . p.~s:~()t. utility secvfcesJ 'CQnstrocUanof- ROBLRtJ8, ott railWay tio~ anCSranaDiJitali¢n arid

.~ ' ' , r~; ,lUernent." :' • , ~ . ~,::~~' .fe'iafl! ~p.~ ,or ,M~xu~ X:, ~hfrih Js ~nq:~~:u~ t9Al'lne,XtJ~ t , lNHJ\L ,HO Je'tt~r NI)~· "';,,:;~;,' NHAJ/So.Tlf Hl:tWS12.00a dated tSIit t.ebru.~ i21lQ4ltEtacl$1t1at "NR,At wilt p.roviqe-:n~c~~!y:h~lf}

-' ';-- ... ~~ .... ;... . r ~

.)~ .'-'4-~. ~.,... .

..... ,:..-

.A:: lri~~rcontltl~~~~l~~on's:ultan~$ .. :~1:~ ,aqd ~echn.~rats Pvt. ,Ltd.

J .~ ;.Slt. effle ..

~ .,.,.

In , Shit Ki tiaiwl-en-friHiin s.'rV!;es-_1<';';,. ~L:" '. . W" .';: '"

Ifif1t .6 Conaillllng~gm""-~)).ld. . , >

~ ·~i~MM~ . 1- Ie " '~ .·Op~ildjft.too(of$~

N'ea{Somii~eIiIUr~~ ...

... S~,9u.ooAt8i'P~ttrN~

;.

· f

-'.

1;l~!J4.'-"'®~30~, ~ ~T..818'Fax ... Q1~21223a1i) :irele:~01:4ii~223lri:o ," ' . ... " . 224m i~-,da'uii@lG\Oilllri~~·

r(~pi:~(j~~Y:~fI:vICo~rO(;.(~J{n1i1g:otJaipYr-Msb~:f3QT~ctO(l. Nr?ffundir1iMOPf!!m.,mt,l.ib:tljrStBl.,ifR~jaStbMt . ... ~. - .- . _ .. . . '-

'". _", - .' .• - .J • _ , ••••. c ••• ' • • '" •

J~,{1!itie~('tn~ ¢p:~H~JR&'R . ot:Project-affecleQ Peopl~t(PAPs). as 'mayoe:.'requ\feq upder g.~v~ment TP~Ii~Y~ .

lL*iO;JJo~ ' ~ '~ut:ti(~I~q~Jo rtf~!'W:Qn here,·tp.~\Add{Uo.n:~~~Chlef :Se$JftjaFt(ln4alt;p~ d0..til}gJ)~r1odrca. lev!ew11leelirlgs 'M~ with ~~~et8& · pW'OGQ$,P ~O .• NHA.J f~~ '~nceS~Roalt¢ ;~nstnJ.eIatf:.PIl tn.Jit · ~mPfJos~atigrr 1or',G:a:v.~mment S~~es: C:LlPt on-GovtJa".d: sl\Oulcf~· paid~ot ~~J ql~st .~btl.ll(1t11e , stn;fctq~taPPrQ~tt@~~a~. ',. .' .. ; . , .

·· tw§:it.t~fi~~q :~~~~(U?ri1r~g~~Ub.!~~,s~~d.qp'~¢ !Qr ,ca~tiJ~'l~g' the:V:~!q&~Qtwo~~x,~~d are:tne; same :a~c~p.OPt~d b)"PWIJ fQtvaloaUQ.~ :iJHbe tft,e(r~.&i~triJ!tf~PectiV8 :~LIQ,iOgsJn:exi~lfr'fgoRew.

R~p~" thaJ~9,vfi-'sY-9ilii~sfon wuj~§atiSry'your W$rJ(

T~i~.Chrq6Qlo9.y':~f ·U1e"eve(lts 1t'll,l'l,e:m'CiU¢ns Elf\~Q$edJlS Annex,t$, ~~.

~1'!~ric,e'f'~;~~iri.~re~~m~na#jfiadhe:;g~1!nh)f~s~ . S<:'818;1~~OO,{Rs.. "~r#¥~~ght' t~.cs',~,veJ)tY;eigh.t · .thQ.usan~~Q.e btltlqr.f3.<;fa.nd ~J9.hty;thre1:t~nlY} ma¥.Wri9JY:b,EHeJmburAAd;tq.-.jMTPL~afequest~:&r·;hem Yid~'fuejr: rett~~~:~t¢ff03;-17:'lafo;~na~5~1;20H '-~P.epU~~Iy. . , . .

'.r&~~~:~~.td$ YoU~rtJ1Yi • ft"';ICr ?Vflld &Assaciate

. ""-' - • " .. ! ...... _ . .

g-f.l~b · "'fipnexur:e~A · ' C:~C:;l - 'i{~~~d6ffi~, Newll~rhi ..

, ~. :f:ligHW,riy. :en-gi~f. ' '~Tel " ,-

, .

1 ,t • ;

l.

. > '~.

. -.

!~ ,

~. j

' : :".:,. ..

", ...

... ~ ..

)~

~ .. ,

,. ' .'

"

;. . - .'"

. ;:

\ }

ANNEXURE- H .. !

.~l~;~11~~~1~'~ .~ fFix "91on;.~/:~U - ' . .

'S\1b: • ~==~~=:t~~:'it~~~~:c. . ·:K.m,. ,21'~QO():~~e,c.!ioJ1;· 9l'MJ .. 1l·~-g~,-ltip~ seeU'~tt), iil; 1h~. s,~1e 'of-tujast4an

j)p::~OTJ)~b~·f.7(JveliJmmt1fW4i11g ~ i~g4rt1m~ . ,':

. " ~1~ '~r -to YQui-re.~' no.. ~120-t.6f5al)1;3:.ROltre¢li!39.,~~ df.-08~m.2013, .

~ih:YbU~~~u~,io .~n~Y~Whefher.:.~ tfeciSiOItlmS:be~taf!fu .on ll.~~~f Rs;tjls:,4%;~jl/~·~War&:.~~~of~ltL;~d"TIi1hlli~iwitQf~'~RQW., .

,

, . '1' :~ :4r .iS~~~~~~,~)Sj::timat~~~a,t, ~ ~,:tioi~a;reecl~~~ q~ ~sfifrlate of Rs .. . :i .. ~ . ~l& .,~-~trucfiOlt()fG.oVL:aUildiilg'iatJfug:W1t1iiIf:existiDg,RQ'\t .

. " A ~

~ ..

'.

~~pY" '~hm~ : .­vrv.,,~ . . .

'.~ :"

"

"

..

f , .,

...

AflNEXURE. ' I} JAIPUR~MAHUA TOLLWAY PRIVATE LIl"fITED

JMTP 'ICE!l973/04! _0 L

1\[/. LEA oC.ia tes South A ia Pvt. Ltd" LHxmi- Puram, ! 'ear omnath Cham'aha Dau a Raja than

Kind Attn : Mr. G.C. harma Teall:i Leader

10/041-0 12

'ub: Improv ment. Operation, \1aint ·nan e, R habilitation and trengtileni ng of exi ting _ Lane R ad and widening to four Ian di vided highway fi'ol11 Km 120+000 to KI11 _28+000 of , IH- 11 (Jaipur - lBhL/a ' e tion): - Re. Compen ato ry - A fo re tation (Avenue Plan ta tion

R f:- Your lener )\!o . LA A/Higlw:ayJOc !MI73~ 98/Mahua-Jaipur /20 11-12/387 dated -,0.03.20 12

Dear ir,

With reference to above ubjecL we ar' attach ing a li-t of up lO elm 09.04.",01 2.

enlle plant on

Total no . of lew'. v nu f lant. - [4547

Tota! 11 - . of Old Plam- 29098

Total up dated plant 43 45 on 09.04.2012

\Ve would like to inform you hat due to ummer \\eather, plantation work i going low progr $ • . Watering \\' rk i being .tried out ! ropedy. For protect ioh of plant. one cattl~ gua r every ive Km. are being engag d and 'om 10 .ati n brush wo d fI tieing work i und · r proc

·ou th

Oll L Faithfully,

XrJa~hUaT

~)

IIway Pri ate Ltd ..

Authorized i-snatory _ .J ' _ , - ~. l .) ~ "1.?::. '" RDCcWJeu ,:,::" I • i' ... , -• . •

Cc. Date. L . 0 '11.( b . Tirl'e .~""-Project Director, PI - Rharatpu r Sign ...... ......... .

ite Office : Opp. N .vodaya Vidhynlaya, ill. : Kh dli, Agra Road. P.O. ~ Bhandar j - 303 50J Dis!. Dau a (Raj .) Pb. 0.: 01427· - t214_, 5107 I Fax: 01427-512 199

Regd. Off: Plot #- 10 fA 2nd Floor. Journalist Colony ( ) Jubilee Hilis. H derabad · 500 03 . A.P .. INnlA. Tel iFa.'( : +91-40-2 556194

JAIPUR MAHUA TOLLW AY PVT. LTD.

Details of Avenue Plantation

Date Chainage LHS I RHS ,

RemarkJ

12 Mar.12 204+500 to 204+800 I 73

14 Mar.lZ I 204"1'650 to 204+800 91

15 Mar,l2 204+400 to 204.>.800 103 \

15 lVlar.12 I 169+475 to 169+800 46

16 Mar.12 171+975 to 72 .600 114

16 Mad2 204+950 to 205+155 _05

17 Mar.12 172+600 10 173'!-500 12Q I 17 Mar.12 205+155 to 205+430 131

18 Mar.lZ 205+490 to 206+035 I 271

18 Mar.12 127+650 to 127+925 101

18 Mar.1Z 128+155 to 128+500 205

19 Mar.12 206+035 to 205+600 1 6

19 Mar.l2 164 ·700 to 165 000 114 I 20 Mar.12. 173+775 to 174+100 50

20 Mar.12 162+125 to 162+825 245

20 Mar.12 128+500 to 128+725 123

20 Mar.12 21hOOOto 212+430 202 1 21 Mar.12 212+430 to 212+580 103 I 21 Mar.lZ 211+ 780 to 212+390 149

21 Mar.l2 I 170+000 to 171+050 317

21 Mar.12 I 16_+470 to 162+12.5 252

21 Mar.12 128+730 to 129+100 131

22 Mar.12 I 129+100 to 129+300 41

22 Mar.l2 129+730 to 129+900 85

22 Mar.12 161+000 to 161+430 102 I 22 Mar.12 I 161+000 to 161+500 lOS

22 Mar.12 169+175 to 170+000 250

22. Mar.12 212+390 to 212+630 123

23 Mar.12 128+825 to 129+725 220

23 Mar.l2 I 161+600 to 163+300 240 I 23 Mar.12 I 169+300 to 169+625 133 I

!

23 Mar.l2 170+025 to 170 225 82

23 Mar.12 I 212+ 760 to 213+500 286 I 24 MaLl2 128+310 to 128+600 157

24 Mar .lZ 163+225 to 163+425 20

24 Ma(.l2 212+590 to 212 760 60

24 Mar,12 212+665 to 212 735 37 I 163+300 to 164+100 200 26 M~r.12 I ; -l

26 Mar.12 213+ 130 to 213,+830 205

26 Mar. 12 214+320 to 214+625 119

26 Mar.12 127+200 to 128+310 169

26 Mar.12 127+410 to 127+480 39

27 Mar.12 123+190 to 123+400 SO

27 Mar.12 123;.850 to 124+125 118

27 Mac H 125+025 to 125+240 53

27 Mar.l2 127+000 to 127+150 57

27 Mar.12 170+225 to 170+700 76

27 Mar.i2 171+975 to' 72t 5 75 206

27 Mar, l 2 186+350 to 187 000 I 304

I I I 28 Mar.12 185+325 to 185+325 300 I 28 Mar.l2 13&+650 to 139+000 I 84 I 28 Mar.12 138+ 725 to 139 625 296

28 Mar.12 139+930 to 140 020 53

28 Mar,lZ 139+415 to 139+925 180

28 Mar.1 2 172+700 to 173+025 76 I 28 Mar.12 213+640 to214+S10 I 158 I 28 Mar.l2 214+695 to 214+750 22 I 28 Mar.12 215+280 to 215+780 I 260

29 Mar.12 214+960 to 215+325 185

29 Mar,12 215+780 to 215+990 49

29 Ma r.12 185 325 to 185+425 I 29

29 Mar. l2 184-!-950 to 185+150 72

29 Mar.lZ 185 ... 350 to 185+650 95

30 Mar.12 215+325 to 212+550 91

30 Mar.12 212+735 to 212+770 I 2

. 30 Mar.12 216+470 to 216+750 I 106

30 MaLl2 185+675 to 187+000 I 317

30 MaL12 190+050 to _90+850 I 247

30 MaLl2 121+210 to 121+825 I 23 3 I 30 MaLl2 121+940 to122+020 42

31 Mar.12 122+025 to 122+640 170 I 31 Mar,l2 190.,.850 to 191+850 396 I

31 Mar.12 187+000 to 187t900 I 284

31 Mar.12 215+550 to 215+000 I : 222

01 Apr.n 187+900 to 189+000 250

03 Apr.12 189-!-020 to 190+000 348

03 Apr.12 190+400 to 191+225 419

03 Apr. 12 212+180 to 212+200 _0

03 Apr.12 I 216+000 to 216+870 30

03 Apr.12 216+550 to 216+830 56

04 Apr.12 191+250 to 193+050 553

04 Apr.12 206+825 to 207+350 274

04 Apr. 12 210+400 to 211+080 223

05 Apr.12 192+500 to 193+075 180 -

OS Apr.12 205+560 to 206+820 551

06 Apr.12 20,&t 640 to 206+775 I 82

06 Apr.12 205+-370 to 205+420 33

07 Apr.12 191+850 to 192+525 I 315 I 09 Apr.12 192+525 to 193 300 315

09 Apr.12 I 193+075 to 193+200 50

I Tota l 6880 7667 G. Tota l 14547

05.03.2012 Ve rified by LASA 29098

- Total 43645

LEA Associates South Asia Pvt. ltd. /"

/ A LEA Group Company consultIng EngIneers & Planners

LASAlHighwayfO&MI73398/Mahua-Jaipurf2011-12f394

MIs Jaipur Mahua Tollway Pvt Ltd.

Near Govind Dev jl Temple & Krishna Marriage Hall

Agra Road NH-1 1, DAUSA.

RAJASTHAN Pin Code: 303501

Kind Attn.: Utnesh Bhardwaj COO

I ANNEXURE _ J J

Independent Engineerfor Mahua-Jaipur O&M Project Office:

NLaxml Puram", Collector Chauraha, Main NH-ll. Oausa (Rajasthan) 1el: .. 91-1427 ·223951, fax:- +91-1427-223841

e-mail: [email protected]

Dated: 10.04.2012

Subject: - Improvement, Operation and Maintenance, Rehabilitation and Strengthening of EXisting 2-Lane

Road and Widening to 4-1ane of Divided Highway of Mahua- Jaipur Section of National Highway-

21 (Old NH-11 ) from Km. 120.000 to 228.000 in the Stale of Rajasthan on Build, Operate and Transfer (BOT) Basis Under NHDP PHASE-IIIA:- Re. Compensat ory - Afforestation (Avenue

Plantation).

Reference: Latter No. LASAlHighway/O&M173398/Mahua-Jaipur/2011/387 dated: 30.03.201 2

Dear Sir,

With reference to our letter dated 30.03.2012 reverenced as above and meeting with RO NHAI Jaipur on

05.03.2012 you have likewise before you failed to achieve the compensatory afforestion of 48000 plants as

per your obligations under the Concession Agreement the status as on 10.04.2012 on the basis of joint

verification with your representative is given here as under:-

1- Status of plants as on 05.03.2012

2~ Plantation done w.e.f. 06.03.2012 to 10.04.2012

3- The status of Plantation as on 10.04.12

4- Compensatory Afforestation required to be done

5- Balance Plantation to be done (48000.-42984)

: 29098

: 13886

; 42984

; 48000

: 501 6

It has been found that the survival is being hampered for want of adequate grooming of plants and

therefore please note that dead / damaged plants are replaced well grown and healthy plants by you

regularly so that as per your contractual obligation the strength of alive grown up trees does not fan below

48000 at any time during the Concession Agreement.

And further you are also obligated to provide adequate protection to the avenue plantation conforming to

Clause11 .1 5 of IRC:SP-21 and your undertaking dated 16.07 .2011 but contrary to your contractual

obligations you have continued non compliances.

Corporate Office: ii· I /E.27, Mohan Co·oper'al ive Industrial Estate, Mali1ura Road, New Delhi· 110 1)44. India Tel: +91-11-2697 39S()"S2, '1167 8 LSO (8 Unes), Fax: .. 9 1-ll-4167 8659,2697 1052

e·mail:lasa«illasaindia.com. Website: www.lasaindi;l.comflvww.lea.ca nVp.r~ea5 Reeistered Offices: & olonnino solutions

-_ .. _- --.. '-- --.~ .. - ---i.6' dershTp in Engineering

& Planning SOlutions

,;OOsociates South Asia Pvt. ltd. -2-

You are further requested to fulfil your contractual obligations as required pursuant to the Clause 3.4210 of

the OMM and Clause 9.1 (xxx) of the Concessionaire Agreement operation and maintenance requirement

set fOlih in the Concession Agreement aod report compliance.

Please note that likewise previous months the joint recounting of the avenue plants for the month of Apri f

2012 shall be started IN.e.t 1604.201 2, and as discussed with you and please ensure to be present at site

to witness the counting of plants.

Thanking you,

Yours faithfully, for LEA Associates South Asia Pvt. Ltd.

If

~7kb (G. C.SHA~IVlA) Team Lea.der

cc: 1. PD NHAf PIU Jaipur

2. S.K.Poddar Project Co-ordinator LASA New DeihL

Corporate Office: B·1/£·27, Mohan (o<operatlve Industrial fstate. Mathura Ito.d, New Delhi· 110044 India Tel: +91-11-26973950-52,41578150 (8 llnes), Fax: +91-ll-4167 8659, 2697 1062 E·malJ:lilsa@lasaindia,com, V/et)s.le;www.lasaind.a.com!.tb.fV1.1ea.ca Overseas Registered Offices: " Addi(Ah~h;a tHhlnt'il::s\ . 5(~mn~J;t (flp;t",rt~l .nm~n \

1.EA aersilfp In Engineering

&. plannfng 5011ltfor.s

Ref No.: JMTrUHQ/LA A-D u a/201 2 ! 1~ I06fl1. Date: _ ,., ,,1 Jun , _01 i

LEA. S 0 .iat s ' ollth Asia Pvt. Lt l. A LE. Group Company Consulting Engine rs & Plann rs ··La.:"mi Puran1", i-ear 01111131h Chaurahn Main Roac! ~H- ll Dau a. Rajasthan

ANNEXURE ... J k. j

JMTPL JAIPUR-MAHUA

TOLLWAY PRIVATE LIMITED Regd. Office : Plot # 105/A. 2nd Floor, Journalist Colony (A), Jubilee Hills, Hyderabad - 500033. A.P., INDIA. Tel ; +91-40-23556 194 Fax ' +91-40-23556194

KinLi Artcntion : ;\fl'. G C 'b:\rIl <l, Tc~ :lI Le. d 'r

Dear · Ir.

Sub: O&LVI Out tflnd ' no- 1$ '11 '0 1\1' -ling held:1 ,:: LU Bh:lr:lfpul' Offic(' .. :' l 'HAL n ) Of:it't', Jnipur- Re(/'.

W'" I' f r to th abov mc 'til' g il'ld jointly bCLw 'en ! 'H:\L Fe an I the Con ··s. iona' l" on 20!ll nnd 21 I June 20L.

W· ar' plead toonfim'l tl ' st<! ' ;-, of th Op 'ratiuns ' !\.bin 'nan 'work <:1l Jour !'tnilcct prograrn to ., rry ou the main! n::m'~ work for 11 m~jor hahne ' a li\-ilie ' in , \nn~xurc " . ndo cd her\\'ith,

T hank.ing yOLl,

Authorise ign f,Hory

Cc: I. Pruj "1 Dire t IL PI U . . IH/ L Bh3r:11hpur _. NIl'. : Po j~r (Proj 'l \)orci il1" 1rl L f : : . \.:\\ Delhi ~,JMTPL· ile ,nice. D' U~~

\. Site Office: Jaipur-Mahua Tollway Private Limited, Near Sri Govind Devji Mandir, Opposite: Sri Govind Hotel.

Jaipur-Agra Road (NH-11 ). Village Khedli. Post Office-Bhandarej. District· Dausa. Rajasthan - 303 501

'.

SNo. I Activities 1 Milling & Paving ! f_ 101< i of 107876 sqm of mill ing and paving !

i (:omplet > ! a;-; part 01 C01T":,,t i v~ ipr \ (:miv . I main! 'nance (rder pho 'o aHa !led) dmil g ih · Il'~ riod from 0-1-.0-4.201.:, up to 23.06.2012. D~!<til.' I hav.:: b~ 'n . ubm iticd \'jeit- our i,t!(,j' :\(),

I J: iTPLilCl:..' I 997,'Q6/2012. dm<!o 23 .06.2012. r \ !tf~()!!nh \\'c h;·.j !:\rli..:r f')l'oP() ~Gcl "11':'\ in(~-' i ;ni~~O- ;~l r f~:C ing'" tiJ';'" son;e ; elect d i s tl~Ssed ! : pav m III • ' (:{i ns. how vel' W' h. \'~ now ! und_rtv.kcn mi lling & pD\"in~ as I corr ~ctiv.' fpr..:\ --nli \" m, in! nan 'C th~~r ' in .- f)t;tai J:;. I ' \ ' 'talcd abo\ ' . hav' b ell furnish'd \'ideour J titTr

:.Jo . .I ! fTPUICE!l99 /061101 2. (jape! ::?3.(;6.2lH:2. r--- --i'----------------t--------- --.-----... ----.... -. v nue Plantat ion Out of 43000 nos of Av 'flU": Plants. i; \\:lS hHlnd

tha 5016 no ' oj' plants ',11''' !c~d . W.: ll.!d'..T1.<t! ' to do r..: -pl<lIlltlliol. of.lli tb mis:"ing I lants during thi:

, monsoon and thi.s \.vnrk \\ ill be compkld b~

I 30.09._012. Currently 1000 nos of r\\{~nl!c Plant. ! h:wc b~'-'Il !1urch: s! dJld I lac\. at

r---:-_r-:-__ --= __________ -tI_(_·O_l_l(:_·t:-'-'s...:.:-iv'-n'-t_i_r~_- ..:.::>_ .ka$~ 0!!!L.. ___ . _____ . _________ _ 4 Plantation guarding Conce:'joi nil" will ak ~ pr '\"Cnti\'~ !l1L:15Ul\:'11cnlS

while r placi l)g all [he . \v~nll' P!amalit n~ b~

imm diald:- put 111l:1I1PO\\ r at :til ti Dil' b, and 'I:~'f\'ic

'-_ --' ______________ ..;.....D'-o_r jll2£.~ving the carria:; ' 1 'c.1lling_

nddiliol1u! r ad are -

.--

ANNEXURE.. L j

• JAIPUR-MAHUA TOLLWAY PRIVATE LIMITED

JAIPVR-4MJ\UA TOi.LW~Y

JMTPLlICE!2019/07/2012

Mis LEA Associates South Asia Pvt. Ltd., Laxmi- Puram, Near Somnath Chauraha Dausa, Rajasthan Tel. 01427-223951, Fax. 01427-223841

Kind Attn: Mr. G.c. Sharma, Team Leader

19.07.12

Sub: Improvement, Operation, Maintenance, Rehabilitation and Strengthening of existing 2 Lane Road and widening to four lane divided highway from Km 120+000 to Km 228+000 of NH-l1 (Jaipur - !vlahua Section) Re. Replanting of Plantation Programme.

Dear Sir,

With reference to the above matter, we arc submitting the Programme for Replanting of Plamation given below:-

1. 20.07.12 to 23.07.12 Chainage 190. To 200 Both side.(Nos. plant 2500)

2. 24.07.12 to 25.07.12 Chainage 218. To 220 Both side.(Nos. plant 1500)

3. 26.07. 12 to 27.07.12 Chainage 140. To 150 Both side.(Nos. plant 1000)

This is for yOW' information and record please.

Thanks & regards,

Yours Faithfully,

For Jaipur-Mahua Tollway Pvt. Ltd,

Cc: PD PIU Bharatpur

ANNEXURE" i M J

" JAIPUR-lVLt\H1JA TOLLWAY PRIVA.TE LIMITED

JMTPLlfCE/203 J/0812 0 12

Mis LEA A sociates South Asia ]>vt. Ltd ., La 'mi- Puram; Near Somnath Chauraflll Dausa, Rajasth!lD Tel. 01427-223951, Fax. 01427-223841

Kind Attn: .lVll'. G.C. Shamla, Team ]..Ieadcr

31.08.12

Sub: fmprovement. Operation, Maintenanc , R habilitation and trength ning of '. ' i ting 2 Lane Road and widening to four lane divided higbway from Km 120 .000 to Km 228+000 of NH- ll (Jaipur - Mahlla Section) Re. Replanting of Planhltion IJrogramme.

Dear Sir,

With reference to the above matter. \v are submitting the Programme for Replan1ing of Plantation given below:-

1. 01.09.12 to 0 .09.12 Chainage 208.400. To 209.100 LHS side.(Nos. plant 2000)

2 . 04.09.12 to 06.09.12 Chainage 218.000 To 219.300 Both side.(No . plant 2000)

Thi for your information and record please.

Thallks & regards,

Yours Failhfi!lly.

For JajplIr-Mahua Tollway Pvi. Ltd,

AUlhorized signatory

Cc; PD PIU Bharatpur

Re'~lVed Letter No .. £::9 ~ ..... " ate 'D.~'~.B )./2..,.. . Time ........ ..

~'gn ............ ..

ife Office: Opp. Navodaya Vidhyalaya, ViiI. : Khedli, Agra Road, P.O. : Bhandarej - 303 501l)isl. Dausa (Raj.) Ph. '0.: 014 7-512142, 10781 Fax: 01427-5J2199

Rcgd. Off! Plot # lOS/A. 2nd Floor, Journali ' I' C tony, A), Jubilee Hills, Hyderabad - 500 033, A.P .. lOlA. Tel/Fa,x : +91-40-23556194

ANNEXURE _ r';..J j

LEA Associates South Asia Pvt. Ltd. A LEA Group Company

Inde pendent Engineer tor Mahua-Jaipur O&M Project Office:

Consulting Engineers & Planners

"Laxmi Puram", Collector Chauraha, Main NH·ll, Dausa (Rajasthan)

Tel: + 91-1427-223951, Fax:- +91-1427-223841 E·m ail : lasaciausa@!asaindia.com

Our Ref. No.: LASAlHighway/O&MJ73398/Mahua-Jaipur/2011/ 566 Dated: 01.10.2012

Authorised Signatory, Mis Jaipur Mahua Tollway Pvt. Ltd. Near Govind Dev ji Temple & Krishna Marriage Hall Agra Road NH·11, DAUSA, RAJASTHAN, Pin Code: 303501

Subject: • Improvement, Operation and Maintenance, Rehabilitation and Strengthening of Existing 2·Lane Road and Widening to 4-lane of Divided Highway of Mahua-Jaipur Section of National Highway-21 (Old NH-11) from Km. 120.000 to 228.000 in the State of Rajasthan on Build, Operate and Tra-3nsfer (BOT) Basis Under NHDP PHASE-lilA. - Reg. Compensatory Afforestation· Status for the month of September, 2012.

Reference: 1. Letter: LASAlHighway/O&Ml73398/Mahua-Jaipur/2011/374 dated 22.03.2012 2. Letter: LASAlHighwayIO&M/73398/Mahua·Jaipur/2011 / 394 dated 10.04.2012 3. Letter: JMTPUHQ/LASA-Dausal2012113/06/113, dated 23.06.2012 4. Letter: JrvlTPUICE/2019/09/2012, dated 19.07.2012 5. Letter: LASA/Highway/O&MI73398/Mahua-Jaipur/2011 /515. dated 21.08.2012 6. Letter: LASAlHighwayJO&M/73398!Mahua-Jaipur/2011! 528, dated 30.08.2012 7. Letter: LASAlHighway/O&MI73398/rvlahua-Jaipur/2011/393, dated 10.04.201

Dear Sir,

The representatives of Independent Engineer and the Co.ncessionaire have jointly verified the avenue plants in ROW (LHS & RHS) of the project highway. The status of alive the plants site during the period 17.09.2012 to. 30.09.2012 is appended herewith as Annexure·up . and the summary of status is given next in the table ;.

SI. Status of Plants fer the Menth of September· 2012 I No.. of Plants

I No.

--- _0_. 1 Compensatory Afforestation (LHS &RHS) Required 48000 ,

2 i Status ef Plants during Sept.. 2012 (Annexure ."p" ) 32917 j !

!

3 Balance Plantation required to be done 15083

The Concessionaire is again requested to. note that as per the work program submitted vide its letter dated 23.06.2012 referenced-3 above; plantation work was required to be completed on September 30, 2012.

The balance work of 5016 plants {notified '<ide letter dated 10.04.2012 reference-7 above} completed by you during September 2012 is also inclusive of 32917 plants and now balance 15083 plants are still required to

- be planted by you to. achieve the Compensatory Afforestation.

~VCQ Corporate Office: B-1/E-V, Mohan Co-operative Industrial Estate, Mathura Road, New Delhi- 110044 India Tel : +91·11-2697 3950-52, 4167 8150 (8 Unes), Fax: +91-11-4167 8659, 2597 1062 E-mail:lasa@la:;aindia.com. Website: www.lasaindia.comiwwVI.lea.ca

Overseas Registered Offices: LEA dership in Engineering

& Planning Solurions

.----- - ................ --... - ... --...... -~- ------

LEA Associates South Asia Pvt. ltd. - 2-

And also still you have not started the fencing work for the protection of plants and as such the Concessionaire has failed to adhere to the work programme submitted by it and has continued non-compliances in remedying the defects and deficiencies and the O&M obligations in accordance with the provisions of Concession Agreement.

Thanking you,

Yours fa ithfully,

for LEA Associates South Asia Pvt. Ltd.

(G~ Team Leader

Enclosures I As above (3-sheets- Status of plantation)

cc:

1. Project Director, PIU, NHAI, Bharatpur

2. Mr AK. Sharma, LASA HO. Delhi

Corporate Office: 8-1/E-27. Mohan Co-operative Industrial Estate, Mathura Road, New Delhi- 110044 India Tel: +91-11-26973950-52, 4167 8150 (8 Lines), Fax: +91-11-4167 8659, 26971062 E-mail: lasa@lasa india.com, Website:www.lasaindia.comi www.lea.ca

Overseas Registered Offices: -Add is Ababa (Ethiopia) 'Kampala (Uganda) 'Oman)

LEA dership in Engineering

& planning solutions

Independent Engineer Services for Operation and Maintenance Stage of 4/6lanning of Mahua - Jaipur BOT Project from Km. 120+012 to 229+100 NH-11 under NHDP Phase iliA in the state of Rajasthan.

Status of Avenue Plants Verified during the e.eriod 17/0912012 to 3010912012 Plantation done against shortfall-vide O&M

51. No. Chainage Plants Inspection Report No. 97

! I I

! From

(1) I (2)

1 i 120+000 2 121+000 3 I 122+000 4 123+000 5 I . 124+000 I

6 I 125+000 I , 7 i 126+000 8 127+000 9 128+000 10 129+000 11 130+000 12 131+000 13 132+000 14 133+000 15 134+000 16 135+000 17 136+000 18 137+000 19 138+000 20 ' 139+000 21 140+000 22 141+000 23 142+000 24 143+000 25 144+000 26 145+000 27 146+000 28 I 147+000 29 148+000 30 149+000 31 150+000 32 151+000 33 152+000 34 153+000 35 154+000 36 155+000 37 156+000

( ~h~) Tech. Supervisor

~J·~t~. ( ~(}..ljlt1J . 7Judf--) Highway Engineer.tI

To LHS

(3) I (4) I

121+000 0 122+000 I 32 123+000 97 124+000 44 125+000 64 126+000 32 127+000 27 128+000 100 129+000 272 130+000 92 131+000 0 132+000 28 133+000 72

134+000 0 135+000 0

136+000 28 137+000 62 138+000 36 139+000 123 140+000 228 141+000 164 142+000 100 143+000 9 144+000 7 145+000 0 146+000 79 147+000 204 148+000 213 149+000 103 150+000 379 151+000 124 152+000 60 153+000 0 154+000 I 0 155+000 0 156+000 12 157+000 87

,~~~Vt1--M.s.MOOun Sr Manoger

JMTPL . Oaus<!

I I I

I

Page No.1 of 3

RHS dated 08.10.2011 (5) I (6)

0 0

56 I 0 29 0

32 ! 0 I

20 I 119 60 I 0

3 102 66 0

42 0 158 0 0 0

6 , 156 118 190 0 0

21 0

"" vI) 0 158 0 77 0

128 0 176 0 205 0 180 0 235 0 14 41 0 0 15 0

137 131 151 328 204 161 233 481 339 316 71 0

0 0

0 0

0 0 26 0

78 87

-----------~~-- ------------- ---------- _. -

! I !

I

I

,\ u {Annexure.f'

Total (4)+(5)+(6)

(7)

0 88 126 76 203 92

132 166

314 250 0

190 380 0

21 84 220 113 251 404 369 280 244 62 0

94

472

692 ;

468 I

1093 779 131 0 0 0

38 252

I

I

Independent Engineer Services for Operation and Maintenance Stage of 416 lanning of Mahua • Jaipur BOT Project from Km. 120+012 to 229+100 NH·11 under NHDP Phase iliA in the state of Rajasthan.

Status of Avenue Plants Verified during, the e.eriod 17109/2012 to 30109/2012 -

sr. No. Chainage

From

(1) (2)

38 157+000 39 158+000 40 159+000 41 160+000 42 161+000 43 162+000 44 163+000 45 164+000

46 165+000 47 166+000 48 167+000 49 168+000 50 169+000 51 170+000 52 171+000 53 172+000 54 173+000 55 174+000 56 175+000 57 176+000 58 177+000 59 178+000 60 179+000

61 180+000 62 181+000 63 182+000 64 183+000 65 I 184+000 66 185+000 67 186+000 68 187+000 69 188+000 70 189+000 71 190+000 72 191+000 73 192+000 74 193+000

(...s~ 1 Tech. Supervisor

-;{j~ ( 1TOO}{~ r;, 1£t{'W I) Highway Engineer-II

To (3)

158+000 159+000 160+000 161+000 162+000 163+000 164+000 165+000 166+000 167+000 168+000 169+000 170+000 171+000 172+000

173+000 174+000 175+000 176+000 177+000 178+000 179+000 180+000

181+000 182+000 183+000 184+000 185+000 186+000 187+000 188+000 189+000 190+000 191+000 192+000 193+000 194+000

Plants

LHS RHS

(4) (5)

160 106 20 35 0 234 17 59

427 447 398 352 78 386 93 343 46 36 75 88 130 270

I 144 269 168 234 101 186 0 5

46 65 20 78 13 24 0 0 0 0

11 8 7 1 20 16 51 56 45 5

0 0 0 0

42 0 336 153 433 183 175 390 75 116

102 277

484 354 679 294

709 583 182 69

Page No.2 of 3

Plantation done against shortfall·vide O&M

Inspection Report No. 97 dated 08.10.2011

(6)

13 0

0 0 0

182 0 0 0

82 7 0 0 0 0

0

0 0 0 0

57 56

0 0

75 0 0

30 0 0

0 0 0

0 90

306 82 i

\t u {Annexure.1?

Total (4)+(5)+(6)

(7)

279 55

234 76

874 932 464 436 82 245 407 413 402 287

5 111

98 37 0 0

76 64

36 107 125 0 0 72

489 616 565 191 379 838 1063

1598 333

---------------------------~---- - - _ .. _.---_. - -------

! I

I

I

f

Independent Engineer Services for Operation and Maintenance Stage of 4/6 lanning of Mahua . Jaipur BOT Project from Km. 120+012 to 229+100 NH-11 under NHDP Phase lilA in the state of Rajasthan.

Status of Avenue Plants Verified during the e.eriod 17/0912012 to 30/0912012 Plantation done against shortfall-vide O&M

SI. No. Chainage

(1)

75 76

77

78

79 80

81

82

83

84

85

86 87

88

89

90

91

92

93

94

95 Q~

,,0

97

98

99

100

101

102

103

104

105

106

107

108

109

From (2)

194+000 I 195+000

I 196+000 I 197+000 I

I 198+000

! 199+000 I 200+000

201 +000 202+000 203+000 204+000 205+000 206+000 207+000 208+000 209+000

I 210+000 211+000 I

I 212+000 I

213+000 214+000 215+000 216+000 217+000 218+000 219+000 220+000 221+000 222+000 223+000 224+000

i 225+000 226+000 227+000 228+000

TOTAL

( ~n& )..-' Tech. Supervisor

~¥ ·~n. ~~ ')(f1 )

Highway Engineer-II

To (3)

195+000 196+000 197+000 198+000 199+000 200+000 201+000 202+000 203+000 204+000 205+000 206+000 207+000 208+000 209+000 210+000 211+000 212+000 213+000 214+000 215+000 216+000 217+000 218+000 219+000 220+000 221+000 222+000 223+000 224+000 225+000 226+000 227+000 228+000 229+000

Plants

LHS (4)

49

I 123 127 91 4 74 78 57 20 165 354 249 228 27

564 748

72

207 236 334

250 648 197 106 469 131 0 0 0 0

0 0 0 0 0

13773

~\~v~ M.S.~~ sr. Ma!'llOger

JM1P\...DauS3

RHS

(5)

62 36

115 33 108 52 72

26 64 14

439 179 347 50 0 0

99 167 250 493 546

1115 154 192 519 128 0 0

0 0 0 0 0 0 0

14076

Page No.3 of 3

Inspection Report No. 97 dated 08.10.2011

(6)

0 0 0 0 0 0

0 0 0 0 0 0 0 0

481

385 0 0 0

265 0

0 0

I 178 619

I 48 0 0 0 0

0 0 0 0 0

5068 ., ¥

.A ___ ---.---- -.,-- _._--

I

I\..... t, {Annexure·w

Total (4)+(5)+(6)

(7)

111 159 242 124 112 126 150 83 84 179 793 428 575 ~7 { ,

1045 1133 171 374 486 1092 796

1763 351 476 1607 307 0 0 0 0

0 0 0 0

0

32917