LDRRF Interventions in six districts

42
Meeting of the LDRRF Technical Committee Technical Review of Proposed Schemes CDMP II Ministry of Disaster Management & Relief

description

LDRRF Interventions in six districts

Transcript of LDRRF Interventions in six districts

Meeting of the LDRRF Technical Committee

Technical Review of Proposed Schemes C D M P I I

Ministry of Disaster Management & Relief

Agenda of the TEC

•Review and endorse decisions of the last meeting.

•Review proposals against RRAP submitted by DMCs (Urban & Rural).

•Any other Business.

Review and endorse decisions of the last LTC meeting

Urban Projects

Rural Projects

Summary of Proposed Rural Interventions

Total Districts: 6

Total Upazilas: 6

Total Unions:7

Total Schemes: 17

Total Budget (BDT): 76,480,314

Total Budget (USD): 966,270.5

Decreer Char Union of Faridpur Sadar Upazila under Faridpur District

• Major Hazard • Flood & Sedimentation

• River Bank Erosion

• Vulnerabilities • Crop loss in case of flash flood

• Heavy soil erosion of the village / settlements.

• Lack of permanent protection against flood .

• Interventions proposed by DMCs/Community people

• Killa/School Ground raising

• Plinth Raising

• Construction of Flood resilient house

• Embankment cum road

Decreer Char Union of Faridpur Sadar Upazila under Faridpur District

Target Hazard Flood

Existing Resources

*Raised Ground

*Embankments cum road

Proposed DRR Interventions

Construction of 80 Flood Resilient Houses with solar panel & Improved Woven

Impacts & Expected Results

80 ultra poor and vulnerable families will have safe flood resilient shelter on raised land with solar panel and Improved Woven.

Construction of 80 Flood Resilient house with Solar Panel and Improved Woven at Kazam Matabarar Dangi & Baparir Cluster Village

Improved Woven

Decreer Char Union of Faridpur Sadar Upazila under Faridpur District

Scheme Name of the Scheme Estimated Budget-BDT

Beneficiaries Design Data

1 Construction of 80 Flood Resilient house with Solar Panel and Improved Woven at Kazam Matabarar Dangi & Baparir Cluster Village

93,85,120

435 Room size 15’x 10’ Verandah 15’x4-7”

Gaukandia Union of Durgapur Upazila under Netrokona District

• Major Hazard • Flash Flood

• River Bank Erosion

• Flood

• Vulnerabilities • Sudden heavy rainfall in the upstream

inundate the vast area Gaukandia union through river Someshwari.

• Existing infrastructures wash away/breached due to heavy current.

• Damage of crops and silted cultivable lands.

• Interventions proposed by DMCs/Community people

• Killa/Ground raising

• Construction or extension of embankment cum road

• River bank protection work

ROAD CUM EMBANKMENT FROM GOURAKHALIKANDA GPS TO BISWANATHPUR

SMESWARI RIVER

BWBD

EMBANKMENT

CDMP-II

EMBANKMEN

T

PROPOSED

EXTENSION

Dead

Canal

Gourakhalikanda

Primary School

BIRISHIRI

Gaukandia Union in Durgapur Upazila under Netrokona District

Target Hazards Flood,River Erosion,Flash Flood

Existing Resources

*Two Embankments

*06 School used as temporary shelter.

Proposed DRR Interventions

One Embankment cum road

Impacts & Expected Results

@ Protect sand deposition on cultivable land

@ Protect people and homestead from hilly flash flood

@ Shelter for livestock on the embankment during disaster

@ Develop communication network.

Construction of Embankment cum Road from Gaukandia primary School to adjacent dead Khal near H/O of Shorab at Biswanathapur Village

Gaukandia Union in Durgapur Upazila under Netrokona District

Scheme Name of the Scheme Estimated Budget-BDT

Beneficiaries Design Data

1 Construction of Embankment cum Road from Gaukandia primary School to adjacent Mora Khal near H/O of Shorab at Biswanathapur Village

37,67,278

6,500 Length: 1215 m Top Width: 4.27 m Bottom Width: 16.27m Height: 3.0 m HFL: .75 m from base Soil Type : Sandy Clay Side Slope: 1:1.5

Poksia Union of Borhanuddin Upazila under Bhola District

• Major Hazard • Cyclone • Tidal Surge • Flood • River Bank Erosion • Water logging

• Vulnerabilities • Lack of permanent structures against

cyclone • Crop loss in case of flood • Heavy soil erosion of the village /

settlements. • Un-availability of raised ground

during flood .

• Interventions proposed by DMCs/Community people • Cyclone Resilience Habitat • Killa construction • Raising of Graveyard for Burial • Plinth Raising of Houses • Embankment cum road

Poksia Union of Borhanuddin Upazila under Bhola District

Target Hazard Flood

Existing Resources

*Embankments cum road

*Cyclone Shelters

* School & Madrasa fields

Proposed DRR Interventions

Earth raising for Graveyard near Keramotgonj Bazar

Impacts & Expected Results

People will have safe place for burial of dead bodies all the year round.

Earth raising for Graveyard near Keramotgonj Bazar

Poksia Union of Borhanuddin Upazila under Bhola District

Scheme Name of the Scheme Estimated Budget-BDT

Beneficiaries Design Data

1 Earth raising for Graveyard near Keramotgonj Bazar

227297.00 ( Approx 2.2 lac)

7560 Length: 71.0 m Width: 14.0 m Height: 2.3 m HFL: 1.0 m from base

Laxmitari Union of Gangachara Upazila under Rangpur District

Laxmitari Union of Gangachara Upazila under Rangpur District

• Major Hazard • Flood • River Bank Erosion • Drought • Tornado • Water logging

• Vulnerabilities • Crop loss in case of flash flood and

water logging. • Heavy soil erosion of the village /

settlements. • Lack of permanent protection against

flood.

• Interventions proposed by DMCs/Community people

• Killa/School Ground raising • Plinth Raising • Embankment cum road

Laxmitari Union of Gangachara Upazila under Rangpur District

Target Hazard Flood & River Bank Erosion

Existing Resources

*Raised Ground

*Embankments cum road

*River bank protection cum road

*Groin

Proposed DRR Interventions

2 Embankment cum road schemes

Impacts & Expected Results

140 ultra poor families and vulnerable people of the flood affected area covering 3500 Hector of land will be more resilient to disaster especially flood.

Embankment cum Road at Esli Bridge to Sonkar-dah Madrasa Mor under Laxitary UP

Embankment cum Road at Esli Karar Bridge to Bagarhat under Laxitary UP

Laxmitari Union of Gangachara Upazila under Rangpur District

Scheme Name of the Scheme Estimated Budget-BDT

Beneficiaries Design Data

1 Embankment cum Road at Esli Bridge to Sonkar-dah Madrasa Mor under Laxitary UP

2596266.26 ( Approx 25 lac)

1100 Length: 2165 m Top Width: 4.3 m Bottom Width: 10.7m Height: 1.6 m HFL: .7 m from base Soil Type : Sandy Side Slope: 1:2

2 Embankment cum Road at Esli Karar Bridge to Bagarhat under Laxitary UP

935215.88 ( Approx 9 lac)

700 Length: 1220 m Top Width: 4.3 m Bottom Width: 10.3m Height: 1.5 m HFL: .6 m from base Soil Type : Sandy Side Slope: 1:2

Bahara and Sullah Union of Shalla Upazila under Sunamganj District

• General Description of the Unions • Villages are isolated and surrounded by

Haor; locally named as AATI. After flash flood, the entire area gets inundated when erosion of soil takes place due to wave action causing damage of HH & disrupts livelihood.

• The only rice crop (Boro) is cultivated and harvest is subject to sudden flash flood and require high ground for storage.

• People use RCC roads for communication which remains submerged for more than 6 months.

• 90% of inhabitants use open toilets. • Within 4 to 5 km there is no markets or

even graveyard for burial. • No Electricity

Bahara and Sullah Union of Shalla Upazila under Sunamganj District

Bahara and Sullah Union of Shalla Upazila under Sunamganj District

Bahara and Sullah Union of Shalla Upazila under Sunamganj District

Bahara and Sullah Union of Shalla Upazila under Sunamgonj District

Major Hazard • Flash flood • Wave action • Inundation • Sanitation

Vulnerabilities • Crop loss in case of flash flood • Heavy soil erosion of the village / settlements. • Lack of permanent/insufficient protection

against wave. • Un-hygienic toilet. • Un-availability of drinking water. • Village remains isolated from other villages,

union, upazila.

• Interventions proposed by DMCs/Community people

@Construction of Killa

@Protection wall

@Killa connecting road

@Community Toilet & Sanitary latrine

@Tube-well

@Grave yard raising

@Solar system

@Tree plantation

Bahara and Sullah Union of Shalla Upazila under Sunamgonj District Target Hazard

Flood Existing Resources

Flood Shelters

Submerged RCC roads constructed by LGED

Embankment constructed by BWDB

Proposed DRR Interventions

Comprehensive scheme including @3 Nos of Killa @7 Village and Killa Protection Walls @0ne Killa connecting road @ 130 nos Sanitary latrine @10 nos Deep Tube-wells @Sultanpur,Bhatgaon,Kartikpur and Shobji Mohal grave yard raising @35 Solar system & Tree plantation @ One Foot bridge connecting village and

High school

Impacts & Expected Results

• Killa can be used as storage of crops and shelter for Livestock in high flood season, use as market place, religious and social gathering round the year.

• Village will be permanently protected from flood/Haor wave action.

•Graveyard will facilitate funeral during flood and in dry season as well.

• Improved WatSan .

Bahara Union of Shalla Upazila under Sunamgonj District

Scheme Name of the Scheme Estimated Budget-BDT

Beneficiaries Design Data

1 Comprehensive scheme at Meda. Interventions: i) Construction of Killa ii) Killa Protection wall iii) Killa connecting road iv) Community Toilet v) Tube-well

8,804,625 3,000 As attached

2 Comprehensive scheme at Shantipur. Interventions: i)Village Protection wall ii) Sultanpur grave yard raising iii) Sanitary latrine iv) Tube-well v) Solar system vi) Tree plantation

8604714 330

3 Comprehensive scheme at Harinagar. Interventions: i) Killa Protection wall ii) Construction of Killa iii) Sanitary latrine iv) Tube-well

3643424 6000

4 Comprehensive scheme at Bhatgaon. Interventions: i)Village Protection wall ii)Bhatgaon grave yard raising

4383660 1000

Sullah Union of Shalla Upazila under Sunamganj District

Scheme

Name of the Scheme Estimated Budget-BDT

Beneficiaries Design Data

1 Comprehensive scheme at Bolorampur. Interventions: i) Raise school field ii) Foot bridge connect to school and village iii) Tree plantation iv) Solar panel

788340 420 As Attached

2 Comprehensive scheme at Kartikpur (Notunhati). Interventions: i) Village protection wall ii) Kartikpur Graveyard raising iii) Sanitary latrine iv) Tube-well

3914857 230

3 Comprehensive scheme at Rowa Notunhati (Bagerhat). Interventions: i) Village protection wall ii) Sanitary latrine iii) Tube-well

4663902 300

4 Comprehensive scheme at Graam Sullah. Interventions: i) Construction of Killa ii) Raam shallah sbojimohol ghrave yard raising.

2183323 7000

5 Construction of village protection at Kandigaon by CC block.

2157269 1800

Section of Brick Retaining Wall

Detailed Drawing of Village protection wall at Kartikpur Notun Hati under Shalla

Union of Shalla Upazila, Sunamganj.

75mm BFS 150mm Sand Filling

375

500

625

750

875

1000

Filter materials (Brick Bats)

1300 mm

300mm

Earth side

GL

150mm CC

Earth Filling

Project type: Retaining Wall Comprehensive Disaster Management Program (CDMP-II)

250

300mm

300mm

300mm

300mm

300mm

300mm

300mm

375mm

Mathurapur village of Munshigonj Union under Shyamnagar Upazila in Satkhira District

Major Hazard • Cyclone • Tidal Surge • Salinity • Water logging • River Erosion • Arsenic

Vulnerabilities • Displaced people due to river bank erosion • Lack of permanent/sufficient structure for

shelter during cyclone • Unhygienic toilet. • Unavailability of drinking water. • Village remain isolated from other village,

Union, Upazila lacks from livelihood.

Interventions proposed by DMCs/Community people

@Construction of Killa

@Cyclone Shelter

@ Cyclone resilience Habitat

@ Re-excavation of canal

@Embankment cum road

@Pond excavation

Mathurapur village of Munshigonj Union under Shyamnagar Upazila in Satkhira District Target Hazard

Cyclone,Salanity

Existing Resources

Cyclone Shelters

Embankment constructed by BWDB

Proposed DRR Interventions

Comprehensive scheme including @65 Nos Cyclone Resilient Habitat @Earth raising for cyclone Resilient habitat @Rain water harvesting @65 Sanitary latrine @1 Deep Tube-well @ BFS road @Income generation support

Impacts & Expected Results

65 river erosion ultra-poor fisher men families will have

• Safe cyclone resilience habitat on develop raised land

• Healthy environments by using sanitary latrine and Rain Water harvesting facilities,

• Families can use Pond though connecting BFS road.

• 65 river erosion ultra-poor fisher men families will get livelihood support.

Mathurapur village of Munshigonj Union under Shyamnagar Upazila in Satkhira District

Scheme Name of the Scheme Estimated Budget-BDT

Beneficiaries Design Data

1 Cyclone resilience Habitat for 65 Fishermen community located at Mathurapur adjacent of Caritas Habitat project

26361727.00 ( Approx 2.63 Crore)

625 As attached

Mathurapur village of Munshigonj Union under Shyamnagar Upazila in Satkhira District

Mathurapur village of Munshigonj Union under Shyamnagar Upazila in Satkhira District

Cyclone resilience Habitat for 65 Fishermen community located at Mathurapur adjacent of Caritas Habitat project

Sl# Name of InterventionCost per Unit in

BDT

Number of

Intervention

Estimated Cost

in BDT

1Earth rising for Cyclone Resilient habit place includes by

product pond 3,486,387.00 1.00 3,486,387.00

2 Land Cost (4 Acor @ 7.5 lac including registration cost) 3,000,000.00 1.00 3,000,000.00

3Construction of Cyclone resilient habit including Toilet

and Rain water harvesting 226,739.00 65.00 14,738,035.00

4 Installation of Rain Rain Water Harvesting Cyclone 19,993.00 65.00 1,299,545.00

5 Installation of Sanitary latrine 10,000.00 65.00 650,000.00

6 Installation of shallow tube well 10,000.00 5.00 50,000.00

7 Installation of Deep tube well 62,613.00 1.00 62,613.00

8 Construction of meeting room 801,738.00 1.00 801,738.00

9 Construction of 800 m long BFS Road at habit place 673,409.00 1.00 673,409.00

10 Livelihood asset -Boat 10,000.00 65.00 650,000.00

11 Livelihood asset -Net 5,000.00 1.00 5,000.00

12 Income generating support-Swing machine (10 families) 15,000.00 10.00 150,000.00

13 Income generating support-Cow for 45 families 15,000.00 45.00 675,000.00

14 Income generating support-Cash for 5 families for shop 15,000.00 5.00 75,000.00

15 Skill training/Awareness (3 batches) 15,000.00 3.00 45,000.00

26,361,727.00 Total