LCWD Board Meeting
January 14, 2014
1680 Carneros Avenue, Napa
Los Carneros Water DistrictLos Carneros Water District
LCW
DB
oard
Mtg
_031
913.
pptx
/2
Today’s Presentation
Present the Recommended Project – Then and Now
Discuss the Modeling Effort
Present the Preliminary and Final Design Scopes and Status
Discuss Construction Management Expectations
Present Next Steps
LCW
DB
oard
Mtg
_031
913.
pptx
/3
Alternative 5 Future was the Recommended Project
Served majority of District/acreage – 5,619 ac
Lowest cost alternative
Addressed most severe groundwater area – Los Carneros Ave.
Eliminated District storage and pumping
Incorporated a water management strategy
LCW
DB
oard
Mtg
_031
913.
pptx
/5
September 2012 Changes:
SCWA/SVCSD will be sending recycled water to the Napa Marsh and some parcels within District boundaries for a limited time
This change affected just over 1,000 acres New project definition: Parcels connecting to the
SCWA pipeline are removed from the LCWD system, lines are resized for the reduced demand
Alt 6A was the updated recommended alternative Now, it’s a modified Alt 6A
LCW
DB
oard
Mtg
_031
913.
pptx
/7
Alternative 6A – Then…
RW Service StatisticsAlternative
6A
Demand (AFY) 1,465
Gross Areas Served (acres)
4,614
Number of LCWD Parcels Served
112
Number of Other Parcels Served
18
Total New Pipeline (miles)
9.1
Total Capital Cost $16.1 M
LCW
DB
oard
Mtg
_031
913.
pptx
/8
Basis of Design – Now…
RW Service StatisticsAlternative
6ABasis of Design
Demand (AFY) 1,465 1,347
Gross Areas Served (acres)
4,614 4,511
Number of LCWD Parcels Served
112 106
Number of Other Parcels Served
18 18
Total New Pipeline (miles)
9.1 9.1
Total Capital Cost $16.1 M $16.1 M
LCW
DB
oard
Mtg
_031
913.
pptx
/9
Irrigation Assumptions
Description CriteriaVineyard Demand Factor 0.33 AFY/acre
Landscaping Demand Factor 2.5 AFY/acre
Storage Off-stream only, filled in winter over 1 month (1)
Vineyard Irrigation hours (Summer) 6am – 6pm
Landscape Irrigation hours (Summer) 6pm – 6am
Summer storage filling 6pm – 6am
Winter storage filling 24 hours per day
Note: (1) Winter storage reservoirs will be filled in March because the cost of recycled water is expected to be less expensive at that time.
LCW
DB
oard
Mtg
_031
913.
pptx
/10
Hydraulic Design Criteria
Description CriteriaDelivery Pressure – NSD, Summer and Winter 105 psi
Minimum Turnout Pressure 20 psi(1)
Pipeline Design Pressure 150-psi operating, 225-psi max
Maximum Pipeline Velocity 5ft/sec
Maximum Pipeline Headloss
(Diameter <= 12-inches)
10 ft/1,000 ft
Maximum Pipeline Headloss
(Diameter > 12-inches)
7 ft/1,000 ft
Pipeline Roughness (C Factor) 130
Design Condition Peak Hour
Note: (1) Most turnouts will see a minimum pressure of 50-psi. The exception is along Neuenschwander Road where pressures in the system could fall to 20 psi during peak irrigating times.
LCW
DB
oard
Mtg
_031
913.
pptx
/12
Preliminary Design Scope
Finalize Alignments (Carollo)
Surveying (Mountain Pacific)
Potholing (Nielson Construction)
Geotechnical Investigation (RGH)
Corrosion Investigation (JDH Corrosion)
Funding Summary Assistance (Carollo)
Environmental Services (Bowker and Brown)
LCW
DB
oard
Mtg
_031
913.
pptx
/13
Survey Status (Mountain Pacific)
Topographic Surveys are Complete
Utility Surveys are Complete
Resolved datum conflicts between new survey and Stanly Ranch topography.
LCW
DB
oard
Mtg
_031
913.
pptx
/14
Potholing Status (Nielson Construction) Potholing Activities are Complete
• RW Pipeline will be crossing:
• Two 26” Steel High pressure Gas lines
• One 24” Steel High pressure Gas line
• Two 16” Steel High pressure Gas lines
• One 12” Transmission Gas Main
LCW
DB
oard
Mtg
_031
913.
pptx
/15
Geotechnical Status (RGH)
Geotechnical Borings are Complete
Soil Testing is Complete
Draft Geotechnical Report Delivered – to be considered mainly for pipeline design and installation conditions.
LCW
DB
oard
Mtg
_031
913.
pptx
/16
Corrosion Investigation Status (JDH)
Chemical Analysis is Complete
Draft Corrosion Report Delivered
• Soils are severely to mildly corrosive – this was expected
LCW
DB
oard
Mtg
_031
913.
pptx
/17
Environmental Status (Bowker and Brown) Initial Study and Mitigated Negative
Declaration (IS/MND) – released Dec 2013
Publically noticed for 30 days: Dec 19 – Jan 21
Review on line at District’s web page and Napa County Library
To date: 1 Comment Letter received from Caltrans – traffic and encroachment
LCW
DB
oard
Mtg
_031
913.
pptx
/18
Funding Status Submitted 2 of 4 SRF low interest loan
packages – general and technical (1/10/14)
Financial, and environmental packages to follow next
Last year grant funds were available too and distributed among the loan applicants – no additional application is needed
When the financing is approved, the SWRCB staff also look at grant funds available and apply what they can
LCW
DB
oard
Mtg
_031
913.
pptx
/19
Construction Management Considerations/Expectations Only one buried utility - gas
River Crossing – have obtained the bridge drawings from the County
Culvert Crossings – will develop a few standard details
Consider environmental considerations
Pavement considerations
LCW
DB
oard
Mtg
_031
913.
pptx
/21
Culvert crossings will require a combination of deep undercrossings and concrete encasements
LCW
DB
oard
Mtg
_031
913.
pptx
/22
The contractor needs to be maintain responsibility for utility coordination
LCW
DB
oard
Mtg
_031
913.
pptx
/24
Final Design/Next Steps Develop preliminary plans, specs, details
(75% complete)
Design Coordination w other Agencies (NSD, SWRCB, County, etc)
ROW Acquisition/Permitting assistance
Funding application assistance
Bid Phase services
Timing: Jan – May 2014