LCTCS FACILITIES CORPORATION 2019 ANNUALREPORT 2020 RTC LCTCS Facilitie… · 2019 ANNUAL REPORT...
Transcript of LCTCS FACILITIES CORPORATION 2019 ANNUALREPORT 2020 RTC LCTCS Facilitie… · 2019 ANNUAL REPORT...
LCTCS FACILITIES CORPORATION 2019 ANNUALREPORTACT 391 | ACT 360
LCTCS ACT360Executive Summary 2019 ANNUAL REPORT
Page 1 of 30
LCTCS ACT 360 Facilities Improvement Program
The LCTCS Facilities Corporation is a 501(c)(3) private non‐profit corporation formed in 2008 for administration, oversight, and management of the Act 391 and Act 360 statewide facilities improvement program for the benefit of Louisiana's Community and Technical Colleges (LCTCS) students. The Corporation's board of directors consists of civic leaders from geographic areas across the state, that volunteer their time to represent the interest of LCTCS, its colleges, and the State of Louisiana. CSRS, Inc. was hired by the Corporation as their Program Manager to administer design and construction. CSRS has worked as a team with the LCTCS and the Facilities Corporation over the past eleven (11) years delivering on the promises made in Act 391. At the time, the Act 391 program represented a departure from traditional financing and followed the model first conceived for projects in Bossier City, Baton Rouge and Lafayette. There have been great accomplishments made during the delivery of the Program and the Corporation has fundamentally reshaped the way capital improvements are accomplished for the LCTCS. Key to the Program’s success has been collaboration with Facility Planning & Control (FP&C) and the State Board of Regents.
OVER THE PAST ELEVEN YEARS, THE PROGRAM HAS HELPED TO:
CHANGE the perception of what a technical and community collegeshould look like and how the facilities can make a difference in thedelivery of educationMANAGE the largest capital improvements plan in LCTCS history and the first major program utilizing alternative financing and project delivery methodsESTABLISH public trust in the stewardship of alternative financing, whichled to the authorization of funding for the Act 360 Facilities ImprovementProgramDEVELOP standard LCTCS processes and procedures that can be usedfor current and future capital improvements projects and programs throughout the systemFOSTER a culture of diversity and local participation in the delivery of
LCTCS ACT360Executive Summary 2019 ANNUAL REPORT
Page 2 of 30
LCTCS ACT 360 Facilities Improvement Program
management, design and construction services across the state CREATE energy efficient facilities to replace outdated structures thatare far less efficient and have a negative financial impact for the LCTCS
Louisiana is experiencing substantial economic growth and investment from both business and industry. With these new investments, highly‐skilled and a ready‐to‐go workforce to fill the jobs these new businesses are bringing to the state is essential. In this dynamic environment, the role of Louisiana’s community and technical colleges in developing and sustaining this workforce is more important than it has ever been. The LCTCS facilities program is targeted to specific workforce needs in high demand industries, including construction, welding, process technology, nursing, and a variety of skills for the oil and gas industry, and is a prudent investment for the State to support the expanding business and economic growth.
The overwhelming support for Act 391 and Act 360 from legislators from across the state reflects the desire of the citizens of Louisiana to properly educate and develop a sufficient workforce for future economic growth. What better way to reflect that support than to put Louisiana citizens to work on the very program providing the facilities for education? The Program has workedto ensure that Louisiana firms and disadvantaged business enterprises throughout the state are awarded work in every facet of thisprogram.
ACT 391 FACILITIES IMPROVEMENT PROGRAMMaking a Change for Tomorrow's Educational Facilities
Act 391 was authorized during the 2007 Legislative Session in Senate Bill 337 for 23 projects at 14 community and technical colleges totaling $175 million across the state. In October 2009, nine (9) of the 23 projects were identified for the first phase of bond projects and officially closed out.
The Program is currently closing out the remaining Act 391 funds with smallprojects, including maintenance projects, identified by the College for NunezCommunity College in Chalmette.
LCTCS ACT360Executive Summary 2019 ANNUAL REPORT
LCTCS ACT 360 Facilities Improvement Program
ACT 360 FACILITIES IMPROVEMENT PROGRAMProviding increased training capacity and opportunities for students, business, and industry in both rural and urban areas across the state
Senate Bill 204, signed into law by Gov. Jindal in 2013, authorized Act 360 financing in the amount of $285.9 million for 29 projects statewide which includes 25 workforce projects, 3 one stop student testing, career and service centers, and one safety related project. Act 360 requires a combination of state bond financing and 12% private match (Land, Equipment, or Cash Donation). The Program has received private matches from community leaders and private industry. Act 360 Phase I bonds were sold in December 2014. The Program includes 13 rural campus projects, which represent 45 percent of the 29 projects, from the communities of Lacombe, Winnsboro, Jonesboro, Jennings, Minden, Schriever, Ruston, Livingston Parish, Reserve, Morgan City, Avondale, and Tallulah. The remaining 16 projects are in urban areas, including Alexandria, Monroe, Bossier City, Gonzales, Lafayette, Lake Charles, Baton Rouge, New Orleans, Chalmette, and Jefferson Parish.
The Program currently has one (1) Phase I project in closeout, four (4) Phase II projects in closeout, two (2) Phase III projects in design, two (2) Phase III projects in bidding, one (1) Phase III project in construction, and three (3) Phase IV projects in design.
CSRS, Inc.
Brian Budd Program Director
Page 3 of 30
LCTCS ACT 360 COMPLETEDPROJECTSLCTCS FACILITIES CORPORATION
Page 4 of 30
LCTCS ACT360Baton Rouge Community CollegeAcadian Site Renovations
COMPLETED PROJECTS
NARRATIVE
Page 5 of 30
The Acadian Site Renovations project is located at 3250 N. Acadian Thruway, East Baton Rouge, LA 70805. The renovations to the existing campus provided exterior and interior improvements (flooring, paint, system upgrades, storefront, metal panels, signage), light demolition, and a new welding lab that will be outfitted as well as upgrading the existing welding lab and industrial shops.
*The Contractor satisfactorily completed the facility in accordancewith the contract documents.
PROJECT INFORMATIONINITIAL PROJECT FUNDING: $7,258,901
EXPENDITURES AS OF 2019: $8,088,320.16**
COMPLETION DATE: 9/24/2019
RENOVATION SIZE: 130,000 sq. ft.
ARCHITECT: Coleman Partners Architects
CONTRACTOR: Guy Hopkins Construction Co.
VENDORS AMOUNT DESCRIPTIONAmerican Machinery Movers, Inc. $16,222.00 Relocation Services
Arnold & Associates Interiors $2,550.00 Furniture, Fixtures, & Equipment
Austin Fire Systems $2,250.00 Furniture, Fixtures, & Equipment
Baton Rouge Community College $52,947.33 Relocation and Storage Reimbursement
LCTCS ACT360Baton Rouge Community CollegeAcadian Site Renovations
COMPLETED PROJECTS
VENDORS AMOUNT DESCRIPTIONBibliotheca $1,500.00 Furniture, Fixtures, & Equipment
Breazeale, Sachse, & Wilson $14,152.75 Owner's and Lender's Title Insurance
CSRS, Inc. $1,258.44 Reimbursables
Coleman Partners Architects, LLC $568,317.86 Design Services
Coleman Partners Architects, LLC $2,432.27 Reimbursement for Professional Services
Contractor Furniture Group $30,378.24 Furniture, Fixtures, & Equipment
Convergint Technologies $70,270.61 Furniture, Fixtures, & Equipment
Forte and Tablada, Inc. $3,850.00 Surveying Services
Frost-Barber, Inc $163,427.59 Furniture, Fixtures, & Equipment
Guy Hopkins Construction $6,774,933.00 Construction Contract
Interstate Electronic Systems, LLC $360,342.99 Furniture, Fixtures, & Equipment
Jones Walker $5,975.09 Bond Work & Project Match Certification
My Environmental Consulting $2,080.00 Environmental Services
Network Craze Technologies $18,750.00 Furniture, Fixtures, & Equipment
The HON Company $143,111.25 Furniture, Fixtures, & Equipment
Transformyx, Inc $544,046.53 Furniture, Fixtures, & Equipment
Triad $16,336.86 Furniture, Fixtures, & Equipment
Vivid Ink Graphics $59,713.62 Furniture, Fixtures, & Equipment
Workplace Resource, LLC $214,017.48 Furniture, Fixtures, & Equipment
Page 6 of 30
**ACT 360 FUNDS TRANSFERRED TO THIS PROJECT FROM COMPLETED BRCC ARDENDALE PROJECT
END OF BATON ROUGE COMMUNITY COLLEGE ACADIAN SITE RENOVATIONS
LCTCS ACT360Central Louisiana Technical CCWorkforce Industrial Training Campus
COMPLETED PROJECTS
NARRATIVE
Page 7 of 30
The Alexandria Campus consists of the renovation and additions to the McCormick Building and the development of two city blocks within Downtown Alexandria. The new Campus includes general education classrooms, computer and testing labs, adult education classrooms, student services, administrative departments, drafting, welding, and advanced manufacturing departments.
*The Contractor satisfactorily completed the facility in accordancewith the contract documents.
PROJECT INFORMATIONINITIAL PROJECT FUNDING: $19,549,768.23
EXPENDITURES AS OF 2019: $19,085,914.00
COMPLETION DATE: 9/6/2019
BUILDING & RENOVATION SIZE: *72,000 sq. ft.
ARCHITECT: BHB | ABW, A Joint Venture
CONTRACTOR: Ratcliff Construction Co.
VENDORS AMOUNT DESCRIPTIONArc Abatement LTD $115,168.00 Demolition Services
BHB | ABW, A Joint Venture $1,223,268.09 Design Services
BHB | ABW, A Joint Venture $25,790.00 Reimbursement for Professional Services
Breazeale, Sachse, & Wilson $34,884.22 Owner's & Lender's Title Insurance
*New Construction 50,000 sq. ft. - Renovation 22,000 sq. ft.
LCTCS ACT360Central Louisiana Technical CCWorkforce Industrial Training Campus
Page 8 of 30
COMPLETED PROJECTS
VENDORS AMOUNT DESCRIPTIONCentral Louisiana Technical Community College $3,496.27 Reimbursement for FF&E and Misc.
Expenses
Certified Realty Valuations, LLC $2,550.00 Appraisal Services
CSRS, Inc. $2,518.93 Reimbursables
Dell Marketing L.P. $43,605.62 Furniture, Fixtures, & Equipment
DiaMedical USA $23,285.96 Furniture, Fixtures, & Equipment
Fine Print $167.82 Printed Materials
Frost Barber $403,877.19 Furniture, Fixtures, & Equipment
Highway Materials & Signs, Inc. $260.00 Printed Materials
Holly & Smith Architects, APAC $56,175.00 Bridging Architect
Howard Technology Solutions $243,731.00 Furniture, Fixtures, & Equipment
Jones Walker $3,540.30 Bond Work & Project Match Certification
Letterman's Blue Print & Supply $3,515.90 Signage
My Environmental Consulting, LLC $20,190.00 Environmental & Demolition Consulting Services
National Construction Rentals $4,321.64 Security Fencing
Platinum Production $400.00 AV Equipment Rental
Property Owners $1,986,541.12Property purchased by Rapides Area Foundation for the project as part of the Act 360 Match
Ratcliff Construction Co., LLC $16,892,726.89 Construction Contract
SHI, Inc. $62,742.68 Furniture, Fixtures, & Equipment
St. Francis Xavier Church $100.00 Meeting Hall
The HON Company $292,602.88 Furniture, Fixtures, & Equipment
LCTCS ACT360Central Louisiana Technical CCWorkforce Industrial Training Campus
Page 9 of 30
COMPLETED PROJECTS
VENDORS AMOUNT DESCRIPTIONVisual Concepts Design $49.00 Printed Materials
END OF CENTRAL LOUISIANA TECHNICAL COMMUNITY COLLEGE WORKFORCE INDUSTRIAL TRAINING CAMPUS
LCTCS ACT360Louisiana Delta Community CollegeAdvanced Technology Center
COMPLETED PROJECTS
NARRATIVE
Page 10 of 30
The LDCC Monroe Campus is located at 7500 Millhaven Rd, Monroe, LA 71203. The project consists of a new addition to the Advanced Technology Center (ATC) to include a community auditorium, entry lobby, E.D. offices, Louisiana Small Business Development Center (LSBDC) suite, incubation area, workforce development area, testing suite, PTEC offices, lounge, copy room and support spaces.
*The Contractor satisfactorily completed the facility in accordancewith the contract documents.
PROJECT INFORMATIONINITIAL PROJECT FUNDING: $8,200,000
EXPENDITURES AS OF 2019: $7,207,997.61
COMPLETION DATE: 9/12/2019
BUILDING SIZE: 22,000 sq. ft.
ARCHITECT: Architecture +
CONTRACTOR: Boggs & Poole Contracting Group
VENDORS AMOUNT DESCRIPTIONArchitecture + $495,207.91 Design Services
Architecture + $22,078.72 Reimbursement for Professional Services
Boggs and Poole Contracting Group Inc. $6,778,982.00 Construction Contract
Breazeale, Sachse, & Wilson $15,679.75 Owner's and Lender's Title Insurance
LCTCS ACT360Louisiana Delta Community CollegeAdvanced Technology Center
Page 11 of 30
COMPLETED PROJECTS
VENDORS AMOUNT DESCRIPTIONCI Group $212,581.55 Furniture, Fixtures, & Equipment
CSRS, Inc. $1,979.84 Reimbursables
Grainger $3,750.00 Furniture, Fixtures, & Equipment
Jones Walker $9,326.72 Bond Work & Project Match Certification
Louisiana DeltaCommunity College Foundation $9,706.68 Reimbursement for FF&E and Misc.
Expenses
Ouachita Antique Woods $11,200.00 Furniture, Fixtures, & Equipment
Pettus Office Products $46,198.74 Furniture, Fixtures, & Equipment
Professional Land Surveying Company Inc. $1,600.00 Surveying Services
United Automation, LLC $ 5,774.48 Furniture, Fixtures, & Equipment
Wood Electronics, Inc. $1,081.00 Furniture, Fixtures, & Equipment
END OF LOUISIANA DELTA COMMUNITY COLLEGE ADVANCED TECHNOLOGY CENTER
LCTCS ACT360Louisiana Delta Community CollegeAdvanced Workforce Training Campus Upgrade
COMPLETED PROJECTS
NARRATIVE
Page 12 of 30
The LDCC Tallulah Campus is located at 132 Old Highway 65 South, Tallulah, LA 71282. The project generally consists of a new addition to front of the existing building to include RN and LPN classrooms, biology lab and CNA classroom, security office, reception and lobby area; renovations to faculty offices, restrooms, flooring and paint; and demolition to existing Adult Ed modular building.
*The Contractor satisfactorily completed the facility in accordancewith the contract documents.
PROJECT INFORMATIONINITIAL PROJECT FUNDING: $2,500,000
EXPENDITURES AS OF 2019: $2,171,296.96
COMPLETION DATE: 8/27/2019
BUILDING & RENOVATION SIZE: *42,479 sq. ft.
ARCHITECT: TBA Studio
CONTRACTOR: Don M. Barron Contractor Inc.
VENDORS AMOUNT DESCRIPTIONArdaman & Associates, Inc. $4,500.00 Geotechnical Services
Breazeale, Sachse, & Wilson $6,329.29 Owner's and Lender's Title Insurance
CI Group $138,281.50 Furniture, Fixtures, & Equipment
CSRS, Inc. $821.54 Reimbursables
*New Construction 6,900 sq. ft. - Renovation 35,579 sq. ft.
LCTCS ACT360Louisiana Delta Community CollegeAdvanced Workforce Training Campus Upgrade
Page 13 of 30
COMPLETED PROJECTS
VENDORS AMOUNT DESCRIPTIONDRE Medical Group, Inc. $11,400.00 Furniture, Fixtures, & Equipment
Denmon Engineering Company, Inc. $4,382.40 Surveying Services
DiaMedical USA $5,670.00 Furniture, Fixtures, & Equipment
Don M. Barron Contractor Inc. $1,994,749.27 Construction Contract
Grainger $10,462.53 Furniture, Fixtures, & Equipment
Jones Walker $5,724.64 Bond Work & Project Match Certification
Louisiana Delta Community College Foundation $5,917.72 Reimbursement for FF&E and Misc.
Expenses
My Environmental Consulting $2,051.00 Environmental Services
Summit Intergration Systems $13,916.73 Furniture, Fixtures, & Equipment
TBA Studio $181,829.43 Design Services
Transformyx, Inc $15,286.65 Furniture, Fixtures, & Equipment
END OF LOUISIANA DELTA COMMUNITY COLLEGE ADVANCED WORKFORCE TRAINING CAMPUS UPGRADE
LCTCS ACT360Northshore Technical Community CollegeAdvanced Technology Center
COMPLETED PROJECTS
NARRATIVE
Page 14 of 30
The NTCC Livingston Campus is located at 11640 Burgess Ave., Walker, LA 70785. The new facility includes administration spaces, welding and advanced manufacturing labs, general education spaces, and a pathway that connects to the Literacy Center. The facility includes a 1,000 sq. ft. tenant spaced that is occupied the Livingston Economic Development Council.
*The Contractor satisfactorily completed the facility in accordancewith the contract documents.
PROJECT INFORMATIONINITIAL PROJECT FUNDING: $5,238,000
EXPENDITURES AS OF 2019: $5,161,143.60
COMPLETION DATE: 8/7/2019
BUILDING SIZE: 14,000 sq. ft.
ARCHITECT: Holly & Smith Architects, APAC
CONTRACTOR: Cangelosi Ward Contractors
VENDORS AMOUNT DESCRIPTIONBayou Irrigation, Inc. $3,830.00 Furniture, Fixtures, & Equipment
Breazeale, Sachse, & Wilson $13,153.94 Owner's and Lender's Title Insurance
CSRS, Inc. $1,228.13 Reimbursables
Cangelosi Ward General Contractors, LLC $4,482,994.57 Construction Contract
LCTCS ACT360Northshore Technical Community CollegeAdvanced Technology Center
Page 15 of 30
COMPLETED PROJECTS
VENDORS AMOUNT DESCRIPTIONDiaMedical USA $20,579.89 Furniture, Fixtures, & Equipment
Holly & Smith Architects, APAC $321,267.76 Design Services
Holly & Smith Architects, APAC $15,300.00 Reimbursement for Professional Services
Jones Walker $4,078.81 Bond Work & Project Match Certification
Louisiana Community & Technical College System $1,960.00 Reimbursement for Land Abstract
Northshore Technical Community College $7,709.03 Reimbursement for FF&E and Misc.
Expenses
Sivad, Inc. $60,552.00 Furniture, Fixtures, & Equipment
Venture Technologies $57,012.87 Furniture, Fixtures, & Equipment
Workplace Resource, LLC $215,224.24 Furniture, Fixtures, & Equipment
END OF NORTHSHORE TECHNICAL COMMUNITY COLLEGE ADVANCED TECHNOLOGY CENTER
LCTCS ACT 360 CONSTRUCTIONPROJECTSLCTCS FACILITIES CORPORATION
Page 16 of 30
LCTCS ACT360Delgado Community CollegeAdvanced Workforce Training
CONSTRUCTION PROJECTS
NARRATIVE
Page 17 of 30
The DCC Westbank Campus is located at 2440 Constellation Street, New Orleans, LA 70114. The new facility is anticipated to contain but not limited to all academic STEM programs, labs, and faculty to serve academic and workforce programs for Algiers and the West Bank of New Orleans, specifically the healthcare, Petro‐chemical, digital media, and transportation logistics industries.
*The Contractor is satisfactorily working in accordance with thecontract documents.
PROJECT INFORMATIONINITIAL PROJECT FUNDING: $12,188,000
EXPENDITURES AS OF 2019: $455,947.82
ANTICIPATED COMPLETION DATE: 4/26/2021
BUILDING SIZE: 32,660 sq. ft.
ARCHITECT: Holly & Smith Architects, APAC
CONTRACTOR: MAPP, LLC
VENDORS AMOUNT DESCRIPTIONBayou Tree Service $14,140.00 Arborist Treatment and Services
Breazeale, Sachse, & Wilson $31,566.16 Owner's and Lender's Title Insurance
CSRS, Inc. $1,920.90 Reimbursables
Dufrene Surveying Services $5,300.00 Surveying Services
LCTCS ACT360Delgado Community CollegeAdvanced Workforce Training
Page 18 of 30
CONSTRUCTION PROJECTS
VENDORS AMOUNT DESCRIPTIONEustis Engineering, LLC $9,925.00 Geotechnical Services
Holly & Smith Architects $713,948.70 Design Services
Holly & Smith Architects $903.32 Reimbursement for Professional Services
Jones Walker $4,515.92 Bond Work & Project Match Certification
Louisiana Community & Technical College System $3,450.00 Reimbursement for Professional Services
MAPP, LLC $9,609,000.00 Construction Contract
Terracon $10,920.00 Environmental Services
END OF DELGADO COMMUNITY COLLEGE ADVANCED WORKFORCE TRAINING
LCTCS ACT 360 DESIGNPROJECTSLCTCS FACILITIES CORPORATION
*Rendering provided by TBA Studio
Page 19 of 30
LCTCS ACT360Delgado Community CollegeCenter for Hospitality and Culinary
DESIGN PROJECTS
NARRATIVE
Page 20 of 30
The LCTCS Facilities Corporation engaged in extensive negotiations with the original donor for the project match. The negotiations ended in February 2020 without a final agreement. As of March 2020, the Facilities Corporation is in preliminary discussion with another donor to provide the necessary match for the project. The new facility will provide the necessary spaces for Hospitality and Culinary programs.
*Project is currently in planning andscope confirmation.
PROJECT INFORMATIONINITIAL PROJECT FUNDING: $9,000,000
EXPENDITURES AS OF 2019: $363,497.28
COMPLETION DATE: TBD
BUILDING SIZE: TBD
ARCHITECT: TBD
CONTRACTOR: TBD
VENDORS AMOUNT DESCRIPTIONCSRS, Inc. $699.58 Reimbursables
Jones Walker $30,419.96 Bond Work & Project Match Certification
Manning Architects | Mackey Mitchell Architects $330,408.00 Design Services
LCTCS ACT360Delgado Community CollegeCenter for Hospitality and Culinary
Page 21 of 30
DESIGN PROJECTS
VENDORS AMOUNT DESCRIPTIONThe Lemoine Company $28,593.00 Pre-Construction Services
END OF DELGADO COMMUNITY COLLEGE CENTER FOR HOSPITALITY AND CULINARY
LCTCS ACT360Delgado Community CollegeMain Campus
DESIGN PROJECTS
NARRATIVE
Page 22 of 30
The DCC Main Campus project (formerly Blair project) is anticipated to be located at 615 City Park Ave, New Orleans, LA 70119. The project is anticipated to include a new workforce training facility and campus wide site enhancements that will create a new and uniform branding for Delgado Community College. This project will be run in conjunction with the DCC Center for Hospitality and Culinary.
*Project is currently in planning andscope confirmation.
PROJECT INFORMATIONINITIAL PROJECT FUNDING: $8,181,818
EXPENDITURES AS OF 2019: $0.00
COMPLETION DATE: TBD
BUILDING SIZE: TBD
ARCHITECT: TBD
CONTRACTOR: TBD
VENDORS AMOUNT DESCRIPTION
BOND SALE COMPLETED ON DECEMBER 19, 2019
END OF DELGADO COMMUNITY COLLEGE MAIN CAMPUS
LCTCS ACT360Delgado Community CollegeNursing and Allied Health Training Building
DESIGN PROJECTS
NARRATIVE
Page 23 of 30
The LCTCS Facilities Corporation engaged in extensive negotiations with the original donor for the project match. The negotiations ended in February 2020 without a final agreement. As of March 2020, the Facilities Corporation is in preliminary discussion with another donor to provide the necessary match for the project. The new facility will provide the necessary spaces for Nursing and Allied Health Training programs.
*Project is currently in planning andscope confirmation.
PROJECT INFORMATIONINITIAL PROJECT FUNDING: $34,000,000
EXPENDITURES AS OF 2019: $97,924.51
COMPLETION DATE: TBD
BUILDING SIZE: TBD
ARCHITECT: Manning Architects I Mackey Mitchell
CONTRACTOR: The Lemoine Company
VENDORS AMOUNT DESCRIPTIONCSRS, Inc. $2,328.73 Reimbursables
Gandolfo Kuhn, LLC $14,000.00 Surveying Services
Gulf South Engineering & Testing, Inc. $2,900.00 Geotechnical Services
Jones Walker $20,421.32 Bond Work & Project Match Certification
*Rendering provided by Manning Architects I Mackey Mitchell
LCTCS ACT360Delgado Community CollegeNursing and Allied Health Training Building
Page 24 of 30
DESIGN PROJECTS
VENDORS AMOUNT DESCRIPTIONLouisiana Community & Technical College System $1,000.00 Reimbursement for Appraisal Services
My Environmental Consulting $6,595.00 Environmental Services
The Lemoine Company $133,407.00 Pre-Construction Services
END OF DELGADO COMMUNITY COLLEGE NURSING AND ALLIED HEALTH TRAINING BUILDING
LCTCS ACT360Fletcher Technical Community CollegeNew Workforce Training Building
DESIGN PROJECTS
NARRATIVE
Page 25 of 30
The New Workforce Training Building will be located at 1407 Highway 311, Schriever, LA 70395. The new facility will provide training classrooms and labs, workforce training offices, offices for South Central Industrial Association (SCIA), offices for Workforce Commission, Veteran's Resource Center, career services interview and resource room, shared lab space for line-worker program and a multipurpose room.
*Project is currently in schematicdesign.
PROJECT INFORMATIONINITIAL PROJECT FUNDING: $5,113,636
EXPENDITURES AS OF 2019: $0.00
COMPLETION DATE: TBD
ANTICIPATED BUILDING SIZE: 15,271 sq. ft.
ARCHITECT: Weimer Gros Flores
CONTRACTOR: TBD
VENDORS AMOUNT DESCRIPTION
BOND SALE COMPLETED ON DECEMBER 19, 2019
END OF FLETCHER TECHNICAL COMMUNITY COLLEGE NEW WORKFORCE TRAINING BUILDING
LCTCS ACT360Louisiana Delta Community CollegeNursing, Welding, Workforce Training Campus
DESIGN PROJECTS
NARRATIVE
Page 26 of 30
The LDCC Ruston Campus is anticipated to be located North of Highway 80, Ruston, LA 71270. The new facility will provide general education space, classrooms, administrative, security, and supportive areas and also include signage, parking, and a loading dock. There will be spaces for welding, industrial instrumentation, patient care, and a student services suite.
*The project is currently closing out Construction Documents for releaseto the approved shortlist.
PROJECT INFORMATIONINITIAL PROJECT FUNDING: $8,100,000
EXPENDITURES AS OF 2019: $78,443.57
COMPLETION DATE: TBD
BUILDING SIZE: 30,775 sq. ft.
ARCHITECT: TBA Studio
CONTRACTOR: TBD
VENDORS AMOUNT DESCRIPTIONALTEC Environmental Consulting LLC $2,850.00 Environmental Services
Breazeale, Sachse, & Wilson $19,863.74 Owner's and Lender's Title Insurance
CSRS, Inc. $840.56 Reimbursables
Denmon Engineering Company, Inc. $14,460.00 Survey Services
*Rendering provided by TBA Studio
LCTCS ACT360Louisiana Delta Community CollegeNursing, Welding, Workforce Training Campus
DESIGN PROJECTS
VENDORS AMOUNT DESCRIPTIONJones Walker $3,104.70 Bond Work & Project Match Certification
Kepper Dirt and Rental $43,800.00 Tree Clearing Services
TBA Studio $538,890.00 Design Services
TBA Studio $9,597.00 Reimbursement for Professional Services
Page 27 of 30
*ACT 360 FUNDS TRANSFERRED TO THIS PROJECT FROM COMPLETED LDCC MONROE & TALLULAH PROJECTS
END OF LOUISIANA DELTA COMMUNITY COLLEGE NURSING, WELDING, WORKFORCE TRAINING CAMPUS
LCTCS ACT360Nunez Community CollegeStudent Testing and Career Counseling Center
DESIGN PROJECTS
NARRATIVE
Page 28 of 30
The NUNEZ Community College Student Testing and Career Counseling Center will be located at 3710 Paris Rd. in Chalmette, LA. The new facility is anticipated to include spaces that support Student Success Activities including Student Services office, tutoring spaces, computer labs, conference rooms, Veteran Resource Centers, bookstore, coffee shop, incubation spaces, and other spaces deemed necessary for student success.
*The project is currently in planningand scope confirmation.
PROJECT INFORMATIONINITIAL PROJECT FUNDING: $6,480,000
EXPENDITURES AS OF 2019: $0.00
COMPLETION DATE: TBD
BUILDING SIZE: 22,000 sq. ft.
ARCHITECT: Holly & Smith Architects, APAC
CONTRACTOR: TBD
VENDORS AMOUNT DESCRIPTION
BOND SALE COMPLETED ON DECEMBER 19, 2019
END OF NUNEZ COMMUNITY COLLEGE STUDENT TESTING AND CAREER COUNSELING CENTER
*Rendering provided by Holly & Smith Architects, APAC
LCTCS ACT360SOWELA Technical Community CollegeCulinary, Gaming and Hospitality Center
DESIGN PROJECTS
NARRATIVE
Page 29 of 30
The SOWELA Gaming & Hospitality Campus is anticipated to be located at 3771 Senator J. Bennett Johnston Ave., Lake Charles, LA 70615. The new facility willinclude classrooms, workforce flex lab for gaming, front desk/hotel rooms, baking lab, hot foods lab,meal service line and full‐service kitchen, dining area, storage room, cafe/pastry area, student lounge area, faculty offices, and administrative areas.
*Project is currently in bidding andcontract negotiations.
PROJECT INFORMATIONINITIAL PROJECT FUNDING: $9,945,743.39
EXPENDITURES AS OF 2019: $298,512.03
COMPLETION DATE: TBD
BUILDING SIZE: 28,000 sq. ft.
ARCHITECT: Champeaux Evans Hotard, APAC
CONTRACTOR: TBD
VENDORS AMOUNT DESCRIPTIONChampeaux Evans Hotard, APAC $636,650.00 Design Fees
Champeaux Evans Hotard, APAC $19,000.00 Reimbursables for Professional Services
CSRS, Inc. $1,038.59 Reimbursables
Daniel J. Holder, P.E., Inc. $6,500.00 Professional Services
*Rendering provided by Champeaux Evans Hotard, APAC
LCTCS ACT360SOWELA Technical Community CollegeCulinary, Gaming and Hospitality Center
DESIGN PROJECTS
VENDORS AMOUNT DESCRIPTIONJones Walker $3,951.42 Bond Work & Project Match Certification
Providence Engineering $5,075.00 Professional Services
SOWELA Technical CC $4,800.00 Reimbursement for ESA Phase I
Page 30 of 30
*ACT 360 FUNDS TRANSFERRED TO THIS PROJECT FROM COMPLETED SOWELA STUDENT SERVICES PROJECT
END OF SOWELA TECHNICAL COMMUNITYCOLLEGE CULINARY, GAMING AND HOSPITALITYCENTER