16
Approximate Property Lines for Community Lots

description

a work in progress

Transcript of LCCI Plans

Page 1: LCCI Plans

Approximate Property Lines for Community Lots

Page 2: LCCI Plans

The leaning pool retaining wall will be replaced in the first phase of the project.

Page 3: LCCI Plans
Page 4: LCCI Plans

This stone wall with aluminum fence on top is an approximate representation .

Page 5: LCCI Plans

Aluminum fencing will add aesthetic appeal, and the minimum 48” height and self-closing gate will provide an

effective barrier to unattended children.

Page 6: LCCI Plans

Phase 1 also includes grading and removal of tennis courts which will be dumped in the hole behind the pool saving

hauling costs.

Page 7: LCCI Plans

Grading will address the drainage from parking lot and hill which currently flows behind and under the sinking gazebo.

Page 8: LCCI Plans

Gazebo roof top shows ~10 foot change in elevation from court level to pool area.

Page 9: LCCI Plans

Trees currently block the view of the hole.

Page 10: LCCI Plans

The “filled” area behind the pool will be the future construction site of the playground.

Page 11: LCCI Plans

There are many options to consider for the play area.

Page 12: LCCI Plans
Page 13: LCCI Plans

Email your ideas to: [email protected]

Page 14: LCCI Plans

Rebuilding 2 tennis courts will be completed in Spring 2011

Page 15: LCCI Plans

Your dues make the new community property recreational facilities a reality.

Page 16: LCCI Plans

For future consideration: Lighting would increase court usage as many summer days are too hot to play and

working people could play Monday through Friday evenings during winter months.

Cost for lighting installation on two courts ~$15,000 (Lighting pattern may be different than shown.)