LC Paper No. CB(2) 194/00-01(01) For information on 10.11.2000 SUB-COMMITTEE TO FOLLOW UP THE OUTSTANDING CAPITAL WORKS PROJECTS OF THE FORMER MUNICIPAL COUNCILS Progress report on the 160 former Municipal Councils Capital Works Projects involving leisure and cultural facilities PURPOSE The purpose of this paper is to report to Members the progress made on the planning of various capital works projects since the establishment of the Leisure and Cultural Services Department (LCSD). BACKGROUND Priority Projects 2. With the dissolution of the two Provisional Municipal Councils (PMC’s), LCSD assumed responsibility for 160 capital works projects involving leisure and cultural facilities. Of the 160 projects, 11 are priority projects (Appendix A) which received funding approval from the former PMC’s. In the last legislative session, 8 projects were directly injected into the Public Works Programme (PWP) as Category A projects. We will seek to upgrade the remaining three projects, namely the Hammer Hill District Park, Stanley Complex and the Kowloon Bay Recreation Ground when outstanding issues related to these projects have been resolved. A detailed report on progress with these three projects is at Appendix B. Remaining Projects 3. Of the remaining 149 projects, we have proposed to proceed first

Transcript of LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

Page 1: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

LC Paper No. CB(2) 194/00-01(01)

For informationon 10.11.2000

SUB-COMMITTEE TO FOLLOW UP THEOUTSTANDING CAPITAL WORKS PROJECTS

OF THE FORMER MUNICIPAL COUNCILS

Progress report on the160 former Municipal Councils

Capital Works Projectsinvolving leisure and cultural facilities

PURPOSE

The purpose of this paper is to report to Members the progressmade on the planning of various capital works projects since the establishmentof the Leisure and Cultural Services Department (LCSD).

BACKGROUND

Priority Projects

2. With the dissolution of the two Provisional Municipal Councils(PMC’s), LCSD assumed responsibility for 160 capital works projects involvingleisure and cultural facilities. Of the 160 projects, 11 are priority projects(Appendix A) which received funding approval from the former PMC’s. Inthe last legislative session, 8 projects were directly injected into the PublicWorks Programme (PWP) as Category A projects. We will seek to upgrade theremaining three projects, namely the Hammer Hill District Park, StanleyComplex and the Kowloon Bay Recreation Ground when outstanding issuesrelated to these projects have been resolved. A detailed report on progresswith these three projects is at Appendix B.

Remaining Projects

3. Of the remaining 149 projects, we have proposed to proceed first

Page 2: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

- 2 -

with the 16 projects listed at Appendix C. In summary, progress with these 16projects is as follows -

(a) we have set aside funding for upgrading 6 projects to Category B,and we anticipate upgrading these projects to Category A withinthe next two years;

(b) we will proceed with improvement works to the Lok WahPlayground as a minor works project; and

(c) we plan to proceed with the Preliminary Project Feasibility Studies(PPFS) for the remaining 9 projects in the coming year.

4. As to the remaining projects, we will continue to review theposition regularly in the light of the readiness of the projects and the demand forleisure and cultural facilities.

CRITERIA FOR SELECTION

5. We have adopted the following criteria in selecting projects forinclusion in the PWP -

(a) whether there is a need to upgrade facilities for safety reasons;(b) the speed of population in-take in new residential developments;(c) the extent of local demand for the facilities, including usage rates

and views of District Councils (DC’s);(d) whether the sites for the facilities are ready for development;(e) the extent of readiness of the projects , in terms of finalized scope

of development, conceptual layout, preliminary projectfeasibility study and the resolution of major technical issues;and

(f) the extent to which financial resources are available.

CONSULTATION WITH DISTRICT COUNCILS

6. As noted above, in the process of assessing local demand for new

Page 3: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

- 3 -

facilities, we will take into consideration the views of DC’s.

7. The Director of Leisure and Cultural Services (DLCS) willpersonally visit the DC’s to promote the work of the department and to seek theadvice of members on the provision of leisure and cultural services. DLCS hasvisited 12 DC’s so far and plans to visit all of the Councils before the end of theyear.

8. In addition, staff of the department’s Planning Section attendmeetings of the DC’s and their functional committees regularly to listen to theviews of the Council members, to consult them on the scope of individualdevelopments, and to report on progress with capital projects under planning.Between January and November, staff of the Planning Section have attendedover 60 meetings of DCs and their functional committees. 9. A detailed account of the issues discussed with the DC’s is atAppendix D.

PRESENTATION

10. This paper is presented for Members’ information.

Home Affairs BureauNovember 2000

Page 4: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

Appendix A

Item

1 369RO Redevelopment of Victoria Park - Improvement to ParkProper

2 234RS Water Sports Centre at Stanley Main Beach

3 367RO Jordan Valley Playground (Phase II) Stage 2

4 44RG Indoor Recreation Centre cum Library in area 100, Ma OnShan

5 48RE Renovation to External walls of Shatin Town HallComplex and Tuen Mun Town Hall Complex

6 366RO Local Open Space in area 44, Tuen Mun

7 235RS Improvement Works to Lady Maclehose Holiday Villageand Sai Kung Outdoor Recreation Centre

8 45RG Tai Kok Tsui Complex (Phase II)

9 12NM Stanley Complex

10 370RO Hammer Hill Road District Park

11 368RO Kowloon Bay Recreation Ground

Note 1: First 8 projects approved by PWSC/FC for direct injection to the PWPas Category A projects.

Note 2: Projects listed at (9)-(11) will be upgraded to Category A whenoutstanding issues have been resolved.

List of 11 projects for direct injection into the PWP as Category A projects

Title

Page 5: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

Appendix B

Situation Report on 368RO - Kowloon Bay Recreation Ground370RO - Hammer Hill Road District Park12NM - Stanley Complex

368RO - Kowloon Bay Recreation Ground

This project will provide a recreation ground comprising twonatural grass soccer pitches, two tennis courts, a cycling area, a tai-chi areaand a children's play area.

2. Development of the project will involve permanent closure ofa section of Kai Lai Road which falls within the boundary of the projectsite. We briefed Kwun Tong District Council in March. Majority of theDC members accepted the proposed road closure.

3. After further consultation with departments concerned, theSecretary for Transport gazetted the road closure notice on 15.9.2000 forgeneral attention. Subject to no public objection being received intwo months' time, i.e. by 14.11.2000, the Secretary for Transport will effectthe road closure and the Director of Lands will be able to hand over theproject site to us for development by the middle of next year.

4. We plan to seek PWSC and FC's approval to directly inject theproject into Category A of the Public Works Programme in early 2001.

370RO - Hammer Hill Road District Park

5. The site of this project is located right in front of the Chi LinNunnery Monastic Complex. When we briefed Members in February onthis project. Most Members were in support of a Chinese garden designcompatible with the nunnery complex, so that the entire area could bedeveloped into a landmark for tourism.

6. In the light of Chi Lin's experience and knowledge in Tang

Page 6: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

- 2 -

style constructions, Members at the meeting in June also endorsed aproposal to enter into a package with Chi Lin for the delivery of the projectwithin a budget of $177 million (MOD price), which is the funding levelearmarked for this project based on the cost estimate prepared by theArchitectural Services Department for the original design approved by theformer Provisional Urban Council.

7. We have since written to Chi Lin on the proposal. Chi Lin, inresponse, has indicated that they would need to consider carefully thefinancial implications and the liabilities involved, and agreed that the twoparties should start discussion on the subject matter. At the subsequentmeetings with Chi Lin, we have exchanged views broadly and reachedconsensus on a feasibility study by Chi Lin to work out a commonlyacceptable project plan, prior to commitment to an agreement. Chi Linhas already started the feasibility study. We will brief Members further onreceipt of the study report from Chi Lin.

12NM - STANLEY COMPLEX

8. In the last legislative session, Members were informed that theAdministration would conduct a market viability study to assess the needfor a new market in Stanley and to review the leisure and cultural facilitiesin the Stanley Complex project with a view to ensuring that the facilitiesprovided therein will be to the best interests of the general public.

9. We understand that FEHD's latest proposal is not to proceedwith a market in the project.

10. Our review on the leisure services facilities has indicated thatthere is a genuine need for an indoor games hall in Stanley where nosimilar facility is available. The nearest indoor games hall is in Aberdeenor Ap Lei Chau quite a distance away from Stanley. The SouthernDistrict Council and the local community all along have been requestingfor a more conveniently located indoor sports centre for Stanley residents.In response to the earnest local demand, we propose to include in thisproject an air-conditioned leisure centre comprising a main sports arena, achildren's playroom, a table tennis room and a dance room.

Page 7: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

- 3 -

11. We have also reviewed the cultural facilities in Stanley andconsider it necessary to strengthen our library provision in the area.Currently Stanley is served by mobile libraries which visit the place weekly.The usage rate is relatively low, probably due to limitations of the service.We propose to provide a small library in the Stanley Complex which willbetter cater for local requirements. Computers with internet access will bemade available in the library for public use.

12. We are also examining the possibility of incorporating thecommunity hall facilities originally planned for the Ma Hang area in thisproject to optimize site utilization. Two options are being considered :

(a) to add a secondary games hall to the leisure centre with theprovision of portable stage and movable partitions forcommunity uses when required; and

(b) to provide a multi-purpose hall with a stage and otherassociated facilities which can serve sports and communityhall functions.

The adoption of either option will be subject to physical constraints havingregard to the small size of the site and the stringent height restriction. TheArchitectural Services Department is examining the technical feasibilitiesand the cost implications of both options.

13. We would also provide a public toilet in the Complex for theconvenience of tourists as well as the general public.

14. Upon finalizing the combination of the community hallfacilities, we will proceed to consult the Southern District Council on thisproject.

Home Affairs Bureau7 November 2000

Page 8: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

Appendix C

Appendix C

Item Project Title1 + A multi-purpose grass pitch on Sai Tso Wan former landfill

2 * Additional Open Space to Tsuen Wan Town Hall

3 * Indoor Recreation Centre Area 17 Tin Shui Wai

4 * Improvement works to Lei Yue Mun Park

5 * Kwai Chung Park - Further Development

6 * Recreational facilities at Tseung Kwan O landfill

7 Improvement to Victoria Park - Swimming Pool Complex

8 New Tennis Centre cum Car Park at Moreton Terrace

9 Tung Chung Park Area 7, Tung Chung

10 Indoor Recreation Centre cum Library Area 17 Tung Chung

11 Temporary Recreational Development at Jordan Valley Landfill

12 District Open Space Area 3 and 8 Tsing Yi

13 Improvement to the Jockey Club Wong Shek Water Sports Centre

14 Ma On Shan Sportsground (Phase II)

15 Golf Course in Shuen Wan Landfill Tai Po

16 # Improvement Works to Lok Wah Playground

* Project upgraded to Category B pending approval of a Preliminary ProjectFeasibility Study (PPFS) report.

+ Category B project with PPFS accepted.

# Project to be pursued as a minor works project.

List of 16 Capital Works ProjectsRecommended for Inclusion to PWP as Category C Projects

Page 9: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

Appendix D(i)

An account of capital works projects discussed at District Council meetingsNT Districts

* DLCS’s visit to DCPS125-00(1).doc

District Committee Date Subjects/Projects discussed Views of DC Department’s Responses/Remarks

YuenLong

DC - fullCouncilmeeting

2.2.200022.6.2000

Report on the progress of Ex-PMCprojects under planning in Yuen Long

General enquiry on progress of projects. Progress on projects was reported.Members noted.

TownPlanning andDevelopmentCommittee ofYLDC

20.9.2000 Proposed development of IRC at Area101, Tin Shui Wai

General enquiry on progress. Progress of planning reported. Thisis not one of the 160 ex-PMC projects.

TuenMun

Leisure andCultureCommittee ofTMDC

28.2.200028.8.200023.10.2000

Proposed development of recreationfacilities at the former Gordon HardSouth Military Camp Site

Enquiry on progress and scope ofdevelopment and implementationprogramme.

Progress of planning was reported.Members were assured that DC wouldbe consulted on the scope of facilitiesproposed. Implementationprogramme is not available at thisstage. This is not one of the 160 ex-PMC projects.

Leisure andCultureCommittee ofTMDC

17.4.2000 Proposed Local Open Space at Area 14(Mouse Island) Tuen Mun

Enquiry on progress and implementationprogramme.

Progress reported. DC would beconsulted on the proposed scope offacilities. Implementationprogramme was being reviewed.

DC - fullCouncilmeeting

14.9.2000 Development of ex-refugee camp atPillar Point

Proposed to develop the site as a touristattraction with recreational facilities.

At present, there is no plan to developthe site. Views of DC were noted.This is not one of the 160 ex-PMCprojects.

Page 10: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DC Page 2PS125-00(1).doc

District Committee Date Subjects/Projects discussed Views of DC Department’s Responses/Remarks

North DC – fullCouncilmeeting

8.6.2000 Proposed Regional Indoor Stadium atArea 11A in Fanling

DC members urged strongly earlyimplementation of the project by includingit into the PWP as soon as possible.

Project under planning with a numberof technical issues to be resolved.HAB to review policy of provision ofterritory-wide stadium.Implementation of the project will besubject to the outcome of the review.

DC – fullCouncilmeeting

10.8.2000 Proposed development of communityhall, library, youth centre and market inFanling South

General enquiry on the provision ofcommunity hall, library, youth centre andmarket in Fanling South

The department noted the concern ofDC on the provision of communityfacilities in the district. DC Membersnoted that a new public library wouldbe provided in the new Luen Wo Huicomplex to be completed in mid 2002.This is not one of the 160 ex-PMCprojects.

DC – fullCouncilmeeting

12.10.2000* General planning issues. The department should review theprovision of leisure facilities and expeditethe implementation of new projects tomeet the growing population andincreasing demand within the district.

According to HKPSG, the provision ofleisure facilities in North District is ingeneral adequate. In addition, anIGH will be provided in the Luen WoHui Complex in Area 19Fanling/Sheung Shui which is nowunder construction for completion in2002.

There is a shortage in the provision oflarge-scale sportsground and football pitch(grass pitch) in the district.

The department will review the localdemand for football pitch (grass pitch),and will plan for the developmentsubject to resource and landavailability.

Page 11: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DC Page 3PS125-00(1).doc

District Committee Date Subjects/Projects discussed Views of DC Department’s Responses/Remarks

Implementation of projects underplanning in North District

Special Projects:Regional Indoor Stadium Area 11AFanling/Sheung Shui

The department should increase theprovision of libraries to meet the demandof the growing population.

General enquiry on progress of projectsunder planning

Members expressed their strong view thatthe department should expedite the project.

According to existing planningstandards, one district library isplanned for 150,000 persons. Thereare at present 3 libraries (1 districtlibrary and 2 small library) in NorthDistrict serving 280,000 population.In addition, a new district library willbe provided in the Luen Wo Shuicomplex in Area 19 which is nowunder construction for completion in2002.

Progress of projects was reported.Members noted.

Project under planning with a numberof technical issues to be resolved.HAB to review policy of provision ofterritory-wide stadium.Implementation of the project will besubject to the outcome of the review.

Local Open Space in Areas 18 and 21Fanling/Sheung Shui

The department should expedite theimplementation of the project to meet theneeds of the growing population.

Members’ views are noted. DCwould be consulted on the scope ofdevelopment.

Page 12: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DC Page 4PS125-00(1).doc

District Committee Date Subjects/Projects discussed Views of DC Department’s Responses/Remarks

Tai Po DC – fullCouncilmeeting

7.3.20002.5.20004.7.20005.9.2000*

New Tai Po Civic Centre and the CentralLibrary

Members enquired about project progress.They said that the project had dragged onfor some years and members stronglyrequested the government to include theproject into the PWP. In this regard, DChad written to LegCo and the Cultural andHeritage Commission for assistance. DCmembers also met with representatives ofSHA in June to reflect the need andurgency of the project. Members alsoappealed to DLCS for implementation ofthis project when he attended DC meetingon 5.9.2000. DC members contemplatedto approach HK Jockey Club for fundingsupport.

The project has not been shortlisted asone of the 16 priority projectsrecommended for inclusion in PWP.There is a need to review the policy ofproviding more civic centres in HKhaving regard to the high capital andmaintenance costs and utilization rateof existing facilities. The impendingterritory-wide review does notcoverTai Po District alone. Tai PoDC will be consulted when theoutcome is available.

Culture andLeisureCommittee ofTPDC

19.1.200015.3.20009.5.200012.7.200012.9.2000

New Tai Po Civic Centre and the CentralLibrary

Members enquired about the projectprogress and requested regular report infuture meetings.

The project is not one of the 16priority projects recommended forinclusion in PWP. Implementation ofproject will be subject to a review onthe policy of providing more civiccentre in HK to be conducted by HAB.DC will be closely informed of detailsof the review and outcome.

Page 13: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DC Page 5PS125-00(1).doc

District Committee Date Subjects/Projects discussed Views of DC Department’s Responses/Remarks

DC – fullCouncilmeeting

5.9.2000* Progress on ex-PMC capital projects in TaiPo district

The department should expediteimplementation of projects approved by theformer Pro RC and report the progress to DCregularly.

The department would report progress tomembers at the Committee Meeting on14.11.2000.

Individuals projects :(a) Lung Mei Beach

There are no beach facilities in NT East.The department should provide an artificialbeach in Lung Mei.

A feasibility study was being conductedby Arch SD. DC consultation will bearranged when outcome of the study isavailable. This is not one of the 160ex-PMC projects.

(b) Football Pitch and Changing FacilitiesArea 5 Tai Po

DC members expressed disappointment atthe football pitch project which wasapproved by the former Pro RC but notimplemented by the department.

The department is in the process ofreviewing the scope of facilities and thepossibility of converting the 11-a-sidesoccer pitch into two 7-a-side soccerpitches.

(c) Golf Course in Shuen Wan Landfill Tai Po

The project has obtained sponsorship fromthe Hong Kong Jockey Club. Thedepartment should expedite itsimplementation.

Members’ views are noted.

Page 14: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DC Page 6PS125-00(1).doc

District Committee Date Subjects/Projects discussed Views of DC Department’s Responses/Remarks

SaiKung

DC – fullCouncilmeeting

27.6.2000 Development of leisure and culturalfacilities in Sai Kung district

Members raised concerns over(a) The development of Tseung Kwan O

(TKO) Complex if FEHD decided topull out the EH facilities in theproject, and

(b) The development of TKO landfillproject and scope of the facilitiesprovided.

(a) To date, the need and scope offacilitates of TKO Complex is stillunder review.

(b) DC will be consulted on the scopeof facilities and implementationprogramme.

DC – fullCouncilmeeting

3.10.2000* General planning issues DC members expressed concerns over theimplementation of the ex-PMC projects.

The department will plan and implementthe 8 projects taken over from the formerPro RC according to stipulatedprocedures of the Public WorksProgramme.

There is a shortage of sportsgrounds in theTseung Kwan O district. The departmentshould expedite the implementation of theproject.

The project in Tseung Kwan O Area 45comprises a sportsground, a town parkand an IRC. The project is still in anearly planning stage and noimplementation programme is availableat the moment.

Individual projects :(a) Sportsground in Area 45

Tsueng Kwan O

There is a shortage of sportsground facilityin the Tseung Kwan O district. Thedepartment should expedite theimplementation of the project.

The project in Tseung Kwan O Area 45comprises a sportsground, a town parkand an IRC. The project is still in anearly planning stage and noimplementation programme is availableat the moment.

Page 15: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DC Page 7PS125-00(1).doc

District Committee Date Subjects/Projects discussed Views of DC Department’s Responses/Remarks

(b) Tseung Kwan O Complex DC members understood that governmentdepartments were reviewing the scope offacilities in the proposed complex, theyexpressed concerns that LCSD would giveup part of the facilities during the review.

The project is still at preliminaryplanning stage and the joint userdepartments are reviewing the scope offacilities. The project is coordinated byGPA subject to its scrutiny on plot ratio. There is no implementation programmeat this stage.

(c) Civic Centre for Sai Kung District Area 66 Tseung Kwan O

A civic centre was planned for each districtby the former Pro RC. The departmentshould implement this policy and provide acivic centre for Sai Kung district.

Site formation and access road works arein progress. HAB is in the process ofreviewing the provision of civic centresin HK. At present, there is noimplementation programme for thisproject.

General planning issues There is a shortage of sportsgrounds in theClear Water Bay area. The departmentshould expedite the provision of asportsground. The department should alsoconsider the provision of facilities to meetthe needs of villagers in the relatively remoteareas when planning projects in future.

Members’ views are noted. Thedepartment will consider providingleisure facilities for residents in thedistrict when there are suitable ‘openspace’ sites for development

Sha Tin DC – fullCouncilmeeting

26.5.2000* The proposed water sports developmentat Whitehead

Members proposed that the departmentshould work closely with TerritoryDevelopment Department (TDD) to developrecreational facilities to meet local demand.

TDD is conducting a study on thehousing development in Whitehead.The department will work closely withTDD to provide recreational facilities asfar as possible to meet local demand.This is not one of the 160 ex-PMCprojects.

Page 16: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DC Page 8PS125-00(1).doc

District Committee Date Subjects/Projects discussed Views of DC Department’s Responses/Remarks

The two vacant sites near Kam FungCourt

The department should expedite thedevelopment of the two sites to providerecreation facilities to the residents.

The department intends to develop thesetwo sites with passive recreationfacilities under minor works projectsschemes. The proposed SOA for thetwo sites have already been forwarded toArch SD for rough cost estimates.

This is not one of the 160 ex-PMCprojects.

External Wall of Leisure and CulturalServices Headquarters in Shatin

The department should improve theappearance of the external wall of theheadquarters building.

The department will liaise with Arch SDon the proposed improvement of theexternal wall during annual maintenanceexercise.

This is not one of the 160 ex-PMCprojects.

General planning issues The department should review andstrengthen the monitoring of projects.

The department will relate the messageto Arch SD during the various projectprogress/project liaison meetings.

DC – fullCouncilmeeting

28.7.2000 Development of Ma On Shan Promenadeproject

Members urged the department to developthe water front promenade as soon aspossible. Temporary improvement worksshould also be considered if the projectwould not be proceeded in the near future.

This project is still at an early planningstage. The scope of facilities is beingreviewed. TDD has agreed toexplore the possibility of providingtemporary measures during theinterim.

Page 17: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DC Page 9PS125-00(1).doc

District Committee Date Subjects/Projects discussed Views of DC Department’s Responses/Remarks

KwaiTsing

DC – fullCouncilmeeting

9.3.2000 Report on the latest position of DistrictOpen Space in Area 9, Tsing Yi

General enquiry on the usage of thereclaimed land at North Tsing Yi andrequest for report of progress.

Members were informed that part ofthe reclaimed land would be theproject site for developing the DistrictOpen Space.

DC – fullCouncilmeeting

18.5.2000 Report on the latest position of DistrictOpen Space in Areas 3 and 8, Tsing Yi

Members enquired about theimplementation programme of the project.

Members were advised that this hasbeen recommended as one of the 16priority projects in PWP as Category Citems and planning would be takenforward according to PWP procedures.

DC – fullCouncilmeeting

13.7.2000 Report on the progress of ex-PMCscapital works projects under planning inKwai Tsing

Members enquired on the latest position ofthe 7 capital works projects under planningin Kwai Tsing district.

Members were advised that two ofthese projects namely, Kwai ChungPark Further Development andDistrict Open Space in Area 3 & 8,would be included into PWP asCategory C items and would be takenforward according to PWPprocedures. The Department wouldreview the remaining 5 projects onregular basis having regard to factorslike local demand and projectreadiness.

Planning andEnvironmentalProtectionCommittee ofKwT DC

19.6.2000 Report on the progress of IRC in Area9H, Kwai Chung and Kwai Chung Park -Further Development

Members enquired whether the IRCproject has been shelved. They alsoenquired about the scope of facilities ofKwai Chung Park - Further Development.

Members were advised that the IRCproject is at preliminary planningstage. Members’ suggestions on theproposed facilities of Kwai ChungPark Further Development were noted.

Page 18: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DC Page 10PS125-00(1).doc

District Committee Date Subjects/Projects discussed Views of DC Department’s Responses/Remarks

TsuenWan

Traffic andTransportCommittee ofTWDC

10.5.2000 Report on the progress of District OpenSpace and IRC in Area 25, Tsuen Wan

Members enquired about the scope offacilities under the project.

Members were informed of theproposed scope of facilities.

TWDC -WorkingGroup onVenue Matters

13.6.2000 Report on the progress of ex-PMCscapital works projects under planning inTsuen Wan

Members enquired about the progress ofex-PMCs capital works projects underplanning in Tsuen Wan.

Members were briefed on the latestposition of these projects.

Islands DC – fullCouncilmeeting

22.5.2000* General planning issues The department should providerecreational facilities to cater for the needof the growing population.

Of the 7 ex-PMC projects, twoprojects, namely, IRC cum library inArea 17 Tung Chung, and DistrictOpen Space in Area 7 Tung Chung,are among the 16 projectsrecommended by the department forinclusion into PWP as Category Citems. However, no implementationprogramme can be given at the presentstage. As regards the other 5projects, they are still in an earlyplanning stage and are not ready forinclusion in the PWP.

Page 19: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

Appendix D(ii)

An account of capital works projects discussed at DC meetingsUrban Districts

* DLCS’s visit to DC

PS127-00(3).doc

District Committee Date Subjects/Projects discussed Views of DC Department’s Response/Remarks

KwunTong

KTDC -Culture,Recreationand SportsCommittee

29.2.200025.4.200020.6.20005.9.2000

31.10.2000

Progress report on capital worksprojects under planning

Members requested early implementationof the former PUC projects as listed in theprogress report.

Members were assured that the formerPUC projects would be processed inaccordance with the procedures laiddown in the Public Works Programme

KTDC -Traffic andTransportCommittee

16.3.2000 Kowloon Bay Recreation Ground -proposed closure of a section of KaiLai Road falling in the site boundary.

Majority of the members accepted theproposed road closure and urged for earlyimplementation of the project.

We would report to LegCo Sub-committee and follow up withdepartments concerned on DC'sadvice.

KTDCEnvironmentand HealthCommittee

12.9.2000 Improvement to Lok Wah Playground Members urged for early implementationof the project. To facilitate constructionworks, they would allow constructionvehicles to use the estate road during theworks period.

The project is under active planning.We would work with Arch SD toimprove firstly the urgent parts of thePlayground under minor works.

DC – FullCouncilmeeting

16.10.2000* 'Green promenade' in Kwun TongDistrict

There is a lack of ‘green promenade’ inKwun Tong District.

Part of the site in the proposed greenpromenade, such as Kwun TongRecreation Ground, Laguna Park, SinFat Road Tennis Courts, has alreadybeen developed into open space area.We would convey members' view toPlanning Department and willcontinue to identify suitable locationsfor providing a green environment.

Page 20: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DCPage 2

PS127-00(3).DOC

District Committee Date Subjects/Projects discussed Views of DC Department’s Response/Remarks

Lam Tin Service Reservoir The department should consider to convertLam Tin Service Reservoir into a centralpark.

Lam Tin Service Reservoir is underthe management of Water ServiceDepartment. We will discuss withdepartments concerned regarding theprovision of a park at the top of theservice reservoir.

General issue There are no civic centres or large scaleindoor performing venues in Kwun Tong.The department should reserve site for thebuilding of a city hall.

HAB and LCSD are in the process ofreviewing the overall policy of theprovision of civic centres in theterritory. The review will considerthe utilization rate, public demand,community need, site and scope offacilities. During the review, viewsfrom DCs and their CulturalCommittees will be sought.

Recreational Development at JordanValley Landfill

The department should expedite thedevelopment of an ecological park atJordan Valley Landfill

This is one of the priority landfilldevelopment projects. The HongKong Jockey Club has agreed tofinance part of the project cost and theEnvironmental Protection Departmenthas agreed to undertake the project andhas completed a consultancy study onthe development. We are consideringto include this project in the PublicWorks Programme as a Category Citem.

Page 21: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DCPage 3

PS127-00(3).DOC

District Committee Date Subjects/Projects discussed Views of DC Department’s Response/Remarks

Improvement to Kwun TongSwimming Pool

The department should expedite theproject to convert the pool into indoorheated pool.

The department is following up withArch SD and is reviewing thesuitability for including the projectinto the Public Works Programmetaking into consideration betterresource allocation.

Lam Tin Park (Phase II)(i.e. Ma Yau Tong Central Landfill)

Members requested to expedite thedevelopment of the project to meet theneed of residents in Lam Tin and Sau MauPing.

There are 4 landfill sites in KwunTong, namely, Sai Tso Wan, JordanValley, Ma Yau Tong West, Ma YauTong Central (Lam Tin Park Phase II).EPD has agreed to manage thedevelopment of two priority landfillsites in Sai Tso Wan and Jordan Valley,and has engaged a consultant to studythe development programme of thesetwo priority landfill sites. Theconsultancy study is in progress.After EPD has gained experience frommanaging the two priority landfillsites, the department will furtherdiscuss with EPD on the developmentof the remaining sites.

Library facility in Lam Tin FamilyLeisure Centre

Members requested the provision of adistrict library in Lam Tin.

Housing department has reserved asite for the development of the LamTin Family Leisure Centre after 2002.We would follow up the projectaccording to the procedures of thePublic Works Programme, and wouldreview the scope of facilities includinglibrary services to meet the need of thecommunity.

Page 22: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DCPage 4

PS127-00(3).DOC

District Committee Date Subjects/Projects discussed Views of DC Department’s Response/Remarks

ShamShui Po

SSPDC -CommunityAffairs,Leisure andCulturalServicesCommittee

25.5.20006.7.2000

Progress report on capital worksprojects under planning in SSP district

Members pressed for early implementationof the former PUC projects as listed in theprogress report. They also proposed someimprovements to the layout design of theproposed children’s playground in TaiHang Tung Estate.

Members were assured that the formerPUC projects would be processed inaccordance with the procedures laiddown in the Public Works programme.We also agreed to revise the layoutdesign of the children’s playgroundtaking into members’ suggestions.

SSPDCEnvironmentand FoodCommittee

26.9.2000 Fuk Wing Street Complex - proposalto provide temporary park facilities onthe project site.

In view of the shortage of open spacefacilities in the vicinity, a temporary parkshould be provided on the vacant site.

We explained that the site isdesignated for the Fuk Wing StreetComplex project, the facilities ofwhich is still under review by FEHDand LCSD. We noted that DLO/KWis now considering temporary use ofthe site for a fee paying car park.

DC – FullCouncilmeeting

5.10.2000* General Issue There is a lack of vitality in the leisurefacilities. The department should makereference to examples in other countriesand include different kinds of activities inone facility. It may also considerconverting existing facilities into themeparks.

We would consider to provide versatilefacilities according to the needs in adistrict. We would also seek viewsfrom DC members on the projectscope.

Lai Chi Kok Park - proposal toprovide a cover for the amphitheatre

There is a lack of performing art venue inthe district. Members proposed to addcover and seating to the amphitheatre inLai Chi Kok Park.

A feasibility study will be conductedby Arch SD. We would reportprogress to DC members.

(This is not one of the 160 ex-PMCprojects.)

Page 23: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DCPage 5

PS127-00(3).DOC

District Committee Date Subjects/Projects discussed Views of DC Department’s Response/Remarks

Improvement to existing facilities Apart from providing new facilities, fundsshould be reserved for improvement ofexisting facilities

We would work closely with DistrictLeisure managers in improvingexisting facilities. We also welcomesuggestions by DC members regardingimprovement works.

Improvements to Cheung Sha WanPlayground

In planning the improvement works, thedepartment should reserve sufficient areafor the park to be used as a night marketduring Chinese New Year.

We would consider members’ view.At present, the project is still atpreliminary planning stage.

Proposal to combine the Lei ChengUk Han Tomb Garden and the HanGarden

There are few exhibits in the Lei ChengUk Han Tomb Museum. The departmentshould consider combining the tombgarden and the neighbouring Han Garden,and display more exhibits apart from thosefrom the tomb.

The Han Garden is under themanagement of the HousingDepartment(HD). HD has recentlyproposed handing over the garden toLCSD. The department is currentlyreviewing the proposal.

(This is not one of the 160 ex-PMCprojects.)

Request for more performing artvenues

There is a lack of performing art venue inSSP district. The department shouldexpedite the implementation of a civiccentre project in Fortune Street asproposed by PUC.

The Administration is reviewing thelong-term policy for the provision ofcivic centres in the territory and willseek views from DCs and CultureCommittees.

Progress on projects approved by theex-PUC

Members were concerned about theimplementation of projects approved bythe PUC.

These are ex-PUC projects at planningstage and without approved fundings.They will be processed according tothe procedures set out in the PublicWorks Programmes.

Page 24: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DCPage 6

PS127-00(3).DOC

District Committee Date Subjects/Projects discussed Views of DC Department’s Response/Remarks

Fuk Wing Street Complex - proposalto provide temporary park on theproject site

Members requested to provide temporarydevelopment on the project site

The department is holding discussionswith Lands Department and SSPDistrict Office regarding thetemporary use of the project site, andwill report to DC shortly.

(This is not one of the 160 ex-PMCprojects.)

CentralandWestern

C&WDC -WorkingGroup on SunYat SenMemorialPark

30.3.200030.5.20003.8.2000

Sun Yat Sen Memorial Park Members requested early implementationof the project, and proposed temporarydevelopment of the project site pendingconstruction of the project.

We briefed Members of the progressof this project, explaining that as theproject site is separated from theadjacent residential and commercialarea by highways and flyover, it isnecessary to improve the accessibilityfirst. We are now liaising with TDand Plan D to explore ways and meansfor improvement.

We would also consider providingtemporary recreational facilities on thesite under a minor works item.

DC – FullCouncilmeeting

19.7.2000* Sun Yat Sen Memorial Park Members pressed for early implementationof the project and made proposals toimprove the accessibility of the projectsite.

Members’ view was noted. Theywere informed of our response above.

Members maintained the initial proposal todevelop the park to commemorate Dr. SunYat Sen.

The department noted the views of theDC members which will be taken intoconsideration in our further planningof this project.

Page 25: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DCPage 7

PS127-00(3).DOC

District Committee Date Subjects/Projects discussed Views of DC Department’s Response/Remarks

Members reiterated the proposal to buildan indoor pool in the park.

The department noted the views of theDC members which will be taken intoconsideration in our further planningof this project.

Southern SDC -Capital WorksCommittee

6.3.200017.4.200012.6.200024.7.200030.10.2000

Progress on works projects inSouthern District

Members made enquiries onimplementation programme, project scope,proposed facilities and constructionslippage, etc.

We provided detailed information tothe DC.

DC – FullCouncilmeeting

29.6.2000 Stanley Complex Members requested for the provision ofIGH and library in this project.

We informed members that theproposed facilities in this project werebeing reviewed. We would consultthe DC on the outcome of our review.

Eastern DC – FullCouncilmeeting

13.7.2000 Request for early implementation ofthe Aldrich Bay Complex

The project scope was approved by ex-PUC and should be implemented asoriginally planned

This is a joint project providing FEHDand LCSD facilities. We explained toDC that FEHD was planning toprovide a new market in Aldrich Bay.LCSD would provide a new library inLei King Wan. Since there is an IGHin Sai Wan Ho and a new leisurecentre is coming up soon, there is noimmediate need for an additional IGH.

EDC – WorksDevelopmentCommittee

6.7.20005.10.2000

Aldrich Bay Complex - request for adistrict library.

Members were concerned about theprovision of a district library in a joint-userproject at Lei King Wan in lieu of the oneoriginally proposed for the Aldrich BayComplex.

Members noted that we are followingup with Arch S.D. on the operationalrequirements of a district library

Page 26: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DCPage 8

PS127-00(3).DOC

District Committee Date Subjects/Projects discussed Views of DC Department’s Response/Remarks

DistrictManagementCommittee

2.5.200027.6.200022.8.200017.10.2000

1. Quarry Bay Park Phase II Stage II& III;

2. Proposed district library in LeiKing Wan

Members requested early implementationof the project and considered that there is aneed to provide a district library in LeiKing Wan.

1. We explained that the project is ata very preliminary planning stage.Moreover, Plan D would conduct aland use review in the concernedarea. We would k.i.v. the resultof the review.

2. We reported on the planningprogress of the district library.

DC - FullCouncilmeeting

13.7.2000

EDC -CommunityBuilding andServicesCommittee

24.7.2000

)))))))))

Siu Sai Wan Complex Members requested early implementationof the project

We informed that the proposed leisureand cultural facilities for this projectare being reviewed. Initially weconsidered the provision for an IGHand a small library necessary. Wewould report further on this project.

Page 27: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DCPage 9

PS127-00(3).DOC

District Committee Date Subjects/Projects discussed Views of DC Department’s Response/Remarks

Yau TsimMong

DC – FullCouncilmeeting

1.2.2000 Tai Kok Tsui Complex - Proposal torelocate the swimming pool facilities.

Members noted the potential danger ofplacing the pool facilities on the highfloors of the Complex under the originaldesign, but were concerned that anychange to the design would jeopardizeearly implementation of the project.

A Working Group was set up to study theissue.

We are keen to implement the projectand would work with the WorkingGroup to study the relocation proposal.The finding of the Working Groupwould be reported to the LegCo’sSub-Committee.

YTMDC -WorkingGroup on TaiKok TsuiComplex

3.3.200025.4.2000

To study the relocation proposal forthe pool facilities in Tai Kok TsuiComplex.

After considering the pros and cons ofalternative proposals, the Working Groupopted to retain the pool in the Complex butrequested the Department to work outadministrative measures to ensure orderand public safety.

We proposed effective measures toimprove pool management which wereaccepted by the Working Group. Weproceeded to upgrade the Complexproject as Cat. A items in PWP in May2000.

DC – FullCouncilmeeting

29.6.2000 Review on the provision of open spacein Mong Kok - Cherry Street Park

Members of YTMDC urged to expeditethe development programme of the openspace sites at Yau Tsim Mong District,particularly, the Cherry Street Park.

We noted DC's concern and wouldreview the development programme ofCherry Street Park.

YTMDC -WorkingGroup on TaiKok TsuiComplex(Phase 2)

15.8.2000 Control of nuisance during theconstruction of the Tai Kok TsuiComplex

In view of the close proximity of theschools nearby, Members of the WorkingGroup expressed concern over the noiselevel of the construction works. Theysuggested enhancing the noise mitigationmeasures.

We explained that the requirement foreffective noise mitigation measureswould be included in the tenderdocument for the building contract.

Page 28: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DCPage 10

PS127-00(3).DOC

District Committee Date Subjects/Projects discussed Views of DC Department’s Response/Remarks

DC – FullCouncilmeeting

24.8.2000* Provision of large-scale sportsgrounds There is a shortage of large-scalesportsground in the district. Thedepartment should provide onesportsground in the West KowloonReclamation area.

According to the South West KowloonOZP, sites have been reserved fordevelopment of IGH/IRC in WestKowloon Reclamation area withinYTM district boundary but notsportsground.

(This is not one of the 160 ex-PMCprojects.)

Provision of additional swimmingpool facilities in the district

Kowloon Park Swimming Pool is the onlyswimming pool facility in the district.The department should provide additionalswimming pools in the district.

A training pool and a leisure pool willbe provided inside the Tai Kok TsuiComplex the construction of whichwill begin in December 2000 forcompletion by mid 2004.

Communication with DCs The department should strengthen itscommunication with DCs, for example, byarranging meetings between DC membersand senior officers of the department.

DC’s comments were noted. Undercurrent practice, officers in thePlanning Section will attend DCmeetings when issues discussed touchon planning matters, whereasrepresentatives of operation branchesconcerned will attend meetings whenissues discussed touch upon provisionof facilities and venues in districts.Where issues discussed requirepolicy/operational and planning inputs,representatives of operation branchesconcerned and planning officers ofPlanning Section will attend themeetings jointly.

Page 29: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DCPage 11

PS127-00(3).DOC

District Committee Date Subjects/Projects discussed Views of DC Department’s Response/Remarks

Wong TaiSin

DC – FullCouncilmeeting

30.5.2000* The department should renovate andimprove facilities, such as, the Morse ParkSwimming Pool.

We have an on-going programme torenovate and improve its existingfacilities. For example, a series ofimprovements works have been carriedout for the Morse Park Swimming Poolin the past years. Earlier this year, wehave also installed hot water supply forsome of the showers in the changingroom. On the other hand, we havescheduled to replace the equipment inthe toilets later this year to furtherimprove the sanitary condition of theswimming pool. We will continue tolook for areas for improvement inorder to provide quality services to thepublic.

(This is not one of the 160 ex-PMCprojects.)

Proposal to construct more watersports centres

There are only 4 water sports centres in theterritory. Members proposed to constructa water sports centre in Ma On Shan area.

In view of the current utilization rate ofthe water sports centres and theupcoming new facility at Stanley MainBeach, we will have to assess criticallythe need to provide another one in MaOn Shan as suggested by the WTS DCmembers in due course.

(This is not one of the 160 ex-PMCprojects.)

Page 30: LC Paper No. CB(2) 194/00-01(01) For information on 10.11 ...

* DLCS’s visit to DCPage 12

PS127-00(3).DOC

District Committee Date Subjects/Projects discussed Views of DC Department’s Response/Remarks

Members requested for progress report onnew projects with construction tocommence soon.

For new projects in WTC Districtwhich are under construction or to beconstructed shortly, the PlanningSection will prepare a progress andpass it to WTS DC for information.DLM(WTS), the departmentalrepresentative on WTS DC will helpexplain the details, wherevernecessary.

The department should construct moresportsgrounds and facilities to promotesports.

There are at present 17 projects underconstruction and another 11 will startconstruction soon or are under activeplanning. Among them, Hammer HillRoad District Park is a major oneunder active planning in Wong Tai SinDistrict.

Note : No issues related to capital works and planning matters were raised at DLCS’ visit to Wanchai and Kowloon City DCs.