LBT Q2 2007 Engineering Review

7
LBT Q2 2007 LBT Q2 2007 Engineering Review Engineering Review TER TER Tertiary Mirror Units Tertiary Mirror Units

description

LBT Q2 2007 Engineering Review. TER Tertiary Mirror Units. Summary. Polish mirrors Coat mirrors Attach loadspreaders Integrate M3 assemblies Coordinate s/w dev Acceptance test units Install on telescope. Highlights (Q3/2007). SX unit installed on telescope  - PowerPoint PPT Presentation

Transcript of LBT Q2 2007 Engineering Review

Page 1: LBT Q2 2007 Engineering Review

LBT Q2 2007 Engineering LBT Q2 2007 Engineering ReviewReview

TERTER

Tertiary Mirror UnitsTertiary Mirror Units

Page 2: LBT Q2 2007 Engineering Review

26-Oct-200726-Oct-2007 LBT Q3 2007 Engineering RevieLBT Q3 2007 Engineering Revieww

SummarySummary Polish mirrorsPolish mirrors Coat mirrorsCoat mirrors Attach loadspreadersAttach loadspreaders Integrate M3 Integrate M3

assembliesassemblies Coordinate s/w devCoordinate s/w dev Acceptance test unitsAcceptance test units Install on telescopeInstall on telescope

Page 3: LBT Q2 2007 Engineering Review

26-Oct-200726-Oct-2007 LBT Q3 2007 Engineering RevieLBT Q3 2007 Engineering Revieww

Highlights (Q3/2007)Highlights (Q3/2007)

SX unit installed on telescope SX unit installed on telescope Both mirrors integrated with supports Both mirrors integrated with supports

Cabling completed and reterminated Cabling completed and reterminated

Basic software test completed Basic software test completed

Page 4: LBT Q2 2007 Engineering Review

26-Oct-200726-Oct-2007 LBT Q3 2007 Engineering RevieLBT Q3 2007 Engineering Revieww

Open IssuesOpen Issues

TechnicalTechnical Software not certified safeSoftware not certified safe Mirror installationMirror installation

Schedule/FinancialSchedule/Financial Pending software and need Pending software and need

ResourceResource Support needed for mirror installSupport needed for mirror install

Page 5: LBT Q2 2007 Engineering Review

26-Oct-200726-Oct-2007 LBT Q3 2007 Engineering RevieLBT Q3 2007 Engineering Revieww

Progress (Q3/2007)Progress (Q3/2007)

Loadspreader mounting (complete)Loadspreader mounting (complete) Software development (at milestone?)Software development (at milestone?)

Cannot be completed until both units Cannot be completed until both units installedinstalled

No further work/testing planned in 2007No further work/testing planned in 2007 Integration (SX nearly complete)Integration (SX nearly complete) Installation (SX unit installed)Installation (SX unit installed)

Page 6: LBT Q2 2007 Engineering Review

26-Oct-200726-Oct-2007 LBT Q3 2007 Engineering RevieLBT Q3 2007 Engineering Revieww

Progress (Q3/2007) cont.Progress (Q3/2007) cont.

SX wiring (complete)SX wiring (complete) Remove mirror cells (complete)Remove mirror cells (complete) Mount mechanisms to telescope (SX Mount mechanisms to telescope (SX

done)done) Loadspreader mounting (complete)Loadspreader mounting (complete) Mirror installation (Pending decision)Mirror installation (Pending decision) Commissioning (Pending)Commissioning (Pending)

Page 7: LBT Q2 2007 Engineering Review

26-Oct-200726-Oct-2007 LBT Q3 2007 Engineering RevieLBT Q3 2007 Engineering Revieww

Planning (Q4/2007)Planning (Q4/2007)

Pre-glass safety reviewPre-glass safety review Install SX mirror (depends on need)Install SX mirror (depends on need) Commissioning?Commissioning? Perform acceptance tests (requires Perform acceptance tests (requires

s/w)?s/w)? Operations to complete power to Operations to complete power to

UMACSUMACS