LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

21
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009

Transcript of LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

Page 1: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

LBA Calibrator Survey

Chris Phillips

eVLBI Project Scientist

23 July 2009

Page 2: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

ATCA

Hobart

Sydney

Ceduna

ASKAP

The LBA

Perth

Melbourne

Tidbinbilla

Mopra

Parkes

Page 3: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

The LBA

• 6 telescopes within Australia• Parkes, 64m• ATCA, 5x22m phased array• Mopra, 22m• Hobart, 26m• Ceduna, 30m• Tidbinbilla, 34m&70m

• Also • Hart, Kokee, TIGO, O’Higgins, Shanghai, Kashima

• 1-20 GHz • Data rates up to 1 Gbps

• LBADR recording system (Mark5b mode)• eVLBI up to 1 Gbps

• Pa, At, Mp, Ho (64-128 Mbps)

CSIRO. eVLBI-Aus

Page 4: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Page 5: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

LBA Operations

• Coordinated VLBI for 3 weeks/year• 3-4 dedicated sessions/year

• Fixed schedule• Actual schedule depends on experiment request

and TAC grading

• Correlated using DiFX• Correlation contracted to Curtin University

(Steve Tingay, Cormac Reynolds, Hayley Bignall)

CSIRO. eVLBI-Aus

Page 6: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

LBA - Future

• Wide band DAS• 1-2 GHz• ATCA CABB commissioned• DFB3 Pulsar Backend for Parkes/ATCA

• AuScope• 3x12m for geodesy• WA, NT and Tasmania• S/X only• No operational funds for astronomy

CSIRO. eVLBI-Aus

Page 7: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Page 8: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

ASKAP

• Number of dishes 36 • Dish diameter 12m• Max baseline 6km• Resolution 30 • Sensitivity 65 m2/K

• Observing frequency 700 – 1800 MHz• Field of View 30 deg2

• Processed Bandwidth 300 MHz

• Multiple VLBI beams• Up to 30, requested at least 2

• Combined with cluster-cluster VLBI at other stations

• Parkes multibeam, ATCA array, Hobart 12mCSIRO. eVLBI-Aus

Page 9: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

LBA Astrometry

• Adam Deller’s PhD Thesis• Parallaxes to 7 pulsars

• J0437-4715: Most accurate pulsar distance to date

• 1E 1547.0–5408 magnetar propermotion• 6.7 GHz methanol maser parallax

• H20 maser proper motion in LMC

CSIRO. eVLBI-Aus

Page 10: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

LBA Astrometry – The Problem

CSIRO. eVLBI-Aus

Page 11: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

AT20G

• All Southern sky 20 GHz survey• South of Dec 0

• 8 GHz bandwidth• Analog correlator

• 3 antenna• Sensitivity limit ~50 mJy

CSIRO. eVLBI-Aus

Page 12: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

Survey Design

• Wideband (8 GHz) analogue correlator

• Fast scan rate: 15°/min at meridian

• Follow-ups at 4.8, 8.6 & 20 GHz to confirm detection and for spectral info

Page 13: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

Survey Parameters

SurveyFrequency

(GHz)Source

#Area

(sq. Deg.)Slim(mJy)

Taylor et al. 2001 15 66 60 20

9C (Waldram et al. 2003 - 2007)

15 (22, 43) 465 520 25

WMAP (Wright et al. 2008) 23, 33, 41, 61, 94

390 Full Sky (40000)

1000

AT20G 20 (4.8,8.6) 5800 ½ Sky (20000) 50

Page 14: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

LBA Calibrator Survey

• Using AT20G as a basis for sample to increase density of Southern calibrators

• σ > -0.55• S(8.4 GHz) > 190 mJy• Dec < -40

• Correlated at Bonn• Native Mark5A, Mark5B, translated Mark5b

shipped electronically• Processed with CALC/Solve by Leonid Petrov

• 8 GHz only – limited by LBA DAS• 4x 24hr observed

• 3x 24hr correlated/analyzed

CSIRO. eVLBI-Aus

Page 15: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

LBA Calibrator Survey - Results

• 422 new sources observed• 326 processed• 317 detections

• 97.2% detection rate

• 4 more epochs proposed

CSIRO. eVLBI-Aus

Page 16: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

Results

CSIRO. eVLBI-Aus

BeforeNowFinal

Page 17: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

Results

CSIRO. eVLBI-Aus

Page 18: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

Probability of Close Calibrator

Zone [-90, -40] [+40, +90]

Jan 2008 Now 2010 Now

2deg radius 21.2% 57.8% 78.0% 73.4%

3deg radius 41.2% 84.4% 96.2% 95.0%

4deg radius 60.5% 96.0% 99.5% 99.6%

# objects 163 517 1000 721

CSIRO. eVLBI-Aus

Page 19: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

Results – Formal Errors

CSIRO. eVLBI-Aus

Page 20: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

Compactness

CSIRO. eVLBI-Aus

Page 21: LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.

Contact UsPhone: 1300 363 400 or +61 3 9545 2176

Email: [email protected] Web: www.csiro.au

Thank you

ATNFChris PhillipseVLBI Project Scientist

Phone: +61 2 93724608Email: [email protected]: www.atnf.csiro.au/vlbi