Laying a new pipeline

11
Laying a new pipeline A pictorial story

description

Laying a new pipeline. A pictorial story. Where it begins: a proving slot. The proving slots are small trenches dug at regular intervals so that it can be “proved” as to what pipes and other services are actually in the ground and exactly where these items are. Safety Equipment. - PowerPoint PPT Presentation

Transcript of Laying a new pipeline

Page 1: Laying a new pipeline

Laying a new pipeline

A pictorial story

Page 2: Laying a new pipeline

Where it begins: a proving slot

The proving slots are small trenches dug at regular intervals sothat it can be “proved” as to what pipes and other services are actually in the ground and exactly where these items are.

Page 3: Laying a new pipeline

Safety Equipment

Safety vests and appropriate protective equipment are suppliedto local labour on the project

Page 4: Laying a new pipeline

Trenching begins

Solid rock bringsout the Jackhammer

Excess material is removed asquickly as possible to designated holding sites

Heavy machineryis available asneeded

Page 5: Laying a new pipeline

Road crossings

Cutting the strip

Road closure for safety’s sake

And the dust fliesas the cuts are made

Page 6: Laying a new pipeline

Laid pipe showing householderconnection

3 way join with tee valves in place

Pipe laying in progress

Trench also contains other services

Pipe laying

Page 7: Laying a new pipeline

Pipes and the consumer

Barricading open trenchesFor safety purposes Waiting to be

connected

To consumersmeter

Preparing trenches tocarry connection toconsumers

Page 8: Laying a new pipeline

Reinstatement

Closing the trench

Temporary road reinstatement

Consumers driveway being reinstated

Page 9: Laying a new pipeline

Reinstating a road

Traffic Control

Preparations forreinstatement

Applying a primingagent

The Bitumenarrives

Spreading theasphalt

And lastly compaction

Page 10: Laying a new pipeline

And soon to be as good as new!

Page 11: Laying a new pipeline

And finally when all is donePressure Testing takes place to

check for leaks

Water is pumped into the system under pressure and the whole system checked for leaks. Only after this will the new system “take over” from the old