Launch Readiness Review Team Name
-
Upload
datherine-cooper -
Category
Documents
-
view
51 -
download
0
description
Transcript of Launch Readiness Review Team Name
Launch Readiness ReviewTeam Name
University/Institution
Team Members
Date
• User notes:
– This template shall be followed as closely as possible.
– Deviations from this template will make it hard to assess your flight readiness. Without an understanding of your level of flight readiness, your chances of being awarded a primary position will be decreased.
• Show off your payload– Pictures of your payload– Pictures of your team with the payload– Pictures of anything else that you think would be good/fun to show off
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
Type of Restriction Restriction Status
Mass allotment: <= your allotment
Volume allotment: <= your allotment
The payload’s center of gravity (CG): In 1”X1”X1” envelope of centroid?
Activation met under requirement: (either 1.SYS.1 or 1.SYS.2)
Yes?
Structure mounts: Top and bottom bulkheads. No
mounts to sides of cans.
Sharing: Fully developed?
• Where are you at on integration?• Do you have a plan
– What is it?– What areas worry you?
• Mitigation?
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
• Any updates on testing– Pictures, plots, etc (may not be required if your payload has
been complete and presented prior to this reviews)
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
• Most important slide! (or two or three)• Are you ready?• What is ready?• What isn’t ready?• Why aren’t certain areas ready (if applicable)
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
• Action Items from now until June 17th!!– If you aren’t ready, will you be ready?
• How are you going to ensure you are ready?
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
• Are you ready for Wallops?– What tools do you plan to bring?– What tools are you assuming you have at your disposal?– Are you brining extra hardware?
• Come prepared!
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
• Have you went through the procedure?• Do you have questions?• Will you come prepared to ACE it?
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A
• Do you have a clear idea of how the week of integration/launch will go?
• What other questions do you have?
User Guide ComplianceFinal Payload Integration Update/Plan Testing Results
Level Of Readiness Required Tools Inspections Q/A