Launch InVesta Green Gas 2.0/Milena Biomass Gasification Europe Alkmaar, 2 October 2014 Britta van Boven

description

Presentation given Biomass Gasification Europe 2014 at the Conference of the European Biogas Association 2014.

Transcript of Launch InVesta - Britta van Boven

Page 1: Launch InVesta - Britta van Boven

Launch InVesta Green Gas 2.0/Milena

Biomass Gasification Europe

Alkmaar, 2 October 2014

Britta van Boven

Page 2: Launch InVesta - Britta van Boven
Page 3: Launch InVesta - Britta van Boven

BioSNG will be an important cornerstone of a renewable energy mix

Source: Routekaart Hernieuwbaar Gas, June 2014

Renewable gas -  Heating and electricity

production -  Backup for renewable

electricity -  Feedstock for industry -  As a transport fuel: CNG and

LBG

-  Expected demand for renewable gas supersedes local biomass potential for anaerobic digestion

-  Future import of sustainable biomass

-  BioSNG and gasification as the most energy and cost efficient solution

Page 4: Launch InVesta - Britta van Boven

Green Gas 2.0 (Milena) project

Present

R&D Refinements

Operation (Alkmaar)

Build demo 4MW plant

Final plan and FID decision

Consortium building and commercial negotiations

Successful R&D and lab scale test, small

demo*

Near Future Future steps Past

Selling licences

Launching customer

50- 100MW plant

Analyses & review, build-up of consortium

GG 2.0

2015 2017 2014 20xx 20xx 20xx 2011 2012 2014 2014

Assignment of TKI and SDE+

subsidies

*Gasification and cleaning on small demo scale, gas upgrading on lab scale

Installation Alkmaar, Green Gas 2.0

-  4 MW Milena gasifier -  Capex: ca. EUR 23 mln -  Location: Alkmaar, NL -  Input material: sustainable woodchips -  Output: ca. 2,8 MW biomethane for injection in local grid -  Partners: Gasunie, Dahlman, Taqa, ECN, (PDENH), (HVC)

Enabling competitive large-scale biomethane production

Page 5: Launch InVesta - Britta van Boven

4MW MILENA gasifier for Alkmaar

Gasification Methanation and gas

upgrading

Cleaning (tar removal)

MILENA OLGA SNG

CH4

§  4 MW installation to be build in NL for GG 2.0

§  Possibly to be tested with OLGA in Portugal for project in Alkmaar

§  4MW installation is in place in Portugal

§  Existing installation available for test

§  New OLGA installation to be build in Alkmaar for GG 2.0 project

§  4 MW added in Alkmaar as part of GG 2.0 project

Lab scale installation in Petten

0,8 MW installation in Petten

4 MW installation in Portugal