Large Scale CCS in the Yorkshire/Humber Area: 1 … Scale CCS in the Yorkshire/Humber Area: 1-Year...

15
Large Scale CCS in the Yorkshire/Humber Area: 1-Year On Steve Furnival The Don Valley CCS Project is co-financed by the European Union’s European Energy Programme for Recovery The sole responsibility of this publication lies with the author. The European Union is not responsible for any use that may be made of the information contained therein.

Transcript of Large Scale CCS in the Yorkshire/Humber Area: 1 … Scale CCS in the Yorkshire/Humber Area: 1-Year...

Large Scale CCS in the Yorkshire/Humber

Area: 1-Year OnSteve Furnival

The Don Valley CCS Project is co-financed by the European Union’s European Energy Programme for Recovery

The sole responsibility of this publication lies with the author.

The European Union is not responsible for any use that may be made of the information contained therein.

Twelve Months Ago …

Discussed work to date in characterising 5/42

After several years of screening work, identified massive

saline aquifer in Bunter Sandstone of UK SNS

Seismic, two well penetrations plus surrounding wells

Since then

Have drilled & tested UK’s first dedicated CCS appraisal

well, 42/25d-3 funded by EEPR & ETI

Aim here is to discuss these developments

2

CCS Infrastructure: Yorkshire & Humber

The Don Valley CCS Project is co-financed by the European Union’s European Energy Programme for Recovery

The sole responsibility of this publication lies with the author.

The European Union is not responsible for any use that may be made of the information contained therein.

5/42 Top Bunter Depth Surface

4

200 – 250 m thick

Enough information

to put together a

storage plan?

Not yet!

Need appraisal well

42/25d-3

DECC awarded UK’s first

CCS appraisal well licence

in Nov 2012

Drilled/tested Jun/Jul 2013

5

“The goal of the characterization

of the storage site and complex

is to assess the site’s capacity,

injectivity, hydrodynamics, containment

and monitorability in order to ensure

safe and permanent storage of CO2”

EU CCS Guidance

Need to know - Predrill

Containment

Seal characteristics, permeability, strength and continuity

Faulting

Well penetrations

Capacity

Structure

Reservoir characterisation (porosity/permeability)

Depth

Compartmentalisation/connected volumes

Injectivity

Reservoir quality

Near well bore effects

Little knowledge

Significant

knowledge

Well understood

Data Acquisition

7

The most comprehensive

data gathering program

in a UK well for years

Logs

Conventional

GR, Resistivity & Neutron (Standard) & Density (for G/M)

Special

Dipole Sonic (Shear Velocity), UBI & OBMI (Fractures)

Spectral GR (Shales)

NMR (Future K-Pred)

ECS (Minerals)

8

MDT-1

Pressure

Measure Mobility = K/

Know hence K

Results match regional K()

Sampling

Samples from 3 Depths

PPM vs. Depth

Minerals & Isotopes

9

MDT-2

Mini-Frac

1xCap Rock &

1xLower Bunter

Vertical Interference

Test (VIT)

Measure KV & KH in

UB, MB & LB

10

Linear - Fracture

2350

2360

2370

2380

2390

2400

2410

2420

p (

psi(

a))

0.800.840.880.920.961.001.041.081.121.161.201.241.281.321.361.401.441.481.52

Superposition Linear Time (t1/2) (h)

pdata

History

2330

2340

2350

2360

2370

2380

2390

2400

2410

2420

Pre

ssu

re (

psi(

a))

0

1

2

3

4

5

6

7

8

9

10

11

Liq

uid

Rate

(bb

l/d)

0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.20 2.40 2.60 2.80 3.00 3.20 3.40 3.60 3.80 4.00 4.20 4.40 4.60 4.80 5.00

Time (h)

pdata

qwater

Radial

2350

2360

2370

2380

2390

2400

2410

2420

p (

psi(

a))

1.0101102103104 2345678234567823456782345678

Superposition Radial Time (t) (h)

pdata

Analysis 1

kh 1192.5443 md.ft

h 100.000 ft

k 11.9254 md

s' 113.751

p* 2428.7 psi(a)

Typecurve

10-2

10-1

1.0

101

2

3

4

6

2

3

4

6

2

3

4

6

p

/q,

Deri

vati

ve (

psi/

(bb

l/d

))

10-4 10-3 10-2 10-1 1.0 1012 3 4 5 6 7 8 2 3 4 5 6 7 8 2 3 4 5 6 7 8 2 3 4 5 6 7 8 2 3 4 5 6 7 8

Real Time (h)

p/qdata

Derivativedata

Spherical -1/2

hp 3.2 ft

kS 12.9288 md

rS 0.676 ft

s' 0.161

Radial 0

k 11.9254 md

s' 113.751

p* 2428.73 psi(a)

DST

11

Period Time Rate

[hours] [stb/d]

Produce 24 5000

Shut-In 48 0

Inject 3 -5000

Inject 3 -10000

Inject 3 -15000

Fall-Off 12 0

Test Design

Post Drill Status

Containment

Seal characteristics, permeability, strength and continuity

Faulting

Well penetrations

Capacity

Structure

Reservoir characterisation (porosity/permeability)

Depth

Compartmentalisation/connected volumes

Injectivity

Reservoir quality

Near well bore effects

Little knowledge

Significant

knowledge

Well understood

Going Forward - FDP & MMV

13

Static Dynamic

Geomech

VIT Fluids

Pressures

Mini-Frac

Logs

DST

Core

4D Synthetic Seismic

Conclusions

Regional studies show saline aquifers are very suitable

for large scale CCS

5/42 is big, close to emitters & has right properties

Data analysed to date from 42/25d-3 appraisal well

appears to confirm & enhance initial thinking

Continue to analyse data as it becomes available and

work with pipeline and facilities teams to refine design

Prepare FDP

Develop Technical MMV Plan

14

Thanks & Questions