Large Excavation Planning in 3D

41
RAJDEEP EXCAVATION PROCESS MAPPING BRIDGESTONE BUILDCON PVT. LTD. deeptec Infrastruct ures

description

3D Excavation Plan

Transcript of Large Excavation Planning in 3D

Page 1: Large Excavation Planning in 3D

RAJDEEP

EXCAVATION PROCESS MAPPINGBRIDGESTONE

BUILDCON PVT. LTD.

deeptecInfrastructures

Page 2: Large Excavation Planning in 3D

3D Visualization & Geological Interpretations

Page 3: Large Excavation Planning in 3D

Understanding & Verifying Strata

Page 4: Large Excavation Planning in 3D

Accurate positioning of the strata

Page 5: Large Excavation Planning in 3D

Visualization inside earth

Page 6: Large Excavation Planning in 3D

Making the layers of the earth

Page 7: Large Excavation Planning in 3D

Precise Quantities for Optimized Planning

Page 8: Large Excavation Planning in 3D

Process Mapping & Project Sequencing

Page 9: Large Excavation Planning in 3D

CAD Superimposed on Google

Page 10: Large Excavation Planning in 3D

Boundary Line on Google Earth

Page 11: Large Excavation Planning in 3D

Strata Identification on Google Earth

Page 12: Large Excavation Planning in 3D

Process Initiation by understanding Vicinity

Page 13: Large Excavation Planning in 3D

Positioning the Rock For Safe Blasting

Page 14: Large Excavation Planning in 3D

4D Planning by Defining Timeline

Page 15: Large Excavation Planning in 3D

Starting Points by Thorough Technicalities

Page 16: Large Excavation Planning in 3D

Haulage Planning Designing Nearest Roads

Page 17: Large Excavation Planning in 3D

Cycle of Layers Minimizing Re-handling

Page 18: Large Excavation Planning in 3D

Designing Priorities For Construction Phase

Page 19: Large Excavation Planning in 3D

Proper Filling Sequence

Page 20: Large Excavation Planning in 3D

Simultaneous activity reduces cost

Page 21: Large Excavation Planning in 3D

Utilization of Machinery No Idling

Page 22: Large Excavation Planning in 3D

Maintained Sequence Targeted Completion

Page 23: Large Excavation Planning in 3D

Excavation Process Avoids Trial & Error

Page 24: Large Excavation Planning in 3D

Safe Distances From Green Concrete

Page 25: Large Excavation Planning in 3D

Planning Benches Opposite to Villages

Page 26: Large Excavation Planning in 3D

Multiple Benches Optimizing Process

Page 27: Large Excavation Planning in 3D

Dimensioning Future

Page 28: Large Excavation Planning in 3D

Critical Blasting Areas At Last

Page 29: Large Excavation Planning in 3D

3D Visualization & Geological Interpretations

Page 30: Large Excavation Planning in 3D

Excavation Flow Mapped By Radial Distances

Page 31: Large Excavation Planning in 3D

Clean Environment Safe Completion

Page 32: Large Excavation Planning in 3D

Handover Within Timeline

Page 33: Large Excavation Planning in 3D

Drilling Blasting Technicalities Detailing

Page 34: Large Excavation Planning in 3D

Fragmentation Analysis & Blast Optimization

Page 35: Large Excavation Planning in 3D

Blast Documentation with Video Analysis

Page 36: Large Excavation Planning in 3D

Vibration & Sound Monitoring

Page 37: Large Excavation Planning in 3D

Site Pictures

Page 38: Large Excavation Planning in 3D

Site Pictures

Page 39: Large Excavation Planning in 3D

Site Pictures

Page 40: Large Excavation Planning in 3D

Site Pictures

Page 41: Large Excavation Planning in 3D

Thank youwww.deeptec.in