LAr at Point 1 : Power supplies
description
Transcript of LAr at Point 1 : Power supplies
endcap A endcap Cbarrelendcap A endcap Cbarrel
LAr at Point 1 : Power supplies
LVPS supplies electronics to a Front End crate 2*16 in Barrel, 2*13 in Endcaps LVPS takes 280V (from USA15) and makes +-4, 6,
+-7, 11V up to 180A (total ~3kW) Modular : N module contributing to current. N+1
modules available for each voltage (27 modules/PS)
Radiation tolerant, Redundant, very tightly packed Long story of failing manufacturing going back to year
2003 Recurring problems lead to frequent exchanges during
installation phase in pit 2006: Task force (ATLAS, BNL, expert consultants)
identified problems Design issues Fabrication issues Proposed a complete reworking of the parts 2007 Refurbishment: components, connectors,
screws…. (~50 modifications/module) During operation 2008 all LVPS worked OK but
2 in redundant mode 2 identified a “new” failure possibility not
addressed in 2007 Campaign
L.Hervas 1
2008-09 : new retrofitting campaign (all 58 LVPS from point 1 to US and back)2008-09 : new retrofitting campaign (all 58 LVPS from point 1 to US and back)
endcap A endcap Cbarrelendcap A endcap Cbarrel
LAr at Point 1 : LVPS To come
One [known] unsolved issue (Capacitor damage “C26”) we could not find a better replacement
58 LVPS in operation since April 09, no failures, no redundant mode If one “C26” fails, that voltage goes into redundant mode. LVPS can operate OK. Would need to have a new failure in one of the other ~4 modules of that
voltage. Conclusion: we have fixed all we could LVPS in good shape, redundancy should work
Medium term: producing a new set of LVPS 2 Vendors contacted Phase 1: Single voltages modules of correct size, done OK Currently making full prototypes (delivery ~September09) Choice of vendor End 2009 Production 1st half 2010
Prove reliability of series off detector (?) Installation when access permits
L.Hervas 2
endcap A endcap Cbarrelendcap A endcap Cbarrel
LAr at Point 1 : OTx
OTx is the optical transmitter sending off the serialized data of one FEB to the ROD.
Mezzanine : little circuit + Laser emitter (VCSEL) coupling onto fiber with ST connector
1 OTx / FEB (Tiles has 2!) Reliable devices were difficult to obtain in 2005 at the
time of FEB production After QC and other improvements devices were
acceptable Extra steps of QC … Problems seemed solved
No failures during ~1.5 years
L.Hervas 3
endcap A endcap Cbarrelendcap A endcap Cbarrel
LAr at Point 1 : OTx
L.Hervas 4
In 2008 operation ~8 devices failed Abruptly Not correlated to anything obvious (B, power on,
humidity) All replaced during shutdown
In 2009 they keep failing, ~1/week (out of the 1600) By now (since detector closed in May) 5 dead Happen anywhere (now 4 Front, 1 Middle) Always : VCSEL is the element failing
Task force analyzing the causes and preparing actions No root cause yet Also failed efforts to estimate the size of problem ESD damage at the time of fabrication is main suspect Expect some results from FA experts starting now Preparing backup device
Other VCSEL, similar circuit, similar mezzanine, produced under best conditions
Double VCSEL, but would need two fibers. Difficult installation (eg. in EC chains)
Replacing all OTx’s is a BIG operation Unclear when it could take place
Effects can be mitigated with L1 Trigger readout