LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34...

15
34 TH STREET LANE RE-PURPOSING PROJECT 22 ND AVE S to 54 TH AVE S

Transcript of LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34...

Page 1: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

34TH STREET LANE RE-PURPOSING PROJECT

22ND AVE S to 54TH AVE S

Page 2: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

• FDOT resurfacing 22nd Ave N to 54th Ave S

• Additional improvements on 22nd Ave S to 54th Ave

• Purpose of improvementso Advance goals of

Skyway Marina District Plan

o Safety and accessibility for all users

About the Project

Google Maps

Page 1

Page 3: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

Project Area Description

• Two mile section• Six lanes with median• 45 mph posted speed limit• FDOT jurisdiction• Skyway Marina District • South St Petersburg CRA• Bus Route 34

• 5:15 AM to 11:30 PM, M-F

• 20-30 min. headways

30th Ave S

Page 2

Page 4: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

Average Annual Daily Traffic (AADT)

54th

Ave

S

22nd

Ave

S

Cent

ral A

ve

5thAv

e N

26,68828,00036,500

Goog

le m

aps

Page 3

2017 AADT

AADT By Year

Page 5: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

Level of Service Conditions

• Operating at less than 50% of six lane capacity, LOS C

• 22nd Ave S and 54th Ave S intersections, LOS E

• Parallel Roadso I-275 o 31st Sto 37th St

• Lane elimination study/feasibility analysis

Google Maps

Google Maps

Page 4

Page 6: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

Crash Trends 2013 – 2017

• 22nd Ave S and 54th

Ave S• 41% of all crashes• 50% of bike/ped

crashes• 2 fatalities (22nd Ave

S and 38th Ave S)

Google mapsPage 5

Intersections

Page 7: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

Crash Trends 2013 - 2017

Page 6

• Average annual crashes

• Total = 148• Injuries = 19

• Youngest age groups (15-24) involved in 18% of crashes

Page 8: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

Crash Trends 2013 - 2017

• 45% - straight ahead movements. 50% of the total injuries

• Aggressive driving was a factor in 30% of straight ahead crashes and 70% of the left turn crashes

• 7% of straight ahead crashes involved vulnerable users

Page 7

Page 9: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

Cross Sections – Existing Section

Page 8

Page 10: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

Cross Sections – BAT Lane Concept

Page 9

Page 11: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

Cross Sections – Proposed Pedestrian Crossing

Page 10

Page 12: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

Median Extension at Intersections

Page 11

Page 13: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

Mid-Block Crossing

Page 12

Page 14: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

Transition Areas

Page 13

Page 15: LANE RE-PURPOSING PROJECT 22ND AVE S to 54TH AVE S...• South St Petersburg CRA • Bus Route 34 • 5:15 AM to 11:30 PM, M-F • 20-30 min. headways 30th Ave S Page 2 Average Annual

Next Steps

Page 14

• April 4 – Public meeting and open house

• April 23 - Skyway Marina District Board

• April/May - Complete Streets Committee

• May - City Council • June 12 - Forward Pinellas

Board • Design work, 2020• Construction, 2022• Development of complete

streets concept plan, TBD