Landslide Risk Management Dr.G.P.Ganapathy, Ph.D, FICDM Associate Professor Centre for Disaster Mitigation and Management VIT University , Vellore 632014 Tamil Nadu, India E-mail: [email protected] Dr.G.P.Ganapathy, Ph.D, FICDM Associate Professor Centre for Disaster Mitigation and Management VIT University , Vellore 632014 Tamil Nadu, India E-mail: [email protected]

Transcript of Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit...

Page 1: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Landslide Risk Management

Dr.G.P.Ganapathy, Ph.D, FICDMAssociate Professor

Centre for Disaster Mitigation and Management

VIT University , Vellore 632014

Tamil Nadu, India

E-mail: [email protected]

Dr.G.P.Ganapathy, Ph.D, FICDMAssociate Professor

Centre for Disaster Mitigation and Management

VIT University , Vellore 632014

Tamil Nadu, India

E-mail: [email protected]

id3465109 pdfMachine by Broadgun Software - a great PDF writer! - a great PDF creator! - http://www.pdfmachine.com http://www.broadgun.com

Page 2: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Landslide Hazard

in India

Page 3: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Landslide Hazard Zonation (LHZ)

simply means the division and

preferably subdivision of a land

surface into various zones

according to the degrees of

actual/ potential hazard caused by

landslides and related phenomena

Landslide Hazard Zonation (LHZ)

simply means the division and

preferably subdivision of a land

surface into various zones

according to the degrees of

actual/ potential hazard caused by

landslides and related phenomena

LANDSLIDE HAZARD ZONATION LANDSLIDE HAZARD ZONATION

Page 4: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

The earliest

landslide studies in

the country were

carried out by the

GSI.

This includes the

study of the Nainital

landslide by Sir R.D.

Oldham in 1880 and

C.S. Middlemiss in

1890.

Page 5: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

SPECIFIC AREAS

CONSIDERED

FOR LANDSLIDE ANALYSIS

SPECIFIC AREAS

CONSIDERED

FOR LANDSLIDE ANALYSIS

Page 6: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

METHODOLOGY

USED TO PRODUCE

LANDSLIDE HAZARD

ZONATION MAP OF INDIA

METHODOLOGY

USED TO PRODUCE

LANDSLIDE HAZARD

ZONATION MAP OF INDIA

Page 7: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building
Page 8: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building
Page 9: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

WEIGHT AND RANKWEIGHT AND RANK

Weight decides the preference or priority of the one

theme over another in a grid based analysis. For

example slope is assigned 10 and the less contributing

themes are assigned lesser weights within ten-point

scale.

Rank decides the contribution of one unit over another

within a theme. For example, high slope angle

contributes more towards landslide susceptibility than

low angle slopes.

A suitability scale ranging, in values from 1 to 5, was

devised. The value of �1� was assigned to the lowest

contributing unit in a particular theme and the highest

contributing unit was assigned a value of �5�.

Weight decides the preference or priority of the one

theme over another in a grid based analysis. For

example slope is assigned 10 and the less contributing

themes are assigned lesser weights within ten-point

scale.

Rank decides the contribution of one unit over another

within a theme. For example, high slope angle

contributes more towards landslide susceptibility than

low angle slopes.

A suitability scale ranging, in values from 1 to 5, was

devised. The value of �1� was assigned to the lowest

contributing unit in a particular theme and the highest

contributing unit was assigned a value of �5�.

GIS ANALYSISGIS ANALYSIS

Page 10: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

WEIGHT AND RANKWEIGHT AND RANK

The weight values in a ten point scale and rank

values from 1 to 5 help bring out the

differences in contributions between the

themes and between units within a theme

during GIS analysis.

The rank and weightage values were also

modified from region to region to achieve the

best match between the reported landslide

inventory of the region and the corresponding

inferred landslide hazard zonation map.

The weight values in a ten point scale and rank

values from 1 to 5 help bring out the

differences in contributions between the

themes and between units within a theme

during GIS analysis.

The rank and weightage values were also

modified from region to region to achieve the

best match between the reported landslide

inventory of the region and the corresponding

inferred landslide hazard zonation map.

Page 11: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

GEOLOGICAL MAP OF INDIA(WEIGHTED)

GEOLOGICAL MAP OF INDIA(WEIGHTED)

Page 12: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

RAINFALL MAP OF INDIA

(WEIGHTED)

RAINFALL MAP OF INDIA

(WEIGHTED)

Page 13: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Landslide Hazard Zonation Map of IndiaLandslide Hazard Zonation Map of India

3%

7%

30%

60%

Page 14: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Landslide hazard zonal significanceLandslide hazard zonal significance

Page 15: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

�Geological Survey of India (GSI)

�Central Road Research Institute (CRRI)

�Central Building Research Institute (CBRI)

�Indian Institute of Technology, Roorkee (IIT-R)

�Wadia Institute of Himalayan Geology (WIHG)

�Department of Space (DoS)

�National Remote Sensing Centre (NRSC)

�Defence Terrain Research Laboratory (DTRL)

�Bureau of Indian Standards (BIS)

�some academic institutions, and individual experts.

Agencies involved

Page 16: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Components of Landslide Disaster Management Process

Page 17: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building
Page 18: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

�You pay and talk for the

mund�

Ootacamund

Page 19: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Landslide Occurrences Since 1865 in Nilgiris

300 LS

Page 20: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Landslide Occurrences Since 1865 in Nilgiris

Page 21: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

20011901

Population growth in Nilgiri District

Area : 2500Sq.km

0.37 Lakhs 7.62 Lakhs

Page 22: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Geological Map

Page 23: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Geomorphological Map

Page 24: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Topography - Coonoor to Ooty

Page 25: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Aerial view of Coonoor to Ooty

Page 26: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Monthly Normal Rainfall in Nilgiri District

Page 27: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

� Heavy rains triggered a series of

landslides in Ooty, Coonoor and

Kotagiri regions of the Nilgiris

� Killed 42 people within 48 hours. Total

Deaths 80.

� Estimated loss about 300 Crores

November 2009 Landslides

Page 28: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Spatial Distribution - November 2009 Landslides

RF: 19cm

RF: 82cm RF: 31cm

Page 29: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Daily Rainfall from 01 � 15 November 2009

A valanchiB urliyar

C o o no o rD evala

Em eraldG .B azaar

G edda i damGlenmo rgan P o int

Kundha damKalhatty

KethiKinnakko ra i

Ko danadKo tagiri

N aduvattamUpper B havani

Uthagam andalam

0

100

200

300

400

500

600

700

800

900

Total Rainfal in mm

Dat

e

Avalanchi

Burliyar

Coonoor

Devala

Emerald

G.Bazaar

Geddai dam

Glenmorgan Point

Kundha dam

Kalhatty

Kethi

Kinnakkorai

Kodanad

Kotagiri

Naduvattam

Upper Bhavani

Uthagamandalam

Page 30: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

� Many slides have taken place in

areas of intense cultural activity.

� agricultural operations,

� construction of buildings and roads

� removal of earth and rock

� levelling of slopes

� deforestation and

� blocking of natural drainage.

November 2009 Landslides Lessons Learned

Page 31: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Considering all these evidences the following factors

appear to have been involved, singly or in

combination, in inducing the landslides.

� Water (Heavy rainfall)

� Toe Removal

� Increase of Head Load

November 2009 Landslides Lessons Learned

Page 32: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Lovedale Road view from Coonoor Road 10.11.2009

Toe Removal

Increase of Head

Load

Water

Page 33: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Closer View

Page 34: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Closer View

Page 35: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Closer View

Page 36: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Lovedale Road View from Coonoor Road Landslide Scenario

28.11.200910.11.2009

Page 37: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Lovedale Road at Thalayattu

Mandu on 10.11.09 top and

bottom side showing the Zone

of Crack and Zone of Failure

Zone of Crack

Zone of Failure

Page 38: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Houses built in the Stream Channel �

Severe Damage at Naduhatti

Page 39: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Debris covered at Naduhatti

Page 40: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Severely Damaged Road - Ooty Coonoor Road near

Thalayattu Mund Junction.

Page 41: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Ooty Coonoor NH. 2 kms from Valley View point.

No way beyond this point.

Page 42: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Near Sagar Holiday Resorts, Valley View.

Page 43: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Unplanned colonization

Page 44: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building
Page 45: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Lessons for the Planners and public

2009

landslides

Severe to High

Landslide Areas

identified by GSI

in 1982

Page 46: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Landslide hazard zonal significance(BMTPC, Landslide Hazard Zonation Atlas of India 2003)

Page 47: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Vulnerability

Page 48: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Critical Facilities

1.Essential facilities

hospitals, medical clinics,

schools/educational institutions, fire

stations, police stations and emergency

operations facilities

2.High potential loss facilities

dams, levees, military installations,

nuclear power plants and hazardous

material sites

Page 49: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Lifeline Inventory

1. Transportation

highways, railways, bus, ports, ferry and airports

2. Lifeline Utility

potable water, wastewater, natural gas, crude &

refined oil, electric power and communications.

Page 50: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Sl.No Facilities Total Falls Under High to

Moderate Hazard Areas

Percentage

1 Essential 114 24 21%

2 Lifeline 96 7 7.3%

3 Transportation 20 6 30%

4 Village/Towns 42 7 16.7%

Vulnerability

Page 51: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Dangerous Slopes

Page 52: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Blocking the Natural Draines

Page 53: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

We Don�t Bother

Page 54: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Understanding the Past and Present

Page 55: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

Additional rain gauge stations may be installed in close interval and

monitor the intense rainfall as well as the existing unstable slopes.

Monitoring

Page 56: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

One of the most difficult problems concerning landslide hazards

in place like Nilgiris is dealing with existing urban areas where

buildings are constructed on or close to a landslide.

- avoid further development in high-risk

landslide prone areas, limit existing-use

rights to rebuild, and limit the use of

buildings.

- avoid further development and use of

buildings (building type) is consistent with

the level of risk posed and the district plan

maps clearly show landslide hazard zones.

Recommendations

Page 57: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building

- A detailed large scale risk

map is required for further

planning.

- Town planning bye-laws needs to

be developed, which will

translate and codify landslide

concerns into village

development.

- Appropriate legislation may

be considered for the

enactment for future safe

and planned development

in towns and villages affected

by landslide hazard

Recommendations

Page 58: Landslide Risk Management · landslide prone areas, limit existing-use rights to rebuild, and limit the use of buildings. - avoid further development and use of buildings (building