Landscape redesign and upgradation
-
Upload
shershada-rauf -
Category
Documents
-
view
242 -
download
4
description
Transcript of Landscape redesign and upgradation
@ S
T. G
ERO
SA H
IGH
SC
HO
OL,
MA
NG
ALO
RE
TRAINING PORTFOLIO
6" dia pipe to be connected to well
S_05
1.9202.423
8" Ø
pipe
trench
20.54
4
RP-1Cover top finish level =100.341fOutgoing invert level =99.891
Distance from the last chamber=17.688m @1%=100.341-0.176= 100.165mFin ground level at 1st branch =100.165fOutgoing invert level at 1st junction=100.165-(0.228+0.200+0.210)=99.527m
20.268
Perforated pipe -01
0.4150.101
0.1010.4150.101
1.475
2.227
60 m ash track- 6 lanes ( 0.9 m X 6 no.s)Inner perimeter of track = 117 m
UPG
RA
DAT
ION
OF
AM
NET
IES
@ S
T. G
ERO
SA H
IGH
SC
HO
OL,
MA
NG
ALO
RE
REORGANIZED PLAN- GIRLS’ TOILETMEETINGS
SITE VISITS
UPG
RA
DAT
ION
OF
AM
NET
IES
@ S
T. G
ERO
SA H
IGH
SC
HO
OL,
MA
NG
ALO
RE
REORGANIZED PLAN- GIRLS’ TOILET
P15
P-19
8" Ø pipe to drain
6" dia pipe to be connected to well
20.34
1
Distance from the last chamber=20.270m @1%=100.165-0.202= 99.963mFin ground level at 1st branch =99.963fOutgoing invert level at 1st junction=99.963-(0.228+0.200+0.210)=99.325mDifference between fin gr level & invert = 0.638mOutgoing invert leading to convent well / 110mm Ø PVC pipe, CL2 /=99.325m (provide valve in inspection chamber at entry to convent well)
14.39
3
20.26
8
RP-2Cover top finish level =99.963fOutgoing invert level =99.325
Outgoing invert level =99.325 /
leading to convent well /
4" Ø PVC pipe, CL2 /=99.325m
1.500
Existing ground level
Existing drain invert level
Exist
ing ga
llery
outlin
e
0.100
0.600
0.100
0.100
1.401
Riser = 0.381Tread = 0.609
16mm MS bars to be rammedinto existing masonary , approx 0.228m, to anchor the PCC work above @ approx 6 ft ² grid
1:3 CM plaster to finishflush with 229x229x20mm thk terracotta tilesedge tiles
Exist
ing ga
llery
outlin
e
0.361
Riser = 0.381Tread = 0.609
0.6000.100
0.6630.282
100.292
1:3:6 PCC using 20mmdowngraded aggregate with nominal reinforcement
100.751
0.075
Distribution steel @ .3 c/c
Main reinforcement bars @ .45 c/c.
100.291Existing ground level
102.296
Riser = 0.381Tread = 0.609
0.439
Existing ground level
Section of SouthWest Gallery S-04 Section of NorthEast Gallery S-03
Section of NorthWest Gallery S-02Section of NorthWest Gallery S-01
UPG
RA
DAT
ION
OF
AM
NET
IES
@ S
T. G
ERO
SA H
IGH
SC
HO
OL,
MA
NG
ALO
RE
GALLERY SECTIONS
UPG
RA
DAT
ION
OF
AM
NET
IES
@ S
T. G
ERO
SA H
IGH
SC
HO
OL,
MA
NG
ALO
RE
LIGHTROOFING AND FOOTING DETAILS
150 Ø pipe (20.3 kg/ m)od=166.5thickness= 8.25 mm
0.415x0.415/12mm thk MSbase plate with provision for18mm Ø MS threaded bolts, projecting38 mm above footing surface,of 0.228m length set as assemblyat time of pouring of concrete tospecified spacing
10 mm bar @ .15 m c/c
10 mm bar @ .15 m c/c
0.100
SECTION OF UPPER FOOTING SECTION OF LOWER FOOTING
150 Ø pipe (20.3 kg/ m)od=166.5thickness= 8.25 mm
0.415x0.415/12mm thk MSbase plate with provision for18mm Ø MS threaded bolts, projecting38 mm above footing surface,of 0.228m length set as assemblyat time of pouring of concrete tospecified spacing
10 mm bar @ .15 m c/c
10 mm bar @ .15 m c/c
0.100
100.751
0.381
100.370
0.230
150 Ø pipe (20.3 kg/ m)od=166.5thickness= 8.25 mm
SECTION OF UPPER FOOTING SECTION OF LOWER FOOTING
100.751
Road
Wide
ning
Outlin
e / 1
00' R
OW
100.370
0.230
150 Ø pipe (20.3 kg/ m)od=166.5thickness= 8.25 mm
Existing granite slabs used as covers
0.130
0.884
0.1000.100
1.637
6.841
4.947
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
UPG
RA
DAT
ION
OF
AM
NET
IES
@ S
T. G
ERO
SA H
IGH
SC
HO
OL,
MA
NG
ALO
RE
0.386
0.244
0.150
0.430
0.175
0.0860.548
0.068
0.050 0.050
100.299m
100.149m
40 mm downgraded aggregatesoil macadam hardcoreSoil to be filled and compacted
1:3:6 lean concrete
0.250 0.500 0.500 0.500 0.500 0.500 0.249
1.5370.136
0.394
0.086
0.086
3.2091.412
0.068
S_01
Existing building line
DEVELOPMENT OF AMENITIES AT ST. GEROSASCHOOL, MANGALORE
17-6-362/13(81), Basement Floor, Shalom Shopping Complex,Fr. Muller Road, Jeppu, Mangalore-575002Tel: +91 824 4252919 E-mail: [email protected] WASHBASIN TROUGH @ RENOVATED GIRLS' TOILET BLOCK
Sectional Elevation E-01
Plan of Trough
Key Plan
Section S-02
WASHING TROUGH DETAILS
0.641
1.500
3.754
0.600
1.800
0.600
1.800
0.100
1.800
3.806 1.500
1.500
99.968Existing ground level
0.0750.075
0.765
0.050
0.812
0.1000.415
0.100
0.075
0.075
0.075
0.110
0.306
0.100
0.7060.100
100.804
Riser = 0.150mTread = 0.300m
0.0750.075
0.765
0.050
0.812
0.1000.415
0.100
100.786
Existing stage profile
0.574
0.100
Section through stage Section through steps
PLAN
S-02S-01
UPG
RA
DAT
ION
OF
AM
NET
IES
@ S
T. G
ERO
SA H
IGH
SC
HO
OL,
MA
NG
ALO
RE
STAGE ENTRANCE STAIR AND DRAIN DETAILSLIGHTROOFING AND FOOTING DETAILS
100.751
0.381
100.370
0.230
150 Ø pipe (20.3 kg/ m)od=166.5thickness= 8.25 mm
96.790
96.540 depth of pit / hardcore starts above this
0.150
0.100
3.000
100.341f
0.101
99.891
0.150
0.100
0.3041.5240.3042.132
1.374
250gsm geotextile barrier
0.075 mm thick custom-made internal Ø 1.370m RCC rings with 6 perforations of Ø 75 mm.
75 mm downgraded aggregates
0892m x0892 m precast RCC cover-slab
6" Øinlet pipe 8" Ø outlet pipe
0.666
4.016
0.362 0.362
0.450
0.150
Precast RCC frame
0.2280.228 0.750
1.050
99.963f
0.200
99.325
0.150
8" Øinlet pipe 8" Ø outlet pipe
0.8480.6
38
To be detailed
Ground Precast RCC frame
0.228
1.050
0.691 0.6910.200
0.050RCC slab
0.698
0.150
RCC Side wall
In this level also provide4" out going invert leadingto convent well
0.288
0.848
0.774
0.1000.168 0.600 0.168
0.1001.136
0.100
0.636
0.200
0.936
44 mm pre cast rcc cover
0.200
0.6780.117 0.117
Outlet 6"Ø pipe
3"Øinlet / toilet roof
inlet 6"Ø pipe/trench
Angle section 50x50 /6 mm thk/fixed in to pcc
150mm solid PCC blockmasonary in one layer onlywith 18mm thk plaster intwo layer on inner side of I C
4" thk pcc bed using 1:2:4 mix&20mm aggregates
0.1000.117
0.0120.678 0.012 0.117 0.1001.136
150mm PCC with 18mm thkplaster in two layer on inner side
0.006 0.012
S_01
0.600
3"Øinlet / toilet roof
Outlet 6"Ø pipe
0.702
0.100
0.150 0.150
1.286
1.839
0.150
0.075 0.0040.892 0.004 0.0751.050
0.750
Outlet 6"Ø pipe
over flow pipe 6"ØInlet pipe 6"Ø pipe
0.1000.786
0.100
101.153f
0.150 0.750 0.1501.286
0.1180.118
99.890
0.600
4"thk hardcore using40mm aggregatesand soil
100mm thk RCC wall with18mm thk plaster in two layer on inner side
0.892m x 0.892 mm precast RCC cover16 no's /50 mm Øpipe for infiltration
precast RCC frame
0.118
0.892m x 0.892 mm precast RCC cover
101.153f0.8
19
Section through filtration tank
Plan/ Section- Trench
Scale 1:20
UPG
RA
DAT
ION
OF
AM
NET
IES
@ S
T. G
ERO
SA H
IGH
SC
HO
OL,
MA
NG
ALO
RE
DETAILS OF DRAINAGE COMPONENTS
0.500
PLAN
UPG
RA
DAT
ION
OF
AM
NET
IES
@ S
T. G
ERO
SA H
IGH
SC
HO
OL,
MA
NG
ALO
RE
REORGANIZED PLAN- GIRLS’ TOILET
REORGANIZED PLAN- GIRLS’ TOILET UPG
RA
DAT
ION
OF
AM
NET
IES
@ S
T. G
ERO
SA H
IGH
SC
HO
OL,
MA
NG
ALO
RE
SECTIONS- GIRLS’ TOILET
1. The finishes allowances are as follows: 12 mm thick plaster + 4 mm thk fixing mortar + 6-10 mm tilethickness
2. Provide 3 mm thk spacer for tile both flooring and daddoing.epoxy grout of Dubond make shall be used. spacers shall be ofPVC
3. All toilet shutters will be Sintex make, single leaf with SS hingesand Aluminium tower bolts. The masonry opening size shall be30" X 6'6"
4. The ceramic fixtures shall be as follows-Orrisa pan- Parryware Make, C0116 /530mm/White/Thrift-Urinal- ParryWare Make c0501/White/ Flatback-Washbasins, Parryware make- C0499/ 500mm/White Flair-WC- Parryware Make- C0287 Make/ 88 (S trap)/White/Petite-The plumbing fixtures shall be of Jaquar make- to be specified
5. The plumbing contractor is to furnish the list of fixtures to besupplied at the earliest. He shall also finalise the drainagearrangement after taking into consideration the currentarrangement
6. The door openings shall be topped by 100 mm deep RCC lintelwih nomial reinforcement
7. The ventilator will not need any lintels8. The floor levels in the individual toilets are sloped towards the
Orissa pan or the floor traps as the case maybe..
Section _01
Scale 1:35
UPG
RA
DAT
ION
OF
AM
NET
IES
@ S
T. G
ERO
SA H
IGH
SC
HO
OL,
MA
NG
ALO
RE
REORGANIZED PLAN- BOYS’ TOILET
TOILET 1 TOILET 4TOILET 2
TOILET 5 TOILET 7TOILET 6
2 EQ
TREA
DS @
300=
600
TOILET 3
2.759
0.890
1.021
2.598
S_01
0.410
1.462
1.012
1.228
0.400
1.228
0.675
0.595
0.617
0.300
1.605
0.635
1.927 1.949
0.202
0.438
0.436
0.236
EXISTING CORRIDOR
0.400
0.200
Plan
UPG
RA
DAT
ION
OF
AM
NET
IES
@ S
T. G
ERO
SA H
IGH
SC
HO
OL,
MA
NG
ALO
RE
SITE VISITS
DEMOLITION OF GIRLS’ TOILET FOR REORGANIZATION
DEMOLITION OF GIRLS’ TOILET FOR REORGANIZATION
PLUMBING WORKS COMPLETED GIRLS’ TOILET
MASONRY WORKS
PRECASTING OF CONCRETE RINGS FOR RECHARGE PITS @ SITE
PRELIMINARY ESTIMATE
SGS_civWORKSest_17061417th June 2014PROJECT : UPGRADATION OF SCHOOL PLAYGROUND AT ST. GEROSA HIGHSCHOOL, MANGALORE
Sl. No. Items of work/Description Quantity Unit Rate Total
(30.765X0.150)/2 X 32.021 73.884 cum 617 45586.43
Leveling work with excess soil to be spread over 73.884 cum 617 45586.4313675.93
104848.782.0.02.1.0
0.012 X 32.776 X 80.007 X 32.776 X 1
2.098 X 33.408
0.047 X 33.408 71.659 cum 3600 71.65
6.31 X 33.4 210.754 sqm 470 99054.38
Fixing and grouting of 228x100x38mm wire cut bricks for gallery edge, including pointing 3152 no.s 25 78800Contingencies and SundriesMiscellaneous @ 15%
233367.232.2.0
1.669 X 62.617 104.508 cum 617 64481.30PCC bed in gallery levelling works
0.012 X 5 X 64.5 3.870 cum 7408 28668.96Plaster In 1:3 CM mix, 18mm thk plastered in 2 layers including cost of scaffolding, curing etc complete3.664 X 63.108 231.228 sqm 470 108677.02
2.2.4 Factory brick cladding 3050 no.s 25 76250
2.1.2
Total
Factory brick cladding
Using 1:5 CM mortar, including cost of dressing , scaffolding, transport, curing etc complete
Using 1:2:4 mix, including cost of material , scaffolding, transport, curing etc complete
2.2.1
2.1.5
1.0.0
Earthwork in excavation in cut and fill of playfield
2.2.3
2.2.2
2.1.4
2.1.3
Playfield Grading
earthwork in fillingNorth East Gallery
Galleries
30439.2045
Plaster In 1:3 CM mix, 18mm thk plastered in 2 layers including cost of scaffolding, curing etc complete
3.375 cum 7408 25002.00
Earthwork in filling
Contingencies and Sundries, MiscellaneousTotal
2.1.1
Northwest Gallery PCC bed in gallery levelling works
Using 1:2:4 mix, including cost of material , scaffolding, transport, curing etc complete
Laterite Masonry in 1:5 CM
1/Estimate for works related to Upgradation of St. Gerosa High School grounds
Contingencies and SundriesMiscellaneous @ 15%
319788.87272.3.0 Southwest Gallery
Earthwork excavation for gallery foundation .509 m2 X 14.27 m = 7.160.464X 10.198 = 4.731 11.896 cum 617 7339.83Earthwork in filling2.181 m2 X 14.662 m 31.978 cum 617 19730.32Hardcore for foundations
0.105 X 14.270.095 X 14.66
0.240 X 14.66 6.408 cum 514 3293.7122.3.4 PCC works
0.128 m2 X 14.6620.128 m2 X 14.27 3.703 cum 7408 27431.82
2.3.5 PCC bed in gallery levelling works0.012 X 28.792 X 5 1.728 cum 7408 12797.47
2.3.6
Using 1:5 CM mortar, including cost of dressing , scaffolding, transport, curing etc complete
(1.294+ .055) X 14.0770.729 X 14.662 29.678 cum 3600 106842.50
2.3.7In 1:3 CM mix, 18mm thk plastered in 2 layers including cost of scaffolding, curing etc complete3.844 X 28.792 110.676 sqm 470 52017.93
2.3.8 Factory brick cladding 1360 no.s 25 34000Contingencies and SundriesMiscellaneous @ 15%
302971.61856127.72
3.0.0 Stormwater drainage3.1.03.1.1 Earthwork in excavation works
0.65 m2 X 29.584 m 19.230 cum 617 11864.663.1.2 Hardcore for foundations
0.070 X 29.584 2.071 cum 514 1064.433.1.3 PCC bed in drains
0.093 m2 X 29.5842.753 cum 7408 20394.22
3.1.4 PCC to create L profile for placement of cover0.0147 X 2 X 29.584 0.870 cum 7408 6443.25
3.1.5 PCC solid block masonry Using 1:5 CM mortar, including cost of scaffolding, transport, curing etc complete.0838 X 2 X 29.584 4.958 cum 3290 16312.74
TotalTotal- Galleries
2.3.3
2.3.2
Total
39518.04
2.3.1
2.2.5
Plaster
Laterite Masonry in 1:5 CM
41711.59
NorthWest drains
2/Estimate for works related to Upgradation of St. Gerosa High School grounds
3.1.6 Plaster in drain1.339 X 29.584 39.613 sqm 470 18618.10
3.1.7 RCC works- PrecastPerforated covers as panels using nominal steel0.5 x .45 panel 65 units 340 22100
3.1.8 Contigencies and sundries, Miscellaneous 14519.61111317.02
3.2.0 NorthEast drains3.2.1 earthwork in excavation works
0.887 m2 X 63.108 m 55.977 cum 617 34537.683.2.2 Hardcore
0.081 X 63.108 m5.112 cum 514 2627.438472
3.2.3 PCC bed in drains 0.108 X 63.108 6.816 cum 7408 50490.44
3.2.3 PCC to create L profile for placement of cover0.016 X 2 X 63.108 2.019 cum 7408 14960.13
3.2.4 PCC solid block masonry Using 1:5 CM mortar, including cost of scaffolding, transport, curing etc complete0.127 X 2 X 63.108 16.029 cum 3290 52736.83
3.2.5 Plaster in drain2.127 X 63.108 134.231 sqm 470 63088.44
3.2.6 RCC works- PrecastPerforated covers as panels using nominal steel0.5 x .45 panel 140 units 440 61600
3.2.7 Contigencies and sundries, Miscellaneous 42006.14322047.10
3.3.0 SouthEast Drains3.3.1 Earthwork in excavation works
0.65 m2 X 38.697 m 25.153 cum 617 15519.433.3.2 Hardcore for foundations
0.070 x 38.697 m 2.709 cum 514 1392.323.3.3 PCC bed in drains
0.093 X 38.697 3.599 cum 7408 26660.073.3.4 PCC to create L profile for placement of cover
0.016 X 2 X 38.697 1.238 cum 7408 9173.363.3.5 PCC solid block masonry
Using 1:5 CM mortar, including cost of scaffolding, transport, curing etc complete0.0838 X 2X 38.697 6.486 cum 3290 21337.68
3.3.6 Plaster in drain1.339 X 38.697 51.815 sqm 470 24353.18
3.3.7 RCC works- PrecastPerforated covers as panels using nominal steel0.5 x .45 panel 85 units 340 28900
3.3.8 Contigencies and sundries, Miscellaneous 19100.41
Total
Total
3/Estimate for works related to Upgradation of St. Gerosa High School grounds146436.44
4.0.0 Gallery CanopySloped corrugated galvalume lined steel frame canopy for galleries 160 m2 2421 387500
Contigencies and sundries, Miscellaneous 58125TOTAL 445625
5.0.0 Recharge Wells5.1.0 Earthwork excavation for recharge detention tank
5.430 X 2.653 X2 28.812 cum 617 17776.745.2..0 Hardcore using 40 mm downgraded macadam for recharge well
5.430 X 0.1X2 1.086 cum 514 558.205.3.0 PCC works in foundation
5.430 X 0.15 X 2 1.629 cum 7408 12067.635.4.0 Cast-in-situ RCC works
Recharge pit cover 10500/ cum
5.43 X .15 X 2 no.s3000/cov
er for steel
5.5.0 Perforated circular Rings 14 NO.S 4000 560005.6.0 Geotextile 24.27 sqm 20 485.475.7.0 Aggregates
2.8063 X 2.15.8.0 Contigencies and sundries, Miscellaneous 16985.07313
TOTAL 130218.8946.0.0
Currently the students need to walk a considerable distance to reach the external toilets.
The toilets proposed to be reorganized to improve access and avoid crossing through playground.
Contigencies and sundries, Miscellaneous 111482.4Total 854698.4External Illumination 100000
Contigencies and sundries, Miscellaneous 15000115000
3086319.36
46.451 m2 16000 743216
1.629 cum 23104.5
TotalGrand Total
5.893 cum 550 3241.27
total
Reorganising Toilets
4/Estimate for works related to Upgradation of St. Gerosa High School grounds
RECHARGE PIT EXCAVATION- GEOTEXTILE BARRIER-CONCRETE RINGS SET IN PLACE
UPG
RA
DAT
ION
OF
AM
NET
IES
@ S
T. G
ERO
SA H
IGH
SC
HO
OL,
MA
NG
ALO
RE
MEETINGS
SITE VISITSEXCAVATION FOR DRAIN ABUTTING STAGE STAIRS
iMAGE FROM MEETING HELD ON 2ND OCTOBER, 2014, TO PRIMARILY DISCUSS THE QUANTUM OF WORKS INVOLVED AND BUDGETING.
PCC BED FOR NORTH WEST GALLERY FOUNDATIONS CENTERING FOR PCC OF DRAIN AT BUILDING REAR
Minutes of the meeting held on 27 October, 2014 @ 5:30 PM
A meeting was held on Octobet 27, 2014 @ St. Gerosa High School Convent Hall to discuss the works done as well proceedings, with time limits provided for each item of work. The meeting saw the presence of Mr. Sitaram Kottary, the contractor for the project, Mr. Mokshit, the site supervisor, Sister Emma, the headmistress of St. Gerosa High School, Ar. Ashok Mendonca, the architect and Lata and Shershada from Mendonca Associates.
1. The completion of the toilet for girls and upper toilet for boys’ is the priority. This is to be completed and handed over by November 8, 2013.
2. The drain behind the building is to be completed by 3rd Novemeber, 2014 in all respects.
3. The reworking of plumbing lines were discussed and it was agreed to act on the same. The existing roof top tanks will be placed on a newly constructed slab on the upper boy’s toilet and the rerouting of supply lines were discussed.
4. The drain covers will be precast at Modern Cement Works as per drawings issued and brought to site.
DEMOLITION OF UPPER TOILET (BOYS’ BLOCK)