Lakeside Mine closure project-DOGMOpen-House Powerpoint

download Lakeside Mine closure project-DOGMOpen-House Powerpoint

of 32

Transcript of Lakeside Mine closure project-DOGMOpen-House Powerpoint

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    1/32

    Utah AbandonedMine Reclamation

    Program

    Division of Oil, Gas& Mining

    Department of

    Natural Resources

    Lakeside Project

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    2/32

    Purpose :

    To seal hazardous

    abandoned mines

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    3/32

    Abandoned Mine Hazards

    Roof collapse

    Unstable side walls

    Total darkness you can easily getlost

    Hidden vertical shafts inside

    Toxic gases Lack of oxygen

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    4/32

    Project would close:

    14 portals

    19 shafts

    Affect

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    5/32

    Right of Entry (ROE)

    Permission is obtained from allland owners prior to any

    construction work

    Private land

    Public (Bureau of Land Management) State Trust Lands (minerals)

    Private (Surface)

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    6/32

    Legal Authority

    Utah has primacy under the

    Surface Mining Control andReclamation Act of 1977, SMCRA

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    7/32

    Project Costs

    Funded by a tax

    on current coal

    production

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    8/32

    Project Selection

    Ranking priority system considers:

    Population: Resident and Transient Mining Districts: historic mining areas

    Mine density

    Roads and accessibility

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    9/32

    Project Schedule Work would occur in late summer/fall of

    2008

    Work would require 4 weeks

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    10/32

    Some of the laws we comply with:

    National Environmental Policy ActNEPA

    National Historic Preservation Act

    Antiquities Act

    Endangered Species Act

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    11/32

    Environmental Assessment

    Analyzes potential impacts on theenvironment

    Includes clearances from: State Historic Preservation Officer

    US Fish and Wildlife Service

    Sign-offs from: Office of Surface Mining

    Bureau of Land Management

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    12/32

    Surveys & Data Collection

    Abandoned Mine Inventory

    Cultural & Historical Surveys Bat Surveys

    Paleontological Surveys

    (not applicable for LakesideProject)

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    13/32

    Abandoned MineInventory

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    14/32

    Historical and Cultural Inventory

    House Foundation

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    15/32

    Bat Surveys

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    16/32

    Paleontological Survey

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    17/32

    AMRPs Intent Cause the least amount of

    disturbance possible

    Design mine closures so thathistorical features are preserved

    Revegetate all areas disturbed

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    18/32

    Mine Closure Designs

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    19/32

    Hand Backfill

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    20/32

    Equipment Backfill

    -before & after

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    21/32

    Equipment Backfill

    before & after

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    22/32

    Equipment tracksraked & seeded

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    23/32

    Locked steelgates allow for

    access and bat

    usage

    Bat Gates

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    24/32

    Pinned Grate before & after

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    25/32

    Pinned Grate

    before & after

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    26/32

    Shaft Grate -Concrete Grade

    Beam

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    27/32

    Block Wall before & after

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    28/32

    Block Wall before & after

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    29/32

    Stone Wall

    before & after

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    30/32

    Stone Wall before & after

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    31/32

    Closure # Avg. Costs

    Machine Backfill 21

  • 8/14/2019 Lakeside Mine closure project-DOGMOpen-House Powerpoint

    32/32

    Public Participation

    What are your concerns?

    Please give us your comments.

    Contacts:

    Chris Rohrer or Connie Jo

    GarciaEA Coordinator ProjectManager

    801 538 5322 801 538 5347