Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town...

32
December 10, 2018 Lake George Septic Initiative Program Lake George Town Board Information Meeting

Transcript of Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town...

Page 1: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018

Lake George Septic

Initiative Program

Lake George Town Board Information Meeting

Page 2: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 2

Outline

Town of Lake George Septic Initiative Program

• History

• Purpose and Goals

2015 DEC WQIP Grant

• Work Plan

• Findings

• Prioritization Algorithm

• Recommendations

Next Steps

Take Aways

Page 3: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 3

Town of Lake George Septic Initiative Program

Page 4: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 4

Page 5: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 5

TOLG Septic Initiative Program (SIP)

Algae indicator of excessive nutrients

Correlation between failing or sub-standard septic systems and excessive algae growth

Page 6: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 6

Lake George Algae Blooms

12/12/2018

Stewart Brook (Bolton)

Harris Bay (Queensbury)

Diamond Point (TLG)

Assembly Point (Queensbury)

Page 7: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 7

TOLG Septic Initiative Program Purpose and Goals

• Inventory and assess all existing onsite wastewater treatment systems (OWTS) within the town, with the goal to ensure that OWTS are functioning optimally.

• Increase Public Awareness through survey

• Develop an inventory

• Outreach & Education of residents, designers and contractors

• Obtain funding

12/12/2018

Page 8: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 8

TOWN OF LAKE GEORGE

20 Old Post Road Lake George, New York 12845

518.668.5131

Pre-Inspection Worksheet for Onsite Wastewater Treatment Systems (OWTS) Date ______________________________ Tax Map ID # ________________________ Name _______________________________________ Address _______________________________________ Lake address ________________________ _______________________________________ Lake phone ________________________ Phone _________________________________ (home) _________________________________ (cell) Email __________________________________________________________ SEPTIC SYSTEM SKETCH FINDINGS Unknown _________ [check here if you do not know the specifics about wastewater treatment on your property] Septic system sewage flows into: Concrete septic tank ________ gals (size of tank) Plastic septic tank ________ gals (size of tank) Metal septic tank ________ gals (size of tank) Holding Tank ________ gals (size of tank) Cesspool ________ gals (size and construction of cesspool) Effluent from septic tank flows to: Soil Treatment Area (STA) ________ Seepage pit / drywell ________ Eljen ETU ________ Puraflo ETU ________ Other (please describe) _______________________________________________________________ OTHER INFORMATION Age of septic system _____________ Distance to lake or stream _______________ feet Age of home ___________________ # of bedrooms _____________ Garbage disposal? Yes No (please circle) Water treatment system? Yes No (please circle) Sump pump to OWTS? Yes No (please circle) DATE of last septic tank pump out _______________ Septic hauler _____________________

<< Please attach a copy of your recent inspection and pump out receipts >>

Page 9: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 9

Program Boundaries

• Phase I – Diamond Point Area

• Phase II – Cannon Point to Hearthstone

• Phase III – Hearthstone to English Brook

• Phase IV – East Side (Plum Point to Wiawaka, and Elm School south)

Page 10: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 10

2015 DEC Water Quality Improvement Program (WQIP) Grant

Page 11: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 11

Round 12 (2015) DEC WQIP Grant

• Awarded $104,000 Grant

• 6 major “objectives” administered by The FUND

– Inventory and Assessment of all OWTS

– SIP Report and Mapping

– Municipal Outreach and Coordination

– Algae sampling and water quality testing

– High Priority areas & Funding

– Amend Town Sanitary Code/Ordinance

Page 12: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 12

Inventory

PHASE TOTAL PARCELS VACANT

PARCELS

CENTRAL

SYSTEM

PACELS

I 85 3 -

II 85 11 41

III 245 75 10

IV 133 48 -

Page 13: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 13

Inventory – Survey Results

PHASE

TOTAL

PARCELS

SURVEYED

PARCELS

RESPONDED

PERCENT

RESPONSE (%)

I 82 33 40

II 73 33 45

III 159 36 23

IV 83 31 37

TOTAL 397 133 34

Well above industry standard of 10% (+ 5%) response rate

Higher response rate in Phases I & II

Page 14: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 14

Inventory – System Assessment

Page 15: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 15

Inventory – System Assessment Results

Approximately 1/3 operating within life expectancy Approximately 1/3 near or past life expectancy Approximately 1/3 are unknown

PHASE AGE OF OWTS

0-30 YEARS 30-40 YEARS >40 YEARS UNKNOWN

I 33 (40%) 21 (26%) 18 (22%) 10 (12%)

II 21 (28%) 5 (7%) 16 (22%) 32 (43%)

III 68 (43%) 16 (10%) 35 (22%) 40 (25%)

IV 33 (41%) 10 (13%) 13 (16%) 24 (30%)

TOTAL 155 (39%) 52 (12%) 81 (21%) 106 (28%)

Page 16: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 16

Inventory – System Assessment Results

1 out of 5 tanks are undersized Approximately 1/3 of tanks are unknown size &

construction Very few known metal tanks

PHASE TOTAL

TANKS

UNDERSIZED

TANKS UNKNOWN

METAL

TANKS

I 70 14 (20%) 24 (34%) 2 (3%)

II 70 21 (30%) 27 (39%) 3 (4%)

III 136 15 (11%) 61 (45%) 0 (0%)

IV 71 15 (21%) 14 (20%) 2 3%)

TOTAL 348 66 (19%) 126 (36%) 7 (2%)

Page 17: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 17

Inventory – System Assessment Results

40% of systems are compliant 1 of 5 systems are unknown 1 of 5 are dry wells (increased failure potential)

PHASE TOTAL

SYSTEMS

COMPLIANT

SYSTEMS

UNKNOWN

SYSTEM

DRY

WELLS CESSPOOLS

I 70 31 (44%) 4 (6%) 18 (26%) 6 (9%)

II 70 14 (20%) 15 (20%) 18 (26%) 7 (10%)

III 136 61 (45%) 38 (28%) 22 (16%) 6 (4%)

IV 71 37 (52%) 10 (14%) 13 (18%) 2 (3%)

TOTAL 347 143 (41%) 67 (19%) 71 (20%) 21 (6%)

Page 18: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 18

Inventory – System Assessment Results

Overall, more 50% of properties have unknown pumpout Number reduced with increased outreach documented by

Phase I

PHASE TOTAL PARCELS NO PUMPOUT

KNOWN

I 82 23 (28%)

II 74 35 (47%)

III 160 122 (76%)

IV 83 44 (53%)

TOTAL 399 224 (56%)

Page 19: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 19

Outreach & Training

Page 20: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 20

Outreach & Training

Page 21: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 21

Algae Sampling

Page 22: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 22

Algae Sampling

PROTOCOL1 2016 2017

PALMER POLLUTION INDEX

PROBABLE ORGANIC POLLUTION (15-19) 2 3

PALMER POLLUTION INDEX

SLIGHT ORGANIC POLLUTION (11-14) 2 0

TROPHIC INDEX

SEVERE IMPACT (86-100) 1 3

TROPHIC INDEX

MODERATE IMPACT (71-85) 3 1

TROPHIC INDEX

SLIGHT IMPACT (51-70) 7 6

Page 23: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 23

How Do We Prioritize??

Create Weighted Data Bases on Inventory Assessment Implement GIS to Evaluate Parcels for Site Suitability Map areas of excessive algae growth Develop Prioritization Algorithm and Map Results

Page 24: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 24

Site Suitability Item Characteristic/Range Weighted

Steep Slopes Above 15% = 1

16% Below 15% = 0

Depth to Bedrock

Less than 1’ = 1

16% less than 2’ = 0.5

2’ and above = 0

Depth Seasonal High Groundwater

Less than 1’ = 1

16% less than 2’ = 0.5

2’ and above = 0

Stream Buffer Greater than 100’ = 0

26%

Less than 100’ = 1

Shoreline Buffer Greater than 500’ = 0

Less than 500’ = 1

APA wetland

Within wetland = 1

Outside wetland = 0

Less than 200’ Palmer 15-20 = 1

hydraulic conductivity (Ksat)

0 to 3.52 micrometers/sec= 1

26% 3.52 to 7.06 micrometers/sec= 0.5

7.06 to 423.33 micrometers/sec= 0

423.33 to 705 micrometers/sec= 0.5

Page 25: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 25

Existing System Inventory Item Characteristic/Assessed Points

System Age

0-30 Years = 2

30-40 Years = 1

>40 Years or Unknown = 0

System Components

Compliant Systems meeting Codes = 3

Undersized Septic Tank = 2

Undersized Absorption Field = 2

Seepage Pits = 1

Cesspools = 0

System Maintenance/Pumpouts

0-4 Years = 3

4-8 Years = 2

>8 Years = 1

Unknown or Never = 0

System Record Record Drawings, sketch, information exist = 1

No record drawings or system information = 0

OWTS Certification Town or Professional sign off = 1

No sign off = 0

Page 26: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 26

Site Suitability

Page 27: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 27

Prioritization Map

Page 28: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 28

Recommendations Categorized as Short-, Mid-, and Long-Term

MANAGEMENT

Inspection program, GIS Database Inventory Assessment for

Planning Dept., Pumpout Program, Test Pilot Program

OUTREACH

Municipal Presentations, Web page, Septic Summit

REGULATION

Transfer Law, Water Conservation fixture program

MONITORING

Algae Biomonitoring, Existing System Evaluation

FUNDING

Grants (FUND, CFA HABs Program, NYS Infrastructure), Work w/

Bank, PILOT Program

Page 29: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 29

Looking Forward

Complete Final Report

Establish GIS Inventory Data

Base

Develop Inspection Program

Continue Algae Biomonitoring

Secure Funding for Prioritized

Areas

Develop Lake-wide Strategy

Page 30: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 30

Take Aways

Management programs for onsite wastewater treatment

systems, septic systems, are necessary based on review

of system inventory and maintenance records.

The Town of Lake George has put together an approach

based on public outreach and inventory documentation to

support an inspection and management program.

The FUND for Lake George has developed a GIS based

algorithm to determine prioritized management areas

based on site suitability, existing system evaluation and

water quality.

Page 32: Lake George Septic Initiative Program · Lake George Septic Initiative Program Lake George Town Board Information Meeting . December 10, 2018 2 Outline ... Assembly Point (Queensbury)

December 10, 2018 32

Thank You!!