Lake County’s Adaptive Signal Control System Jon Nelson, P.E. Bill Eidson, P.E., PTOE Lake County Division of Transportation October 14, 2015

Transcript of Lake County’s Adaptive Signal Control System 3/Ada… ·  · 2015-10-27Lake County’s Adaptive...

Lake County’s AdaptiveSignal Control System

Jon Nelson, P.E.Bill Eidson, P.E., PTOE

Lake County Division of Transportation

October 14, 2015

Project Team

Aptakisic Road Project Overview

• County Highway –3.25 miles from IL 83 to US 45/IL 21

• 8 traffic signals• Mix of Land Uses and Traffic• 20,000-25,000 ADT (Aug 2014)

Aptakisic Road Corridor

New technology - 2009

• FHWA releases“Every Day Counts”

• Forward thinking

• History of trying something new.

Funding & Education - 2011

• Congestion Mitigation & Air Quality (CMAQ) application and selection

• Webinars (FHWA & vendors)

• NCHRP review

System Engineering - 2011

• FHWA releases draft SE model for Adaptive Systems

August 2011• FHWA holds SE workshop

September 2011• TES Conference workshop

October 2011

V Diagram

System Engineering - 2012

• One of the first agencies to work with FHWA Resource Center on document following the model (multiple versions reviewed)

System Engineering - 2012

• FHWA releases updated model –August 2012

• System Engineering approved –

October 2012• Concept of Operations• System Requirements• Verification Plan• Validation Plan• System Maintenance

Request for Proposals - 2013

• Worked with IDOT OP&P Agreement signed March 2013

• RFP released May 2013

• Contract with Rhythm Engineering signed August 2013

PS & E

• Designer selected – April 2012– Base plans developed– Project on hold until

system selected• Modified plans to

meet new design• Project let Jan 2014

Cost

• In Sync Cost - $247,000– Includes equipment, configuration, training

• Installation Cost - $336,000 (low bid contract)

– Includes new cabinets & controllers, additional detection, and optimization/validation studies

InSync System

• Processors in Each Cabinet

• Communications Between All Processors

• Designer Sets Parameters and Schedule

• InSync Adapts within Parameters

Installation

• New Cabinets Installed at 5 intersections

• All Controllers Econolite ASC/3

• On Existing PASSAGE Network

• Fiber Optic, Ethernet Based Communications

Installation

Installation

Installation

Installation

Installation

Installation

Detector Mode Operations

Adaptive Operations

Adaptive Operations

Adaptive Operations

80

90

100

110

120

130

140

150

6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM

Perio

d/Cy

cle

(Sec

)

Time of Day

TOD Cycle Lengths vs. Adaptive Period LengthsWeekday Conditions

Adaptive Period (6/3/2015) Adaptive Period (6/4/2015) TOD Cycle Length

Adaptive Operations

• Video Clips

Validation Study ResultsBefore vs. Optimized

AM Eastbound PM Westbound

Before

Optimized

AM Eastbound PM Westbound

Validation Study ResultsAdaptive vs. Optimized

Adaptive

Optimized

Validation Study Results

Validation Study Results

TOD Peak

Adaptive Peak

Westbound Through

(PM)Eastbound Through

(AM)

General Observations

• Overall Good Performance• Increased Volumes on Aptakisic Rd.• Public Comments

Corridor Challenges

• Railroad Preemption• Area Construction• Fiber Optic Cable• Congestion at IL 83

Thank You

Jon Nelson, P.E.Bill Eidson, P.E., PTOE

Lake County Division of [email protected]@lakecountyil.gov

847-377-7000

Questions?