LAGUINDINGAN AIRPORT DEVELOPMENT LAGUINDINGAN AIRPORT DEVELOPMENT PROJECT PROJECT “Our Northern Gateway to Mindanao” PROJECT STATUS AND UPDATES AS OF 15 OCTOBER 2012 PROJECT STATUS AND UPDATES AS OF 15 OCTOBER 2012

description

Presented by the Laguindingan Airport Development Project Office of the DOTC' s Civil Aviation Authority of the Philippines (CAAP) to the Northern Mindanao Regional Development Council

Transcript of Laguindingan Airport Development Updates October 24 2012

Page 1: Laguindingan Airport Development Updates October 24 2012

LAGUINDINGAN AIRPORT DEVELOPMENT PROJECTLAGUINDINGAN AIRPORT DEVELOPMENT PROJECT“Our Northern Gateway to Mindanao”

LAGUINDINGAN AIRPORT DEVELOPMENT PROJECTLAGUINDINGAN AIRPORT DEVELOPMENT PROJECT“Our Northern Gateway to Mindanao”

PROJECT STATUS AND UPDATES AS OF 15 OCTOBER 2012PROJECT STATUS AND UPDATES AS OF 15 OCTOBER 2012PROJECT STATUS AND UPDATES AS OF 15 OCTOBER 2012PROJECT STATUS AND UPDATES AS OF 15 OCTOBER 2012

Page 2: Laguindingan Airport Development Updates October 24 2012

A. Civil Works and Building Component• Substantially completed• Remaining works are the interfacing items with the Air Navigation System and

Support Facilities (ANSSF) component such as the duct banks and the testing and commissioning of equipment installed in all buildings

B. Air Navigation System and Support Facilities (ANSSF) Component• Procurement Process is Ongoing• The invitation for bid was published on 13 July 2012• Submission and opening of bids were undertaken on 29 August 2012.• With the additional 3 months contract duration required by EDCF, the project is

expected to be completed in January 2014.• Bid evaluation is ongoing.

CC. Operation and Maintenance (O&M) of the Laguindingan Airport• Deloitte Touche Tohmatsu, the Transaction Advisor has submitted the O&M study in

June 2012 and is still under review by DOTC

98.66%

DD. Planned Commercial/Soft Opening of the Laguindingan Airport• Per instructions from DOTC SMar and in coordination with CAAP, the airport is

planned to open in January 2013 using Visual Flight Rule (VFR)

Page 3: Laguindingan Airport Development Updates October 24 2012

Pavement Markings Pavement Markings Pavement Markings

ApronTaxiway

Storm Drainage

Runway

Perimeter Fence & Road

Sodding

Page 4: Laguindingan Airport Development Updates October 24 2012

Passenger Terminal Bldg

Operation & Control Tower Bldg

Administration BldgCrash Fire & Rescue Bldg

Cargo Terminal Bldg

Power House Bldg

Maintenance Bldg

Cold Water Receiving Station

Guard House

Page 5: Laguindingan Airport Development Updates October 24 2012

Car Parking Area Car Parking Area Sewage Treatment Plant

Landscaping

Landscaping

LandscapingLandscaping

Landscaping Landscaping

Page 6: Laguindingan Airport Development Updates October 24 2012
Page 7: Laguindingan Airport Development Updates October 24 2012

Ambulance

Grass Cutter

Tractor & Cart

Page 8: Laguindingan Airport Development Updates October 24 2012

Departure Area

Escalatorr

Initial Security Check

Automated Weighing Scale & Conveyors

Wicket Counters

Elevator @ Departure Area

CCTV Camera Final Security Check

Check-in Counters

Page 9: Laguindingan Airport Development Updates October 24 2012

Inspection Benches Departure Lounge Gang Chair

Gate 1Gate 2 Gate 3

Boarding BridgeCIP Lounge VIP Lounge

Page 10: Laguindingan Airport Development Updates October 24 2012

Hallway @ Boarding/Arrival Elevator @ Arrival Baggage Handling Carousel

Baggage Handling Carousel CCTV Camera @ Arrival AreaDome Type CCTV Camera @

Arrival Area

Arrival Exit

Information Counters FIDS @ Arrival Arrea

Page 11: Laguindingan Airport Development Updates October 24 2012
Page 12: Laguindingan Airport Development Updates October 24 2012

Weather Instruments

VHF Bipole Antenna

Page 13: Laguindingan Airport Development Updates October 24 2012

ACTIVITIESOffice-In-Charge

2012 2013

RemarksSept Oct Nov Dec Jan

1. Provision of Makers & Markings LADP-PMO

2. Coms(Tower) Equipment CAAP

2a. Site Preparation LADP-PMO

2b. Mobilization & Installation CAAP

2c. Testing CAAP

3. Submission of Aerodrome Data LADP –PMO

4. Evaluation & Publication CAAP-ATS Until 09 January

5. Wind Speed & Direction Sensor CAAP

5a. Delivery

5b. Installation

5c. Testing

6. Wind Cone CAAP

7. Delivery of Fire Truck LADP

8. Delivery of Runway Sweeper LADP

9. Delivery of Furniture LADP

Page 14: Laguindingan Airport Development Updates October 24 2012

ACTIVITIESOffice-In-Charge

2012 2013

RemarksSept Oct Nov Dec Jan

11. System Testing of Airport Equipment

LADP Contractor, Consultant & PMO

12. Identification & Designation of Counters & Offices (Airlines)

CAAP

13.Training of CAAP Personnel LADP Contractor, Consultant & PMO

14.Transportation System LTFRB & CAAP

15.Stakeholders Coordination Meeting

16. Probing Flight/Dry Run

17. Inauguration

Page 15: Laguindingan Airport Development Updates October 24 2012