Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

download Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

of 13

Transcript of Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

  • 7/29/2019 Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

    1/13

    Republic of the PhilippinesDEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS

    LAGUINDINGAN AIRPORT DEVELOPMENT PROJECTOur Northern Gateway to Mindanao

  • 7/29/2019 Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

    2/13

    A. Civil Works and Building Component

    Substantially completed

    Remaining works are the interfacing items with the Air Navigation System and Support

    Facilities (ANSSF) component for the testing and commissioning of equipment installed in

    all buildings

    98.66%

    B. Air Navigation System and Support Facilities (ANSSF) Component

    Notice of Award was issued on 14 January 2013 to SKY-KR Consortium, the winning bidder

    The Contract Agreement with SKY-KR Consortium was signed on 18 February 2013 and it

    was concurred by EDCF on 07 March 2013 The Notice to Proceed was issued on 12 March 2013

    The project is expected to be completed in the 2nd Quarter of 2014

    C. Operation and Maintenance (O&M) of the Laguindingan Airport

    The DOTC is considering the inclusion of possible development in the O&M for reason that

    the Lumbia airport has already surpassed the design annual passenger movement of the

    Laguindingan airport for the year 2020

    D. Planned Commercial Opening of the Laguindingan Airport

    The airport is planned to open on 30 April 2013 using Visual Flight Rule (VFR)

  • 7/29/2019 Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

    3/13

    Pavement Markings Pavement MarkingsPavement Markings

    ApronTaxiway

    Storm Drainage

    Runway

    Perimeter Fence & Road

    Sodding

  • 7/29/2019 Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

    4/13

    Passenger Terminal Bldg

    Operation & Control Tower Bldg

    Administration BldgCrash Fire & Rescue Bldg

    Cargo Terminal Bldg

    Power House Bldg

    Maintenance Bldg

    Cold Water Receiving Station

    Guard House

  • 7/29/2019 Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

    5/13

    Car Parking Area Car Parking Area Sewage Treatment Plant

    Landscaping

    Landscaping

    LandscapingLandscaping

    Landscaping Landscaping

  • 7/29/2019 Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

    6/13

    Ambulance

    Grass Cutter

    Tractor & Cart

  • 7/29/2019 Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

    7/13

    Departure Area

    Escalator

    Initial Security Check

    Automated Weighing Scale &

    Conveyors

    Wicket Counters

    Elevator @ Departure Area

    CCTV Camera Final Security Check

    Check-in Counters

  • 7/29/2019 Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

    8/13

    Inspection Benches

    Departure Lounge

    Gang Chair

    Gate 1Gate 2 Gate 3

    Boarding BridgeCIP Lounge VIP Lounge

  • 7/29/2019 Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

    9/13

    Hallway @ Boarding/Arrival Elevator @ Arrival Baggage Handling Carousel

    Baggage Handling Carousel CCTV Camera @ Arrival AreaDome Type CCTV Camera @

    Arrival Area

    Arrival Exit

    Information Counters FIDS @ Arrival Arrea

  • 7/29/2019 Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

    10/13

  • 7/29/2019 Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

    11/13

    Weather Instruments

    VHF Dipole Antenna

  • 7/29/2019 Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

    12/13

    ACTIVITIES STATUS REMARKS1. Power Supply The airport facility was energized by MORESCO-1 on

    21 February 2013. The testing and commissioning ofinstalled equipment commenced on the same day andwill last until 15 April 2013.

    Initially, MORESCO-1 is supplying

    power to the airport using 1MVAduring the testing of equipment withtheir 10MVA substation in Moog,Laguindingan. They are capable of

    providing the 4MVA requirement ofthe airport.

    2. Water Supply A newly drilled well and rehabilitation of the existing

    well is 80% completed. Completion of the system is

    scheduled by the end of March 2013.

    3. Telephone System The PLDT has already accomplished 80% of its cablingactivity from the national highway to the airport.

    CAAP to sign an agreement with PLDT for the

    connection .

    Target date of completion includingthe connection to the airport facilityis by the 1st week of April 2013.

    4. Transport System DOTC Planning Service conducted site visit & survey atLaguindingan airport on 06 March 2013 relative to theestablishment of the airports transport system.

    LTFRB requested DOTC for the lifting of moratorium forthe granting of franchises.

    LTFRB-10 will further explainregarding this matter.

    5. CommunicationSystem

    CAAP installed VHF & HFSSB for an interimcommunication facility.

    Tested already.

  • 7/29/2019 Laguindingan Airport Development Project (LADP) Status as of 15 March 2013

    13/13