f IntroductionIntroduction
LAFS = LHC at FNAL Software LAFS is a part of LHC@FNAL LAFS consists of a core group of 14 Fermilab*
people 8 computer professionals 6 accelerator physicists
LAFS immediate goal is to provide software support for the LHC With a long term view to be involved in the
commissioning and operations of the LHC LAFS is mutually beneficial to CERN and Fermilab
• We provide CERN with a valuable software service• In return, we are trained on LHC control system so that
we are poised to make valuable accelerator contributions to the LHC in the future
Note: Membership not restricted to Fermilab employees
LAFS Update - LARP Collaboration Meeting - McGinnis
f LAFS ManagementLAFS Management Although we are part of LHC@FNAL, we view ourselves as a software
team working for CERN’s Accelerator and Beams Department Controls group (AB/CO) under the direction of Hermann Schmickler We have an MOU We follow all the CERN requirements for software engineering
• Programming language and environment• Documentation• Look and Feel• Etc.
We view our main customer is Accelerator and Beams Department Operations group (AB/OP) in which our main contact is Mike Lamont
At Fermilab LAFS reports to the head of LHC@FNAL (Erik Gottschalk) Is lead by Dave McGinnis with Jean Slaughter as deputy Has three project leaders
• Suzanne Gysin• Elliott McCrory• Jim Patrick
Our goal is to have a constant presence at CERN Suzanne Gysin (October 1, 2006 – July 1, 2007) Dennis Nicklaus (Summer 2007) Elliott McCrory (August 1, 2007 – August 1, 2008)
LAFS Update - LARP Collaboration Meeting - McGinnis
f LAFS ProjectsLAFS Projects
We are involved in 10 projects Each project will have a leader and a contact at CERN With the exception of RBA which is well underway, most
projects are currently involved in writing requirements documents
LAFS Projects Role Based Access Control (S. Gysin) Sequencer Development (J. Patrick) Instrumentation Applications
• Tune Measurement (J. Patrick)• Wire Scanners (E. McCrory)• Synchrotron Radiation Monitor (D. Nicklaus)• Microwave Schottky Monitor (J. Patrick)• Residual Gas Monitor (E. McCrory)• Beam Profile Fit Library (E. McCrory)
Drag and Drop Display Builder (Synoptic Display) (T. Bolshakov)
Sequenced Data Acquisition (on hold) (E. McCrory)
LAFS Update - LARP Collaboration Meeting - McGinnis
f LAFS-CERN VisitsLAFS-CERN Visits
S. Gysin -> CERN, October 2006 P. Charrue & E. Hatziangeli -> Fermilab, November 15-
17, 2006 E. McCrory -> CERN, November 13-17, 2006 G. Kruk -> Fermilab, December 12-15, 2006
LHC Java Application Development Training Class Over 10 Fermilab people enrolled Huge Success!!!
J. Patrick & D. McGinnis -> CERN, February 14-20, 2007 J. Annala, D. Still, B. Hendricks -> CERN, March 19-23,
2007 D. Nicklaus-> CERN, March 26 – April 2, 2007 E. McCrory ->CERN, March 26 – April 9, 2007 A. Petrov & C. Schumann -> CERN, April 10-20, 2007 P. Charrue & E. Hatziangeli -> Fermilab, April 17-20,
2007
LAFS Update - LARP Collaboration Meeting - McGinnis
f Role Based Access Control (RBAC) S. Role Based Access Control (RBAC) S. GysinGysin
RBAC is software to prevent
An ignorant person from doing anything, anytime.
1. Login using NICE user name and password.
2. No login required in CCC, critical applications being the exception
3. Timeouts
A well meaning person from doing the wrong thing at the wrong time.
1. Access is determined by: role, location, mode, and application
2. Logging
What is a ROLE? A role is a job function
within an organization.Examples: LHC Operator, SPS Operator, RF Expert, BPM Developer …
Roles are defined by the instrument designers in a security policy.
A user may have several roles
What is being ACCESSED? CMW devices which map to
physical devices (power converters, collimators, kickers, etc.)
What TYPE of access? get: the value of a property
once monitor: the property
continuously set: the value of a property
LAFS Update - LARP Collaboration Meeting - McGinnis
f RBAC OrganizationRBAC Organization
RBAC team leader (S. Gysin - FNAL- LAFS) reports directly to AB-CO-IN section leader (P. Charrue)
Development: Authorization – K. Kostro AB-CO
• CMW - W. Gajewski AB-CO• RBAC server - S. Gysin FNAL-LAFS
Authentication – A. Petrov FNAL-LAFS Database – M. Peryt AB-CO LSA – G. Kruk AB-CO JAPC – R. Gorbonosov AB-OP
LAFS Update - LARP Collaboration Meeting - McGinnis
f Participation in Requirements and DesignParticipation in Requirements and Design
Requirements:
Prepared by: S. Gysin FNAL/ LAFS K. Kostro AB/CO G. Kruk AB/CO M. Lamont AB/OP S. Lueders IT/CO W. Sliwinski AB/CO P. Charrue AB/CO
Checked by: J. Wenninger AB/OP S. Page AB/PO E. Hatziangeli AB/CO V. Kain AB/OP K. Hanke AB/OP R. Schmidt AB/CO R. Steerenberg
AB/OP
Approved by: P. Collier AB/OP H. Schmickler AB/CO R. Bailey AB/OP S. Myers AB
Design:
Prepared by: P. Charrue AB/CO V. Baggiolini AB/CO W. Gajewski AB/CO S. Gysin FNAL/ LAFS V.Kain AB/OP K. Kostro AB/CO G. Kruk AB/CO R. Gorbanosov AB/CO S. Page AB/PO A. Petrov FNAL/LAFS W. Sliwinski AB/CO N. Stapley AB/CO
Design:
Checked by: E. Hatziangeli
AB/CO K. Hanke AB/OP M. Lamont AB/OP S. Lueders IT/CO
R. Schmidt AB/CO R. Steerenberg
AB/OP J. Wenninger
AB/OP
Approved by: P. Collier AB/OP H. Schmickler
AB/CO R. Bailey AB/OP S. Myers AB
LAFS Update - LARP Collaboration Meeting - McGinnis
f RBAC High Level DesignRBAC High Level Design
A1: User requests to be authenticated. RBAC authenticates user via NICE
user name and password or CERN certificate
RBA returns token to ApplicationA2:
Application sends token to CMW when connecting.
CMW/FE verifies token signature once, and uses the credentials for every subsequent request
CMW checks access map for role, location, application, mode
Application RBAC
RBAC Token:
•Application name
•User name
•IP address/location
•Time of authentication
•Time of expiry
•Roles[ ]
•Digital signature (RBA private key)
CMW client
FESA
CMW server
Access MAP
LAFS Update - LARP Collaboration Meeting - McGinnis
f RBAC Slice Test SummaryRBAC Slice Test Summary Status:
Working on production release Vertical Slice Test Complete January 18 RBA Review Feb. 16
Successfully executed the vertical slice test for RBAC on January 18 and 19, 2007. The purpose of the test was to verify the design concepts and roughly measure the overhead. We wrote seventeen tests to verify Authentication with an LHC software application via NICE username and password Checking the permissions to set/get a device property for the role obtained in the
first step. The tests also included the generation, storage, and distribution of the public and private keys for the digital signature and its verification.
We tested on Windows and Linux, and used the BPM properties to test the permissions.
All tests passed. Our timing measurements showed that the time it takes to authenticate on Windows or Linux is about 970 ms. The average time to verify a token is 2.3 ms, and the average time to check an access permission is 2.2 ms. The 2.2 ms to check the access permission are part of a command that took about 600 ms to execute, the RBAC overhead is between 0.5 -1% of the total command time.
The test included code for authentication written by Andrey Petrov (FNAL), authorization software in Controls Middle Ware by Wojciech Gajewski, EquipState modifications by Agnieszka Chabrowska and Greg Kruk, JAPC modifications by Roman Gorbonsov, and new authorization code written by Suzanne Gysin. In total, we added about 30 Java classes to the repository, plus the CMW C++ code.
We concluded the design concepts are valid, the added overhead is acceptable, and we can continue with the current design and develop the production <<RBAC_TestReport_070118.doc>> n version of RBAC.
LAFS Update - LARP Collaboration Meeting - McGinnis
f RBAC Review – February 16, 2007RBAC Review – February 16, 2007
LAFS Update - LARP Collaboration Meeting - McGinnis
f LHC Sequencer Development (Patrick)LHC Sequencer Development (Patrick)
Automates the very complex sequence of operations required to operate the LHC.
Typical commands Set, get, check devices Wait for conditions Execute more complex
operations Start regular programs Start plots Send data to shot log
Step through commands Stops on error Allow restart at failed
command
Sequencer is used for: Normal operations Studies or special cases
Working with CERN on requirements
LHC State Diagram
LAFS Update - LARP Collaboration Meeting - McGinnis
f Sequencer DevelopmentSequencer Development
Jerry Annala, Brian Hendricks and Dean Still traveled to CERN on behalf of the LAFS sequencer group to collaborate on the LHC sequencer design and development. During this time we met with Reyes Alemany, Mike
Lamont, and Vito Baggiolini and joined various meetings and discussion centered around the current and projected LHC sequencer work.
This also involved a demonstration of the current and proposed Hardware Commissioning (HWC) Sequencer and the LHC Sequencer.
Presented with work currently being developed for a proposed states machine that will be capable of interfacing to the sequencer.
Joined the two meetings that discussed the interactions between the LHC sequencer and the BLM and collimator systems.
Developed a summary of our involvement along with comments and recommendations for continuing progress and development directed at the LHC sequencer work. Not ready for public release
LAFS Update - LARP Collaboration Meeting - McGinnis
f Summary of Sequencer CollaborationSummary of Sequencer Collaboration
Reviewed the different versions of the sequencer. Evaluated the design choices using the requirements
document generated by CERN. Evaluated CERN’s proposal on implementing a finite
state machine engine. Encouraged them to continue with the development.
Encouraged sequencer team to begin detailed meetings with each subsystem group to begin the documenting and specifying the communications needed between the subsystems and: sequencer, Finite State Machine engine, timing system, etc.
LAFS Update - LARP Collaboration Meeting - McGinnis
f Tune Measurement Requirement Tune Measurement Requirement DocumentDocument
LAFS Update - LARP Collaboration Meeting - McGinnis 16
f Tune Measurement Prototype Waterfall/Slice DisplayTune Measurement Prototype Waterfall/Slice Display
LAFS Update - LARP Collaboration Meeting - McGinnis
f Wire Scanner Requirements ExampleWire Scanner Requirements Example
Num Title Description Priority Source
2.05 Data 1The WSA shall collect profile data from the wire scanner hardware when it
initiates a scan.Critical
2.10 Data 2The WSA shall collect profile data from the wire scanner hardware when a
scan is initiated by another agent.Expected
2.15 Adjust gains The WSA shall adjust the gains on the wire scanner readout in order to
accommodate the different intensities in the LHC. Critical GC, 26-Mar-07
2.20 Bunch Data The WSA shall plot each of the key parameters for all possible bunches in
the LHC. Critical GA, 28-Mar-07
2.25 Text OutputThe WSA shall provide a textual table of the key parameters for all
possible bunches in the LHCCritical
2.30 Histogram The WSA shall histogram (“frequency distribution”, dX/dn) each of the key
parameters for all possible bunches in the LHC. Critical GA, 28-Mar-07
2.35 Key Parameters
The key parameters returned by the wire scanner front end are understood to be:§Beam Centroid §Beam size/RMS §Sigma of Gaussian fit to the profile §Non-gaussian content of the beam§The 2 and/or the “goodness of fit”
Expected
LAFS Update - LARP Collaboration Meeting - McGinnis
f Synchrotron Light Monitor Requirements Synchrotron Light Monitor Requirements ExampleExample
f Drag and Drop Controls Display and BuilderDrag and Drop Controls Display and Builder(Synoptic Display)(Synoptic Display)
For rapid development, the system expert (operator, engineer, or physicist) should be the one to develop the displays or applications
These advanced control systems can seem overwhelming to non controls experts. This is why Lab View is so popular However Lab View offers little of the benefits of an advanced
control system. Drag and Drop is an environment that gives non-control
system experts the ability to quickly build controls displays which operate inside the control system framework.
Drag and Drop: is easy to use sophisticated enough to handle complex displays operates inside the control system framework. uses web browsers and/or Java Web Start (requires no extra
software installation) is easily extendible is a mature application
• Developed in 2001• Fermilab Cryogenics department are heavy users
f Demo – Builder, Meson Compressor RoomDemo – Builder, Meson Compressor Room
LAFS Update - LARP Collaboration Meeting - McGinnis
f Demo – Display, Meson Compressor Demo – Display, Meson Compressor RoomRoom
LAFS Update - LARP Collaboration Meeting - McGinnis
f SummarySummary
Since its inception 7 months ago LAFS has grown rapidly. Now has a core group of 14 Fermilab people
• 8 computer professionals• 6 accelerator physicists
Involved in 10 projects• Ranging from a mature project such as RBAC to new
ideas such as Drag and Drop
LAFS immediate goal is to provide software support for the LHC With a long term view to be involved in the
commissioning and operations of the LHC LAFS is mutually beneficial to CERN and Fermilab
• We provide CERN with a valuable software service• In return, we are trained on LHC control system so that
we are poised to make valuable accelerator contributions to the LHC in the future