    An-Najah National University

    Faculty of Engineering

    Department of Civil Engineering

    Transportation Systems Engineering II - CE !"

    T#AFFIC EN$INEE#IN$ %A&'#AT'#( AND )#'*ECTT#AFFIC EN$INEE#IN$ %A&'#AT'#( AND )#'*ECT

    Prepared by:

    Dr+ ,hale Al-Sahili

    )rof+ Sameer A.u-Eisheh

    Instructors:

    )rof+ Sameer A.u-Eisheh

    Dr+ ,hale Al-Sahili

    Eng+ /ussain A.u 0ant

    Eng+ 1ohamma A.u Nimeh

    Eng+ ,halil Aham

    Spring 2"3"

    1

  • 8/13/2019 Lab Manual Overall Spring2010

    2/24

    An-Najah National University - Department of Civil Engineering

    Transportation Engineering II - CE !"

    Traffic Engineering %a.oratory an )roject

    %a.oratory Notes4

    Each student must submit a laboratory report for each project on due date.

    You will work as groups. However each student mustsubmit his!her own

    report.

    "opying others# reports is absolutely not allowed. It may result in a 0E#'

    grade in the project.

    You must show your calculations clearly in the report.

    Each report mustcontain a discussion and conclusion section. $his section

    may include discussion of the theory data analysis conclusions of the project

    observations and comparison between the e%perimental values and e%pected

    values. &iscussion of the sources of error may also be included in the

    discussion.

    You should read the project before you come to the class with reasonable

    understanding of the theory and the idea behind the e%periment.

    %a.oratory E5periments an )roject

    "ondition &iagram

    '. (peed (tudies ) (pot (peed (tudies *$ime)+ean (peed,

    -. (peed (tudies (pace)+ean (peed

    /. $raffic 0olume ) 0ehicle "lassification (tudies ) +anual

    1. $raffic 0olume ) "lassification (tudies 2sing +achines

    3. $raffic 0olume (tudies Intersections +anually

    4. $raffic 0olume (tudies Intersections 2sing +achines

    5. Parking (tudy

    6. Pedestrian 0olume "ount (tudy

    7. Intersection &elay (tudy'8. Inventory (tudy

    ''. Intersection &esign and "ontrol Project

    $raing System4

    $he laboratory will account for -89 of the total grade for the transportation systems

    engineering II course

    2

  • 8/13/2019 Lab Manual Overall Spring2010

    3/24

    3

  • 8/13/2019 Lab Manual Overall Spring2010

    4/24

    An-Najah National University Department of Civil Engineering

    Traffic Engineering %a.+)roject No+ 34 Spee Stuies

    Using %aser Spee Detection Instrument

    &ac6groun4

    (peed studies had been performed through manual methods to measure time vs.

    measured distance. ater traffic data collectors were utili;ed to measure speed

    through computing the time re location close to the university is to be chosen. > sample of one hundred

    observations is to be considered.

    #e7uire4

    '. ?rite a report including purpose methodology data collection analysisdiscussion and conclusions.

    -. $abulate the data @ find the average speed standard deviation @ median.

    /. &raw the speed histogram the fre

  • 8/13/2019 Lab Manual Overall Spring2010

    5/24

    5

  • 8/13/2019 Lab Manual Overall Spring2010

    6/24

    An-Najah National University Department of Civil Engineering

    Traffic Engineering %a.+)roject No+ 24 Spee Stuies

    Space 1ean Spee

    &ac6groun4

    (peed studies had been performed through manual methods to measure time vs.

    measured distance. $hese involve measuring the time re

  • 8/13/2019 Lab Manual Overall Spring2010

    7/24

    An-Najah National University Department of Civil Engineering

    Traffic Engineering %a.+)roject No+ 84 Traffic 9olume Stuies : 1anual

    &ac6groun4

    "ongestion problems in ablus "ity re comprehensive study should be conducted to

    develop a system by which the network should be designed. &ue to limited time and

    resources spot studies are suggested for this project.

    Fiel Stuy4

    (everal counts are to be conducted on different roadways for the purpose of thisassignment. $he study locations will be given in the lab by the instructor.

    $hose counts will be limited to volume and classification counts. $he counting period

    will be limited to one)hour due to time limitation. However an e%tended)time count

    will be provided for you based on previous studies.

    #e7uire4

    '. ?rite a report including purpose methodology data collection data analysis

    discussion and conclusions.

    -. $abulate the results for the study.

    /. Identify the peak hour and peak hour volume for the '8)hr count.

    1. Estimate the >&$ for each street based on your ')hr count.

    3. Prepare a traffic flow map.

    4. Aind the peak hour factor for your street.

    5. Aind the percentage of private automobiles ta%is buses and trucks at your

    station.

    7

  • 8/13/2019 Lab Manual Overall Spring2010

    8/24

    8

  • 8/13/2019 Lab Manual Overall Spring2010

    9/24

    An-Najah National University Department of Civil Engineering

    Traffic Engineering %a.+)roject No+ 4 Traffic 9olume Stuies

    Using Electromechanical Data Collection #ecorers

    &ac6groun4

    +anual traffic volume counting can be used only for short periods. It re

  • 8/13/2019 Lab Manual Overall Spring2010

    10/24

    An-Najah National University Department of Civil Engineering

    Traffic Engineering %a.+)roject No+ ;4 Traffic 9olume Stuies : Intersection

    1anual Counts

    &ac6groun4

    =ecent $raffic congesting problems in ablus especially along the main arterial

    crossing the city attract the attention to study the inbound and outbound traffic

    volumes as well as the traffic volumes along those arterials especially at key

    intersections.

    $raffic volumes at intersections can be observed and recorded manually. (pecial

    forms can be used for this purpose. $he attached form shows the various vehicleclasses that might occur on city streets in the ?est Cank.

    Fiel Stuy4

    >s part of the effort a study of several intersections in ablus will be "ounted.

    +anual counting is to be used for turning movements at several locations. "ounts

    should be performed to catch the peak hours.

    %ocation4Intersections will be illustrated in lab session.

    #e7uire4

    '. ?rite a report including purpose methodology data collection data analysis

    discussion and conclusions.

    -. $abulate the results for the study using the special forms.

    /. Identify the peak hour and the peak hour volume for your station.

    1. Prepare an intersection traffic flow diagram.

    3. Aind the peak hour factors for each approach and for the intersection.

    4. Aind the percentage of heavy vehicles at your station.

    10

  • 8/13/2019 Lab Manual Overall Spring2010

    11/24

    11

  • 8/13/2019 Lab Manual Overall Spring2010

    12/24

    12

  • 8/13/2019 Lab Manual Overall Spring2010

    13/24

    An-Najah National University Department of Civil Engineering

    Traffic Engineering %a.+)roject No+ !4 Traffic 9olume Stuies : Intersection

    1achine Counts

    &ac6groun4

    $raffic congesting problems in ablus especially along the main arterial crossing the

    city attract the attention to study the inbound and outbound traffic volumes as well as

    the traffic volumes along those arterials especially at key intersections.

    $raffic volumes at intersections can be observed and recorded manually or by

    mechanical hand counters. $hese machines have been used where pushing buttons

    manually corresponds to recording vehicles. =ecently and in order to facilitatecollection recording and retrieving of data for short periods of time electronic data

    collection recorders have been developed and utili;ed.

    Fiel Stuy4

    >s part of the effort a study of several intersections in ablus will be "ounted.

    +achine counting is to be used for turning movements at several locations. "ounts

    should be performed to catch the peak hours.

    %ocation4

    Intersections will be illustrated in lab session.

    #e7uire4

    '. ?rite a report including purpose methodology data collection data analysis

    discussion and conclusions.

    -. $abulate the results for the study using the special forms.

    /. Identify the peak hour and the peak hour volume for your station.

    1. Prepare an intersection traffic flow diagram.

    3. Aind the peak hour factors for each approach and for the intersection.

    4. Aind the percentage of heavy vehicles at your station.

    13

  • 8/13/2019 Lab Manual Overall Spring2010

    14/24

    An-Najah National University Department of Civil Engineering

    Traffic Engineering %a.+)roject No+ een========== an4=================

    Num.er of Spaces4========================

    Time

    &eginning

    Facility

    No+)ar6ing Type

    )ar6ing

    Accumulation

    Time

    &eginning

    Facility

    No+)ar6ing Type

    )ar6ing

    Accumulation

    6:88 '-:88 6:'3 '-:'3 6:/8 '-:/8 6:13 '-:13 7:88 '/:88 7:'3 '/:'3 7:/8 '/:/8 7:13 '/:13 '8:88 '1:88 '8:'3 '1:'3 '8:/8 '1:/8 '8:13 '1:13 '':88 '3:88 '':'3 '3:'3 '':/8 '3:/8 '':13 '3:13

    15

  • 8/13/2019 Lab Manual Overall Spring2010

    16/24

    An-Najah National University Department of Civil Engineering

    Traffic Engineering %a.+

    )roject No+ ?4 )eestrian 9olume Count Stuy

    &ac6groun4

    Pedestrian traffic volume is relatively heavy in major downtowns in Palestinian cities.Pedestrians cross streets from any location whether it#s a designated pedestrian cross)

    walk or not. $hese random and unorgani;ed pedestrian crossings cause major

    vehicular delays at heavy pedestrian areas. $he study of pedestrian volume assists in

    evaluating the vehicle!pedestrians interaction. $his study is also used to e%amine

    Warrant: Minimum Pedestrian Volume.

    Fiel Stuy4

    Each group is re

  • 8/13/2019 Lab Manual Overall Spring2010

    17/24

    17

  • 8/13/2019 Lab Manual Overall Spring2010

    18/24

    18

  • 8/13/2019 Lab Manual Overall Spring2010

    19/24

    An-Najah National University Department of Civil Engineering

    Traffic Engineering %a.+)roject No+ @4 Intersection Delay Stuy

    &ac6groun4

    &elay is observed at a number of intersections in the area of ablus and other

    Palestinian cities. $he study of delay at intersections would assist in evaluating the

    performance of those intersections.

    Fiel Stuy4

    Each group is re

  • 8/13/2019 Lab Manual Overall Spring2010

    20/24

    20

  • 8/13/2019 Lab Manual Overall Spring2010

    21/24

    An-Najah National University Department of Civil Engineering

    Traffic Engineering %a.+)roject No+ 3"

    Inventory Stuy

    &ac6groun4

    $he general characteristics or roads in Palestinian cities are somewhat the same.

    Inventory of roads are hardly done in these cities. =oad network is not officially

    classified in a systematic way according to set standards. =oad signs are somewhat

    limited or need maintenance or replacement. +ost roadway sections have two lanes

    one lane per direction. Pavement conditions are fair to poor e%cept at locations where

    streets have been recently resurfaced.

    $he road inventory study is an important task that each jurisdiction should do to

    identify their assets. $hese studies include roadway classification and roadway

    elements. (tandard forms are typically used for this purpose.

    Fiel Stuy4

    $his study focuses on the inventory of e%isting conditions along some selected

    sections!intersections in the vicinity of >n)ajah ational 2niversity. $hese locations

    will be identified during lab sessions. Bne should pay attention to special conditions

    of traffic and geometry along the study sections. (tudents may use the attached form

    to facilitate collecting the information. >dditional information may be added as seen

    necessary by the observer.

    #e7uire4'. ?rite a report including purpose methodology data collection data analysis

    discussion and conclusions.

    -. ?rite your observations regarding special features *traffic and geometry, of

    the study location.

    21

  • 8/13/2019 Lab Manual Overall Spring2010

    22/24

    FIE%D IN9ENT'#( F'#1

    Section Type J mid)block J intersection

    Num.er Intersection %egs J / J 1 J +ulti

    )avement 1ar6ings J Good condition J Poor condition J &oesn#t e%ist

    1eian 'pening

    #oa>ay East >pproach J &ivided J undivided J Yes J o

    ?est >pproach J &ivided J undivided J Yes J o

    (outh >pproach J &ivided J undivided J Yes J oorth >pproach J &ivided J undivided J Yes J o

    Num.er of %anes EC FFF anes

    ?C FFF anes

    (C FFF anes

    C FFF anes

    /oriontal Alignment )( J (traight J "urveE)? J (traight J "urve

    9ertical Alignment )( J Gradient J evel

    E)? J Gradient J evel

    Shouler East >pproach J Yes J o ?idth K m

    ?est >pproach J Yes J o ?idth K m

    (outh >pproach J Yes J o ?idth K m

    orth >pproach J Yes J o ?idth K m

    Sie>al6 East >pproach J Yes J o ?idth K m?est >pproach J Yes J o ?idth K m

    (outh >pproach J Yes J o ?idth K m

    orth >pproach J Yes J o ?idth K m

    Drainage Facilities J Good J Poor J &oesn#t e%ist

    Surface Type J >sphalt J "oncrete J Gravel J &irt

    #oughness J =ough J (mooth

    22

    DATE

    $'9E#N'#ATE CIT( %'CATI'N

  • 8/13/2019 Lab Manual Overall Spring2010

    23/24

    Surface Defects J =utting J Potholes J "orrugation J Cleeding

    J =aveling J othing J Bthers

    Traffic Control J (top sign J yield sign J $raffic signal

    J Policeman J o control

    )ar6ing Control in the 9icinity J Parking J o Parking

    %oaing Facilities in the 9icinity J Yes J o

    %an Uses J "ommercial J =esidential J Industrial

    J (chool ;one J +i%ed J Bther

    Night %ight Conition J Good J Aair J Poor

    Spee %imit EC K Lm ! h

    ?C K Lm ! h

    (C K Lm ! h

    C K Lm ! h

    #oasie Feature

    )oles J East >pproach J ?est >pproach

    J (outh >pproach J orth >pproach

    #oc6s J East >pproach J ?est >pproach

    J (outh >pproach J orth >pproach

    Sie Slopes J East >pproach J ?est >pproach

    J (outh >pproach J orth >pproach

    Trees J East >pproach J ?est >pproach

    J (outh >pproach J orth >pproach

    Safety &arriers J East >pproach J ?est >pproach

    J (outh >pproach J orth >pproach

    'ther J East >pproach J ?est >pproach

    J (outh >pproach J orth >pproach

    9isi.ility of Traffic EC J Good J Aair J Poor

    Control Devices ?C J Good J Aair J Poor

    (C J Good J Aair J Poor

    C J Good J Aair J Poor

    Sight istance EC J Good J Poor

    ?C J Good J Poor

    (C J Good J Poor

    C J Good J Poor

    23

  • 8/13/2019 Lab Manual Overall Spring2010

    24/24

    An-Najah National University Department of Civil Engineering

    Traffic Engineering %a.+)roject No+ 33

    Intersection Analysis an Control

    &ac6groun4

    It has been noticed that traffic congestion in ablus and in other urban areas in the

    ?est Cank are most severe at key intersections. Proper intersection design and

    control is very important in assigning right of way improving traffic flow through the

    intersection and enhancing safety.

    Intersection design features include number of lanes lane widths proper

    channeli;ation curb radii etc. Intersection control features include proper

    installations of traffic control devices including signs and markings. >t specific

    intersections and if warranted traffic signals must be installed. $o evaluate the

    performance of an intersection capacity and level of service analysis are usually

    performed.

    Fiel Stuy4

    $his study focuses on intersection design and control at key intersections.

    First4intersection approach geometries have to be identified. Ne5t4an inventory of

    control measures at the approaches and of e%isting traffic control devices at the

    vicinity of the intersection is to be performed. $his in addition to the peak hour traffic

    volumes at the intersection considered which you have performed in ab. >ss. o. 3

    or will be supplied form a basis for proper design and control.

    #e7uire4

    '. ?rite a report including purpose methodology data collection data analysis

    discussion and conclusions.

    -. &raw the intersection at a proper scale showing all e%isting geometric and

    control features including traffic control devices.

    /. >naly;e the appropriateness of the current geometric and traffic control

    devices.

    1. (uggest modifications and make proper geometric design for the intersection

    including channeli;ation and draw using a proper scale.

    3. (uggest modifications to traffic control and show suggested traffic control

    devices for the intersection.

    4. "heck whether a traffic signal is warranted.

    5. If a traffic signal is to be installed. &esign the signali;ation plan showing

    phases cycle length intervals split etc.