LAB 1 REPORT-ver2

4
GROUP LOGO LAB 1: UTP CABLE CONSTRUCTION & PROCEDURES Prepared Date: UTP Cable Construction & Procedures Centre of Studies Computer Technology and Networking (CTN) ~ 0 ~ UiTM GROUP LOGO LAB 1 REPORT Date GROUP MEMBERS:

Transcript of LAB 1 REPORT-ver2

Page 1: LAB 1 REPORT-ver2

GROUP LOGO

LAB 1: UTP CABLE CONSTRUCTION & PROCEDURES Prepared By:

Date:

UTP Cable Construction & Procedures

Centre of StudiesComputer Technology and Networking (CTN) ~ 0 ~ UiTM

GROUP LOGO

LAB 1 REPORT Date

GROUP MEMBERS:

Page 2: LAB 1 REPORT-ver2

GROUP LOGO

LAB 1: UTP CABLE CONSTRUCTION & PROCEDURES Prepared By:

Date:

TABLE OF CONTENTS

Introduction........................................................................................................................................ 1

Objectives....................................................................................................................................... 2

Hardware and Software Requirements............................................................................................2

UTP Cable Construction......................................................................................................................2

Twisted Pair....................................................................................................................................2

Unshielded Twisted Pair (UTP).....................................................................................................2

Procedure to Construct Cable......................................................................................................2

APPLICATION OF UTP CABLE IMPLEMENTATION..................................................................................2

Straight –through Cable..................................................................................................................2

Cross-over Cable.............................................................................................................................2

Rollover Cable.................................................................................................................................3

How To Assign Logical IP Addressing For Terminal.............................................................................3

How to Assign Static and Dynamic IP addressing............................................................................3

Conclusion.......................................................................................................................................... 3

Group Members Task Delegation........................................................................................................3

References......................................................................................................................................... 3

Appendix............................................................................................................................................ 3

Centre of StudiesComputer Technology and Networking (CTN) ~ 1 ~ UiTM

Page 3: LAB 1 REPORT-ver2

GROUP LOGO

LAB 1: UTP CABLE CONSTRUCTION & PROCEDURES Prepared By:

Date:

INTRODUCTION

Overview of lab 2 exercise

Objectives

Hardware and Software Requirements

UTP CABLE CONSTRUCTION

Twisted Pair

Introduction – explain concept (use your own words- cannot copy –paste technique) – one paragraph only

Unshielded Twisted Pair (UTP)

Intro - one paragraph only

Procedure to Construct Cable

General steps to construct those three types of UTP cable.

Straight –Through CableProvide the colour configurationFunctionAdvantage/disadvantage

Cross-Over CableProvide the colour configurationFunctionAdvantage/disadvantage

Rollover or Console CableProvide the colour configurationFunctionAdvantage/disadvantage

APPLICATION OF UTP CABLE IMPLEMENTATION

Straight –through CableIntroProcedure/steps – provide screen shot and logical design

Cross-over CableIntroProcedure/steps – provide screen shot and logical design

Centre of StudiesComputer Technology and Networking (CTN) ~ 2 ~ UiTM

Page 4: LAB 1 REPORT-ver2

GROUP LOGO

LAB 1: UTP CABLE CONSTRUCTION & PROCEDURES Prepared By:

Date:

Rollover CableIntroProcedure/steps – provide screen shot and logical design

HOW TO ASSIGN LOGICAL IP ADDRESSING FOR TERMINAL

IntroProcedure of Assigning IP Addressing to PCOther related info

How to Assign Static and Dynamic IP addressing

Discuss

CONCLUSION

GROUP MEMBERS TASK DELEGATION

REFERENCES

APPENDIX

Centre of StudiesComputer Technology and Networking (CTN) ~ 3 ~ UiTM