PLANT-WIDEControl and Optimization
SCALABLEand Modular
SECUREOpen and Information-enabled
FLEXIBLEDelivery and Support
Copyright © 2016 Rockwell Automation, Inc. All Rights Reserved. 3PUBLIC
Engineering
Engineer’s perspective – configure device level components
Add code and HMI for new storage tanks to an on-line PlantPAx®
application
Learn about features of the Rockwell Automation® Library of Process
Objects v3.5
On-line programming in Studio5000, and HMI development using
FactoryTalk® View Studio
This lab takes approximately 90 minutes to complete
Copyright © 2016 Rockwell Automation, Inc. All Rights Reserved. 4PUBLIC
Engineering Software
Create control code
to add to current
control strategy
Create and configure
additional HMI
graphical elements
Copyright © 2016 Rockwell Automation, Inc. All Rights Reserved. 5PUBLIC
Code creation tools and features
Control Strategies
50+ control strategies
Import, name and DONE
New
Logical Organizer
Create and organize code
Create libraries
Copyright © 2016 Rockwell Automation, Inc. All Rights Reserved. 6PUBLIC
Create code for new storage tanks
Leverage PlantPAx® Library of Process Objects
Create logic for:
Valves
Level sensors
Pumps
Create and leverage your own control strategy
Copyright © 2016 Rockwell Automation, Inc. All Rights Reserved. 7PUBLIC
Create HMI objects for new storage tanks
Leverage Library of
Process objects
Configure graphical
objects
Configure alarms
Configure interlocks
Test your application
Copyright © 2016 Rockwell Automation, Inc. All Rights Reserved. 8PUBLIC
Operations
Operator’s perspective - interaction with device level components
Touring a simulated plant environment
Become familiar with standard PlantPAx® capabilities, features and
functions as applied in a simulated utilities area
Simulated plant environment built using Rockwell Automation® Library of
Process Objects and PlantPAx® methodologies
This lab takes approximately 90 minutes to complete
Copyright © 2016 Rockwell Automation, Inc. All Rights Reserved. 9PUBLIC
Navigation and Faceplates
Navigating different
displays
Accessing device
faceplates
Navigating available
features inside
faceplates
Copyright © 2016 Rockwell Automation, Inc. All Rights Reserved. 10PUBLIC
Alarms, Interlocks and Permissives
How devices display
adverse conditions
How to access alarm
status information
How devices display
permissive or
interlock issues
How to access
permissive and
interlock information
Copyright © 2016 Rockwell Automation, Inc. All Rights Reserved. 11PUBLIC
Trends
Accessing Trends
Interacting with
Trends
Adding elements to
trends
Copyright © 2016 Rockwell Automation, Inc. All Rights Reserved. 12PUBLIC
What else?
Tend to different
situations/issues in
the sample plant
Run the sample plant
Learn about the
PIDE faceplate
Learn about role-
based access
L08-Oper
Copyright © 2016 Rockwell Automation, Inc. All Rights Reserved. 13PUBLIC
Please take a moment to complete the brief session survey using the
ROKEvent mobile app.
Login to the ROKEvents mobile app with your username and password (set
up when registering for the 2016 Automation Fair® Event)
Locate the session in “Schedule” or “My Event”
Click on the survey icon in the lower right corner in the session details
We want to hear from you and value your opinion!
COMPLETE A SURVEY
Like what you heard? Need more information?