L. NExScI Operational Readiness
Rafael Millan-GabetProject Scientist, NExScI
&Mihseh Kong, NExScI Software Engineer
David Imel, IPAC & NExScI ManagerChas Beichman, NExScI Director
NExScI Compliance
• This presentation discusses NexScI readiness to assume responsibility for the archive
• Relationship to ORR Success Criteria:Satisfies requirement for NExScI to perform processing and archiving of LBTI-produced data
• Concerns: None• Liens: None
L-2
NExScI Responsibilities (1/3) (PLRA 2014 Section 3.1.3)
NExScI shall be responsible for1. Developing common formats for data products and coordinating with UA to
archive data products:a. Interface with UA to receive NASA LBTI datab. Archive the NASA LBTI data at NExScIc. Provide interface for science community access to the archived datad. Monitor data product quality assessments conducted by UA as a service to observers
L-3
All part of the archive service: Developed FITS file formats and keywords for LBTI nulling data Automatic data transfers and ingestion Automatic implementation of periods of exclusive data use and public release Web interface to the archive as well as scripted data access HTML summary tables and browse plots
NExScI Responsibilities (2/3) (PLRA 2014 Section 3.1.3)
NExScI shall be responsible for2. Selecting HOSTS Science Team members:
a. Prepare call for proposalsb. Conduct peer reviewc. Select proposalsd. Manage science deliverables
L-4
Call for proposals issued in Feb 2012 and selections announced in June 2012 Followed standard peer-review and selection procedures LBTI Project PI (UA) and NASA Project Scientist at NExScI co-lead the HOSTS Science Team Defined a set of 6 deliverables for the Science Team Main ST activities to date:
o Monthly telecons + focused telecons (e.g., on the analysis pipeline)o Participation in observing runso Developed target list (Weinberger et al. ApJ, 2015)o Developed exozodi model (Kennedy et al. ApJ, 2015)o Developed quantitative mission success criteria (Mennesson)
Deliverable Due Date CommentPreliminary target list 9/2014 Published paper Weinberger et al., ApJ, 2015Final target list 3/2015 Tied to start of operationsReport on data calibration methods 5/2016 After 1 year of experience with the dataReport on interpretation and implications for exo-Earth imaging
9/20159/20169/2017
Incremental releases
Final report and plans for publications 3/2018
NExScI Responsibilities (3/3) (PLRA 2014 Section 3.1.3)
NExScI shall be responsible for3. Providing oversight and guidance to the ExEPO to protect the LBTI’s science
objectives and implement NASA HQ policies
L-5
NExScI shall be responsible for4. Providing management oversight of LBTI during the Operations Phase:
a. Generate monthly report of science and operations statusb. Provide point of contact to UA and ExEPO for resolution of issues and concerns
The Project Scientist at NExScI provides these functions for ExEP and HQ
NExScI is prepared to assume management oversight functions Plan is to transition at the end of the Science Validation Phase
Science Data Management (PLRA 2014 Section 3.4)
Addresses archival obligations and data rights for• Commissioning data• HOSTS• HOSTS/LEECH• Non-NASA users
L-6
Periods of exclusive data use are implemented in the archive, data goes public when they expire Note: HOSTS/LEECH periods of exclusive data use same as for HOSTS
Consistent with these obligations, the current version of the archive supports LBTI nulling data Small additional archive development needed to support LEECH data planned for FY16
o If LMIRCam data are needed to mitigate PWV, this task may be de-scoped, or replaced with modifications needed to support the new ancillary data for nulling, if needed
Data Rights Implementation
L-7
Project ID associated with each observation at the observatory via the Observe Web tool
Project ID keyword in header of each Level-0 image; then propagated to L1/L2 files by the pipeline
Data Requirements(PLRA 2014 Section 4.2)
Addresses data archiving and public distribution obligations described before, plus types of data and timeliness of transfers and archive ingestions:
All scientific data generated by the NASA HOSTS survey shall be provided from the LBTI observatory to NExScI for archiving and distribution. An instrument data management plan shall be developed by NExScI and UA to address the total activity associated with the flow of NASA science data, from planning through acquisition, processing, data product generation, and validation, to archiving and preservation. NExScI shall develop common formats and coordinate archiving of data with UA. NExScI shall provide an interface to UA to receive NASA LBTI data. NExScI shall provide a link to the archived data for distribution to the various observers for calibration and analysis.
Three types of data products shall be archived; the delivery timescales in each case are appropriate to the needs of the HOSTS survey:
1. Level 0: Merged raw images; delivered from the observatory to NExScI within 72 hrs of observation
2. Level 1: Internally calibrated science data, delivered from the observatory to NExScI within 20 work days of observation. Internally calibrated data consists of: cleaned Level 0 images (dark subtracted, bad pixels removed, flat fielded, background subtracted) and files containing derived quantities (null and stellar fluxes, associated errors, diagnostic quantities)
3. Level 2: Externally calibrated science data, delivered from the observatory to NExScI within 40 work days of observation. Externally calibrated data files contain fully calibrated nulls and associated errors (effects of instrument’s transfer function removed), and result from processing multiple Level 1 files obtained on the target star and its calibrator stars.
L-8
Data Management Plan: delivered and in signature cycle (NExScI, UA, JPL, HQ) The data pipeline (UA) automatically takes Level 0 data and outputs the Level-1 and -2
products as described above Detailed data formats documented in ICD and documentation for archive users Demonstrated automatic data transfers and archive ingestion for the three levels of data, and
under the required times, on several occasions during the commissioning phase
LBTI NExScI Archive Demo (1/4)
L-9
• Password-protected login for PIs• Data search by criteria, or from
lists of dates or objects• Search L0, L1, or L2 data
LBTI NExScI Archive Demo (2/4)Level-0 Images
L-10
• Dynamic HTML tables• Data download options
LBTI NExScI Archive Demo (3/4)L1 Nightly Summary, OB Summary, and Processed Image Cubes
L-11
LBTI NExScI Archive Demo (4/4)Level-1 and -2 Browse Plots
L-12
Holdings• The archive currently contains all commissioning and science verification
data taken in nulling mode• All data (science and engineering) are available to instrument and Science
Team members• Some of the science verification data taken during commissioning
(12-month period of exclusive data use) is of good quality and can be made public now
L-13
Plan
L-14
ORR
Apr 28 May 28
Archivepublic
FY 15 FY 16
Oct
• Archive ops(data ingestions)
• Development frozen
• Archive ops and maintenance (data ingestions)• Resume development:
– Bug fixes and user feedback– Expected evolution of data files during SVP– LEECH data
FY 17
Oct
• Archive ops & maint(data ingestions)
FY 18
Oct
•Ex
tens
ions
to o
ther
LB
TI m
odes
or L
BT
inst
rum
ents
pen
ding
G
O d
ecis
ion
Summary
L-15
PLRA ID Description Status Comment3.1.3.1 Data formats, interface to UA, NExScI
archive✔ • Archive will be made public following ORR
board report• Archive dev frozen after ORR until FY16 due
to funding invested instead in additional resources towards instrument commissioning success
• Data still expected to evolve during SVP• Level of funding supports only minor archive
modifications post public release3.1.3.2 HOSTS Science Team selection and
activities✔
3.1.3.3 Project Scientist functions ✔
3.1.3.4 Management oversight at NExScI ✔ • Deferred to end of SVP3.4 Data rights and data to be archived ✔ • LEECH work deferred to FY16
• Other modes pending GO program decision4.2 Types of data products and timeliness
of transfers. Data Management Plan✔