Engineering Management Capstone Project
EM 697
Compare and C_mtrast
Risk Management Implementation at
NASA and the U.S. Army
L_
Mary Ann Brothers
December 12, 21JO1
https://ntrs.nasa.gov/search.jsp?R=20020048548 2018-08-17T11:21:15+00:00Z
Compare and Contrast
Risk Management Implementation at
NASA and The U.S. Army
Mary Ann Brotlners
EM69712 December 2001
2 of 27
ABSTRACT
NASA at Marshall Space Flight Center (MSFC) andthe U.S. Army at Redstone Av_+enal were analyzed to
determine whether they were successful inimplementing their risk mana_,ement program. Risk
management implementation surveys were distributedto aid in this analysis. The scope is limited to NASA
S&MA at MSFC, includirg applicable supportcontractors, and the U.S. Army Engineering
Directorate, including applicabh_ contractors, located atRedstone Arsenal.
NASA has moderately hi:_her risk managementimplementation survey scoles than the Army.
Accordingly, the implementation of the risk
management program at NA,_,;A is considered goodwhile only two of five of the survey categories
indicated that the risk management implementation isgood at the Army.
INTRODUCTION
The purpose of this project +_ to report tile surveyfindings of the Risk Management Implementation attwo government organizations. A survey developed by
the author, entitled Risk Ma_mgement, was used tosolicit this data. The first ¢_rganization is National
Aeronautics and Space Administration (NASA)Marshall Space Flight Center iMSFC), and the second
is the U.S, Army located at t,tedstone Arsenal. Both
organizations work through matrix support provided tovarious projects and thus each project would dictatespecific needs or requiremenls from the supporting
team. The author will compute and contrast the twoorganizations' implementation cl'lbrts.
ORGANIZATIONS EVALU _TED
This section introduces the two organizations to be
evaluated. It contains a description of the riskmanagement process utilized by both organizations.
Additionally, it defines the risk management categoriesthat will aid in evaluating the effectiveness of the risk
management implementation.
NASA. NASA was established in 1958 and has
accomplished many great scientific and technological
feats in air and space. NASA has also adapted
technology for many uses by the private sector. Thisstudy focuses on a field installation of the NationalAeror.autics and Space Administration, the Marshall
Space Flight Center, located in ttuntsville, AL. MSFCwas e_+tablished in 1960 and named in honor of General
Geor,t,e C. Marshall. General Marshall was the Army
Chief of Staff during World War If, Secretary of State,and Nobel Prize Winner for his world-renowned
"Mar,,.hall Plan." The survey focus at MSFC was theSafety and Mission Assurance (S&MA) team. A
sample of approximately 100 contractors and civilservants are considered to have been involved in risk
management implementation and thus were requested
to participate in providing the survey results.
NASA Risk Management. There are three
requfiements documents for risk management thatNASA considers interdependent:
• NPG 8705.XX (draft), Risk ManagementProcedures and Guidelines
• NPG 7120.5A, NASA Program and Project
Management Processes and Requirements
• NPD 8700.1, NASA Policy for Safety andMission Success
Within Risk Management Procedures andGuid,,lines is the risk management plan and risk lists.
Addilionally, it contains the Program/project manageracts us the integrator of risk management. Ultimately,
it pr,_vides additional information for applying riskmanagement as required by NPG 7120.5A.
The definition for risk management can be foundin NPG 7120.5A: "an organized, systematic decision-making process that efficiently identifies risks, assesses
or analyzes risks, and effectively reduces or eliminates
risks to achieving the program goals." Also found inNPG 7120.5A is the NASA risk management process:
Identify risk issues and concerns
Evaluate (impact/severity, probability,timeframe), classify, and prioritize risks
• Decidewhat,if anything,shouldbedoneaboutrisks
• Monitor risk metric_and verify/validatemitigationactions
• Decideto re-planmitigations,closerisks,invokecontingencypla1_s,orcontinuetotrackrisks
NASA'spolicycanbeli)u:_din theNASA Policy
for Safety and Mission Success. The policy states thatusing qualitative or quantity.live risk assessment
techniques will maximize the likelihood of missionsuccess. Additional evidence of NASA's commitment
and emphasis on risk manag,:ment is in a NASApresentation (Dr. Michael GreeJ_field, 1998) titled Risk
as a Resource. In his presentation, Dr. Greenfieldstates "effective project management depends on a
thorough understanding of the concept of risk, the
principles of risk management, and the establishmentof a disciplined risk management process." Dr.
Greenfield also wrote a paper fc,r NASA that addressesthe need for risk to be managec differently such as the
"knowledge-based" approach that NASA is moving to.NASA also conducts risk management training
classes for civil servants _s well as tbr their
contractors. The risk managem,znt class is presented bythe NASA Safety Training Center. The class
emphasizes that risk management and safety arecorrelated. The class teaches h.,w a risk is an attribute
of a hazard. Additionally, risk is an expression of thecombined severity and probability of loss. NASA uses
the convention for evaluating the severity of a risk for ahazard by working with the worst credible
consequence. When considerirg probability, operatingduration or number of trials/missions/operations isexamined. To assess risk, both must be evaluated. A
useful tool for assessing risl, is a risk assessmentmatrix. A risk assessmen_ matrix includes the
relationship of probability against the severity of the
consequence. Below is a simplified matrix.
Probabit!ty of Mishap
Severity ofConsequences
Cataslrophic
II Cdtical
III Marginal
IV Ne_li[lible
F E O C A
Impossible Improbable Remote Occaslonl Frequent
Some, but not all, of the NASA risk management toolsthat are in place include:
1. Fault Tree Analysis
2. Failure Mode and Effect Analysis
.
4.
5,
EM69712 December 2001
3 of 27
Probabilistic Risk Assessment
Reliability Block DiagramsRisk Assessment Matrix
Methods for establishing risk tolerance limits that areutilized by NASA include:
• Formal analysis
• Professional judgment
• Bootstrapping
Risk management roles and responsibilities are also amajor factor in effective implementation. For NASA,
perfolming risk management analysis is theresponsibility of the line organizations or the staff
specialists. However, the acceptance always falls on
mana),ement.
The U.S. Army. In 1941, congress approved funds forthe A_my to construct a chemical manufacturing and
storage facility, Huntsville Arsenal, to supplement theproduction of the chemical manufacturing plant at
Edgewood Arsenal. A facility, initially known asRedst_me Ordnance Plant, was built adjacent to the
chemical manufacturing installation. The plant was
designated Redstone Arsenal in February 1943.The U.S. Army Aviation and Missile Command
(AMCOM) Aviation & Missile Research,
Development, and Engineering Center (AMRDEC)
Aviation Engineering Directorate located at RedstoneArsenal in Huntsville, Alabama is the focus of this
proje_.t. The Director of Aviation Engineering is theAirworthiness authority for Army developed aircraft
and provides matrix support to their customers.
Aviation Engineering direct customers are the ProgramExecutive Officer Aviation Program/Project/ProductManagers (PMs) and the U.S. Army Aviation and
Missiie Command (AMCOM) Defense SystemsAcquisition PMs. Their ultimate customers are the
Army aircraft crew, passengers, and maintainers thatopera)e the Army aviation systems. The Engineering
Directorate is made up of approximately 660emph,yees. The survey was distributed to about 100contr_ctors and civil servants that were considered to
have applicable knowledge of the risk management
program implementation.
The U.S. Army Risk Management. For the Army,risk i_ a way of measuring the potential that an event
will result in a negative consequence, The Army has arisk management information system website thatcontains many useful tools and techniques utilized by
the Army. Additionally lessons learned as well assafety information can be obtained from this site.
Similar to the NASA philosophy, an Army ProgramManz_ger must consider the probability that an event
will occurandthe consequences should that event
occur when assessing risk. TL> ensure that DOD is
acquiring optimum systems that meet all requirements,Program Managers must manage risk and assess cost,
schedule, and performance. Olce a risk is assessed,Program Managers must determine how best to handle
it. Controlling risk, avoiding risk, assuming risk, andtransferring risk are four strategies used. The four
strategies can be use alone or in combination.Controlling the risk means lowe ing the chance that the
event will occur. Avoiding th,: risk means changing
the source that is subjecting the program to risk.Assuming the risk means Flanning for potential
consequences. Transferring the risk means havingsomeone else take accountability for the risk.
Similar to NASA, tile Army treats riskmanagement as a process for identifying and
controlling hazards to prot,:ct the force. Riskmanagement is a proven accid,:nt-prevention process.
According to BG James E. Sim_nons, director of ArmySafety and commanding genecal of the U.S. Army
Safety Center at Fort Rucker, AI,, accident rates acrossthe Army dropped following the adoption of risk
management as the principle accident-prevention
process. He also states that thc Army's most state-of-the-art safety weapon is ris_. management. Risk
Management is the Army's principle risk-reductionprocess to protect the force. The Chief of Staff states
the Army goal is "to make risk management a routinepart of planning and executin_ operational missions".
Another technique used by the Army is the five-steprisk management process. Acc,_rding to BG Simmons,
effectively applying the five-step risk managementprocess will help do the right training safely and will
also help execute operational missions safely. The
Army's Risk Management Card, which includes thefive-step risk management proc,_'ss, follows.
EM69712 December 2001
4 of 27
Risk Management
Matrix
H 8" '°.The basic principles that provide a framework
for imglementing the risk management process are:
• Integrating risk management into mission
planning, preparation, and execution.
• Making risk decisions at the appropriatelevel in the chain of command.
• Accepting no unnecessary risk.
Risk management integration strengthens risk
management by embedding it in all the Army does,both on and off duty, as organizations and as
individuals. Army risk management integration stepsare:
1, Identify risk management integrationopportunities.
2. Assess improvement opportunities.3. Develop integration procedures.4. Assist implementation of integration
procedures.
5. Measure and reassess the degree ofintegration and its results.
Some, but not all, of the Army risk
management tools that are in place include:
1. Safety Assessment Procedures2. Next Ground Accident Assessment
Individual
3. Leader Training Support Package4. Soldier Training Support Package
for
5. Small Unit Risk Man lgement Booklet
6. Risk Management Cald7. Protection (Safety) Readiness Checklist
from Center for Army Lessons
8. Risk Management W_,_rkSheet
9. CECOM System Stfety Lessons LearnedHandbook
10. Operation Risk Management Leader'sGuide
In addition to risk management tools, below is a
helpful listing of policy and doctrinal references related
to Army risk management.
• AR 70-1, Systems Acquisition Policy andProcedures, dtd 1997.
• AR 385-16, System Safety Engineering and
Management, dtd 3 M;_y 90.
• FM 100-14, Risk Management, dtd 23 April1998.
• HQDA Letter 5-97-1, Risk Management
Integration Responsibilities, dtd 1 May 97.
• MIL-STD-882C, System Safety ProgramRequirements, 19 Jan _)3,
• Center for Army Le_sons Learned (CALL)Newsletter 99-5, "b',_sk Management forBrigades and Battalions", dtd Apr 99.
• FM 101-5 Staff Orgat_zation and Operations,dtd 31 May 1997.
Risk management roles and responsibilities are a
little different for the Army than for NASA.Leadership at the appropriate h:vel of authority making
informed decisions to control hazards or accept risks is
the Army standard for risk management. It is theresponsibility and accountabil_ly of leaders to assess
their operation as a total system and to ensure thatplanning, risk management d:cisions, and executionproactively identifies hazards, assesses the associated
risks, and identifies control measures necessary toreduce the risks to the level commensurate with theircommander's intent.
The level of acceptar,,:e decision authority is
determined by the degree of r_sk. The risk issue mustbe elevated to the next higher command when
resources to control a high risk are not available. Thisprocess promotes that a c_mscious and informeddecision is made to commit the resources to control the
hazards or accept the risk.
EVALUATION.
This section of the report evaluates the results from
each organization individuall,r, Each organization is
EM69712 December 2001
5 of 27
measured against criteria established in the distributed
surveys.
The surveys provide data based on five riskmanagement categories. The risk management
categories, including a demographics section, are: RiskManagement Planning, Risk Identification, Qualitativeand Quantitative Risk Analysis, Risk Response
Planni_lg, and Risk Monitoring and Control. By
answering questions in each of these five categories,ranging from answers of strongly disagreeing to
strongly agreeing, the respondents indicated whether or
not their organization was successful in implementingrisk management. A range of six to eleven questions in
each of the five categories were answered and assigned
a value based on the employee's level of agreementwith five being considered the best score in terms ofsuccess. A score of three or below provided by the
employee indicates a lack of success in this category of
risk management implementation. A one was assignedfor each answer of don't know or not applicable. An
average of the questions was then calculated.
NASA Risk Management Implementation SurveyResults and Evaluation. NASA risk managementimple,nentation surveys were received from eighteen
gover_ment and fifteen support contractors. Of the
thirty-three surveys, results were received from ninemanagers, one support staff, and twenty-three technicalemph,yees. Of those, 39.39% have worked at or
supported NASA over seven years, 27.27% haveworked there between one and three years, 18.18%
have worked there between three and seven years, and
15.15% have been there for less than one year.
'lhe survey results indicated that NASA was most
successful in terms of Risk Management Planning,Risk Identification, and Risk Monitoring and Controlwith mean scores of 3.8. Qualitative And Quantitative
Risk Analysis was next with a mean score of 3.7. Risk
Resp_mse Planning barely ranked as a slightly positivescore with a mean of 3.5.
Although respondents indicated a successful scorefor Qualitative and Quantitative Risk Analysis, aweakness in the risk analysis process was in testing
identified project assumptions against the stability of
the assumption and against the impact on the project ifthe assumption is false.
Three weaknesses were identified in the Risk
Resp,)nse Planning category. One weakness was inchanging the project plan to eliminate the risk and
protecting the project objectives from the risk's impactto avoid specific known risks. The other twoweaknesses are in the risk response plan. The risk
resp_,nse plan does not allow for identification of
residualrisksand/orsecondalyrisksanddoesallowforidentificationofcontr;tctualagreements.
NASA Risk Management
"E
E
<
31,i,i
!!_!_i!!! .I
mt
Risk Management Category
not
EM69712 December 2001
6 of 27
assign personnel or other resources to projects with
different risk rankings, to make a benefit-cost analysisdecisitm about the project, and/or to support a
recommendation for project cancellation. A thirdweakness is that risk analysis is not used to provide a
prioritized list of quantified risks.
R_sk Response Planning received positive
indications, although having an overall unsuccessful
score, in the areas of the Army taking early action to
mitigate risks and developing contingency plans in casethe risk occurs.
For Risk Monitoring and Control, although anoverall unsuccessful score was indicated, a slightly
positive score was achieved for using projectperformance and/or risk reports to monitor and controlrisks.
Army Risk Management lraplementation SurveyResults and Evaluation. The Army risk management
implementation surveys were received from twenty-sixgovernment and five support cc,ntractors. Of the thirty-
one surveys, results were received from five managersand twenty-six technical employees. Of those, 54.84%
have worked at or supported NASA over seven years,22.58% have worked there between one and three
years, 16.13% have been there for less than one year,and 6.45% have worked there between three and seven
years.
The strongest area tbr the Army was RiskIdentification with a mean sco_c of 3.7 and Qualitative
and Quantitative Risk Analy_,is was next followingclose with a mean score of 3.6. The other three
categories indicate weak areas in risk managementimplementation for the Army. Risk ManagementPlanning had a mean score of 3.3 while Risk Response
Planning and Risk Monitoring and Control each had amean score of 3.2.
Although respondents indicated an unsuccessfulscore of 3.3 for Risk Management Planning, responses
to individual questions indiceled that the Army was
strong in that it has a project charter or equivalent andis strong in decision making that influences planning.
Qualitative and Quanttmtive Risk Analysis
received an overall positive score, however,respondents indicated three weaknesses in this area.
The respondents indicated that in the risk analysisprocess, identified project assumptions are not tested
against the stability of the assumption and against theimpact on the project if the assumption is false. A
second weakness is that an overall risk ranking for theproject is not provided by the risk analysis in order to
I::
<
Army Risk Management
4
.............. Iii_iiiilI_iiiiiiiii/i
- - I_ii_iii_i_ii:
272_Risk Management Category
COMPARE AND CONTRAST ORGANIZATIONS
This section will attempt to identify the similarities and
differences in risk management implementationbetween the two organizations.
Both are government organizations workingunde_ a matrix structure that provides their risk
management support. NASA had overall higher meanscores than the Army in each of the five categories.
NASA is considered successful in implementing theirrisk management program with an overall mean scoreof 3.',_7 while the Army is not deemed as having a
successful program with an overall mean score of 3.41.
E
NASA vs Army Risk Management
4
JS
2_
Risk Management Category
Respondents indicated that the strongest risk
management category for both organizations is RiskIdentification. No obvious weaknesses tor either
organization were apparent in this category. RiskManagement Planning ranked second strongest forNASA and ranked third f,_r the Army. Risk
Monitoring and Control ranked third for NASA and
fourth tbr the Army, and Quaiitative and QuantitativeRisk Analysis ranked fourth fet NASA and second for
the Army in terms of succe_,_. Both organizationsranked the weakest in their Risk Response Planning
category.
An area for improvement t,>r both organizations isin the Qualitative and Quantitative Risk Analysis
category. Both are weak in lcsting identified projectassumptions against the stability of the assumption and
against the impact on the project if the assumption isfalse. Additional individual weaknesses, as well as
noted strengths, are listed in the evaluation sections of
this report.
CONCLUSIONS
This section contains the _,ummary of the risk
management implementation _.urvey results for NASAand for the Army.
The implementation of the risk managementsystem at NASA is determined to be good. However,
the following areas indicate a need for improvement:
O Testing identified project assumptions against the
stability of the assumption and against the impacton the project if the assurr, ption is false.
EM69712 December 2001
7 of 27
o Tc_ avoid specific known risks by changing the
project plan to eliminate the risk and/or to protect
the project objectives from its impact.o NASA should develop the risk response plan to
allow for identification of residual risks and/or
secondary risks.
o NASA should develop the risk response plan toallow for identification of contractual agreements.
The implementation of the risk managementsystem at the Army is determined to be poor. Although
survey results in each risk management categoryindicated an overall weakness for the Army, the
follou'ing areas indicatefg'_he _trongest need forimprovement: _Q_.._____------
o q-esting identified project assumptions against the
stability of the assumption and against the impacton the project if the assumption is false.
o Lising risk analysis to provide an overall riskranking for the project to assign personnel or other
re'sources to projects with different risk rankings,tt_ make a benefit-cost analysis decision about the
project, and/or to support a recommendation for
project cancellation.o Using risk analysis to provide a prioritized list of
quantified risks.o Taking early action to mitigate the risk to reduce
the probability and/or impact of a risk to below ant_cceptable threshold.
o I)eveloping a contingency plan in case the riskc,ccurs once it is decided to accept the risk.
_oo
<
<z
L.
=
=
E
r_
<
o°_
N
.<
><
_o
_o
_o
CO
03cd
11 c_
x-. ¢_
.. <(
>., _3-
g _5
_ 5xII C
L7
co 1¢
o-I-a.<
o
UJ
,r- 00 T-- LoT--
'1--"
T'--
"r'-
,r-
v--
'r-
v=-
'r--
'r--
'r--
T--
,r--
v'-
o0
I-- c oc _ C)o E
•-- r" 1=_ o
.N > o(.9 cO
©
o_ cdco
°_
P,
(r_l0.)I
(I)I
C
cl 0JC.-- m
o
o E E,- E.__ _, ._
_ c-t-" c" e".o_ _ o
-i,=.,
0
o
>_ccE
C
C"_
c
o-,j0
x_
Ee--
m_.)
,,,=.
.,.=,
1:::o
C
.9ffl0
c-
C
EI-
E
e,A
L_ 0"_ ¢,D T-- CO
I °
---_ _-- cO l 0i
I
",r--
'r-
'r-
,r-
T'-
('4J
L_
CY
CY
CY
CY
CY
C_
CY
0J
C_
it')
Ec
"o
.7c
..o
r"
E
Eq_
E'_
_0i_-
cy
cy
cy
cy
c_
cy
cy
cy
cy
7_o
_E
o_
.c
6C 0"
q_
o.__
N
O
i
._C
0 m
c __ C
0 --
_m N
-'_ _
o_
edt_ig)
L._
,i
ts_
c
E
o
c
"o
x
-r- .c
t'.-ed
,,-(N
t_
r-
E _o_.c_._-,c
"go__.-- _ _
N_
o_
-_ o
_-_o
N_- _
_ co
.i
L._
,q-
0
9
E
e.._ (
E'_
"_-_1
(..q
ts")
',r--
.i
.r-
,r-
u')
7o
"o
c-
-o'6
o
L_ I._ L_
L_ _
k_ Z'_ II "_t L_ "q"
• l_ II1_ _ "q" ,_"ill _I) _[. II
c -e_l IJJI E_ •
I:=== ml _I
_ c! '--6 N
[,E ,-_._7 / o_
E _'-_1 / .--OE _)
__ _ __'q)l / __ _ _I __"°-_ I - _ _I _I
cn.__c -_I I_'" _- 0 "_i _ O) .._ _"0 _ ___1 I
t"q
o,.I
.T- o,.I
o'3
o4I'-.-o3
i..o
co
oo
o")
o")
o3
o'3
o4
._..ec
t=_
c _ c
._NO E
o •
o
t_
coo¢o0¢o
_,.
LE_
.,_
¢0
O0
L_
O3
O4
C
E
o
o
cc
_-_
e6 O3
0
._-
_._
OD
,,_
C_
.,_
,,_
.,_
4
O4
45o
cl.-_
o£
•e- C
C _
C •_1o o-ol
u')
ed
if)
._- ,_•"=-- I'¢'
o
.-_ _
cN
"-- C
I__ I_
7' ,_ II T"
(/') r't II _1
D tl_
tt ,,_r
t-
O
I.._70
b- '-'-C e)
U')
ts_
,/)
./)
.__ _:_- .9
Lf)
o
o
'E
.m_
X"E
if) C-=- _
I
o
edT--O
U') U'_
CO Or0 (DO
_0
E
c_
(.-q
t.t'3
c_
kt") O')a3t,-.. oO
t_
L_
t._
C'3
CO
C_
C")
Z'_l_ IIT-
r,/]a ll_
a ii _"_
[,/3 ,_ ii it)
r_n,-
.,r-- o
Lt'3
C_
C_
C_
C'3
C_
L_
C'3
L._
c-o'_
•._-, -o Q
_ (3 (/)
Emm
•r-- _ _
_Ecc_c
.-_ o •
.__ E_.m- t.- c
,,r,,,-
,,--- (xl
ed'--
U')
.i
U')
0
,,.,_
_-.__.
.--
_- 0
_ E .
_r-m
,o__m
r- ---_ ..=
o t.--t--- _
0"_ 0 t"q
er_Cr_
• .!-_
_Em'_ E
"_ E._
EgU
ig)
tc)
cN
u') t'_
r_ .,- o
_1-
¢o
co
,4-
v--
v--
v--
t- .• C
•_ .__
.__ 0
._ r--
c
go
<_
u')
O0 T-O
_t
O0
U')
O0
O_
o5
oo
LO
O0
04
o c_ o
c _
> e--
_'Ec _
_-._
o o:e'_ c_._
o cc- •
_ 0 _
eb
_E
m_
• o
c_.-Io o!e'_ c
• t-c- •
Z"_ IIT--
1:1 tt_
n,,
>
0
"';3"
":3"
It')
0
C
C
0 0_E
ET-C_I0000
03
'4"
LO
0'3
0'3
0'3
Lr)
04
LO
.C ":-C "7
C _ _
"._o
O3 O3
._-o
(]3 ._ -7
• - 0") 0L¢)
kt3
03
"4"
It')
Lt')
U'3
04
. ¢-
_0_.>
e_f'4 e-"E Nc30.
;__ o •
":5 c _
=_ _0
090
,r-co
co0o_0co
it)
,_-
03
Lt3
,_-
tt_
co
,_-
,_-
Lt3
co
u_
i
I""- _ t"-
<
L,
c_
=o
<
o
- >
==
°J.
= (/)mc_ IZ:
-< i
0
<
_0
II
(_
(_) GO
I
• C
c9 _
0
a.<
00
uJ
r-
x--
EE
o
o!
_o
r--
r-
r'-
r--
o
C
0
_D
o
co
C0.m
No_t-
O
r-
e
.o_
0
L_
Eo_
C
E
cy_
r-
s--
C
0_---7
_._
o
>o0
E
0.m
C
EI-
0"r-
o
O- oQ.,-
_0 0
r--. _ ['--
c.q o
.c,
c_
.c_CDE
I--
co L_ CO ,,--O CD _,-- r,..o_ o r,o coo.i co .,- c0•,- _ u,_ co
•,- o,.i _ID LC;
U_ I'--
.r-
T-
>_.,-j
C <D_
co
o
i
O_1',- r-..
,r-
>.c
<D >>.
r-. u_
co o
.-_-ICnl
._ul
.'_-I
CD>.,OCLEcD
w.-o
E
CO ",- _..O
.v'-
,,z-
l--
T-
ou_.r-
"13C
Lr_CM CMC C(_.C.i,-,
T--
o
L_
"OC 0
0Lr_ C
c _c
Z
ZZ
.JQ.
)-.Ziii
UJ(.9
Z!
v(/)
E
!
L_ Lt3
E
cq
o')
¢q
r--.
o_
o) ('y
o9
o,.i
coco
¢o
o,.i
o")
o,.i
0o
o_
co
co
o.i
¢'9LO
CO
L.O
0C
,,__. C 0
X:EN
r-E_o.._ oo m cD
m,--N
.___
_oo
,,.-o
o
o
o4
c_
(N
cN
T'--
t.--
__ .-_.__-ot- ..__ e- o "_
_._ __.•r" -_'*" _ 0m. r- .-
._._g _,-_
_D0
_DCO
0
T--
o_
o5
Lt_
09
CO
CO
CO
O9
CO
1.0
Lt_
0":-
_'_
• o
o5
c_u3
cooco
co
u3 u3
o3 03
o3 c_
co co
co c_
co co
co co
co co
co
•_ co
co
co
co "_
u3 t_
co co
u3 u3
o
.o o_
o _,g c-_
2e
O.._
,. mN
,,-O4
CO
0'3
O
0 "" •0_E -o_
_ o _u_ _-
_... _ __ '_- e-
_.,_ o)_ cN_C C_'--
C C _
_EoEo0 "7,__ "_ :_-_ 0 a_ t,O 0-
_'0,_ _ O.
_ _0
E_
o o
N _
N t,-- O
N ._ol
If
_ .-- if)
t_ 09 ocoO.o_
•_ _..__ m
,r-
cooo'_
T-- _r'- 04J
LO
OJ
o9
OJ
¢0
OJ
CO
o_
CO
o3
I.O
2co
c o
o_
Ec
u m
_..__.c_ -_
.__._ _
(N0
_6
(._,<
W
,<
.C
c_
T-O
_0
O_COCO
uDCO
05
_t
_t
co
04
co
co
co
_t
_t
co
,s--
I'_
o'_or-.ed
O3
_0 oo
o
-r- _N
_._
<o
,r"O
p_
CO
C0
N._-__
>,_
_No
.-_ "E
>,
g_
iT: _ "=
,.--o
u').q,._oocou_co
.,t-- T- .T--
u')
co
o,I
co
co
.q,.
co
co
co
.r--
co
co
LO
co
co
co
co
.-- _g.__
o
>,.__
-o._
.__ £
__
¢.D
0
'v- 0_1T--
UD
___.>
•._ .=_ o
"_ _ _
,_gs'm _'5
_cq o
,,.O
t"q
to
eo
to
I.LI
zzz
..Ia.
I,LlC/)Z
0a.c/)I,Llt_
m_a:
T-O
tO
coo4coo03o4
co
o4
to
to
w--
CO
T--
03
03
v--
v--
O3
CO
O9
03
w--
tO
co
oC b
C 4-,
"_ c:
_ _i -
*" 0
o_=: £ E
U3
t,DOCOLO
O3
v-- ._r-- ,r-
0'3
O3
CO
03
,r-
co
co
.._ o _
p,--N5__ c-_l
_o_ 03_
¢,_ °_
I-.- _ E E
coo_o
o5
_. 8 _
_E-_
_&oE
"_ ..,,: .-
_0_
to
o3
o"3
o3
03
co
oD
0o
o')o1",.-
04
o'_
o3
oJ
o3
o3
o3
o3
o3
o3
o3
o,,I
o3
o3
o3
.> nO
c- m
°$ff)'r-
"r- "_c-
O9
O3
O4
C_
O3
0"'_
_'V__
if)
If
e_
E8
I'_od
o 0oco 'l-ea e'i
CN
CO
_Y
T--
T--
co
T"
"r-
0
l--Z0oaZ
z
0l.-
Z0:Ev
L_
s--
L._
(D0_OLO
L_
O_
0'3
CO
(/)
o..-_
-_--
.__ o
o o
c_
o
oe_.._
_ _ ub L_
LO(43003LZ')
¢'3
•,'- 0 "_-
CO
0")
CO
CO
0')
CO
CO
CO
O_
CO
CO
LO
CO
"00_0
O0 O0C '_-
0 __ _
c.o
go
co
c_
,t"-
o,I
cooo_
o4
_oo_coo4co
co
04
o0
co
o,I
co
co
",::1"
oo
oo
co
co
co
,,,¢
oo
o4
i.£)
o,1
co
c
"o
-3"o
o.CD..Q
c,-_,"_ "r"
"E m__.C_
0 .C_ "r-
0
0,1
CO
CO
c...,.__IEc_
c
_ o-_
_'__ _ C
"_- O¢'_ v'
"._ ..O
.N .O
W
W
EM69712 December 2001
27 of 27
References
AR 385-16, "System Safety En_zineering and Management," (May 3, 1990).
AR 70-1, "Systems Acquisition_ Policy and Procedures," (1997).Greenauer George, http://safety.army.mil/home.html.Greenfield, Michael A, Dr., "Rb, k As a Resource," Langley Resear_:h Center, (May 14, 1998).
Greenfield, Michael A, Dr., "Ri_k Balancing Profile Tool," Washington, D.C., (NA)Greenfield, Michael A, Dr., "Ri:_k Management Tools," Langley Research Center, (May 2, 2000).
Headquarters Department of the Army, FM 100-14, "Risk Management," Washington, D.C., (April 23, 1998).
Internal Relations and Communications Office, http://www.msfc.nasa.gov/.MIL-STD-882C, "System Safety Program Requirements," (Januar3 19, 1993).
NASA Safety Training Center, "Risk Management & Fault Tree AJlalysis II."
NPD 8700.1, "NASA Policy tbl Safety and Mission Success," (June 12, 1997).NPG 7120.5A, "NASA Program and Project Management Processes and Requirements," (April 3, 1998).
NPG 8705.x (draft), "Risk Management Procedures and Guidelines"Simmons, James E, "Safety anti Risk Management Integration-M_tre Critical than Ever," Army Aviation, (October
31, 2001), pp. 24-26.Team Redstone, http://www.red_tone.armv.mil/.
United States Army Logistics Management Center, "A Course of Irlstruction In Risk Analysis."United States Army Safety Cen or, http:l/rmis.army.mil/.
2
RISK MANAGEMENT SURVEY
SA = strongly agree; A= agree; D = disagree; SD = strongly disagree, NA = notapplicable
DEMOGRAPHIC
1 Organization TypeGove rnment
Support Contractor
2 Position in the organization
managementtechnical employee (I.e. engineer, designer, scientist)production employeesupport staff (I.e. clerical, human resource)
3 Time in that positionless than 1 year1 to 3 years3 to 7 yearsover seven years
4 Number of employees at yoJr specific siteless than 25between 25 and 150between 150 and 500
greater than 500
RISK MANAGEMENT PLANNING SA A D
½
I,SD NA
My organization has a project charter or equivalent that includes the business needs] and project description at a level appropriate to the needs of the project.
2 Risk management has not been used in my organization.
.:3My organization does not have predefined methods for qualitative risk analysis.
4 My organization does not have predefined methods for quantitative risk analysis.My organization has predefined roles, responsibilities, and authority levels for
5 decision-making that influer_ce planning.
6 Tolerances for risk are expressed in policy statements or revealed in actions.A template for my organization's risk management plan exists and is adaptable to
7 each project by the project manager or the risk management team.
8 The risk management template is improved based on experience from each project.
Meetings are conducted that are designed to adapt the risk management plan9 template to the current project.
10
My organization's risk management plan documents how risk identification,assessment, quantification, response planning, monitoring, and control will bestructured and performed during the pro]ect life cycle.
RISK IDENTIFICATION
]Process outputs are reviewed to identify possible risks.Risk categories are well defined and reflect common sources of risk for the industry
2,Ior application area.
SA A D SD NA
4
3 Historical information on pricr projects is available for review by the project team.
My organization performs structured documentation review(s) of one or more of the
following: project plans and assumptions, prior project files, and other applicable
4 information as an initial step by project teams.
My organization utilizes one or more information gathering techniques in risk
5 identification.
My organization's risk identification process provides adequate indications that a risk
6 has occurred or is about to occur.
,A system is in place at my o'ganization to use identified risks as inputs to other
7 )rocesses.
QUALITATIVE AND QUAN'I_ITATIVE RISK ANALYSIS SA A D SD NA
5
5
6
7
8
9
10
11
1 Risk probability and/or risk impact are risk analysis tools used by my organization.
2 Probability / impact risk rating matrix is a risk analysis tool used by my organization.
In my organization's risk analysis process, identified project assumptions are tested
against the stability of the assumption and against the impact on the project if the
3 assumption is false.
My organization examines tlie extent of the understanding of a risk, the data
available about the risk, the quality and integrity of the data, and the reliability of the
data in order to evaluate the degree to which the data about risks are useful for risk
management.
Risk analysis is used to provide an overall risk ranking for the project which is used:
to assign personnel or other resources to projects with different risk rankings, to
make a benefit-cost analysis decision about the project, and/or to support a
recommendation for project cancellation.
Risks classified as high or moderate would be prime candidates for more analysis,
including quantitative risk analysis, and for risk management action.
My organization utilizes appropriate inputs for quantitative risk analysis
As a part of the risk analysis process, my organization utilizes appropriate tools and
techniques.
Risk analysis is used by my organization to provide a prioritized list of quantified
risks.
Risk analysis is used by my organization to provide a probabilistic analysis of the
Iproject.
,Risk analysis is used by my organization to provide the probability of achieving the
)roject cost and time object yes.
RISK RESPONSE PLANNING
To avoid specific known risks, my organization changes the project plan to eliminate
the risk or condition and/or lo protect the project objectives from its impact.
To reduce the probability ar_J/or impact of a risk to below an acceptable threshold,
my organization takes early action to mitigate the risk.
If my organization decides to accept a risk, a contingency plan may be developed in
case the risk occurs, or the project team may deal with the risk as it occurs.
A risk response plan or equivalent exists and is written to the level of detail at which
the actions will be taken.
The risk response plan (or _:quivalent) allows for identification of residual risks and/or
secondary risks.
SA A D SD NA
6
The risk response plan (or equivalent) allows for identificatior, of contractual6 agreements.
RISK MONITORING AND CONTROL
ISA A D SD
INA
7
] Project performance and/or risk reports are used to monitor and control risks.My organization implements risk identification, assessment, quantification andresponse planning for potential risks that surface as a result of measuring project3erformance.
When required, my organization implements new risk analysis and response plans3 (or equivalent) as a result of scope changes.
My organization utilizes appropriate tools and techniques for risk monitoring and4 control.
Plans are updated as appropriate based on risk monitoring and control, workaround5 _lans, corrective action, project change requests, and/or risk response.
My organization implements and maintains a risk database that is used in the risk6 management process.
My organization updates the risk identification checklists (or _quivalent) as7 appropriate based on risk mc)nitoring and control.
OPTIONAL QUESTIONS
consider the following tools and/or techniques to be greatly effective in my
1 organizations risk management process:
I do not consider the followirg tools and/or techniques to be !jreatly effective in my2 organizations risk managem!.,nt process: