KYC Vision 2040
Transcript of KYC Vision 2040
Vision 2040
Previous work to KYC Premises1993/1994 Major Extension to building
Office, Changing Rooms, Toilets, Bar
1998/1999 Club House refurbishmentHeating, Wiring, Gear Store, Training Equipment, RIBs
2002/2003 Bar, cellar etc
2010/2011 Club House central roof, ceilingCar Park, Tarmac & Garden Paving
The Building
Reviews that have been carried out on the existing building which sits on reclaimed / infill land Include:
Existing building structureFlat RoofsHeating SystemEntry SystemSecurity
Areas Under Review
1. Ladies Changing Room2. Men’s Changing Room3. One Room Club House4. Heating System5. Disabled changing and
shower area
More Areas Under Review
1. Security of the building and grounds
2. Refurbishment to east end of clubhouse
3. Tender & Dinghy Parking4. General Storage5. Car Park6. Boat Preparation
Considerations after Review
1.Build a second floor 2.Complete Re-Build3.Extension4.Leave unaltered
General Concerns
1. Leased Land2. Environmental Issues3. Cost Benefit Analysis4. Practical Considerations5. Actual Benefit to Membership6. Membership Demographics
PremisesKYC Lease NFDC review /renew 2021
Rent £11,833.36 per year (fixed)5 yearly reviews 2016, 2021
Rates £936.00 per yearSubstantially Discounted due to membership of CASC
scheme Community Active Sports Club
Full financial details included in the KYC Ltd. accounts report
Relevant Consultations
Planning National Park Authority / NFDC
Landlord NFDCBuilding Regs. NFDC / NPADesign Architects
Committee / DirectorsKYC Membership
Concept Site Plan
Dinghy Park Existing
Dinghy Park New
Vision 2040 Funding