PRESENTATION – APRIL, 2016
Kindasa is the first private potable water supply company engaged in seawater desalination anddistribution of potable water to Jeddah Industrial City (JIC) and residential complexes in Jeddah.
Kindasa derived its name from the first seawater desalination plant which was constructed in Jeddahin the early 20th century.
Kindasa is a limited liability company incorporated in Jeddah, Saudi Arabia in the year 2000. Kindasa became a Closed Joint Stock company incorporated in Jeddah, Saudi Arabia in the year 2015.
KINDASA
The establishment of Kindasa is the result of the cooperation among two leading Saudi Business Groupsknown for their professionalism, integrity and financial strength:
Saudi Industrial Services Co. (SISCO) – 65% Share.
Mohammed Abdul Latif Jameel Co. (MALJ) – 35% Share.
SHAREHOLDERS
WESSCO is a limited liability company incorporated in Jeddah, Saudi Arabia in the Year 2007. WESSCO was established to execute Saudi Airlines Seawater RO Desalination Plant 12 Years BOOT
Project. It is a Joint Venture (JV) between Kindasa & WESCO.
SHAREHOLDERS
Kindasa Water Services (KWS) – 49% Share
Water and Environmental Services Co. (WESCO) – 51% Share
YKWS is a limited liability company incorporated in Al Hudaydah, Yemen in the Year 2009. YKWS was established to build SWRO Desalination Plant BOO Project in Yemen. It is a Joint Venture (JV) between Kindasa & Yemeni Partners.
SHAREHOLDERS
Kindasa Water Services (KWS) – 60% Share
Yemeni Partners– 40% Share
1. WATER AND ENVIRONMENTAL SAUDIA SERVICES COMPANY (WESSCO)
2. YEMEN KINDASA WATER SERVICES (YKWS)
Build new plants at different locations within Saudi Arabia and Worldwide.
Undertake BOOT (Build Own Operate Transfer) & BOO (Build Own Operate) contracts on longterm basis in Saudi Arabia and Worldwide.
AIM
VISION
MISSION
To be the leading private sector supplier of quality potable water at competitive andsustainable prices.
To provide the Saudi Industrial Sector with consistent and reliable water supply.
To participate and invest in the privatization of the water industry in the Kingdom.
INTAKE AT BERTH 39 FILLING STATION (FS#1)
WITH STORAGE TANKS (AREA – 22,867 M2)
DESAL. PLANT –65,500 M3/DAY & FILLING STATION
(FS#2) (AREA – 20,380 M2)
800MM DIA BURIED GRP PIPELINE (PRESSURIZED) TO JEDDAH INDUSTRIAL CITY‐1
(JIC‐1) – 10.30 KM FROM FS#1
POTABLE WATER TRANSFER PIPELINES TO FS#1– 2.00 KM FROM
DESAL. PLANT
1. 800MM DIA BURIED GRP PIPELINE
2. 800MM DIA ABOVE GROUND GRP PIPELINE
BRINE/REJECT AT BERTH 57
800MM DIA BURIED GRP PIPELINE (PRESSURIZED) TO
JEDDAH AL‐KHUMRAH DISTRICT (JAD) – 21.75 KM
FROM STAR CIRCLE
Kindasa has invested SR. 306 Million in the below projects:
Jeddah Islamic Port (JIP)
Containerized Desalination Plant Capacity 14,000 m³/day
(Phase‐A) Area = 5005 m2
Potable Water Storage Tank
Capacity – 7500 m3 Area = 1711 m2
Jeddah Islamic Port (JIP)
Intake Screens & Pumps Chambers Area = 637 m2
65,500 m3/day Desalination Plant Constructed in an Area = 20,380 m2
Desalination Plant Capacity 34,000 m3/day (Phase‐B1+B2) Area = 8927 m2
Desalination Plant Capacity 17,500 m3/day
(Phase‐C)Area = 3650 m2
Filling Station No. 2 with 2 Nos. Water Loading
StationsCapacity 2,000 m3/day
Area = 450 m2
PHASE A DESALINATION PLANTClient:Location:Project Type:Capacity:No. of Trains:Plant Type: Project Cost:Technology: Pre‐Treatment:Commissioning Date:
Contract Expiration Year:
JIP, JIC‐1 & JADJIP‐Jeddah, Saudi ArabiaBOOT & Partial BOO14,000 m3/d7x2,000 m3/dMobile ContainerizedSR. 32.70 MillionSWRO with Energy Recovery Turbine (ERT)Conventional Filtration System2 Trains ‐ Oct., 20005 Trains ‐ April 20012022 + 5 Years extension provision
PHASE B DESALINATION PLANTClient:Location:Project Type:Capacity:No. of Trains:Plant Type: Project Cost:Technology: Pre‐Treatment:
Commissioning Date:
Contract Expiration Year:
JIP, JIC‐1 & JADJIP‐Jeddah, Saudi ArabiaBOO34,000 m3/d4x8,500 m3/dSkid MountedSR. 166.11 MillionSWRO with ERTHybrid of Dual Media Filtration & Ultra Filtration System3 Trains ‐ Aug., 20061 Train ‐March 20132022 + 5 Years extension provision
PHASE C DESALINATION PLANTClient:Location:Project Type:Capacity:No. of Trains:Plant Type: Project Cost:Technology:
Pre‐Treatment:
Commissioning Date:
Contract Expiration Year:
JIP, JIC‐1 & JADJIP, Jeddah, Saudi ArabiaBOO17,500 m3/d7x2,500 m3/dSkid MountedSR. 86.4 MillionSWRO with Energy Recovery Device (ERD) ‐ Pressure Exchanger (PX)Primary & Secondary Conventional Filtration System2 Trains ‐ Feb., 2014, 2 Trains ‐Mar., 2014, 2 Trains ‐ April 2014 1 Train ‐May 20142022 + 5 Years extension provision
Storage Tanks No.4, Capacity –
15,000 m3
16 Nos. Water Loading Stations Capacity – 32,500
m3/d
Storage Tanks No.3, Capacity – 15,000 m3
Storage Tank No.1, Capacity – 6,000 m3
Storage Tank No.2, Capacity –
9,400 m3
SEC Substation (19 MVA)
Filling Station (FS) No.1 with Storage Tanks Constructed in an Area = 22,867 m2
Potable Water Transfer Pumping
Station Capacity – 2700 m3/hr
FILLING STATION (FS) NO. 01Client:Location:
Project Type:Project Cost:Water Loading Stations (WLS):Filling Capacity: Storage Tanks Capacity:Commissioning Date:
Contract Expiration Year:
JIP & Various CustomersOutside JIP Gate No. 9 –Jeddah, Saudi ArabiaBOOSR. 33.70 Million16 Nos.32,500 m3/d45,400 m3FS & Tank‐01 – Jan, 2001, Tank‐02 – Aug., 2002 Tanks 03 & 04 – Nov., 20072022 + 5 Years extension provision
FILLING STATION (FS) NO. 02Client:Location:Project Type:Project Cost:Water Loading Stations (WLS):Filling Capacity: Storage Tanks Capacity:Commissioning Date:Contract Expiration Year:
Ships Berthed in JIPAdjacent to Phase C PlantBOOSR. 0.40 Million2 Nos.2,000 m3/d7,500 m3April, 20152022 + 5 Years extension provision
FILLING STATION (FS) NO. 03Client:Location:Project Type:Project Cost:Water Loading Stations (WLS):Filling Capacity:
Storage Tanks Capacity:Commissioning Date:
Contract Expiration Year:
Various CustomersJeddah Al‐Khumrah District (JAD)BOOSR. 3.0 Million6 Nos.
11,040 m3/d
1000 m3 1. 3 Nos. WLS – May, 20142. 3 Nos. WLS – June, 20152024
DETAILS PROJECT‐1 PROJECT‐2 PROJECT‐3
Project Name:
Pipe Diam./Mtl./Length:Client:Location:Project Type:Project Cost:Commissioning Date:Contract Expiration Year:
Transfer Pipeline from JIP Plant to FS No.1800mm/GRP/2.00 KM LongJIPJIP‐Jeddah, Saudi ArabiaBOOSR. 6.00 MillionJanuary, 20012022 + 5 Years extension provision
Transfer Pipeline from FS No.1 to JIC‐1.800mm/GRP/10.30 KM LongTAWZEAJIC‐1, Jeddah, Saudi ArabiaBOOSR. 18.70 MillionMarch, 20052022 + 5 Years extension provision
Pipeline from main header to Storage Tank No. 02 in FS No.1450mm/GRP/0.10 KM LongJIPFS NO.1‐Jeddah, Saudi ArabiaBOOSR. 1.10 MillionMarch, 20062022 + 5 Years extension provision
DETAILS PROJECT‐4 PROJECT‐5Project Name:
Pipe Diam./Mtl./Length:Client:Location:
Project Type:Project Cost:Commissioning Date:Contract Expiration Year:
Transfer Pipeline from Old Stars Circle to JAD800mm/GRP/21.75 KM LongVarious Customers & FS No.03JAD‐Jeddah, Saudi Arabia
BOOSR. 37.39 MillionFebruary, 20122022 + 5 Years extension provision
Transfer Pipeline conversion to pressurized pipeline800mm/GRP/32.055 KM LongTAWZEA & Various CustomersFS No.1 to JIC‐1 & JAD‐Jeddah, Saudi ArabiaBOOSR. 6.80 MillionMarch, 20132022 + 5 Years extension provision
Stand‐by A/G PWT P/L from JIP Plant to FS No.1800mm/GRP/1.70 KM LongJIPJIP‐Jeddah, Saudi Arabia
BOOSR. 3.00 MillionOctober, 20152022 + 5 Years extensionprovision
RO Building with Control
RoomPre‐
Treatment Area
Containerized Plants
Filling Station with 4 Nos. of Water Loading Stations
Administration Building
Potable Water Storage Tank – ACapacity – 18,000
m3
Potable Water Storage Tank – BCapacity – 18,000
m3
Filling Pumps
Store Building
Workshop Building
Potable Water Transfer
Pumping House
12” Buried PermastandPipeline to Saudia City
DN100 Buried PVC Pipeline to DAMAC
Tower
WESSCO has invested SR. 47.80 Million in the below projects Constructed in an Area – 24,700 m2
PHASE 1 DESALINATION PLANTClient:Location:
Project Type:Capacity:No. of Trains:Plant Type: Project Cost:Technology: Pre‐Treatment:Commissioning Date:
Contract Expiration Year:
Saudia AirlinesSaudia City Desalination (SCD) Plant, Corniche, JeddahBOOT10,020 m3/d6x1,670 m3/dSkid MountedSR. 40.00 MillionSWRO with ERD (PX)Conventional Filtration System2 Trains ‐ Dec., 20074 Trains ‐ April 20082018
PHASE 2 DESALINATION PLANT Client:Location:Project Type:Capacity:No. of Trains:Plant Type: Project Cost:Technology: Pre‐Treatment:Commissioning Date:
Contract Expiration Year:
Various CustomersSCD Plant, Corniche, JeddahBOO3,000 m3/d3x1,000 m3/dContainerizedSR. 6.00 MillionSWRO with ERD (PX)Conventional Filtration System1 Train ‐ Dec., 20082 Trains ‐ Jan., 20092018
FILLING STATIONClient:Location:Project Type:Project Cost:Water Loading Stations (WLS):Filling Capacity: Storage Tanks Capacity:Commissioning Date:Contract Expiration Year:
Various CustomersSCD Plant, Corniche, JeddahBOOSR. 1.00 Million4 Nos.6,500 m3/d36,000 m3April, 20082018
TRANSFER PIPELINESDETAILS PROJECT‐1 PROJECT‐2
Project Name:
Pipe Diam./Mtl./Length:
Client:Location:Project Type:Project Cost:Commissioning Date:Contract Expiration Year:
Existing Transfer Pipeline from SCD Plant to Saudia city300mm/Permastand/3.60 KM Long
Saudia AirrlinesJeddah, Saudi ArabiaOperation & Maintenance (O&M)Included in Phase 1 Plant CostDecember, 20072018
Transfer Pipeline from SCD Plant FS to DAMAC Tower, Corniche100mm/PVC/0.80 KM Long
DAMACCorniche‐Jeddah, Saudi ArabiaBOOTSR. 0.80 MillionDecember, 20132020
YKWS has invested SR. 15.00 Million in the below projects constructed in an Area – 25,350 m2
DESALINATION PLANTClient:Location:Project Type:Capacity:
No. of Trains:Plant Type: Project Cost:Technology: Pre‐Treatment:Commissioning Date:Contract Expiration Year:
Various CustomersAl Hudaydah, YemenBOO1,000 m3/d (with infrastructure for expansion to 12,000 m3/d)1x1,000 m3/dContainerizedSR. 14.50 MillionSWRO with ERD (PX)Conventional Filtration SystemMay, 20112030
FILLING STATIONClient:Location:Project Type:Project Cost:Water Loading Stations (WLS):
Filling Capacity:
Storage Tanks Capacity:
Commissioning Date:Contract Expiration Year:
Various CustomersAdjacent to SWRO PlantBOOSR. 0.50 Million4 Nos. (with infrastructure for expansion to 12 Nos.)1,000 m3/d (with infrastructure for expansion to 12,000 m3/d)500 m3 (with infrastructure for expansion to 20,400 m3)May, 20112030
ISO 9001 CERTIFICATE
ISO 14001 CERTIFICATE
ECOGRA LICENSE
PME LICENSE
MINISTRY OF MUNICIPAL AND RURAL AFFAIRS
KAU SAUDI ENGINEERS SUMMER TRAINING
SAUDI FAST GROWTH 100 ARABIA FAST GROWTH 500
Abdullah HashimGas
Jeddah Chamber Of Commerce SADAFCO
Abuljedayyel MS Beverage Saudia City
American Cake National Food Ind. Siyanco DPA
Amiantit Nestle Sunbulah
Aquafina Pepsi Coal Factory TAWZEA
Delta Front Rajhi Steel Industries Xenel Industries Ltd.
HalwaniBrothers
Red Sea Gate Terminal
THANK YOU
Location Head Office Desalination Plant Filling Station No.1 Filling Station No.3
PO Box:Jeddah:Mobile:Telephone:Fax:E‐mail:Web site:Address:
813821482
+966 12 6067818+966 12 [email protected] Gate Building, Tower B, Third floor, suite 304, Sari Street
813821482
+966 12 6270704+966 12 [email protected] Islamic Port
813821482
+966 12 6485423+966 12 6485423 ext. [email protected] Islamic Port Near Gate 9
813821482+966 5 00524886
[email protected], Factory, Jeddah Al‐Khumrah District (JAD)