EXPERIENCE KWAME Delivering total value through pure construction and program management services
02
01
Corporate Overview Experts in Program Management/Construction Management
• Higher Education • Aviation • Corporate Facilities • Entertainment/Hospitality • Healthcare
Nationwide Experience
Vertical Market Expertise: • K-12 Education • Municipal/Justice Facilities • Roads • Rails • Utilities/Water Systems
Company Overview Areas Of The Country Kwame Building Group Has Developed Projects
"
"
"
"
"
" "
"
"
" " "
"
"
What Makes Us Better
Services
Risk Management KWAME's cost management system works to ensure that Designers are at-risk for cost overages due to design error. Schedule Risk Management
Cost Risk Management
Quality Management
DBE Program Development/Monitoring
Document Management
Stakeholder Communica?ons
CPM Schedule Development & Analysis
With on-time job sites, you get more productivity when you need it most.
An effective schedule clarifies complex projects and resolves various issues before a commitment of labor, materials and facilities is made. The Critical Path Method (CPM) schedule relates and organizes major activities into a series of management events, and becomes the primary controlling document for the entire project. By identifying the discrete work activities required to complete the project as well as the relationship of those activities to one another, CPM scheduling allows for the determination of what activities are critical to completing the project -- those that must be performed on their early start and finish dates to avoid any delay to the project’s completion. Therefore, non-critical activities have the ability to be delayed in their start and/or finish by some defined amount of time, commonly referred to as “float,” without the risk of delaying the project.
Master Schedule | Design Schedule | Construction Schedule
The Schedule
The master schedule represents a summary-level project schedule - the purpose of which is to identify all of the major design and construction phase deliverables for the project - as well as all individual work breakdown structure components.
1
2
3
The design schedule is a detailed schedule identifying key design components and critical design milestones necessary for the timely completion of a project's design phase.
The construction schedule is one of the most powerful management tools at the service of the construction manager. A well-planned and realistic schedule that takes into account as many variables as possible will help keep a construction project moving along smoothly, alert the construction manager when the project is about to run into snags, and help make needed adjustments when unforeseen circumstances arise.
Annotated schedule fragnet’s assist in communicating schedule commentary to all stakeholders.
Ongoing analysis of the project’s Critical Path makes certain that all stakeholders are aware of deliverables critical to the success of the project.
Project Control Cost Control
KWAME uses our extensive local and national experience in professional fees and construction costs, as well as our historical databases, in order to systematically develop all aspects of the program/project costs.
Cost Estimating
Design Errors &
Omissions
Contractor Mistakes
Owner driven
changes
Unforseen Conditions
Procurement Strategy Project Accounting
KWAME works within our client's established policies and procedures, stated procurement goals and stakeholder requirements to ensure that the project procurement strategy supports the Team's cost, schedule and quality goals.
KWAME's utilization of Project Accounting provides our Project Managers with the ability to accurately assess and monitor project budgets and ensure that the project is proceeding on budget. Project managers can quickly address any cost overruns and revise budgets if necessary.
Quality Control Services
Constructibility Review
Performance Review
Construction Inspection
Services DBE Program Development / Monitoring
Goal vs. Actual
DBE/HUB Outreach Mentor/Protege Programs Workforce Outreach Apprentice Programs Internship Programs Compliance Monitoring Certified Payroll
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35
Lambert
Busch
I-64
Normandy
SLCC
Project Control Document Control
Reporting - The immediate availability of project data is not a luxury, but rather a requirement, as analysis and decisions on tough construction issues must be made faster than ever before as delays in decision-making can cost millions of dollars.
01
02
03
Change Management - The best sets of plans and specifications have never been able to produce a construction program that does not contain some number of changes. KWAME proactively manages changes and keeps all stakeholders abreast of potential cost impacts so that positive cash flow is constantly maintained.
Document Management - Centralized document control allows project stakeholders to access information quickly. As with any system, proper planning at the early stages will save substantial time and money later. Intelligence in the document numbering system allows documents to be tagged and filed in an organized manner which makes data retrieval around major issues much easier and more efficient.
Document Control
Stakeholder Communications
KWAME's cost management system works to ensure that Designers are at-risk for cost overages due to design error, Contractors are at-risk for their mistakes, project contingency plans/funds address unforeseen conditions, and Owner changes are minimized through proper project scoping and thorough stakeholder communication.
Better Communications Means Better Management
Kwame Experience We are better, because we’ve done it before
Lambert – St. Louis Airport Expansion Project Port Authority of Allegheny County North Shore Connector Project Cost: $50 Million
Schedule: Completed 2006 State of Missouri’s First traffic tunnel 1,400-foot tunnel with two 46-foot wide cells Life safety and traffic monitoring features
Cost: $539 Million Schedule: Completion in 2011 1.2-mile dual bored tunnels beneath the Allegheny River Life safety features
Kwame Experience We are better, because we’ve done it before
Missouri Department of Transportation New Mississippi River Bridge Project
Missouri Department of Transportation Interstate 270/Interstate 70 Interchange Rehabilitation Project
Cost: $667 Million Schedule: Completion in 2015 1,500-foot cable-stayed bridge
Cost: $4 Million Schedule: Completed in 2006
Rehabilitation of Missouri’s busiest interchange
Kwame Experience We are better, because we’ve done it before
Metropolitan St. Louis Sewer District Lower Meramec WWTP Project
Lumiere Casino & Hotels Project
Cost: $120 Million Schedule: Completed in 2009
28 Million Gallons per day Water Treatment Plant
Cost: $500 Million Schedule: Completed in 2007
New Four Seasons Hotel and Casino in Downtown St. Louis
Company Roles We have the people and processes in place to ensure a quality result for each project
People Management
Policy & Strategy
Resources
People Satisfaction
Customer Satisfaction
Impact on Society
LEAD
ERSH
IP
resu
lt
proc
ess