Pre Bid Meeting at UP Sadan, New Delhi 4 th February, 2013
-
7/27/2019 Kushinagar Details
2/35
50 km radius
100 km radius
Location & Coverage Area
Districts in 100 km radius of Kushinagar:
Uttar Pradesh Gorakhpur, Deoria, Maharajgunj, Azamgarh, MauBihar Siwan, Gopalkunj, Champaran, Saran & Nepal
150 km radius
A Heavily Populated region, in the catchment of Uttar Pradesh, Bihar
and Nepal. There in no International Airport in its 150 kms radius .2
-
7/27/2019 Kushinagar Details
3/35
Project Background
Project : Development of International Airport atKushinagar with a Public Private Partnership (PPP) modeon Design Build Finance Operate Transfer (DBFOT) basis.
IL&FS IDC is the Project Consultant .
Project USP World Famous Buddhist Pilgrimage Center Concentration of NRI Labour Maitreya Project First Airport project to get approval for Viability
Gap Funding from the Government of India.3
-
7/27/2019 Kushinagar Details
4/35
Tourism potential Buddhism is the world's
fourth largest religion ( 6% of the world's population)
48 crore Buddhist population
in the top 20 countries
Japan, Thailand, Vietnam,Burma, Cambodia, HongKong, Mongolia have more
than 80% population asBuddhists
2 million Buddhist touriststravel to India annually.
44
-
7/27/2019 Kushinagar Details
5/35
Prominent Buddhist Centers
As per the faithevery Buddhist in hislife, aspires to visit at
least once to Lumbini Bodhgaya
Sarnath Kushinagar
Bodhgaya ,Sarnath
Kushinagar
Map Most popular Buddhist sites
Lumbini
5
-
7/27/2019 Kushinagar Details
6/35
Kushinagar is..
.where Lord Buddha entered Maha-parinirvana !Geographically centrally located to Lumbini, Kapilwastu, Sankisa,
Sravasti, Vashali, Kesariya etc.6
-
7/27/2019 Kushinagar Details
7/35
Buddhist sites Land Distances
56
210
256
125
Kushinagar Gorakhpur 56
Gorakhpur Varanasi 210Varanasi Bodhgaya 275Gorakhpur Lumbini 125Lumbini - India Border 25Vaishali - Kushinagar 280Balrampur - Sravasti 15
Kapilvastu - Balrampur 130Varanasi - Sarnath 12
-
7/27/2019 Kushinagar Details
8/35
97.20% 1.80%
1.00%
Modes of transport to India
Airport are the mostimportant accessmodes for Foreigntourist.
To achieve our tourism vision theairports at Touristlocations have to beimproved
8
-
7/27/2019 Kushinagar Details
9/35
Runway 2700m vs 3200m
Reach of 2700 m runway
Extended reach of 3200m runway
2700 mB737, A3203500 km
3200 mB747, A33013000 km
9
-
7/27/2019 Kushinagar Details
10/35
Proposed Airport Development
Planned for wide-bodyaircraft (B 747, A 330)
Runway of 3200 m
Airport Code 4E
Non Stop flights fromJapan/Korea
10
-
7/27/2019 Kushinagar Details
11/35
East West Corridor (NH 28)
East WestCorridor
(NH 28)
Site location
Distance of the Airport from theNational Highway is less thanone Kilometer. And about 2.5 kmFrom the main temple
11
-
7/27/2019 Kushinagar Details
12/35
Existing Airstrip + Habitation
12
12
-
7/27/2019 Kushinagar Details
13/35
Current Project Site
1313
-
7/27/2019 Kushinagar Details
14/35
Land Availability
Existing Airstrip on 1700meters (97 acres)
Land available for theproject = 550 acres
14
-
7/27/2019 Kushinagar Details
15/35
Land Availability
Entire land hasbeen fenced(about 19 km inlength)
15
-
7/27/2019 Kushinagar Details
16/35
Sno Action taken Date
1 Sanction by the Government of Uttar Pradesh 15 th Jan 2010
2 Clearance from the Ministry of Defence, GoI. 3 rd March 2010
3 Clearance from the Department of Customs, GoI 8 th March 2010
4 Site Clearance by the Ministry of Civil Aviation, GoI 16 th March 2010
5 No Objection by the Department of Metrology, GoI 31 st March 2010
6 No Objection Certificate by the U.P. PollutionControl Board 01st April 2010
7 EIA Clearance from the Ministry of Environment &Forest 14th May 2010
8 In- principal Approval from the Ministry of Civil
Aviation, GoI21 st Sept 2010
Approvals & Clearances
16
-
7/27/2019 Kushinagar Details
17/35
High Concentration of NRI
2009 Survey revealed, 80,000 contract workers from EasternUttar Pradesh, (i.e 50 km radius) and more than 1.5 lakhs in
the 100 km radius travelling to Middle East annually.
(Data from adjoining Bihar districts not included.)17
-
7/27/2019 Kushinagar Details
18/35
Maitreya Project
Proposed Worlds Tallest Bronze statue with an Height of 154 meters along with world class hospital, university and alliedfacilities.Earmarked site 4 kms from the International Airport Site.More information on www.maitreyaproject.org
Land acquisition in advanced stage now.
18
http://www.maitreyaproject.org/http://www.maitreyaproject.org/ -
7/27/2019 Kushinagar Details
19/35
Maitreya Project
1919
-
7/27/2019 Kushinagar Details
20/35
20
-
7/27/2019 Kushinagar Details
21/35
Site on the East West Corridor
NH- 29
NH- 28
Earmarked site for International Airport
21
-
7/27/2019 Kushinagar Details
22/35
Potential for cargo to Nepal
22
Land locked Nepal gets cargofrom Kolkata Port
Check post in UP- Sonauli
Volume of Export at Sonauli2007-08 1449 crores2008-09 1561 crores2009-10 1720 crores
(Till Jan 10)
Major Commodities exchanged:
Petroleum products, Cement,Clinker, M.S billets, Paper,Sanitary Goods, Cotton Fabric,Yarn, Fruits & Vegetables,machine and parts, Tractors, Twowheelers, Auto Parts, Coal, Salt,Clothes, Medicines, Paints etc
Proposed site
Sonauli
N E P A L
22
-
7/27/2019 Kushinagar Details
23/35
Project Restructuring Land Availability-
Initially planned 750 acres (with Real Estate 200 acres) Only 615 acres Land could be acquired
Project Cost
Initial Cost Rs 850 crores Current cost Rs 350 crores
Eligibility criteria Technical eligibility had an International Airport
Experience must, now not mandatory.
Regional Development Initially the developer had to develop all the Buddhist
sites in the region, now only an Airport project.
-
7/27/2019 Kushinagar Details
24/35
Summary Airport Development
24
International Airport - Airside development on 550 acres for Code E aircrafts
Runway: 3200 m x 45 m
Taxiway: Two taxiways for Apron + taxiway for Isolation Bay
Turning pads: Two pads at runway ends
Airfield Lighting-- Precision Cat I approach lighting Runway &Taxiway Edge lights as per ICAO Standards Apron flood lights
Apron: Parking for 5 aircrafts (4 narrow-body and 1 wide-body) + Isolation Bay
Terminal Building 150 ARR +150 DEP peak hour Capacity
Navigational & landing Aids: ILS ( Cat I) with DME; DVOR / DME ; PAPI
Fuel Farm
Fire Safety Services Cat X
Air Traffic Services Control Tower and ATC complex24
-
7/27/2019 Kushinagar Details
25/35
Domestic Users
Domestic traffic in Kushinagar in 2010 per year 6,98,626Estimated domestic traffic at start of COD per year 9,36,225
Total Domestic traffic using Kushinagar Airport per year 5% 46,811International Usersa. Buddhist TouristsForeign traffic in Kushinagar in 2010 per year 55,000
Estimated foreign traffic at start of COD per year 73,705Foreign traffic using Kushinagar Airport per year 60% 44,223
New foreign traffic using Kushinagar Airport per year 34,475
Day time visitor at Kusinagar 10 buses ,35 pass per day six month 20% 12,600
b. People employed in Middle East (M.E.)People employed in M.E. from influence area (100 km radius) in 2010 1,20,000Estimated people employed in M.E. at start of COD 1,60,811M.E. traffic using Kushinagar Airport per year 60% 96,486Middle East passengers from adjoining Bihar Districts 15,000
Total International Traffic using Kushinagar Airport (a + b) per year 2,02,785
Total Passengers (Intl + Domestic) per year 2,49,597
Traffic Forecast (Dom + Intrnl)
25
-
7/27/2019 Kushinagar Details
26/35
Project Cost
A Basic Project Cost + Pre-operativesAmount
(Rs./crores)i Basic Airport Capital Cost 269.20
ii Engineering & Consultancy (5% of the basic project cost) 13.46iii Insurance Charges (1% of the basic project cost) 2.69
ivProject Management & Other expenses (2.0% of the basic
project cost) 5.38v Financial & Legal charges (1.5% of the basic project cost) 4.04vi Contingencies & Escalation (5% of the all above costs) 14.74vii Total project Cost excl. IDC 309.52
B Interest During Construction (IDC) 45.12
C Total Project Cost incl. IDC (A+B) 354.64
26
-
7/27/2019 Kushinagar Details
27/35
The Project was critically evaluated by- Planning Commission of India Department of Economic Affairs Department of Expenditure Ministry of Civil Aviation
Kushinagar project is the first Airport to havebeen approved VGF by the CentralGovernment.
VGF approval granted Rs 70.93 crores(20% of the project cost)
Additional support up to 20% by State Govt.
Total permissible VGF Rs 140 crores
Viability Gap Funding (VGF)
-
7/27/2019 Kushinagar Details
28/35
HIGHLIGHTSOF THE
REQUEST FORQUALIFICATION
DOCUMENT
28
-
7/27/2019 Kushinagar Details
29/35
Critical Components - RFQ
Two stage bidding process Concession Period for International Airport 30+20 years
Project will be awarded to the Bidder quoting thehighest Premium, and in the event that noBidder offers a Premium, then to the Bidder seeking the lowest Grant.
The Grant to be a maximum of 40% of theProject Cost 20% maximum from the Central Government 20% additional (up to) from the State Govt.
29
-
7/27/2019 Kushinagar Details
30/35
Technical Eligibility Criteria
For demonstrating technical capacity and experience (theTechnical Capacity ), the Applicant shall, over the past 5(five) financial years preceding the Application Due Date,have: paid for, or received payments for, construction of
Eligible Project(s); and/ or paid for development of Eligible Project(s) in Category
1 and/or Category 2 specified in Clause 3.2.1; and/ or collected and appropriated revenues from Eligible
Project(s) in Category 1 and/or Category 2 specified inClause 3.2.1,
such that the sum total of the above is more than Rs.700crore (Rs. seven hundred crore) (the ThresholdTechnical Capacity ).
-
7/27/2019 Kushinagar Details
31/35
Eligible ProjectsEligible Projects would: Be of a PPP nature (BOT/BOLT/BOO/BOOT/others) Capital cost of each project must be more than Rs 70 crores Executed in the last 5 yearsTechnical Experience would be evaluated based on experience in
any of the following criteria: Category 1: Project experience of Eligible Projects in airport sector Category 2: Project experience of Eligible Projects in core sector Category 3: Construction experience of Eligible Projects in airport sector Category 4: Construction experience of Eligible Projects in core sector
For the purpose of this RFQ: airport sector would be deemed to include airports and aerodromes;
and core sector would be deemed to include power, telecom, ports,
highways, expressways, bridges, tunnels, airfields, railways, metro rail,industrial parks/ estates, logistic parks, and real estate development.
-
7/27/2019 Kushinagar Details
32/35
Financial Eligibility Criteria
Applicant shall have a minimum Net-Worth of Rs 90 crores asat the close of the preceding financial year (the FinancialCapacity )
In case of a Consortium, the combined technical capacity andnet worth of those Members, who have and shall continue tohave an equity share of at least 26% (twenty six per cent)each in the Special Purpose Vehicle (SPV), should satisfy theabove conditions of eligibility provided that each such Member shall, for a period of 2 (two) years from the date of commercialoperation of the Project, hold equity share capital not lessthan: (i) 26% (twenty six per cent) of the subscribed and paid up equity of
the SPV; and (ii) 5% (five per cent) of the Total Project Cost specified in the
Concession Agreement.
-
7/27/2019 Kushinagar Details
33/35
O & M Experience
Applicant has either by itself or through its Associate,experience of 5 (five) years or more in operation andmaintenance (O&M) of Airport sector projects aggregate capital cost more than the Estimated Project Cost.
In the case of a Consortium, include a Member with O&Mexperience who shall subscribe and continue to hold at least
10% (ten per cent) of the subscribed and paid up equity of theSPV for a period of 5 (five) years from the date of commercialoperation of the Project.
In the event that the Applicant does not have suchexperience, it should furnish an undertaking that if selected toundertake the Project, it shall for a period of at least 5 (five)years from the date of commercial operation of the Project,enter into an agreement for entrusting its operation &maintenance (O&M) obligations to an entity having theaforesaid experience, failing which the Concession
Agreement shall be liable to termination.
-
7/27/2019 Kushinagar Details
34/35
Evaluation of RFQ
All Applicants meeting the Eligibility criteria of the RFQwill qualify for the RFP stage.
Feasibility report, Obstruction Survey report, Concession Agreement, All clearances letter from the differentCentral and State departments would be shared with thequalified bidders
Last date of Bid Submission would be 21 st February,
2013 before 11.00 am at Directorate of Tourism,Paryatan Bhawan, Lucknow.
RFQ bid opening : 11.30 am on 21 st February, 2013
35
-
7/27/2019 Kushinagar Details
35/35
Thank you
35
Department of Tourism