    The project included physicalimprovement to state highways,institutional strengthening of the

    Public Works Department in thestate, to effectively operate andmanage transport infrastructure inthe state and training for PWD staff

    to sustain changes brought inthrough the project

  • 7/30/2019 KSTP

    3/17

    The Kerala State Transport Project It costing 336 million US dollars (Rs 1612

    crores) - of which World Bank financing is US$ 255 million (Rs 1224 crores) and State'scontribution is US $ 79.00 million(Rs 388crores), aims to improve traffic flow and

    road safety on Kerala State's primary roadnetwork, and to strengthen the institutionaland financial capacity of Kerala's keytransport sector agencies

  • 7/30/2019 KSTP

    4/17

    Main Components Of Project

    The transport corridor improvementcomponent will support upgrading of state

    highways, including related social and

    environmental mitigation measures, and

    rehabilitating inland water transportfeeder canals.

    The road maintenance component willprovide periodic maintenance of state

    highways and major district roads.

  • 7/30/2019 KSTP

    5/17

    The road safety improvement componentcomprises consultant services for blackspot

    identification, programming and designing minorimprovements works for State roads, minormitigation measures and recommendationsidentified through this service will beimplemented.

    The institutional development and technicalassistance (TA) component will provide servicesto implement the institutional strengthening

    action plan by appointing TA consultants in theareas of maintenance management and datacollection, and developing a road managementsystem.

  • 7/30/2019 KSTP

    6/17

    Objectives Of Kerala StateTransport Project

    Improve the capacity and quality of its highlycongested state highways and major district roads

    Improve road maintenance planning andmanagement practices

    Reduce road accidents and fatalities along projectroads

    Strengthen planning, technical and managementcapacities of key road sector institutions

    Implement reforms in the road sector to bring greater

    private sector participation Pilot an inland water transport (IWT) project for testing

    approaches to correct the current imbalance in thenodal share between roadways and IWT in the State.

  • 7/30/2019 KSTP

    7/17

    Components Of The Project

    Construction components

    UpgradingConstruction components of

    Heavy maintenance

    Non construction components

  • 7/30/2019 KSTP

    8/17

    Construction Components -

    UpgradingPhase I- Upgrading and widening of

    about 255 km of state highways and

    major district roads

    Phase I- Rehabilitation of about 100 kmInland Waterway (IWT) feeder canals

    Phase II- Upgrading and widening of

    about 324 km of state highways andmajor district roads. (later revised to

    367km)

  • 7/30/2019 KSTP

    9/17

    Construction Components Of

    Heavy MaintenanceRMC component- Periodic maintenance

    of about 1000 km of state highways and

    other priority roads awarded over a periodof three years

    Improvements of accident blackspots

    Performance based maintenance and

    management (PBMM) contracts

  • 7/30/2019 KSTP

    10/17

    Non Construction Components Road Safety Action Plan

    Identification and improvement of accident blackspots.

    Equipment and accessories for road safetyimprovement

    Institutional Strengthening Action Plan (ISAP)

    Road Maintenance Management Plan

    IT/ GIS, Road condition survey

    Road user satisfaction survey, road safety awarenesscampaign

    Training Accident Management System, Project Financial

    Management System(PFMS), Pre-investment studies,State-wide Video-conferencing

  • 7/30/2019 KSTP

    11/17

    Roads Selected For Upgradation In

    Phase I

    Number Road Location Length (km)

    1 Taikod Kottarakkara 46.022

    2 Kottarakkara - Chengannur 44.4303 Taikod - Kazhakuttam 12.600

    4 Alappuzha - Changanassery 24.140

    5 Muvattupuzha - Thodupuzha 17.83

    6 Muvattupuzha - Angamaly 31.40

    7 Palakkad - Shornur 45.30

    8 Thrissur - Kuttipuram 33.08

    total 254.802

  • 7/30/2019 KSTP

    12/17

  • 7/30/2019 KSTP

    13/17

    IWT - Canals Selected forimproving

    1 Changanasserry - Alappuzha 28.00

    2 Alappuzha - Kottayam 23.00

    3 Kottayam - Vaikom 24.50

    total 75.50

  • 7/30/2019 KSTP

    14/17

    Roads Selected For Upgradation In

    Phase IINo Name of Road Length in Km

    1 Kasargod-Kanjangad 27.760

    2 Pilathara

    Pappinissery 20.9003 Thaliparamba-Irutty 4.500

    4 Thalasserry-Valavupara 53.120

    5 Chenganur-Ettumanoor 47.000

    6 Ettumanoor-Muvattupuzha 40.900

    7 Punaloor- Ponkunnam-Thodupuzha 132.220

    8 Perumbilavu- Pattambi- Perinthalmanna 41.000

  • 7/30/2019 KSTP

    15/17

  • 7/30/2019 KSTP

    16/17

    Major Achievements

    20% reduction in travel time through core

    network of roads (EOP). 37% reduction in State Highways in poor

    condition achieved so far. The total road length(SH) in the state in poor condition at the time of

    taking up KSTP was 90% Reduction in road accidents up to 20% at

    improved accident black spot sites achieved