7/30/2019 KSTP
1/17
-
7/30/2019 KSTP
2/17
The project included physicalimprovement to state highways,institutional strengthening of the
Public Works Department in thestate, to effectively operate andmanage transport infrastructure inthe state and training for PWD staff
to sustain changes brought inthrough the project
-
7/30/2019 KSTP
3/17
The Kerala State Transport Project It costing 336 million US dollars (Rs 1612
crores) - of which World Bank financing is US$ 255 million (Rs 1224 crores) and State'scontribution is US $ 79.00 million(Rs 388crores), aims to improve traffic flow and
road safety on Kerala State's primary roadnetwork, and to strengthen the institutionaland financial capacity of Kerala's keytransport sector agencies
-
7/30/2019 KSTP
4/17
Main Components Of Project
The transport corridor improvementcomponent will support upgrading of state
highways, including related social and
environmental mitigation measures, and
rehabilitating inland water transportfeeder canals.
The road maintenance component willprovide periodic maintenance of state
highways and major district roads.
-
7/30/2019 KSTP
5/17
The road safety improvement componentcomprises consultant services for blackspot
identification, programming and designing minorimprovements works for State roads, minormitigation measures and recommendationsidentified through this service will beimplemented.
The institutional development and technicalassistance (TA) component will provide servicesto implement the institutional strengthening
action plan by appointing TA consultants in theareas of maintenance management and datacollection, and developing a road managementsystem.
-
7/30/2019 KSTP
6/17
Objectives Of Kerala StateTransport Project
Improve the capacity and quality of its highlycongested state highways and major district roads
Improve road maintenance planning andmanagement practices
Reduce road accidents and fatalities along projectroads
Strengthen planning, technical and managementcapacities of key road sector institutions
Implement reforms in the road sector to bring greater
private sector participation Pilot an inland water transport (IWT) project for testing
approaches to correct the current imbalance in thenodal share between roadways and IWT in the State.
-
7/30/2019 KSTP
7/17
Components Of The Project
Construction components
UpgradingConstruction components of
Heavy maintenance
Non construction components
-
7/30/2019 KSTP
8/17
Construction Components -
UpgradingPhase I- Upgrading and widening of
about 255 km of state highways and
major district roads
Phase I- Rehabilitation of about 100 kmInland Waterway (IWT) feeder canals
Phase II- Upgrading and widening of
about 324 km of state highways andmajor district roads. (later revised to
367km)
-
7/30/2019 KSTP
9/17
Construction Components Of
Heavy MaintenanceRMC component- Periodic maintenance
of about 1000 km of state highways and
other priority roads awarded over a periodof three years
Improvements of accident blackspots
Performance based maintenance and
management (PBMM) contracts
-
7/30/2019 KSTP
10/17
Non Construction Components Road Safety Action Plan
Identification and improvement of accident blackspots.
Equipment and accessories for road safetyimprovement
Institutional Strengthening Action Plan (ISAP)
Road Maintenance Management Plan
IT/ GIS, Road condition survey
Road user satisfaction survey, road safety awarenesscampaign
Training Accident Management System, Project Financial
Management System(PFMS), Pre-investment studies,State-wide Video-conferencing
-
7/30/2019 KSTP
11/17
Roads Selected For Upgradation In
Phase I
Number Road Location Length (km)
1 Taikod Kottarakkara 46.022
2 Kottarakkara - Chengannur 44.4303 Taikod - Kazhakuttam 12.600
4 Alappuzha - Changanassery 24.140
5 Muvattupuzha - Thodupuzha 17.83
6 Muvattupuzha - Angamaly 31.40
7 Palakkad - Shornur 45.30
8 Thrissur - Kuttipuram 33.08
total 254.802
-
7/30/2019 KSTP
12/17
-
7/30/2019 KSTP
13/17
IWT - Canals Selected forimproving
1 Changanasserry - Alappuzha 28.00
2 Alappuzha - Kottayam 23.00
3 Kottayam - Vaikom 24.50
total 75.50
-
7/30/2019 KSTP
14/17
Roads Selected For Upgradation In
Phase IINo Name of Road Length in Km
1 Kasargod-Kanjangad 27.760
2 Pilathara
Pappinissery 20.9003 Thaliparamba-Irutty 4.500
4 Thalasserry-Valavupara 53.120
5 Chenganur-Ettumanoor 47.000
6 Ettumanoor-Muvattupuzha 40.900
7 Punaloor- Ponkunnam-Thodupuzha 132.220
8 Perumbilavu- Pattambi- Perinthalmanna 41.000
-
7/30/2019 KSTP
15/17
-
7/30/2019 KSTP
16/17
Major Achievements
20% reduction in travel time through core
network of roads (EOP). 37% reduction in State Highways in poor
condition achieved so far. The total road length(SH) in the state in poor condition at the time of
taking up KSTP was 90% Reduction in road accidents up to 20% at
improved accident black spot sites achieved
-
7/30/2019 KSTP