kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ......

36
Appr Error! Unknown document Baricho 33kV Metering Error! Unknown Date 27/08/2014 Error! Unknown document Error! Unknown document property name. Error! Unknown document property Report on Site Visit Error! Unknown Projects Error! Unknown Error! Unknown document property name. Error! Unknown Error! Unknown Error! Unknown 1 Error! Unkn Error! Unkn Error! Unknown 5 Site Survey Report To: George Ngugi STATION: BARICHO 33KV METERING SUBSTATION 1. General: Information Project Site Survey Station Voltage 33kV Site Survey Done By Tom Kimama Cable Trenches OK 18 Inches Survey Date 26 th August 2014 Station Name & Contact Baricho Water Works 33kV Metering Station Region &Town Baricho, Malindi. Distance to Site(km) 40km from Malindi – Earth Road (All weather Road from Malindi) Station Coordinates 3°07'32.1"S 39°46'45.7"E Access Road 6Km Off the Main MalindiKakuyuniBaricho Rd 33kV Metering S/S 2. Drawings Detailed Station drawings to be collected from Protection office, Coast Region. 3. Equipment Room Location RTCC Room RTU/SAS None Room type and Floor Stone walls. Concrete Floor. Marshalling None Ceiling type No Ceiling. Asbestos Roofing. Cable Routes See Station layout Drawing & Photos

Transcript of kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ......

Page 1: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appr Error! Unknown document

Baricho 33kV Metering Error! Unknown

Date 27/08/2014 Error! Unknown document

Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Error! Unknown

Projects Error! Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 1

Error! Unkn

Error! Unkn

Error! Unknown 5

Site Survey Report 

To: George Ngugi 

STATION: BARICHO 33KV METERING SUBSTATION   

1. General: Information 

Project  Site Survey Station Voltage 33kV 

Site Survey Done By  Tom Kimama Cable Trenches OK ‐ 18 Inches

Survey Date   26th August 2014  

Station Name & 

Contact 

Baricho Water Works

 33kV Metering Station 

 

Region &Town  Baricho, Malindi.  

 Distance to Site(km)  40km from Malindi

– Earth Road 

 (All weather Road from Malindi) 

 

Station Coordinates  3°07'32.1"S 39°46'45.7"E  

Access Road  6Km Off  the Main

Malindi‐Kakuyuni‐Baricho Rd 

 

 

33kV Metering S/S 

 

 

 

2. Drawings 

Detailed Station drawings to be collected from Protection office, Coast Region. 

 

3. Equipment Room 

Location  RTCC Room  RTU/SAS None 

Room type and Floor  Stone walls. 

Concrete Floor. 

Marshalling None 

Ceiling type  No Ceiling. 

Asbestos Roofing. 

Cable Routes See Station layout 

Drawing & Photos 

Page 2: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Baricho 33kV Metering Error! Unknown

Date 27/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 2

Error! Unkn

Error! Unkn

Error! Unknown 5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4. RTU :  No RTU/SAS 

5. Marshalling Cubicles:  

No Marshalling Cubicle 

6. Communication Equipment 

No communication Equipment Available. 

Possible Communication: Radio   

 

 

 

7. Room layout 

Drawing Attached

L x W x H in meters  Room Size 

3m x 3m x 4m 

Communication 

Equipment 

None 

AC Power  240VAC   

DC Power   30VDC   

Charger    HBL Charger. 30VDC, 10A.  

Batteries  Inside Charger Cabinet.   

Power Distribution Board  None   

Grounding System  ok   

Security  Station is within Water works 

Premises.  

Room secure. 

Chain‐Link Fence.  

 

Access Road  Ok   

Page 3: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Baricho 33kV Metering Error! Unknown

Date 27/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 3

Error! Unkn

Error! Unkn

Error! Unknown 5

 

 Limited Space is available for proposed new equipment. 

 

8. AC Supply 

 AC distribution and connection point to be changed 

 

9. DC Supply  

HBL 30 VDC, 10A batteries and charger are in OK condition. 

 

10. Plant Interface 

10.1 Signals list 

Only the following Signal may be available in the Station. 

 

BAY NAME  SIGNAL NAME 

SIGNAL TYPE 

SPI  DPI  STI  SCO  DCO  AMI  ITI 

  33kV Metering Bay 

  33kV CB Main Protection Trip  1             

33kV CB Spring Charging Failure  1             

PT Fail  1             

33kV CB CLOSE/OPEN Command        1     

33kV CB Position Ind  1   

               Active Power (Transducer Required)

        1   Reactive Power (Transducer Required)             1   Voltage (Transducer Required)            1   Current (Transducer Required)    1 

Energy Metering (Tariff Meter Pulses) 1 

  Common Alarms  30V Bat Charger A Trouble 1             

    AC Supply Fail  1             

    RTU Alarm  1             

TOTALS SPI  DPI  STI SCO  DCO  AMI  ITI 

6  1  0  0  1  4  1  

10.2 Installation and adaptation works 

 

Page 4: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Baricho 33kV Metering Error! Unknown

Date 27/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 4

Error! Unkn

Error! Unkn

Error! Unknown 5

a. The  Circuit  Breaker  is OLD  and  has  CTs  on  the  bushings.  Since  this  is  a  Tariff Metering  Point,  the  CB 

mechanism box has seals therefore will make the installation works complicated. 

 

b. The space in the Control room is limited therefore no adequate space for any type of panels. 

  

c. The 2 No. of isolators do not have Auxilliary Switches. 

 

11. Enclosures 

11.1  Site Survey Report 

11.2  Detailed plant drawings  

11.3  Single Line Diagram 

11.4   Control Room Layout 

 

12. Notes 

Distance From The Site (Km) 

In town  Type Of Area  Rural area 

Nearby Buildings  Within the Baricho Water works Compound 

   

Nearby Industries  Baricho Water works  Power Supply  240VAC 

Type Of Soil  Red  soil     

Water Availability  Yes     

Special Authority Pass  Permit of work  Pass Issued By:  RCC  

Station Important to Baricho Water works 

 

13.  Photographic Report 

i. Incoming Overhead Line

 

 

ii. KPLC 33KV Metering CB with Bushing CT’s 

Page 5: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Baricho 33kV Metering Error! Unknown

Date 27/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 5

Error! Unkn

Error! Unkn

Error! Unknown 5

 

 

 

iii. KPLC Isolators without Aux switches. 

 

 

iv. 4 No. of Customers’ Transformers 

 

 

 

Page 6: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appr Error! Unknown document

Gede 33/11kV S/SError! Unknown

Date 27/08/2014 Error! Unknown document

Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Error! Unknown

Projects Error! Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 1

Error! Unkn

Error! Unkn

Error! Unknown 6

Site Survey Report 

To: George Ngugi 

STATION: GEDE 33/11KV SUBSTATION   

1) General: Information 

Project  Site Survey Station Voltage 33kV and 11kV 

Site Survey Done By  Tom Kimama Cable Trenches Not OK – 12 x 9  Inches

Survey Date   26th August 2014

Station Name & 

Contact 

Gede 33/11kV Substation

7.5MVA TX 

Region &Town  Gede, Malindi.

 Distance to Site(km)  18km from Malindi

45km from Kilifi 

Station Coordinates 

Google Maps 

3°18'08.3"S 40°00'43.1"E

Access Road  Along the 

Mombasa ‐ Malindi Rd 

 

33/11kV S/S 

 

 

2) Drawings 

i. Detailed Station drawings to be collected from Protection office, Coast Region. 

ii. Station Single Line Diagram Attached 

 

3) Equipment Room 

Location  Within the Substation land RTU/SAS None 

Room type and Floor  Not Permanent.Unipot Structure. Concrete Floor. 

Marshalling None 

Ceiling type  No Ceiling. Iron sheet Roofing. 

Cable Routes See Station layout Drawing & Photos 

L x W x H in meters  Round Shape 5 meters diameter 

Communication Equipment 

None 

AC Power  415VAC   

DC Power   30VDC   

Charger    HBL Charger. 30VDC, 5A.  

Page 7: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Gede 33/11kV S/SError! Unknown

Date 27/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 2

Error! Unkn

Error! Unkn

Error! Unknown 6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4) RTU :    No RTU/SAS 

 

5) Marshalling Cubicles:  

No Marshalling Cubicle 

 

6) Communication Equipment 

i. No communication Equipment Available. 

ii. Possible Communication: Radio or fibre to Malindi 

7) Room layout 

i. Drawing Attached 

ii. Equipment Room Picture Below 

 

     This is a temporary structure and therefore not suitable for new equipment. 

 

8) AC Supply 

     AC distribution and connection point not OK. 

 

9) DC Supply  

HBL 30 VDC, 5A batteries and charger are in OK condition but surrounding conditions bad. 

 

 

Batteries  Inside Charger Cabinet.   

Power Distribution Board  None   

Grounding System  ok   

Security  Unipot  is within S/S Premises. Light iron sheet door. Chain‐Link Fence.  

 

Access Road  Entrance gates along main road. 

 

Page 8: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Gede 33/11kV S/SError! Unknown

Date 27/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 3

Error! Unkn

Error! Unkn

Error! Unknown 6

10) Plant Interface 

i. Signals list 

Only the following Signal may be available in the Station. 

 

BAY NAME  SIGNAL NAME 

SIGNAL TYPE 

SPI  DPI  STI  SCO  DCO  AMI  ITI 

                 

  Incoming Line Bay 1 

33kV  Isolator Indications ( No Aux Contacts)    

 

       

  Incoming Line Bay 2 

33kV  Isolator Indications ( No Aux Contacts)    

 

       

  Transformer  bay 

33kV & 11kV 

33kV CB Main Protection Trip(Change type of Reclosures)  

 

11kV CB Main Protection Trip(Change type of Reclosures)            Prot./IED Control Box Faulty (Change type of Reclosures)    

        

     

     Temperature Alarm  1           Temperature Trip  1             Buchholz Alarm  1             Buchholz Trip  1             TX OLTC Control/Supply Failure  1           33kV CB CLOSE/OPEN Command (Change type of Reclosures)     

        

11kV CB CLOSE/OPEN Command (Change type of Reclosures)     

        

               OLTC Tap R/L Command(Change type of Relay)             OLTC A/M Command (Change type of Relay)             OLTC Ind/Mst/Fllw Command (Change type of Relay)     

        

A/R & CB Indication (Change type of Reclosures)     

        

               

Tap Pstn Indication      1         

               

   Outgoing 11kV Line 

 Bay‐ Fdr 1 

11kV CB Main Protection Trip(Change type of Reclosures)          11kV CB Main Protection Trip(Change type of Reclosures)          Auto reclose Operated (Change type of Reclosures)    

      

11kV CB CLOSE/OPEN Command (Change type of Reclosures)    

        

A/R & CB Indication                              Active Power (Transducer Required)            

Page 9: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Gede 33/11kV S/SError! Unknown

Date 27/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 4

Error! Unkn

Error! Unkn

Error! Unknown 6

 

BAY NAME  SIGNAL NAME 

SIGNAL TYPE 

SPI  DPI  STI  SCO  DCO  AMI  ITI Reactive Power (Transducer Required)                Voltage (Transducer Required)            Current (Transducer Required)

           

Energy Metering (Tariff Meter Pulses)   1 

               

   Outgoing 11kV Line 

 Bay‐ Fdr 2 

11kV CB Main Protection Trip(Change type of Reclosures)    11kV CB Main Protection Trip(Change type of Reclosures)    Auto reclose Operated (Change type of Reclosures)    

 

11kV CB CLOSE/OPEN Command (Change type of Reclosures)    

        

A/R  Indication (Change type of Reclosures)     

        

               Active Power (Transducer Required)            Reactive Power  

(Transducer Required)      

 

       Voltage (Transducer Required)               Current (Transducer Required)               

Energy Metering (Tariff Meter Pulses)   1 

             

  Common Alarms  30V Bat Charger A Trouble 1             

    AC Supply Fail  1             

    RTU Alarm  1           

TOTALS SPI  DPI  STI  SCO  DCO  AMI  ITI 

8 0 1  0  0  0 2 

ii. Installation and adaptation works 

a. The Equipment/Control room is temporary and is therefore not appropriate for SCADA Equipment. 

b. The Relay panel and wiring in poor condition. 

c. The Auto Reclosurers (33kV = RVE‐8 and 11kV = FTU R100) do not have remote  indications and control 

facilities. These may have to be changed to other switchgears that allow remote operations. 

d. The 3 No. of isolators do not have Auxilliary Switches. 

  

11) Enclosures 11.1  Site Survey Report 

11.2  Detailed plant drawings  

11.3  Single Line Diagram 

11.4   Control Room Layout 

Page 10: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Gede 33/11kV S/SError! Unknown

Date 27/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 5

Error! Unkn

Error! Unkn

Error! Unknown 6

 

12) Notes 

Distance From The Site (Km) 

In town  Type Of Area  Township area 

Nearby Buildings  Rural Homes and small traders surround the station. 

   

Nearby Industries  Baricho Water works  Power Supply  415VAC 

Type Of Soil  Sandy Soil     

Water Availability  Yes     

Special Authority Pass  Permit of work Pass Issued By: RCC 

 

Station is important to Gede region that has tourist hotels, historical attraction places and a town. 

13)  Photographic Report 

i. Incoming Overhead Lines 

 

 

ii. KPLC 33KV Auto Recloser RVE 8 and Isolators without Aux Switches 

   

Page 11: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Gede 33/11kV S/SError! Unknown

Date 27/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 6

Error! Unkn

Error! Unkn

Error! Unknown 6

 

 

iii. 11kV Outgoing Feeder – FTU R100 

       

iv. RTCC and Relay Panel 

     

Page 12: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appr Error! Unknown document

Kanamai 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document

Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Error! Unknown

Projects Error! Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 1

Error! Unkn

Error! Unkn

Error! Unknown 9

Site Survey Report 

To: George Ngugi 

STATION: KANAMAI 33/11KV SUBSTATION   

1. General: Information Project  Site Survey Station Voltage 33kV and 11kV 

Site Survey Done By  Tom Kimama Cable Trenches OK – 24 x 30  Inches

Survey Date   28th August 2014

Station Name & 

Contact 

Kanamai 33/11kV Substation

7.5MVA TX 

Region &Town  Kanamai, Mombasa.

 Distance to Site(km)  25km from Mtwapa

52km from Mombasa 

Station Coordinates 

Google Maps 

3°21'21.4"S 40°00'39.8"E  

Access Road  Mombasa ‐Malindi Rd

 

33/11kV S/S 

 

 

2. Drawings

i. Detailed Station drawings to be collected from Protection office, Coast Region. 

ii. Station Single Line Diagram Attached 

 

3. Equipment Room

Location  Within the Substation land RTU/SAS None 

Room type and Floor  Stone walls. Concrete Floor. 

Marshalling None 

Ceiling type  Concrete ceiling.Iron sheet Roofing. 

Cable Routes See Station layout Drawing & Photos 

L x W x H in meters  5m x 3m x 4m Communication Equipment 

None 

AC Power  415VAC   

DC Power   30VDC   

Charger    HBL Charger. 30VDC, 21A.  

Batteries  Inside Charger Cabinet.   

Power Distribution Board  DCDB and ACDB  

Grounding System  ok   

Page 13: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Kanamai 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 2

Error! Unkn

Error! Unkn

Error! Unknown 9

 

 

 

 

 

 

 

 

 

 

 

 

 

4. RTU :

No RTU/SAS

5. Marshalling Cubicles:

i. No Marshalling Cubicle

6. Communication Equipment

i. No communication Equipment Available. 

ii. Possible Communication: Radio or fibre to Bamburi 

7. Room layout

i. Drawing Attached 

ii. Equipment Room Picture Below 

 

 

     This is a permanent building and therefore suitable for new equipment. 

    There is adequate space to install new equipment for the SAS and Communication. 

 

8. AC Supply

   AC distribution board OK. 

 

 

 

9. DC Supply

DC Distribution board and HBL 30 VDC, 21A batteries and charger are in OK condition. 

      

Security  Stone perimeter wall.Guarded.  

 

Access Road  Entrance gate is along main Mombasa‐Malindi road. 

 

Page 14: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Kanamai 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 3

Error! Unkn

Error! Unkn

Error! Unknown 9

 

 

10. Plant Interface

i. Signals list 

The following Signals may be available in the Station. 

 

BAY NAME  SIGNAL NAME 

SIGNAL TYPE 

SPI  DPI  STI  SCO  DCO  AMI  ITI 

  Incoming  

Line Bay 

33kV 

PT Fail  1 

Isolator Indications  1   

Voltage    1 

  Transformer  bay 

33kV & 11kV 33kV CB Main Protection Trip 1   

11kV CB Main Protection Trip 1             

Prot./IED Control Box Faulty 1             

33kV CB SF6 Gas Low  1 

33kV CB Spring Charging Failure 1   Temperature Alarm  1             Temperature Trip  1             Buchholz Alarm  1             Buchholz Trip  1           TX OLTC Control/Supply Failure  1           33kV CB CLOSE/OPEN Command          1     11kV CB CLOSE/OPEN Command          1     86 L/O RESET Command     1       OLTC Tap R/L Command        1       OLTC A/M Command        1       OLTC Ind/Mst/Fllw Command       1     33kV CB Indication    1           11kV A/R Indication    1           Isolator Indications    1           

Tap Pstn Indication      1        

               

   Outgoing 11kV Line 

 Bay‐ Fdr 1 

11kV CB Main Protection Trip 1   

11kV CB Main Protection Trip 1 

Auto reclose Operated 1   

11kV CB CLOSE/OPEN Command         1     A/R & CB Indication    1           Isolator Indications    1         Active Power (Transducer Required) 

          1   Reactive Power (Transducer Required)             1   Voltage (Transducer Required)

          1   

Page 15: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Kanamai 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 4

Error! Unkn

Error! Unkn

Error! Unknown 9

 

BAY NAME  SIGNAL NAME 

SIGNAL TYPE 

SPI  DPI  STI  SCO  DCO  AMI  ITI Current (Transducer Required)            1   

Energy Metering (Tariff Meter Pulses) 1 

Prot./IED Control Box Faulty 1           

   Outgoing 11kV Line 

 Bay‐ Fdr 2 

11kV CB Main Protection Trip 1   

11kV CB Main Protection Trip 1   

Auto reclose Operated 1 

11kV CB CLOSE/OPEN Command         1     A/R & CB Indication    1           Isolator Indications    1         Active Power (Transducer Required)            1   Reactive Power  

(Transducer Required)      

 

    1   Voltage (Transducer Required)            1   Current (Transducer Required)            1   

Energy Metering (Tariff Meter Pulses) 1 

Prot./IED Control Box Faulty 1             

  Common Alarms  30V Bat Charger A Trouble 1             

    AC Supply Fail  1             

    RTU Alarm  1           

TOTALS SPI  DPI  STI  SCO  DCO  AMI  ITI 

22  8  1  3  5  9  2  

 

ii. Installation and adaptation works 

 

a. The Equipment/Control room is permanent and is therefore appropriate for SAS Equipment. 

b. 33kV  CB  and  Transformer  functions  (Protection  and  Voltage  Regulation)  are  all wired  to  the  existing 

panels therefore possible to capture for the SAS. The Relay panels wiring are in good condition. 

c. Cabling  required  to 3 No. of Auto Reclosurers  (11kV = Nu‐Lec)  to allow  remote  indications and control 

facilities.  

d. All the isolators have Auxilliary Switches and therefore possible to capture status on SAS. 

 

 

 

11. Enclosures

11.1  Site Survey Report 

11.2  Detailed plant drawings  

11.3  Single Line Diagram 

11.4   Control Room Layout 

Page 16: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Kanamai 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 5

Error! Unkn

Error! Unkn

Error! Unknown 9

12. Notes

Distance From The Site (Km) 

In town  Type Of Area  Township area 

Nearby Buildings  Shops, Hotels etc     

Nearby Industries  Umoja Rubber, Coca ColaBottler, Hotel Industries 

Power Supply 415VAC 

Type Of Soil  Sandy Soil

Water Availability  Yes     

Special Authority Pass  Permit of work  Pass Issued By:  RCC 

 

Station is important to Kanamai region that has tourist hotels, large industries and a town. 

13. Photographic Report

i. 33KV CB IT0  and 33kV Isolators with Aux Switches 

 

     

 

 

Page 17: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Kanamai 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 6

Error! Unkn

Error! Unkn

Error! Unknown 9

 

 

ii. 11kV Incomer Switchgear 

     

iii. 11kV Feeder Bays 

 

Page 18: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Kanamai 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 7

Error! Unkn

Error! Unkn

Error! Unknown 9

       

 

 

 

iv. 11kV Switchgear Control Panel ‐ Nulec 

 

Page 19: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Kanamai 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 8

Error! Unkn

Error! Unkn

Error! Unknown 9

 

v. RTCC and Relay Panel 

       

 

vi. Proposed locations for the SAS & Communication Panels 

Page 20: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Kanamai 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 9

Error! Unkn

Error! Unkn

Error! Unknown 9

       

 

Page 21: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appr Error! Unknown document

Mwabungo 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document

Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Error! Unknown

Projects Error! Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 1

Error! Unkn

Error! Unkn

Error! Unknown 8

Site Survey Report 

To: George Ngugi 

STATION: MWABUNGO 33/11KV SUBSTATION   

1. General: Information Project  Site Survey Station Voltage 33kV and 11kV 

Site Survey Done By  Tom Kimama Cable Trenches OK – 24 x 30  Inches

Survey Date   28th August 2014

Station Name & 

Contact 

Mwabungo 33/11kV Substation

7.5MVA TX 

Region &Town  Mwabungo, Kwale.

 Distance to Site(km)  15km from Ukunda

45km from Mombasa 

Station Coordinates 

Google Maps 

4°21'15.5"S 39°32'07.3"E  

Access Road  Along Ukunda _ Ramisi Rd

 

33/11kV S/S 

 

 

2. Drawings

i. Detailed Station drawings to be collected from Protection office, Coast Region. 

ii. Station Single Line Diagram Attached 

 

3. Equipment Room

Location  Within the Substation land RTU/SAS None 

Room type and Floor  Stone walls. Concrete Floor. 

Marshalling None 

Ceiling type  Concrete ceiling.Iron sheet Roofing. 

Cable Routes See Station layout Drawing & Photos 

L x W x H in meters  6m x 5m x 4m Communication Equipment 

None 

AC Power  415VAC   

DC Power   30VDC & 110VDC  

Charger    HBL Charger. 30VDC, 55A.HBL Charger. 110VDC, 80A. 

 

Batteries  Inside Charger Cabinet.   

Power Distribution Board  DCDB and ACDB  

Page 22: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Mwabungo 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 2

Error! Unkn

Error! Unkn

Error! Unknown 8

 

 

 

 

 

 

 

 

 

 

 

 

 

4. RTU :

i. No RTU/SAS

5. Marshalling Cubicles:

i. No Marshalling Cubicle

6. Communication Equipment

i. No communication Equipment Available. ii. Possible Communication: Radio or fibre to Galu 132/33kV S/S 

 

7. Room layout

i. Drawing Attached ii. Equipment Room Picture Below 

 

     This is a permanent building and therefore suitable for new equipment. 

    There is adequate space to install new equipment for the SAS and Communication. 

 

8. AC Supply

   AC distribution board OK. 

 

 

 

9. DC Supply DC Distribution board and 2 No of DC sources  

I. HBL 30 VDC, 55A batteries and charger are in OK condition. II. HBL 110 VDC, 80A batteries and charger are in OK condition 

      

 

Grounding System  ok   

Security  Stone perimeter wall.Guarded.  

 

Access Road  Entrance gate is along main Ukunda _ Ramisi road. 

 

Page 23: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Mwabungo 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 3

Error! Unkn

Error! Unkn

Error! Unknown 8

 

10. Plant Interface

i. Signals list 

The following Signals may be available in the Station. 

 

BAY NAME  SIGNAL NAME 

SIGNAL TYPE 

SPI  DPI  STI SCO  DCO  AMI  ITI 

  Incoming Line 1 Bay 

33kV  

 

Isolator Indications  1   

Voltage (Transducer Required)   1 

  Incoming Line 2 Bay 

33kV 33kV AR Main Protection Trip 1   

Isolator Indications  1   

Prot./IED Control Box Faulty  1           

Auto reclose Operated 1             

11kV CB CLOSE/OPEN Command         1     A/R  Indication    1           Active Power (Transducer Required)         1   Reactive Power (Transducer Required)             1   Voltage (Transducer Required)            1   Current (Transducer Required)

          1   

Energy Metering (Tariff Meter Pulses)           1 

 

  Transformer  bay 

33kV & 11kV 33kV CB Main Protection Trip 1   

11kV CB Main Protection Trip 1           

Prot./ Control Box Faulty 1             

33kV CB SF6 Gas Low  1   

33kV CB Spring Charging Failure 1   Temperature Alarm  1    Temperature Trip  1             Buchholz Alarm  1           Buchholz Trip  1             TX OLTC Control/Supply Failure   1             33kV AR CLOSE/OPEN Command       1     11kV AR CLOSE/OPEN Command          1     86 L/O RESET Command        1       OLTC Tap R/L Command       1       OLTC A/M Command      1       OLTC Ind/Mst/Fllw Command          1     33Kv A/R  Indication    1           11Kv A/R  Indication    1         33Kv Isolator Indications    1           

Tap Pstn Indication      1         

Page 24: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Mwabungo 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 4

Error! Unkn

Error! Unkn

Error! Unknown 8

 

BAY NAME  SIGNAL NAME 

SIGNAL TYPE 

SPI  DPI  STI  SCO  DCO  AMI  ITI 

               

   Outgoing 11kV Line 

 Bay‐ Fdr 1 

11kV AR Main Protection Trip 1 

Prot./ Control Box Faulty 1   

Auto reclose Operated 1   

11kV CB CLOSE/OPEN Command         1     A/R Indication    1         Isolator Indications    1           Active Power (Transducer Required)            1   Reactive Power (Transducer Required)

        1   Voltage (Transducer Required)         1   Current (Transducer Required)            1   

Energy Metering (Tariff Meter Pulses)   1 

             

   Outgoing 11kV Line 

 Bay‐ Fdr 2 

11kV AR Main Protection Trip 1   

Prot./ Control Box Faulty 1   

Auto reclose Operated 1   

11kV CB CLOSE/OPEN Command       1     A/R Indication    1           Isolator Indications    1           Active Power (Transducer Required)

        1   Reactive Power (Transducer Required)         1   Voltage (Transducer Required)            1   Current (Transducer Required)            1   

Energy Metering (Tariff Meter Pulses) 1 

             

  Common Alarms  30V Bat Charger A Trouble 1             

    AC Supply Fail  1             

    RTU Alarm  1           

TOTALS SPI  DPI  STI  SCO  DCO  AMI  ITI 

22  10  1  3  6  12  2  

 

 

ii. Installation and adaptation works 

 

a. The Equipment/Control room is permanent and is therefore appropriate for SAS Equipment. 

b. 33kV  CB  and  Transformer  functions  (Protection  and  Voltage  Regulation)  are  all wired  to  the  existing 

panels therefore possible to capture for the SAS. The Relay panels wiring are in good condition. 

c. Cabling  required  to 5 No. of Auto Reclosurers  (11kV &  33kV)  to  allow  remote  indications  and  control 

facilities.  

d. All the isolators are motorized and have Auxilliary Switches : therefore possible to capture status on SAS. 

Page 25: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Mwabungo 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 5

Error! Unkn

Error! Unkn

Error! Unknown 8

 

 

11. Enclosures

11.1  Site Survey Report 

11.2  Detailed plant drawings  

11.3  Single Line Diagram 

11.4   Control Room Layout 

12.

13. Notes

Distance From The Site (Km) 

In town  Type Of Area Township area 

Nearby Buildings  Shops, Hotels schools etc

Nearby Industries  Hotel Industries  Power Supply  415VAC 

Type Of Soil  Sandy Soil     

Water Availability  Yes     

Special Authority Pass  Permit of work Pass Issued By: RCC 

 

Station is important to Galu region that has several tourist hotels, small industries and schools. 

14. Photographic Report

i. 33KV Msambweni CB, Tx 1 CB IW0  and 33kV Motorised Isolators with Aux Switches 

 

 

Page 26: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Mwabungo 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 6

Error! Unkn

Error! Unkn

Error! Unknown 8

    

 

 

        

   

   

ii. 11kV Incomer Switchgear 

     

Page 27: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Mwabungo 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 7

Error! Unkn

Error! Unkn

Error! Unknown 8

iii. 11kV Feeder Bays 

 

        

 

iv. RTCC and Relay Panel 

 

       

Page 28: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Mwabungo 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 8

Error! Unkn

Error! Unkn

Error! Unknown 8

 

v. Proposed locations for the SAS & Communication Panels 

       

 

Page 29: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appr Error! Unknown document

Watamu 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document

Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Error! Unknown

Projects Error! Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 1

Error! Unkn

Error! Unkn

Error! Unknown 8

Site Survey Report 

To: George Ngugi 

STATION: WATAMU 33/11KV SUBSTATION   

1. General: Information Project  Site Survey Station Voltage 33kV and 11kV 

Site Survey Done By  Tom Kimama Cable Trenches OK – 24 x 30  Inches

Survey Date   27th August 2014

Station Name & 

Contact 

Watamu 33/11kV Substation

7.5MVA TX 

Region &Town  Watamu, Malindi.

 Distance to Site(km)  25km from Malindi

52km from Kilifi 

Station Coordinates 

Google Maps 

3°21'21.4"S 40°00'39.8"E  

Access Road  6km off the main

Mombasa ‐ Malindi Rd 

 

33/11kV S/S 

 

 

 

2. Drawings

i. Detailed Station drawings to be collected from Protection office, Coast Region. 

ii. Station Single Line Diagram Attached 

 

3. Equipment Room

Location  Within the Substation land RTU/SAS None 

Room type and Floor  Stone walls. 

Concrete Floor. 

Marshalling None 

Ceiling type  Concrete ceiling.

Iron sheet Roofing. 

Cable Routes See Station layout 

Drawing & Photos 

L x W x H in meters  5m x 3m x 4m Communication 

Equipment 

None 

Page 30: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Watamu 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 2

Error! Unkn

Error! Unkn

Error! Unknown 8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4. RTU :

No RTU/SAS in station.

 

5. Marshalling Cubicles:

i. No Marshalling Cubicle

 

6. Communication Equipment

i. No communication Equipment Available. 

ii. Possible Communication: Radio or fibre to Malindi 

 

 

7. Room layout

i. Drawing Attached 

ii. Equipment Room Picture Below 

 

 

AC Power  415VAC   

DC Power   30VDC   

Charger    HBL Charger. 30VDC, 21A.  

Batteries  Inside Charger Cabinet.   

Power Distribution Board  DCDB and ACDB  

Grounding System  ok   

Security  Stone perimeter wall.

Guarded.  

 

Access Road  Entrance gate is along main 

Watamu road. 

 

Page 31: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Watamu 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 3

Error! Unkn

Error! Unkn

Error! Unknown 8

 

     This is a permanent building and therefore suitable for new equipment. 

    There is adequate space to install new equipment for the SAS and Communication. 

 

8. AC Supply

   AC distribution board OK. 

 

 

9. DC Supply

DC Distribution board and HBL 30 VDC, 21A batteries and charger are in OK condition. 

   

10. Plant Interface

i. Signals list 

The following Signals may be available in the Station. 

 

BAY NAME  SIGNAL NAME 

SIGNAL TYPE 

SPI  DPI  STI  SCO  DCO  AMI  ITI 

  Incoming  

Line Bay 

33kV 

PT Fail  1 

Isolator Indications  1   

Voltage (Transducer Required)   1 

 

  Transformer  bay 

33kV & 11kV 33kV CB Main Protection Trip 1 

11kV CB Main Protection Trip 1             

Prot./IED Control Box Faulty 1             

33kV CB SF6 Gas Low  1 

33kV CB Spring Charging Failure 1   Temperature Alarm  1             Temperature Trip  1             Buchholz Alarm  1             Buchholz Trip  1             TX OLTC Control/Supply Failure  1           33kV CB CLOSE/OPEN Command          1     11kV CB CLOSE/OPEN Command          1     86 L/O RESET Command     1       OLTC Tap R/L Command        1       OLTC A/M Command        1       OLTC Ind/Mst/Fllw Command         1     

Page 32: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Watamu 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 4

Error! Unkn

Error! Unkn

Error! Unknown 8

 

BAY NAME  SIGNAL NAME 

SIGNAL TYPE 

SPI  DPI  STI  SCO  DCO  AMI  ITI A/R & CB Indication    1           Isolator Indications    1         

Tap Pstn Indication      1         

               

   Outgoing 11kV Line 

 Bay‐ Fdr 1 

11kV CB Main Protection Trip 1   

11kV CB Main Protection Trip 1 

Auto reclose Operated 1   

11kV CB CLOSE/OPEN Command         1     A/R & CB Indication    1         Isolator Indications    1           Active Power (Transducer Required)            1   Reactive Power (Transducer Required)             1   Voltage (Transducer Required)         1   Current (Transducer Required)            1   

Energy Metering (Tariff Meter Pulses)   1 

Prot./IED Control Box Faulty 1             

   Outgoing 11kV Line 

 Bay‐ Fdr 2 

11kV CB Main Protection Trip 1 

11kV CB Main Protection Trip 1   

Auto reclose Operated 1   

11kV CB CLOSE/OPEN Command       1     A/R & CB Indication    1           Isolator Indications    1           Active Power (Transducer Required)            1   Reactive Power  

(Transducer Required)           1   Voltage (Transducer Required)

        1   Current (Transducer Required)            1   

Energy Metering (Tariff Meter Pulses)   1 

Prot./IED Control Box Faulty 1             

  Common Alarms  30V Bat Charger A Trouble 1           

    AC Supply Fail  1             

    RTU Alarm  1             

TOTALS SPI  DPI  STI  SCO  DCO  AMI  ITI 

22  7  1  3  5  9  2 

 

 

ii. Installation and adaptation works 

 

a. The Equipment/Control room is permanent and is therefore appropriate for SAS Equipment. 

b. 33kV  CB  and  Transformer  functions  (Protection  and  Voltage  Regulation)  are  all wired  to  the  existing 

panels therefore possible to capture signals for the SAS. The Relay panels wiring are in good condition. 

Page 33: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Watamu 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 5

Error! Unkn

Error! Unkn

Error! Unknown 8

c. Cabling  required  to 3 No. of Auto Reclosurers  (11kV = Nu‐Lec)  to allow  remote  indications and control 

facilities.  

d. All the isolators have Auxilliary Switches and therefore possible to capture status on SAS. 

 

11. Enclosures

11.1  Site Survey Report 

11.2  Detailed plant drawings  

11.3  Single Line Diagram 

11.4   Control Room Layout 

12. Notes

Distance From The Site (Km) 

In town  Type Of Area Township area 

Nearby Buildings  Shops, Hotels etc

Nearby Industries  Hotel Industries  Power Supply  415VAC 

Type Of Soil  Sandy Soil     

Water Availability  Yes     

Special Authority Pass  Permit of work Pass Issued By: RCC 

 

Station is important to Watamu region that has tourist hotels, historical attraction places and a town. 

13. Photographic Report

i. 33KV CB IT0  and Isolators with Aux Switches 

     

 

 

Page 34: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Watamu 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 6

Error! Unkn

Error! Unkn

Error! Unknown 8

 

 

ii. 11kV Incomer Switchgear, 11kV Busbars and 11kV Busbar VT’s  

     

iii. 11kV Feeder Bays 

 

 

Page 35: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Watamu 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 7

Error! Unkn

Error! Unkn

Error! Unknown 8

iv. 11kV Switchgear Control Panel ‐ Nulec 

 

v. RTCC and Relay Panel 

   

 

 

Page 36: kplc.co.ke - Site Survey Report Survey... · 2015-11-30 · Installation and adaptation works ... Notes Distance From ... i. Incoming Overhead Lines ii. KPLC 33KV Auto Recloser RVE

Appro Error! Unknown document

Watamu 33/11kV S/S Error! Unknown

Date 28/08/2014 Error! Unknown document property name. Error! Unknown document property

Report on Site Visit

Dept Projects Error!

Unknown

Error! Unknown document property name. Error! Unknown

Error! Unknown

Error! Unknown 8

Error! Unkn

Error! Unkn

Error! Unknown 8

      

vi. Proposed locations for the SAS & Communication Panels