Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and...

12
Knoxville, TN October 20, 2009 SG-Systems SG-Systems Systems Requirements Specification Team Status and Breakout Session

Transcript of Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and...

Page 1: Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.

Knoxville, TN October 20, 2009

SG-SystemsSG-Systems

Systems Requirements Specification Team

Status and Breakout Session

Page 2: Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.

Knoxville, TN October 20, 2009

Topics

• Status & Plan Update

• AMI-ENT SRS v1.0 Highlights

• OpenADE Reference Architecture

• OpenADR Reference Architecture

• Breakout Session Topics

Page 3: Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.

Knoxville, TN October 20, 2009

Status & Plan

• Status– AMI-ENT SRS v1.0 released on 10/14/09, ready to be

voted on. – Working with OpenADE and OpenADR task forces on

their systems requirements and architecture needs.

• Plan – Alignment with NIST interoperability roadmap– Develop SG-Systems Reference Architecture to

ensure architecture alignment between OpenAMI-ENT, OpenADE, OpenADR and OpenHAN.

– Support OpenADE team for their SRS needs

Page 4: Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.

Knoxville, TN October 20, 2009

AMI-ENT SRS Table of Content

Contents1.Introduction1.1Purpose1.2Scope1.3Acronyms and Abbreviations1.4External Considerations and References1.5Document Overview2.Architecture Overview2.1Architecture Vision2.2Architecture Guiding Principles2.3Architectural Considerations2.4 Security Considerations2.5AMI-ENT Reference Model3.AMI-ENT Systems Architecture3.1AMI-ENT Business Architecture View3.1.1 Integration Requirements Framework3.1.2 Business Architecture Components3.2Integration Requirements Specification3.2.1 Functional Requirements – Business Processes3.2.2 Functional Requirements – Integration Services3.2.3 Technical Requirements – Integration Services

3.3AMI-ENT Application Architecture View3.4AMI-ENT Data Architecture View3.4.1 Meter Reading and Event View3.4.2 Asset and Customer Information View3.4.3 End Device Control View3.4.4 Outage Record and Work Order3.5AMI-ENT Technical Architecture View3.5.1 Service Patterns3.5.2 Intra-system vs. Inter-system3.5.3 Service Aggregation3.5.4 Master Data Management3.5.5 Complex Event Processing3.5.6 Governance4. Appendices4.1 Terms and Definitions

Page 5: Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.

Knoxville, TN October 20, 2009

AMI-ENT SRS Reference Model

AMI Customer Facing ComponentsAMI Customer Facing Components

AMI Edge AMI Edge ComponentsComponents Utility Operations and Enterprise Analysis ComponentsUtility Operations and Enterprise Analysis Components

Process Integration PlatformProcess Integration Platform

Information Management PlatformInformation Management Platform

Federated Federated ESBsESBs + ESM+ ESM

EII/EDI/ETL + ESMEII/EDI/ETL + ESM

MetadataRepository

ServiceManagement

SecurityManagement

ProcessOrchestration

Monitoring &Management

Data Warehouse& Data Mart

Reporting& Analysis

AMI SpecificComponents

AMI Head End #n

DemandResponse

Command & Control

AMIService Manager

AMI Head End #2

AMI Head End #1

AMI Meter Asset

Maintenance

Utility Operations and EnterpriseUtility Operations and EnterpriseComponentsComponents

AMI NetworkAsset

Maintenance

C&I DemandResource

Management

AMINetwork

Management

CustomerInformation

Analysis

Customer Information

Management

CustomerPresentment &

Analysis (C&I)

CustomerPresentment &

Analysis (Residential)

Customer RelationshipManagement

DistributionEngineering

Analysis

DistributionManagement

DistributionOperational

Analysis

DemandResponse

Management

DistributionSCADA

Enterprise AssetManagement

EnergyManagement

GeographicInformation

Management

Home AreaNetwork

Management

Meter DataManagement

Work and MobileManagement

OutageManagement

Power Trading

RevenueProtection

Supply ChainManagement

TransformerLoad Management

Third PartyPortal

Meter DataAnalysis

CustomerPortal

ComplexEvent Processing

Real TimeBI

Page 6: Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.

Knoxville, TN October 20, 2009

AMI-ENT Services Inventory View

Services Provided/Consumed by “Customer Information System”

Customer Information System

MDUS

Head End

MDUS

Head End

Create

Created

Created

CreatedCommonConfirmation

MeterStatus

HanAsset

BillingDeterminant

MeterStatus

MeterSystemEvent

Service Consumers Service Providers

ScheduledEvent

ConnectDisconnect

CommonConfirmation

MeterStatusCreated

Created HANAsset

BillingDeterminant

MeterStatus

MeterSystemEvent

ScheduledEvent

ConnectDisconnect

CreateMeterStatusRequest MeterStatusRequest

CreateLoadControlCommandRequest LoadControlCommandRequest

CreatedServiceToken ServiceToken

CreateHANAsset HANAsset

CreateBillingDeterminant BillingDeterminant

ChangeMeterAssetRequest MeterAssetRequest

CreateMeterServiceOrderRequest MeterServiceOrderRequest

Service Providers / Consumers

Service Operation

Created

Created

Service Operation

Changed

Page 7: Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.

Knoxville, TN October 20, 2009

System of Systems

Source: “Accelerating Utility Industry Standards Adoption”

Page 8: Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.

Knoxville, TN October 20, 2009

OpenHAN - Home Area Network

AMI Backhaul Network

Load ControlPCT

Certified Plug-In Hybrid Advanced IHDCons

umer

Utility Int

eractiv

e Appl

ication

s

Utility Appl

ication

s

Lighting Control

Smart ApplianceHome Health Care

HA Controller

(e.g., Set Top Box)

Consum

er Appl

ication

s

Certified DG

Utility Secu

red Com

municat

ion

Channel

Utility Publ

ic Broa

dcast

Channel

(e.g,.,

price s

ignal)

Revenue Grade

Electric Meter

Revenue Grade

Non-electric MeterHome Security

Certified

Premise EMS

Utility Application

Gateway

Other Premise

Gateway(Internet)

AMI Gateway

Utility Owned and Operated

Page 9: Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.

Knoxville, TN October 20, 2009

OpenADE - Automated Data Exchange

9

Page 10: Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.

Knoxville, TN October 20, 2009

OpenADR – Automated Demand Response

10

C&I Customer Facility

LOADS

DER

Meter

EMS/Gateway

FacilityManager

Facility/Building Control Network

Residential Customer

HANDevices

DER

Meter

ESI

Customer Home Area Network

EMS/Gateway

ISO/RTO

Utility/LSE

ESP/CSP

Wholesale DRLC/Pricing Signals

Wholesale DRLC/Pricing Signals

Wholesale DRLC/Pricing Signals

Retail DRLC/Pricing Signals

Retail DRLC/Pricing Signals

Retail DRLC/Pricing Signals

Mode of Operation: 1. Email, Phone/ verbal confirmation;2. Automated Control/Confirmation;3. Automated Messaging/Programmed Response;4. Automated Messaging/Manual Response;

Page 11: Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.

Knoxville, TN October 20, 2009

Breakout Session Topics

• Comments and feedback on AMI-ENT SRS v1.0• NIST Interoperability Roadmap alignment• SG-Systems Reference Architecture effort• Others

Page 12: Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.

Knoxville, TN October 20, 2009

If you have comments and/or wish to join and contribute to the AMI-ENT SRS effort,

please contact Joe Zhou

at [email protected]