KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00...

20
2011 KEY FIGURES ISSN: 1848-0993 KLJUCNE BROJKE

Transcript of KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00...

Page 1: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

2011KeyFigures

issN: 1848-0993

KLJUCNEBROJKE

Page 2: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

Dužina po broju trakova/Length by number of lanes

47,9 km

1.182,0 km

20,8 km

1.250,7 kmAutoceste/poluautoceste u prometuMotorways/semi-motorways in service

Nove autoceste otvorene u 2011.New motorways opened in 2011

Dopuna do punog profila u 2011.Upgrade to full profile opened in 2011

Nove autoceste - otvorenje u 2012.New motorways scheduled in 2012

10,0 km

67,0 km

1,5 km

20,8 km

2 × 1 trak/lane

2 × 3 traka/lanes

2 × 2 traka/lanes

47,9 km

1.182,0 km

2

MREŽA AUTOCESTAMOTORWAY NETWORK

Page 3: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

3

Razvoj mreže po godinama (km)Development of network by years (km)

Otvoreno novih autocesta po godinama (km)New motorways opened to traffic by years (km)

MREŽA AUTOCESTAMOTORWAY NETWORK

Page 4: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

4

Nagrade EuroTAP/EuroTAP Award(European Tunnel Assessment Programme:)

6 2 3

2007.

2008.

2009.

1.572 m

1.130 m

2.140 m

50Ukupan broj tunelaTotal number of tunnels

MREŽA AUTOCESTAMOTORWAY NETWORK

Ukupna duljina tunela/Total lenght of tunnels 46,8 km

3,7 %

5,8 km

455> 1 km > 2 km > 5 km

Brinje HAC - A1

VelikiGložac ARZ - A6

Tuhobić ARZ - A6

Udio tunela u ukupnoj mrežiPortion of tunnels in total network

Najduži tunelThe longest tunnel

Mala Kapela - A1

Page 5: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

5

Ukupno/total:

1.251 km

60km

A2

141km

A9A8

868km

A1 A3 A4 A5

A13A12A11A10

MREŽA AUTOCESTAMOTORWAY NETWORK

182km

A7A6A1*

Most KRKBridge Krk] [

dijelom autoceste A1 od Zagrebado Bosiljeva upravlja ARZpart of the motorway A1 from Zagrebto Bosiljevo is operated by ARZ

A1*

U planiranjuIn project

U izgradnjiIn construction

U prometuIn service

A1

A3

A4

A5

A13

A12

A11

A10

A2

A9

A8

A7

A6

A1*

A8

A1

A1

A1

A1

A3

A3

A3

A4

A5

Page 6: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

A2: Zagreb � Macelj 60,00 � � � 60,00 �

UKUPNO/TOTAL: 60,00 � � � 60,00

A1: Bosiljevo 2 � Split � Dubrovnik Ravča - Vrgorac Vrgorac - Č. Ploče Č. Ploče - spoj Metković

399,00

�10,00

11,00�

6,00

416,00

� �A2: Spoj AC na GP sa SLO/Link to SLO border � � � � �

A3: Bregana � Zagreb � Lipovac 307,00 � � � 307,00 �

A4: Zagreb � Goričan 97,00 � � � 97,00 �

A5: Beli Manastir � Osijek � GP sa BiH Sredanci - Svilaj

56,00 � �3,00

� 59,00 ��

A10: Granica sa BiH � č. Metković � � 1,50 1,50 1,50

A11: Zagreb � Sisak Jakuševec - Velika Gorica jug Buševec - Lekenik

9,00��

���

10,0011,00

���

30,00��

���

A12: Vrbovec 2 � Križevci � Koprivnica � GP Gola (H) Gradec - Kloštar Vojakovečki

0,00�

�� 20,00

��

20,00 �

A13: Vrbovec 2 � Bjelovar � Virovitica � GP Terezino polje (H) Vrbovec 2 - Bjelovar

0,00�

�� 27,00

��

27,00 ��

UKUPNO/TOTAL: 868,00 10,00 83,50 6,00 957,50 1,50

A1: Bosiljevo 2 � Zagreb 65,25 � - � 65,25 �

A6: Rijeka � Bosiljevo 2 81,25 � � � 81,25 �

A7: Rupa � Matulji � Diračje � Orehovica 28,00 � � � 28,00 �

D10: Most Krk i pristupne ceste/Bridge Krk + access roads 7,19 � � � 7,19 �

UKUPNO/TOTAL: 181,69 � � � 181,69

A8: Kanfanar � MatuljiKanfanar � Pazin (č. Rogovići)Pazin � Matulji*

64,2118,1346,08

�18,13

��

29,00

64,2118,1346,08

�A9: Umag � Pula

Umag � MedakiMedaki - KanfanarKanfanar - Vodnjan jugVodnjan jug - Pula

76,8041,84

7,3620,70

6,90

�41,84

7,36��

��

����

5,00

76,8041,84

7,3620,70

6,90

�����

UKUPNO/TOTAL: 141,01 **67,33 **29,00***5,00 141,01

Autocesta/poluautocestaMotorway/semi motorway

U prometu/In service 01/01/2012

Otvoreno/Open in 2011

U izgradnji/In constructi-on 1/1/2012

Početak izgradnje/Start of construction in 2012

Ukupno/Total

Otvaranje/Opening in 2012

UKUPNO HRVATSKA/TOTAL CROATIA:

1.250,70 10**67,33

83,50 6,00**29,00***5,00

1.340,20 1,50

* poluautocesta/brza cesta // semi motorway/fast road

HRVATSKE AUTOCESTE d.o.o.

AUTOCESTA ZAGREB � MACELJ d.o.o.

AUTOCESTA RIJEKA � ZAGREB d.d.

BINA � ISTRA d.d.

UKUPNO SVE AUTOCESTE/TOTAL ALL MOTORWAYS

** dopuna do punog profila autoceste

Page 7: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

A2: Zagreb � Macelj 60,00 � � � 60,00 �

UKUPNO/TOTAL: 60,00 � � � 60,00

A1: Bosiljevo 2 � Split � Dubrovnik Ravča - Vrgorac Vrgorac - Č. Ploče Č. Ploče - spoj Metković

399,00

�10,00

11,00�

6,00

416,00

� �A2: Spoj AC na GP sa SLO/Link to SLO border � � � � �

A3: Bregana � Zagreb � Lipovac 307,00 � � � 307,00 �

A4: Zagreb � Goričan 97,00 � � � 97,00 �

A5: Beli Manastir � Osijek � GP sa BiH Sredanci - Svilaj

56,00 � �3,00

� 59,00 ��

A10: Granica sa BiH � č. Metković � � 1,50 1,50 1,50

A11: Zagreb � Sisak Jakuševec - Velika Gorica jug Buševec - Lekenik

9,00��

���

10,0011,00

���

30,00��

���

A12: Vrbovec 2 � Križevci � Koprivnica � GP Gola (H) Gradec - Kloštar Vojakovečki

0,00�

�� 20,00

��

20,00 �

A13: Vrbovec 2 � Bjelovar � Virovitica � GP Terezino polje (H) Vrbovec 2 - Bjelovar

0,00�

�� 27,00

��

27,00 ��

UKUPNO/TOTAL: 868,00 10,00 83,50 6,00 957,50 1,50

A1: Bosiljevo 2 � Zagreb 65,25 � - � 65,25 �

A6: Rijeka � Bosiljevo 2 81,25 � � � 81,25 �

A7: Rupa � Matulji � Diračje � Orehovica 28,00 � � � 28,00 �

D10: Most Krk i pristupne ceste/Bridge Krk + access roads 7,19 � � � 7,19 �

UKUPNO/TOTAL: 181,69 � � � 181,69

A8: Kanfanar � MatuljiKanfanar � Pazin (č. Rogovići)Pazin � Matulji*

64,2118,1346,08

�18,13

��

29,00

64,2118,1346,08

�A9: Umag � Pula

Umag � MedakiMedaki - KanfanarKanfanar - Vodnjan jugVodnjan jug - Pula

76,8041,84

7,3620,70

6,90

�41,84

7,36��

��

����

5,00

76,8041,84

7,3620,70

6,90

�����

UKUPNO/TOTAL: 141,01 **67,33 **29,00***5,00 141,01

Autocesta/poluautocestaMotorway/semi motorway

U prometu/In service 01/01/2012

Otvoreno/Open in 2011

U izgradnji/In constructi-on 1/1/2012

Početak izgradnje/Start of construction in 2012

Ukupno/Total

Otvaranje/Opening in 2012

UKUPNO HRVATSKA/TOTAL CROATIA:

1.250,70 10**67,33

83,50 6,00**29,00***5,00

1.340,20 1,50

** upgrade to full motorway profile *** druga cijev tunela Učka // second tube of tunnel Učka

Page 8: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

8

76Odmorišta

Rest areas

svakih/every

20 km

123

1890

808

23110

USLUGESERVICES

Benzinske postaje

Filling stations

svakih/every

29km

Cafe barovi

Caffe bars

svakih/every

23 km

Restorani

Restaurants

svakih/every

73 km

Hoteli

Hotels

Prijelazi za divlje životinje

Crossings for wild animals

Broj dinamičkih informacijskih panelaNumber of VMS

COKP/MTCCCentri održ. i kont. prometaMaint. & Traffic Control Centres

Page 9: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

9

Broj vozila u područjima naplateNumber of vehicles in toll collection zones 65,8 mil

mio

89,4 %

10,6 %

TvrtkaCompany

%(11/10)

%(11/10)

Total %(11/10)

HAC 29.219.908 1,97 3.969.093 5,81 2,41

ARZ 17.275.751 5,42 1.764.400 3,37 5,22

Bina-Istra 6.875.400 27,27 630.550 29,69 27,47

AZM 5.436.739 -2,38 615.877 0,33 -2,11

UkupnoSubtotal: 58.807.852 4,99 6.979.920 6,43

SveukupnoTotal: 65.787.772 5,14

Udio LV i TV u ukupnom broju vozilaPortion of LV & HV in total no. of vehicles

PROMETTRAFFIC

5,1 %Porast broja vozila u područjima naplateIncrease in number of vehicles in toll collection zones

2011/2010

Page 10: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

10

u mil/in mio

PGDP po tvrtkama/AADT by companies

DruštvoCompany

HAC 10.901 1.550 12.451

ARZ 15.588 1.755 17.343

Bina-Istra 6.235 572 6.807

AZM 14.895 1.687 16.583

Ukupno/total: 11.249 1.476 12.725

1.031,5 ARZ

363,2 AZM

3.914,2 HAC

350,3 Bina-Istra

Broj vozila u područjima naplate 2009. - 2011.Number of vehicles in toll collection zones 2009 - 2011

5.810,3 Broj voznih kilometaraNumber of km travelled

(106 x km)

PROMETTRAFFIC

Page 11: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

11

482 ARZ

98 AZM

1.660 HAC

126 Bina-Istra

Nezgode po vrstama/Accidents by type

2008 2009 2010 2011S poginulima/With fatalities 48 43 39 28

S ozlijeđenima/With injuries 420 425 407 367

S materijalnom štetomWith material damage 2.072 2.287 2.245 1.971

Ukupno nezgodeTotal number of accidents 2.540 2.755 2.691 2.366

Nezgode po tvrtkama/Accidents by companies

3.130 Broj vozila koja su sudjelovala u nesrećamaNumber of vehicles involved in accidents

2.366Ukupno prometne nezgodeTotal traffic accidents

SIGURNOSTSAFETY

12,1 % Pad prometnih nezgodaDecrease in traffic accidents

2011/2010

Page 12: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

12

Ukupno poginuli/Total of fatalities 2008 - 2011

83Broj nezgoda u tunelimaNumber of accidents in tunnels

Vozila registrirana izvan RHInternational registration plates

Vozila registrirana u RHCroatian registration plates

9

22

31 Ukupno poginuliTotal of fatalities

Poginuli prema porijeklu registracijske tablice vozilaFatalities by origin of vehicle registration plates

32,6 % Pad broja poginulihDecrease in fatalities

2011/2010

SIGURNOSTSAFETY

3,5 % Udio nezgoda u tunelimaPortion of accidents in tunnels

Page 13: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

13

1

0

0

Ukupno prometne nezgode službe održavanjaTotal traffic accidents of Maintenance Service Staff

Lakše ozlijeđeniInjuries without hospitalisation

PoginuliFatalities

Materijalna štetaMaterijal damage

Prekoračenje brzine/Excees speedNepoštivanje razmaka/Safety distance Umor/Fatigue

SIGURNOSTSAFETY

5,3 Koeficijent poginulih (109 voz. km)Ratio of fatalities (109 km travelled)

PetakFriday

Najkritičniji danThe most critical day

Najkritičniji mjesecThe most critical month

SrpanjJuly

Najčešće posljediceMost frequent consequences

Najčešći uzrociMost frequent causes

Koeficijenti sigurnosti (na 109 voz. km)Safety ratios (per 109 km travelled)

HAC ARZ Bina- Istra AZM RH

CroatiaRH %

11./10.Koef. nez. s ozlijeđenim osobamaPersonal injury rate 66,43 73,63 31,80 30,09 63,16 -12,81

Koef. nez. s poginulimaFatal accident rate 4,59 4,28 8,56 6,02 4,82 -30,58

Koef. poginulihRate of dead 5,37 4,28 8,57 6,02 5,34 -34,83

Page 14: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

14

272,3 milmio

Prihodi od cestarine (bez PDV-a)Toll revenues (without VAT)

u mil EUR/in mio EUR

Trakovi za ENCETC lanes

Pokriveno ENC-omCovered by ETC

1.191 km411

EKONOMIJAECONOMY

4,2 % Porast prihoda od cestarineIncrease in toll revenues

2011/2010

62,3 ARZ

21,9 AZM

165,9 HAC

22,2 Bina-Istra

93Naplatne postajeToll plazas

Trakovi za naplatuToll lanes

638

1 EUR = 7,58 KN (ožujak 2012./March 2012)

ENC Uređaji/OBUs

247.052Povećanje/Increase

42 % 2011/2010

ENC Pretplatnici/ETC Subscribers

196.171Povećanje/Increase

54 % 2011/2010

Page 15: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

15

Udio načina plaćanja u ukupnim transakcijama Breakdown of transactions by payment mode

2 % Smart kartice/Smart card

1 % Ostalo/Other

63 % Gotovina/Cash

18 % ENC/ETC

Prihodi od cestarine/Toll revenues 2009 - 2011 u mil KN/in mio KN

16 % Kreditne kartice/Credit card

Ukupno investicijeTotal investments

U izgrađene dioniceInto existing sections

U nove dioniceInto new sections

27,8

241,4

u mil EUR/in mio EUR

EKONOMIJAECONOMY

65,8 Ukupan broj transakcija Total transactions

milmio

269,2 milmio €

1 EUR = 7,58 KN (ožujak 2012./March 2012)

1 EUR = 7,58 KN (ožujak 2012./March 2012)

Page 16: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

16

u mil EUR/in mio EUR

* AZM nije imala investicija u nove dionice AZM - had no investments into new sections

170,8 HAC

3,9 ARZ

66,7 Bina-Istra

u mil EUR/in mio EUR

0,5 ARZ

7,9 AZM

16,3 HAC

3,1 Bina-Istra

Ukupno investicije/Total investments 2009 - 2011

EKONOMIJAECONOMY

Investicije u nove dioniceInvestments into new sections241,4 mil

mio €

Investicije u izgrađene dioniceInvestments into existing sections27,8 mil

mio €

u mil KN/in mio KN

1 EUR = 7,58 KN (ožujak 2012./March 2012)

1 EUR = 7,58 KN (ožujak 2012./March 2012)

Page 17: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

17

Podjela zaposlenika po društvimaBreakdown of workforce by companies

Podjela zaposlenika po spoluBreakdown of workforce by gender

733 ARZ

134 AZM

2.827 HAC

242 Bina-Istra

Žene/Women

Muškarci/Men

844

3.092

ZAPOSLENICIWORKFORCE

Stalno zaposleniPermanent Workforce 3.936

Broj intervencija vatrogasih jedinicaNumber of firebrigade interventions 414

Page 18: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

18

Podjela zaposlenika po poslovimaBreakdown of workforce by job function

1.303 NaplataToll collection

156 MenadžmentManagement

2.047 OdržavanjeMaintenance Service Staff

Broj nadzornih video kameraNumber of CCTV cameras

Broj ralicaNumber of snowplowers

ZAPOSLENICIWORKFORCE

1.434

171

Broj mostova i ukupna duljinaNumber and total length of bridges 149 km29,1

180 OphodariPatrol service

6.503Broj parkirališnih mjesta lakih vozilaNumber of parking spaces of light vehicles

2.125Broj parkirališnih mjesta teških vozilaNumber of parking places heavy vehicles

Page 19: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

Izda

vač/

Publ

ishe

r:H

uK

A

Ure

điva

čki o

dbor

Edito

rial B

oard

:A

leks

anda

r Čak

lovi

ćG

lavn

i i o

dgov

orni

ure

dnik

Edito

r in

Chei

f;

Bran

kica

Baj

ićTe

hnič

ka u

redn

ica

Tech

nica

l edi

tor;

Dia

na B

enko

vić

Pom

oćni

ca te

hnič

ke u

redn

ice

Tech

nica

l edi

tor a

ssis

tant

;

Gra

fičko

obl

ikov

anje

Gra

phic

des

ign:

Hrv

oje

Vraž

ićSt

udio

Dom

ino

diza

jn

Foto

grafi

ja n

a na

slov

nici

Phot

o on

the

cove

r:Iv

an V

ukuš

Dat

um iz

danj

aPu

blis

hed:

trav

anj 2

012.

Apr

il 20

12

iMP

res

su

Mis

sN

: 18

48

-09

93

HA

CŠi

rolin

a 4,

HR-

1000

0 ZA

GRE

BT:

+38

5 1

46 9

4 44

4,F:

+38

5 1

46 9

4 50

5E:

info

@ha

c.hr

ww

w.h

ac.h

r

Dra

žen

GU

ŠTIN

Pr

edsj

edni

k U

prav

ePr

esid

ent o

f the

Man

agin

g Bo

ard

Stan

ko K

OVA

ČPr

edsj

edni

k N

adzo

rnog

odb

ora

Pres

iden

t of t

heSu

perv

isor

y Bo

ard

Juro

BA

JIĆ

Nik

ola

BAČU

RIN

Nar

cizo

DA

LSA

SOČl

anov

i upr

ave

Mem

ber o

f the

Man

agin

g Bo

ard

BiN

A-i

str

ASa

vska

106

/4,

HR-

1000

0 ZA

GRE

BT:

+38

5 1

61 3

8 30

0,F:

+38

5 1

61 3

8 30

1E:

bin

a-is

tra1

@pu

.t-co

m.h

rw

ww

.bin

a-is

tra.

hr

Dav

id G

ABE

LICA

Gla

vni d

irek

tor

Gen

eral

Man

ager

Ale

ksa

LAD

AVA

CPo

moć

nik

glav

nog

dire

ktor

aD

eput

y G

ener

al M

anag

er

Char

les

PARA

DIS

Pred

sjed

nik

Nad

zorn

ogod

bora

Pres

iden

t of t

heSu

perv

isor

y Bo

ard

Ar

ZKo

tura

ška

cest

a 43

,H

R-10

000

ZAG

REB

T: +

385

1 65

15

100,

F: +

385

1 65

15

110

E: a

rz@

arz.

hrw

ww

.arz

.hr

Željk

o D

ENO

NA

Pred

sjed

nik

Upr

ave

Pres

iden

t of t

heM

anag

ing

Boar

d

Mel

ita

RAU

KA

RPr

edsj

edni

ca

Nad

zorn

og o

dbor

aPr

esid

ent o

f the

Supe

rvis

ory

Boar

d

AZM

Gar

ićgr

adsk

a 18

,H

R-10

000

ZAG

REB

T: +

385

1 36

89

611,

F: +

385

1 36

89

620

E: o

ffice

@az

m.h

r w

ww

.azm

.hr

Wol

fgan

g SO

MM

ERBA

UER

Pred

sjed

nik

Upr

ave

Pres

iden

t of t

heM

anag

ing

Boar

d

Ale

ksan

dar Č

AKL

OV

IĆČl

an U

prav

eM

embe

r of t

heM

anag

ing

Boar

d

Wol

fgan

g ZE

CHM

EIST

ERPr

edsj

edni

k N

adzo

rnog

odbo

raPr

esid

ent o

f the

Sup

ervi

sory

Boa

rd

T: +

385

1 65

15

375

F: +

385

1 65

15

377

Član

ovi/M

embe

rs

Hrv

atsk

a ud

ruga

kon

cesi

onar

a za

aut

oces

te s

nap

lato

m c

esta

rine

Croa

tian

asso

ciat

ion

of to

ll m

otor

way

s co

nces

sion

aire

s

Dav

id G

ABE

LICA

Potp

reds

jedn

ik/V

ice-

Pres

iden

tA

leks

anda

r ČA

KLO

VIĆ

Pred

sjed

nik/

Pres

iden

t

Kotu

rašk

a ce

sta

43,

HR-

1000

0 Za

greb

E: in

fo@

huka

.hr

ww

w.h

uka.

hr

Page 20: KLJUCNE BROJKE - Domino dizajn d.o.o. · Č. Ploče - spoj Metković 399,00 10,00 11,00 6,00 416,00 A2: Spoj AC na GP sa SLO/Link to SLO border A3: Bregana Zagreb Lipovac 307,00 307,00

www.huka.hr

HRVATSKA UDRUGA KONCESIONARA ZA AUTOCESTE S NAPLATOM CESTARINECROATIAN ASSOCIATION OF TOLL MOTORWAYS CONCESSIONAIRES

Hrvatske autoceste d.o.o.

Autocesta Rijeka - Zagreb d.d.

Bina - Istra d.d.

Autocesta Zagreb - Macelj d.o.o.