Kirloskar Brothers Ltd.
Financial Analysts Meet
Quarter 3
FY 2010-11
20th
January, 2011
This is a proprietary document of Kirloskar Brothers Ltd.
Companywide
Highlights
2
• Focus on being very selective in taking project and product orders
with better terms
• Priority for manufacturing and execution where payment terms are
better
• Projects are controlled more locally and monitored by controller
and chief controller
• Maximize electromechanical projects
Companywide
Other Highlights
• UP 1200/160 largest size split case pump successfully developed for Pipavav
Power station.
• Successfully demonstrated water mist technology at simulation chamber in
CFEES order received for Rs.78 million to design and simulate water mist
system for submarine at Vishakhapatnam.
• Low cost oil header developed and tested at shop for Kaplan turbine runner
blade operation.
• 3,600mm butterfly valve successfully developed after value engineering
• All manufacturing locations covered under QMS 2008 and OHSAS
3This is a proprietary document of Kirloskar Brothers Ltd.
Sector Highlights
Irrigation
Benban & Roziakat Projects - Crossed 50% POC milestone in Dec-2010 and project is
progressing as per client's schedule
Godavari Project - Completed PG testing at 3 sites successfully, for intake it is being
completed during Jan-11
Water Resource Management
KWA Meenad Project: 73 MLD total water supply scheme which includes intake works ,
rising main pipeline, water treatment plant and clear water pumping station commissioned –
value Rs. 760 million
4This is a proprietary document of Kirloskar Brothers Ltd.
Sector Highlights
Water Resource Management (Contd...)
Order for BFV : Rs 53 million order for large size BFV, size involved 2,500 mm & 2,700 mm
from SPML a/c BWSSB
Power
Market survey for pumps in power sector by BDB is completed and report submitted for
review.
Training session on pumping technology held at Calik Enerji, Turkey on 18th October
2010.
Meeting held with Adani Power, Siemens for Sugen, Doosan for Raikheda and Indiabulls
for Amravati and Nashik projects.
5This is a proprietary document of Kirloskar Brothers Ltd.
Sector Highlights
Power (Contd..)
NTPC Senior level team visited KBL Pune office on 23rd Oct'10 to review of progress of
various projects being executed.
Finalization of ANI for N stamp approval proposal made for approval. Formation of task
force at factory to implement N stamp approval process.
Received order for 8 sets of CE pumps from RKS Powergen for 4x320 MW Chhattisgarh
Power Plant.
All six sets CE pumps are modified and running successfully at Siemens Sugen.
Meeting held with Siemens Germany team and MOM singed.
Presentation to Mott Macdonald for CVP for 1040 MW Vizag Plant of Hinduja Power.
6This is a proprietary document of Kirloskar Brothers Ltd.
Sector Highlights
Power (Contd..)
Doosan senior team visited to KOV for CV pump package for 2x685 MW GMR Raipur
projects.
Participated in Annual Nuclear Conference ANUP 2010 held at Kalpakkam on 10th
October 2010.
Presentation to L&T on CV Pump for VISA Power & DB Power project.
Meeting held with TOP management of leading Russian Nuclear project company based
on Light Water Reactor (LWR) Technology.
Oil & Gas
Pre Tendering activities with 'Gactel' resulted in order worth Rs. 18.6 million.
Received order from HPCL for Kadappa Project for 24 Nos.KPD & KPDS Pump with
Motor, ARC Valve & Spares, Value Rs. 12.53 million.
7This is a proprietary document of Kirloskar Brothers Ltd.
Sector Highlights
Oil & Gas (Contd..)
Engineering activity for SHG offshore platform for ONGC completed. Stage payment
being claimed.
Marine & Defence
Completed negotiation for first order of water mist on Nuclear Submarine for the value of
Rs 78 million from DRDO/Indian Navy.
Received order of Rs. 34 million from ITD Cementation for GRSE modernization dry dock
drainage project. The project was awarded to us on premium keeping our current
association in mind.
8This is a proprietary document of Kirloskar Brothers Ltd.
Sector Highlights
Marine & Defence (Contd..)
Received order of Rs 16.5 M from Alcock Ashdown Gujarat for 06 Indian Naval survey
vessels. Scope involves supply of 10 number 3.7 kW NS pumps in special metallurgy per
ship.
KOV plant approval by IRS completed.
9This is a proprietary document of Kirloskar Brothers Ltd.
Sector Highlights
Distribution:
• Industry segment crossed AOP with 105% achievement and 33% growth over last year.
• Submersibles growth of 47% on value over last year achieved by selling 8,419 units this YTM.
New models suitable to South Zone being developed and launched.
CSS
• Most Prestigious high Value order( 17M) of IOCL- Panipat & Rs 18M from NTPC-Sipat are
received.
Industry
• Second export order from JGC, Japan worth Rs.5.0 million through KBTL indicating a sign of
confidence because of the smooth progress of the first order under execution.
10This is a proprietary document of Kirloskar Brothers Ltd.
Sector Highlights
Building & Construction
• For the first time multi outlet multi stage RKB pumps in vertical execution order taken from Pune
region for Paranjape Builders for Blue Ridge project. Order accepted with 50% advance.
• Biggest ever HVAC order from Mumbai international Airport of value Rs 10.2 million.
• FM/UL order for prestigious BARC project at Tarapur – the first order in India for any of BARC
installation.
11This is a proprietary document of Kirloskar Brothers Ltd.
Kirloskarvadi Factory
Highlights
• Shop layout correction in the small pumps division completed which will improve
productivity
• Steel foundry capacity expansion from 50T to 100T is completed, few equipments are
under commissioning - this would help the industry sector sales
• The main impediment of Dies availability for Replicast has been resolved, orders with
Taiwan vendor being finalized
• Casting method simulation software MEGMA Software commissioned with additional work
station for TKSL. Castings yield and RT Level of castings would improve significantly
12This is a proprietary document of Kirloskar Brothers Ltd.
Dewas Factory
Highlights
• MOST study carried out and agreement of 460 minutes will be signed in next 15-days
• New layout for Single Phase & KOS with productivity improvement of upto 80%
• The total capacity once the initiatives stabilizes will be 47,000 pumps from current 24,000
pumps in 3-months, including higher capacities for Industrial pumps like SP & 3-Phase.
• Supplier quality improvement program through “Millap” project & in-house quality through
“Pratibimbh” project.
• Project “Blackgold”, Foundry targets of 320 tons in next 3-months with target cost of 75/- for
Impeller & 50/- for other components
13This is a proprietary document of Kirloskar Brothers Ltd.
Dewas Factory
We Are Changing…
Dewas Factory New Assembly Lines –
Single Phase & KOS
14This is a proprietary document of Kirloskar Brothers Ltd.
Paint Booth
Return Lifter
15
Main Assembly Line
Dewas Factory - New Assembly Line-
Single Phase
Dewas Factory
We Are Changing…
15This is a proprietary document of Kirloskar Brothers Ltd.
Motor Body Sub Assembly
Packaging Set-up
16
Dewas - New Assembly Line- Single Phase
Dewas Factory
We Are Changing…
16This is a proprietary document of Kirloskar Brothers Ltd.
07.01.11
Coimbatore & Ahmedabad Factory
Highlights
• The Coimbatore plant for Mini pumps will be commissioned by March 2011, with trial
production beginning by April 2011
• The Ahmedabad plant for Sumbersible pumps will be commissioned by May 2011 with
trial production by June / July 2011
• The motor capacity will be 6000, which includes more than 2000 motors from Hematic,
Karad
• All major products from Dewas will be star products. More than 100 models already 5-Star
labeled and another 60+ under process.
17This is a proprietary document of Kirloskar Brothers Ltd.
07.01.11
Coimbatore Factory construction update
Coimbatore Factory
Update…
18This is a proprietary document of Kirloskar Brothers Ltd.
Kondhapuri Factory
Highlights
• Developed 1500 mm SLV in rising & non-rising versions & completed order for DJB & UP
Jal Nigam
• Developed 3600 mm BFV with internal ebonite lining for sea water application for Essar
Salaya Thermal Power Plant
• Successfully completed POD testing of 1600 mm BFV with integral ebonite lining
• Developed 800 mm MDNRV with internal ebonite lining for CGPL Mundra Project (PWR)
• Obtained patent for Tamper Proof KAV series
• Booked single largest order of 82.5M for RKM PowerGen for 28 Nos. 2000 mm BFV
19This is a proprietary document of Kirloskar Brothers Ltd.
This is a proprietary document of Kirloskar Brothers Ltd.
Companywide
Pending Orders
20
Sector 3Q % 2Q
(Rs.million) Dec 10 Sept 10
Irrigation (IRR) 17,021 50.6% 17,810
Water Resource Management (WRM) 4,456 13.3% 4,574
Power (POW) 9,717 28.9% 9,448
Oil & Gas (O&G) 986 2.9% 1,089
Marine & Defence (M&D) 145 0.4% 87
Industry (IND) 542 1.6% 597
Building & Construction (B&C) 253 0.8% 238
Distribution (DIS) 195 0.6% 159
Customer Service & Support (CSS) 310 0.9% 377
TOTAL 33,624 100.0% 34,378
This is a proprietary document of Kirloskar Brothers Ltd.
Companywide
Major Orders
Total orders received by KBL during 3Q FY 10-11 amounted to Rs. 1,959 million
21
Sector Order Type Customer Value
(Rs.mil)
Irrigation Conversion of Deisel Engine driven pumpsets to
Electrical Driven Pumpsets
Ministry of Agriculture & Forestry,Laos 193.6
Water Resource Management Supply of E &M equipments KUWS&DB Dharwad WSS 74.5
Power Raw Water Package for Amravati TPP India Bulls Limited 190.0
Oil & Gas 20UPH3M1 DV Gactel 18.6
Marine & Defence Dock Drainage Modernization system ITD Cementation 34.0
Industry Assorted Pumpsets Hindalco 16.5
Building & Construction Assorted Pumpsets ABB Ltd. 12.0
Distribution Assorted Pumpsets KSK Scheme 6.5
Customer Support & Service Supply of Spares NTPC 18.0
22This is a proprietary document of Kirloskar Brothers Ltd.
Sales :
• Total sales are at Rs. 1,221Crs as against Rs. 1,387 Crs in PY - drop of 12%.
• All marketing sectors have crossed sales over previous year except
Irrigation and Water sector
• Fall in Irrigation sector sales of Rs. 304 Crs is mainly due to holding back of
dispatches for projects in Andhra Pradesh in H1. Current dispatches to AP
are being made subject to a maximum cap on amount recoverable.
• In the case of Water Sector, work on the BWSSB order did not commence
due to delay in receipt of order from Karnataka. Dispatches have now started
• KBL was selective with orders and execution to improve sales mix, which
resulted in share of own product sales to total sales going up to 54% as
against 45% in the previous year.
Q3 FINANCIALS
Standalone Highlights
23This is a proprietary document of Kirloskar Brothers Ltd.
• We had planned execution of balance portion of Senegal Export order
(Rs.12 Crs) in Quarter 3, however this is happening in Q4 only
• We made efforts to cross the POC threshold for 4 projects in Q3, but only
2 crossed the same.
• In the current year, threshold limit for POC recognition has increased to
50% from the erstwhile 35%
Q3 FINANCIALS
Standalone Highlights
24This is a proprietary document of Kirloskar Brothers Ltd.
PBT :
• PBT has come down to Rs. 60 Crs ( 5% of Total Income ) as compared to
Rs. 89 Crs ( 6.1% of Total Income) in PY.
• Reduction in profit is mainly due to reduction in Sales & increase in
threshold limit for POC recognition to 50% from 35%
• The execution of the balance portion of Madanpalli supply contract to AP
& Laos export order will take place in Q4
• We are also closely tracking the status of 5 major projects for crossing
POC level in Q4
Q3 FINANCIALS
Standalone Highlights
25This is a proprietary document of Kirloskar Brothers Ltd.
Q3 FINANCIALS
Standalone Highlights
The major focus for Q4 :
• Regulate sales to ensure that only those sales where money
would be immediately recovered are made
• Collect Receivables as planned
• Inventory reduction as planned
• Reduction in borrowings
This will result in a drop in sales and profits in absolute numbers
compared to PY, but will result in a cleaner and better Balance Sheet
compared to December 2010.
26This is a proprietary document of Kirloskar Brothers Ltd.
Q3 KEY FINANCIALS –
Standalone
( Rs in Crores )
Particulars
Dec-10 Dec-09 Dec-08
KEY FINANCIALS
Total Income 1,231 1,407 1,211 2,066
P B D I T 105 134 60 233
P B T 60 89 25 173
P A T 41 59 20 118
CASH PROFIT 63 78 35 144
KEY FINANCIAL RATIOS
P B I D T % AGE 8.6% 9.5% 5.0% 11.3%
P B T % AGE 4.9% 6.3% 2.1% 8.4%
R O C E % AGE 9.4% 15.4% 5.7% 19.2%
Period Ending Year
Ended Mar
31, 2010
27This is a proprietary document of Kirloskar Brothers Ltd.
Q3 KEY FINANCIALS -Consolidated
( Rs in Crores )
Particulars
Dec-10 Dec-09 Dec-08
KEY FINANCIALS
Total Income 1,791 1,862 1,635 2,680
P B D I T 151 172 95 275
P B T 90 108 47 191
P A T 57 67 31 113
CASH PROFIT 90 95 53 152
KEY FINANCIAL RATIOS
P B I D T % AGE 8.4% 9.2% 5.8% 10.3%
P B T % AGE 5.0% 5.8% 2.8% 7.1%
R O C E % AGE 10.6% 14.6% 6.9% 18.9%
Period Ending Year Ended
Mar 31,