  • KIRBY MISPERTON A WELLSITE

    KM8 PRODUCTION WELL

    HYDRAULIC FRACTURE STIMULATION

    WELL INTEGRITY REPORT

    (REF: TE-EPRA-KM8-PO1)

    www.third-energy.com Revision 0

    12th May 2017

  • KM8 Hydraulic Fracturing Operations KM8 Well Integrity Report

    Uncontrolled if printed KM8 PO1/Rev0/12-05-2017 Page 1

    APPROVAL LIST

    Title Name Signature

    Prepared By Environmental &

    Safety Advisor

    Reviewed By HSE and Planning

    Manager

    Approved By Operations Director

    REVISION RECORD

    Version Date Description

    P0 12th May 2017 Draft

    Rev 0 12th May 2017 Original Issue

    Rev 1

    COPYRIGHT

    This document has been prepared for and on behalf of Third Energy UK Gas Limited by Zetland

    Group Limited.

    © Copyright 2017 by Zetland Group Limited

    All rights reserved. No part of this document may be reproduced, distributed, or transmitted

    in any form or by any means both electronic or mechanical, other than for which it was

    intended, without the prior written permission of Zetland Group Limited.

  • KM8 Hydraulic Fracturing Operations KM8 Well Integrity Report

    Uncontrolled if printed KM8 PO1/Rev0/12-05-2017 Page 2

    CONTENTS 1. INTRODUCTION .......................................................................................................................... 4

    2. KM8 WELL INTEGRITY TEST ........................................................................................................ 4

    3. HEALTH AND SAFETY EXECUTIVE ............................................................................................... 5

    4. CONCLUSION .............................................................................................................................. 5

    APPENDIX 1 – MDC KM8 PRESSURE TEST POST OPERATIONS REPORT ........................................... 6

    APPENDIX 2 – KM8 WELL SCHEMATIC ............................................................................................... 8

    APPENDIX 3 – HSE CORRESPONDENCE ............................................................................................ 10

  • KM8 Hydraulic Fracturing Operations KM8 Well Integrity Report

    Uncontrolled if printed KM8 PO1/Rev0/12-05-2017 Page 3

    **This page has been intentionally left blank**

  • KM8 Hydraulic Fracturing Operations KM8 Well Integrity Report

    Uncontrolled if printed KM8 PO1/Rev0/12-05-2017 Page 4

    1. INTRODUCTION

    Third Energy UK Gas Limited (“Third Energy”) is proposing to hydraulically stimulate and test the Kirby

    Misperton 8 well (“KM8”, drilled by Third Energy in 2013.

    The proposed operation is subject to an environmental permit (Ref: EPR/DB3002HE), issued by the

    Environment Agency in April 2016. The permit is subject to five (5) preoperational measures (PO1 –

    PO5). PO1 relates to well integrity and states:

    ‘PO1a: Prior to the operation of the regulated facility the Operator shall conduct a well integrity test

    on the existing borehole in accordance with section 4.3.1 of the Waste Management Plan.

    PO1b: Prior to the operation of the regulated facility the Operator shall submit a written report to the

    Environment Agency including the results of the integrity test carried out in accordance with

    PO1a which should include, but not limited to any comments provided by the Health & Safety

    Executive.’

    Section 4.3.1 of the Waste Management Plan states:

    ‘Prior to the KM8 being suspended following its construction in 2013, the well was pressure tested to

    confirm pressure integrity. Once well bore has been surveyed, the well will be pressure tested to

    reconfirm pressure integrity.’

    In order to comply with PO1a, Third Energy carried out an integrity test on the KM8 well on 25th April

    2017, the results of which are provided as Appendix 1.

    The purpose of this document is to report the outcome of the integrity test, together with

    communications between Third Energy and the Health and Safety Executive (“HSE”).

    This document is being submitted to the Environment Agency in order to comply with PO1b.

    2. KM8 WELL INTEGRITY TEST

    A well integrity test was carried out on the KM8 well by Moorhouse Drilling & Completions (MDC) on

    25th April 2017, following a previously agreed method statement. The equipment used to record the

    pressure test was in calibration and supporting certification inspected.

    The well integrity test consisted of a 5,000psi pressure test, replicating the test carried out

    immediately following its construction in 2013.

    The pressure test was successful, thus demonstrating well integrity. A copy of the MDC KM8 Well

    Pressure Test Post Operations Report is provided as Appendix 1, which contains a copy of the well test

    chart and calibration certification.

    A schematic detailing the construction of the KM8 well is provided as Appendix 2.

  • KM8 Hydraulic Fracturing Operations KM8 Well Integrity Report

    Uncontrolled if printed KM8 PO1/Rev0/12-05-2017 Page 5

    3. HEALTH AND SAFETY EXECUTIVE

    A copy of the MDC KM8 Well Pressure Test Post Operations Report was submitted to the HSE for

    comment. A copy of the communication between Third Energy and the HSE is provided as Appendix

    3. The correspondence confirms that the HSE has no safeguarding concerns as to the information

    provided by Third Energy, in the context of the KM8 pressure test carried out to confirm the integrity

    of the KM8 well.

    4. CONCLUSION

    In accordance with PO1a and PO1b of the environmental permit, Third Energy has carried out a well

    integrity test on the KM8 well and has documented it results, together with comments received from

    the HSE within this document.

    The integrity test was successful and reconfirms the integrity test carried prior to the KM8 being

    suspended following its construction in 2013.

    This document is being submitted to the Environment Agency in order to discharge PO1a and PO1b.

  • KM8 Hydraulic Fracturing Operations KM8 Well Integrity Report

    Uncontrolled if printed KM8 PO1/Rev0/12-05-2017 Page 6

    APPENDIX 1 – MDC KM8 PRESSURE TEST POST OPERATIONS REPORT

  • KM8 Hydraulic Fracturing Operations KM8 Well Integrity Report

    Uncontrolled if printed KM8 PO1/Rev0/12-05-2017 Page 7

    **This page has been intentionally left blank**

  • Moorhouse Petroleum Limited Moor House

    Bessingby Way Bessingby Industrial Estate

    Bridlington East Yorkshire

    YO16 4SJ

    Tel: (01262) 608731 Fax: (01262) 608390

    KM8 Well Pressure Test

    Post Operations Report

    Document Ref:

    TE-KM8-WPTPOR-R0

    8th May 2017

  • FO-107

    REVISION RECORD

    Version Date Description

    Rev 0 8th May 2017 Issued

    COPYRIGHT

    © 2017 Moorhouse Drilling and Completions. All Rights Reserved.

    The contents of this document may not be reproduced or copied without the express written

    permission of Moorhouse Drilling and Completions.

  • FO-107

    Summary Prior to operations taking place the casing design was checked and safety factors calculated for the pressure test – all calculations were accepted. The method statement for the operation was followed. A successful pressure test to 5,000 psi for 30 minutes was performed on the 9-5/8” casing, 7” liner and wellhead on the KM8 well via the wellhead annulus valve meeting the test acceptance criteria of less than 1% variation. The test was witnessed and accepted by the Senior Drilling Engineer of Third Energy.

  • FO-107

    Chart Recorder Test Chart

    Start of staged pressuring of the well

    End of staged pressuring of the well

    Start of 30 min pressure test

    End of 30 min pressure test

  • FO-107

    Chart Recorder Calibration Certificate

  • FO-107

    Datalogging Gauge Chart

  • FO-107

    Datalogging Gauge Calibration Certificate

  • FO-107

  • KM8 Hydraulic Fracturing Operations KM8 Well Integrity Report

    Uncontrolled if printed KM8 PO1/Rev0/12-05-2017 Page 8

    APPENDIX 2 – KM8 WELL SCHEMATIC

  • KM8 Hydraulic Fracturing Operations KM8 Well Integrity Report

    Uncontrolled if printed KM8 PO1/Rev0/12-05-2017 Page 9

    **This page has been intentionally left blank**

  • Casing(in)

    Grade TOC(ft)

    Remarks

    DateCompleted 3rdOctober2013 36¼" - surfaceLicence PL080 26" - surfaceCo-Ordinates 479003.6mN 18⅝" K55 surface

    477135.8ME 13⅜" N80 surfaceGLtoRT 25.5ft 9⅝" L80 3034 TheoreticalGLtobasecellar 10.45ft 7" L80 6157

    3-1/16"5KManualValvewPressureGaugeClaxton13-5/8"5MDrill-ThruWellhead 3"BPVinstalled

    26"Conductor170ft35"holeto174ft

    16joints3-1/2"9.2lb/ftNewVamTubing

    18-5/8"87.5lb/ft,K55,Range3,BTC24"holeto1,062ft 18-5/8"CasingShoe1,046ft

    SuspensionFluid9.2ppgBrine

    TOC3034ft(Calculated)

    13-3/8"68lb/ft,N80,BTC17-1/2"hole4,149ft 13-3/8"CasingShoe4,134ftMD

    TOL5,816ft

    TOC6,157ft9-5/8"47lb/ft,L80,VamTop

    12-1/4"hole6,175ft 9-5/8"CasingShoe6,160ft

    DeepestTaginsideliner10069ftTopLandingJoint10073ft

    8-1/2"hole10,204ftMD 7"LinerShoe10,198ft7"29lb/ft,L80,VamTopHT

    10198

    68

    KM-8

    102048½"4729

    413441496175

    35"24"17½"12¼" 6160

    KirbyMisperton8WellCurrentStatus

    Weight(ppf)--

    87.5

    WellData Size(in)

    Depth(ft)

    Depth(ft)

    1046170.567.5

    17467.5

    1062.0

    42"

    00

    0

  • KM8 Hydraulic Fracturing Operations KM8 Well Integrity Report

    Uncontrolled if printed KM8 PO1/Rev0/12-05-2017 Page 10

    APPENDIX 3 – HSE CORRESPONDENCE

  • 1

    Jonathan Foster

    From: @hse.gov.ukSent: 12 May 2017 14:49To:Cc: @hse.gov.uk; @hse.gov.uk; @hse.gov.uk;

    @hse.gov.uk;Subject: RE: KM8 Pressure test - EA Permit Discharge

    Good afternoon ,

    Thank you for your email. Based on the information presented to me, (KM8 Pressure Test Report -Third Energy ref.TE-KM8-WPTPOR-R0) and the email from yourself (dated the 12 of May 2017) I can say that I have no safeguardingconcerns.

    Kind Regards| HM Inspector of Well Engineering & Operations | Energy Division - Offshore

    Health & Safety Executive | HID Energy Division, ED 6, Lord Cullen House, Fraser Place, Aberdeen, AB25 3UB |

    From:Sent: 12 May 2017 11:22To:Cc:Subject: RE: KM8 Pressure test - EA Permit Discharge

    Hi Thanks for your email and comments.

    I have answered your comments below but please contact me if further clarification is required.1. The pressure test was made against the BPV in the hanger, hanger seals casing and wellhead body.

    a. The 3-1/2” x 9-5/8” annulus valves were body tested and used to monitor pressure , the rationalbeing the annulus valves will be open during the frac operation.

    b. The 13-3/8” x 9-5/8” annulus valve was open to monitor for flow during the test.c. Swab valve is tested as part of the well maintenance programme.

    2. The permit requirement is ‘to conduct the integrity test of the existing borehole prior to operations’. Wetherefore tested the well in its current configuration to 5,000 psi which is in line with pressure testsalready conducted on the well and allowable within the existing casing design factors. Once the 4-1/2”casing is installed during the workover a further integrity test will be made in line with the pressuresexpected during the hydraulic stimulation.

    3. Our understanding of the WLCIG is a Leak Tight acceptance criteria is determined by the well operator.The acceptance criteria applied to this test was based on our company standard which follows API 6Aand 14B, in the case of API 6A we decreased the acceptance level from 5% to 1% to make this test morestringent. The calculated loss rate was 363cm3/min, below 400cm3/minute defined in API 14B .

    I would just like to add the request for the test was not based on any engineering standards or requirements andwas only to discharge a pre-operational condition imposed by the EA in the permit approval.

  • 2

    Regards

    Senior Drilling Engineer

    From:Sent: 11 May 2017 11:10To:Cc:Subject: KM8 Pressure test - EA Permit Discharge

    Good morning ,

    With reference to the above pressure test report I have reviewed the documents provided by Third Energy and Ineed response to the following clarification before I make my comments:

    1. I understand from Table S.1.3 in your email that EA requested a well integrity test. In addition, in thesummary of the report it indicates that the pressure test was performed on the 9 5/8” casing. 7” liner andthe wellhead. However, the documents you supplied do not show that a full well integrity test wasperformed and it does not tell whether the side outlet valves of the casing spool were test. Therefore, I cancomment on the pressure test of the casing only. Please clarify what elements of the wellhead barriers weretested.

    2. Please clarify the rationale of testing the well to 5000psi and how it compares with the maximum pressureexpected in the forthcoming well operations.

    3. In the report it states that the test met the acceptance criteria of less than 1% variation. Please refer to theOil and Gas Well Integrity Guidelines (Issue 3, 2016) for pressure tests.

    Kind Regards| HM Inspector of Well Engineering & Operations | Energy Division - Offshore

    Health & Safety Executive | HID Energy Division, ED 6, Lord Cullen House, Fraser Place, Aberdeen, AB25 3UB |

    *****************************************************************************************************************

    Please note : Incoming and outgoing email messages are routinely monitored for compliance with our policy on the use of electroniccommunications and may be automatically logged, monitored and / or recorded for lawful purposes by the GSI service provider.

    Interested in Occupational Health and Safety information?

    Please visit the HSE website at the following address to keep yourself up to date

    www.hse.gov.uk

    *****************************************************************************************************************

  • 3

    This email and any attachments to it may be confidential and are intended solely for the use of theindividual to whom it is addressed. Any views or opinions expressed are solely those of the author and donot necessarily represent those of Third Energy. If you are not the intended recipient of this email, you mustneither take any action based upon its contents, nor copy or show it to anyone.Please contact the sender if you believe you have received this email in error.

    ______________________________________________________________________This email has been scanned by the Symantec Email Security.cloud service.For more information please visit http://www.symanteccloud.com______________________________________________________________________

  • KM8 Hydraulic Fracturing Operations KM8 Well Integrity Report

    Uncontrolled if printed KM8 PO1/Rev0/12-05-2017 Page 11

    **This page has been intentionally left blank**