Kings Local School District
Facility Master Plan
February 2019
-
Master Facility Planning ProcessLong Range Planning Team
Thought Exchange #1
Building Assessments
Develop Plan Options
Board Recommendation
Thought Exchange #3
March 2019 Aug 2017
Thought Exchange #2
-
Outreach
● Long Range Facility Planning Team
○ Large group started meeting August 2017 and have collectively met nearly a dozen times since.
○ Small group has been meeting regularly since August 2016
-
Three Thoughtexchange Surveys
1. 1,274 participants, 1,305 thoughts, 43,937 ratings
2. 1,003 participants, 784 thoughts, 34,036 ratings
3. 767 participants, 610 thoughts, 27,660 ratings
Outreach
-
Top Thoughts
○ Build for the future growth○ Keep schools close to athletic facilities
and on same campus
○ Make sure plan is cost-effective and sustainable for the long term
○ Keep class size low
Outreach
-
Enrollment Growth
-
Enrollment Growth and ProjectionsConservative Projection
https://docs.google.com/spreadsheets/d/1fpqT8Mrwjh_XQvBYf-if8kRlsl3q8xak3oVCUk97S6A/edit?ts=5c64346b#gid=884576321
-
Current Master Plan Scope of Work- *All Elementaries convert to grades k-3
- Addition/Renovations to JF Burns Elementary School
- Classroom addition to Columbia Intermediate (becomes grades 4-5)
- Build new 6-8 Middle School
- Addition/Renovations to Kings HS
- Relocate Bus Facility (to accommodate expansion)
- Road/Traffic Improvements
*Redistricting is a potential option with additional unexpected student growth
-
Future Master Plan Scope of Work
● All buildings will be able to be added onto if growth is
higher than predicted
● Redistricting of the elementary schools will also be
evaluated if growth is higher than predicted
-
J.F. Burns ElementaryRenovated Kindergarten
Special-Education Wing
24 Classroom/Media
Center two-story addition
Partially renovated
common spaces
New Parking Lot with
separate bus and car
areas
New Main EntryCAR PARKING
& DROP OFF
BUS
DROP OFF
-
J.F. Burns Elementary24 Classroom/Media
Center two-story addition
Existing Renovated Building
-
Columbia Intermediate
(6) New Classrooms
-
Kings HS and MS
Central Bus Pick-up/Drop off
O
ne-w
ay/
En
try O
nly
Student/Visitor
Parking
Staff
Parking
High School
Middle
School
Bus Entry CarEntry/Exit Bus Exit
New Tennis
Courts.
Future Fieldhouse
Relocated Baseball
and Softball Fields
-
Kings MS
Three Story Academic Wing
Main Entry
Cafeteria
Gymnasium
Administration
Possible Future Expansion
-
Kings HS
(12) Future Classrooms
Cafeteria Addition/Renovation
New Theater
Entry-only access drive
Administration
Renovated Music
New Gym / Weight / Locker
New Main HS Entry
(24) New Classrooms
-
Scope of Work
DESCRIPTION COST
(JFB) J.F. Burns Elem converted to (K-3) (40,600 sqft add / 12,175 sqft reno) $12,280,625
(JFB) Burns Elementary (22) trailers for 24 mos. $1,000,000
(CIS) Columbia Int. School converted to (4-5) (7000 sqft add) $2,000,000
(KMS) Kings Middle School (6-8) (163,000 new) $40,750,000
(KHS) Kings HS (9-12) School (86,500 sqft add / 22,500 sqft reno) $28,637,500
(KHS) Softball / Baseball Relocation $800,000
Miscellaneous / Contingency (bus facility, utility extensions, practice fields, storm water, etc.) $4,500,000
TOTAL $89,968,125
-
Cost per square footConstruction Date = 2020
Building SQFT = 150,000
Hard Construction Cost $215.65 sqft
Soft Construction Cost $30.87 sqft
TOTAL $246.52 sqft = NEW CONSTRUCTION
TOTAL $165-$175 sqft = RENOVATION CONSTRUCTION
Hard Construction = Total subcontracted work (site, structure, finishes, glazing, roof, MEP, technology, etc.)
Soft Construction = A/E services, insurance, survey, borings, permits, contingency
* Numbers have been developed from historical k-12 public data in conjunction with construction industry input
-
Cost Scenario
-
Master Facility Planning ProcessLong Range Planning Team
Thought Exchange #1
Building Assessments
Develop Plan Options
Board Recommendation
Thought Exchange #3
March 2019 Aug 2017
Thought Exchange #2
-
Potential ScheduleNov 5
DESIGN (12-18 mos)
CONSTRUCTION (12-24 mos)
Nov 2019 2020 2021 2022 2023
Complete
-
Thank you for your time!Questions?