KINGS BEACH ELEMENTARY SCHOOL ROOF REPLACEMENT
Transcript of KINGS BEACH ELEMENTARY SCHOOL ROOF REPLACEMENT
KINGS BEACH ELEMENTARY SCHOOLROOF REPLACEMENT
8125 STEELHEAD AVE. KINGS BEACH CA
SHT 1 - COVER SHEETSHT 2 - GENERAL NOTESSHT 2A - GENERAL NOTESSHT 3 - ROOF PLANSHT 4 - DETAILSSHT 5 - DETAILSSHT 6 - DETAILSSHT 7 - DETAILS
DRAWING INDEX
KEY PLAN
LOCATION MAP
AREA OF WORK:
OFSH
EET:
REVI
SION
:
GAR
LAN
D
PHO
NE (8
00) 3
21-9
336
/ FAX
(216
) 641
-063
338
00 E
AST
91st
STR
EET
- CLE
VELA
ND, O
HIO
441
05-2
197
A S
ubsi
diar
y of
Gar
land
Indu
strie
s
Des
ign-
Bui
ld S
olut
ions
, Inc
.ÒG
AR
LAN
D /
DB
S IN
C.
DATE
:CH
K BY
:DW
G BY
:GA
RLAN
D RE
P:
PROJ
ECT
NO:
KING
S BE
ACH
ELEM
ENTA
RY S
CHOO
L ROO
F RE
PLAC
EMEN
T81
25 S
TEEL
HEAD
AVE
, KIN
GS B
EACH
, CA
9614
330
-ES-
2001
3811
.12.20
20TO
SCM
71
TYPICAL ROOF CROSS SECTIONFASTENING INSTRUCTIONS
INSULATION BOARD FASTENING PATTERNGENERAL NOTES
NOTES
1. STORE AND HANDLE ROOFING SHEETS IN A DRY, WELL-VENTILATED, WEATHER-TITE PLACE.STORE ROLLS OF FELT AND OTHER SHEET MATERIALS ON RAISED SURFACE. STAND ALL ROLLMATERIALS ON END. COVER ROLL GOODS WITH A CANVAS TARPAULIN OR OTHERBREATHABLE MATERIAL (NOT POLYETHYLENE).
2. DO NOT LEAVE UNUSED MATERIALS ON THE ROOF WHEN ROOFING WORK IS NOT INPROGRESS UNLESS PROTECTED FROM WEATHER AND OTHER MOISTURE SOURCES.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SECURE ALL MATERIAL AND EQUIPMENTON THE JOB SITE. IF ANY MATERIAL OR EQUIPMENT IS STORED ON THE ROOF, THECONTRACTOR MUST MAKE SURE THAT THE INTEGRITY OF THE DECK IS NOT COMPROMISEDAT ANY TIME.
4. DO NOT APPLY ROOFING INSULATION OR MEMBRANE TO DAMP DECK SURFACE.
5. FULLY COMPLETE ALL. MODIFIED BITUMINOUS MEMBRANE ROOFING FIELD ASSEMBLY WORKEACH DAY. PHASED CONSTRUCTION WILL NOT BE ACCEPTED.
CUSTOMER NOTE:
1. ALL OF GARLAND'S SHOP FABRICATED MATERIAL WILL BE MANUFACTURED TO THEDIMENSIONS SHOWN, UNLESS OTHERWISE NOTED.
2. IT IS ESSENTIAL THAT ANY NECESSARY CHANGES, NOTATIONS OR REQUESTEDINFORMATION BE CLEARLY NOTED ON THE SHOP DRAWINGS.
3. NO MATERIAL WILL BE CONSIDERED RELEASED FOR FABRICATION UNTIL ALL PERTINENTINFORMATION (i.e. COLOR, DIMENSIONS, MATERIAL CONFIGURATION) HAS BEEN RECEIVED.
SCOPE OF WORK NOTESTYPICAL ROOF CROSS SECTION DETAIL DESIGN CRITERIA
WIND UPLIFT REQUIREMENTSGENERAL NOTES:
1. IT IS THE ROOFING CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE THEMSELVES WITH ALL DETAILSINVOLVED IN THE ROOFING CONTRACT.
2. ALL DRAWINGS ARE GRAPHIC REPRESENTATION OF APPROXIMATE LOCATION OF EXISTING AND NEWMATERIALS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL EXISTING CONDITIONS PRIOR TOCOMMENCEMENT OF WORK.
3. THE ROOFING CONTRACTOR TO PROTECT ALL ADJACENT SURFACES NOT SCHEDULED FOR WORK AND TOREPAIR ANY DAMAGED AREAS AS A RESULT OF CONTRACTOR WORK AT NO ADDITIONAL COST TO THE OWNER.
4. THE ROOFING CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN WATER TIGHTNESS AND PROVIDEPROTECTION AT ANY/ALL OPENINGS IN THE ROOF LEFT AT THE END OF EACH CONSTRUCTION DAY.
5. ALL WOOD BLOCKING SHALL BE PRESSURE TREATED.
6. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, CONDITIONS, AND QUANTITIES.
SCOPE OF WORK:
1. PROVIDE ALL LABOR, EQUIPMENT AND NON-DISTRICT SUPPLIED MATERIALS TO COMPLETE THE INSTALL OF
A NEW ROOFING SYSTEM.
2. REMOVE AND PROPERLY DISPOSE OF EXISTING ROOF SYSTEM (S) DOWN TO WOOD DECK.
3. REPLACE ALL DRY ROT WOOD DECKING
4. REMOVE AND REPLACE COPING CAP WITH KYNAR 500 COATED METAL.
5. INSTALL RED ROSIN SHEET.
6. INSTALL 2 LAYERS OF POLYISO INSULATION A TOTAL OF R-30
7. INSTALL CRICKETS TO PROVIDE PROPER FLOW TO ALL INTERNAL DRAINS.
8. MECHANICALLY FASTEN ½” SIX-SIDED ASPHALT SATURATED COVER BOARD
9. INSTALL ONE (1) PLY OF STRESSBASE 80 IN GREEN LOCK PLUS MEMBRANE ADHESIVE.
10. INSTALL STRESSPLY PLUS FR MINERAL CAP SHEET IN GREEN LOCK PLUS MEMBRANE ADHESIVE.
11. INSTALL GREEN WELD FLASHING AT ALL PIPE PENETRATIONS
12. APPLY TITLE 24 COMPLIANT COATING PYRAMIC PLUS LO
4 X 8 BOARD PATTERN
RED ROSIN PAPER
STRESSPLY PLUS FRMINERAL CAP SHEET INGREENLOCK PLUSMEMBRANE ADHESIVE
STRESSBASE 80 INGREENLOCK PLUSMEMBRANE ADHESIVE
EXISTING WOODDECK
2 LAYERS POLYISOCYANURATEINSULATION MECHANICALLYFASTENED TO DECKACCORDING TOSPECIFICATIONS.
1/2" COVERBOARDMECHANICALLY FASTENED THRUINSULATION ACCORDING TOWIND UPLIFT CALCS
1. WIND SPEED: 110 MPH
2. EXPOSURE CATEGORY: B
3. IMPORTANCE FACTOR: III
4. DESIGN ROOF HEIGHT: 15.0'
5. ROOF SLOPE: 1/2 UNITS PER 12
RESULTING WIND UPLIFT PRESSURES:
ZONE 1: 20.8 PSFZONE 2: 27.4 PSFZONE 3: 37.4 PSF
ZONES 1, 2, & 3 INSULATION BOARD FASTENER PATTERN: 12 FASTENERS PER BOARD (1:2.67 sqft)
3 SPACES @ 24"
6"
24"
12"
4'
OFSH
EET:
REVI
SION
:
GAR
LAN
D
PHO
NE (8
00) 3
21-9
336
/ FAX
(216
) 641
-063
338
00 E
AST
91st
STR
EET
- CLE
VELA
ND, O
HIO
441
05-2
197
A S
ubsi
diar
y of
Gar
land
Indu
strie
s
Des
ign-
Bui
ld S
olut
ions
, Inc
.ÒG
AR
LAN
D /
DB
S IN
C.
DATE
:CH
K BY
:DW
G BY
:GA
RLAN
D RE
P:
PROJ
ECT
NO:
KING
S BE
ACH
ELEM
ENTA
RY S
CHOO
L ROO
F RE
PLAC
EMEN
T81
25 S
TEEL
HEAD
AVE
, KIN
GS B
EACH
, CA
9614
330
-ES-
2001
3811
.12.20
20TO
SCM
72
TYPICAL ROOF CROSS SECTIONADHESIVE INSTRUCTIONS
GENERAL NOTES
NOTES
1. STORE AND HANDLE ROOFING SHEETS IN A DRY, WELL-VENTILATED, WEATHER-TITE PLACE.STORE ROLLS OF FELT AND OTHER SHEET MATERIALS ON RAISED SURFACE. STAND ALL ROLLMATERIALS ON END. COVER ROLL GOODS WITH A CANVAS TARPAULIN OR OTHERBREATHABLE MATERIAL (NOT POLYETHYLENE).
2. DO NOT LEAVE UNUSED MATERIALS ON THE ROOF WHEN ROOFING WORK IS NOT INPROGRESS UNLESS PROTECTED FROM WEATHER AND OTHER MOISTURE SOURCES.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SECURE ALL MATERIAL AND EQUIPMENTON THE JOB SITE. IF ANY MATERIAL OR EQUIPMENT IS STORED ON THE ROOF, THECONTRACTOR MUST MAKE SURE THAT THE INTEGRITY OF THE DECK IS NOT COMPROMISEDAT ANY TIME.
4. DO NOT APPLY ROOFING INSULATION OR MEMBRANE TO DAMP DECK SURFACE.
5. FULLY COMPLETE ALL. MODIFIED BITUMINOUS MEMBRANE ROOFING FIELD ASSEMBLY WORKEACH DAY. PHASED CONSTRUCTION WILL NOT BE ACCEPTED.
CUSTOMER NOTE:
1. ALL OF GARLAND'S SHOP FABRICATED MATERIAL WILL BE MANUFACTURED TO THEDIMENSIONS SHOWN, UNLESS OTHERWISE NOTED.
2. IT IS ESSENTIAL THAT ANY NECESSARY CHANGES, NOTATIONS OR REQUESTEDINFORMATION BE CLEARLY NOTED ON THE SHOP DRAWINGS.
3. NO MATERIAL WILL BE CONSIDERED RELEASED FOR FABRICATION UNTIL ALL PERTINENTINFORMATION (i.e. COLOR, DIMENSIONS, MATERIAL CONFIGURATION) HAS BEEN RECEIVED.
SCOPE OF WORK NOTESTYPICAL ROOF CROSS SECTION DETAIL DESIGN CRITERIA
WIND UPLIFT REQUIREMENTSGENERAL NOTES:
1. IT IS THE ROOFING CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE THEMSELVES WITH ALL DETAILSINVOLVED IN THE ROOFING CONTRACT.
2. ALL DRAWINGS ARE GRAPHIC REPRESENTATION OF APPROXIMATE LOCATION OF EXISTING AND NEWMATERIALS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL EXISTING CONDITIONS PRIOR TOCOMMENCEMENT OF WORK.
3. THE ROOFING CONTRACTOR TO PROTECT ALL ADJACENT SURFACES NOT SCHEDULED FOR WORK AND TOREPAIR ANY DAMAGED AREAS AS A RESULT OF CONTRACTOR WORK AT NO ADDITIONAL COST TO THE OWNER.
4. THE ROOFING CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN WATER TIGHTNESS AND PROVIDEPROTECTION AT ANY/ALL OPENINGS IN THE ROOF LEFT AT THE END OF EACH CONSTRUCTION DAY.
5. ALL WOOD BLOCKING SHALL BE PRESSURE TREATED.
6. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, CONDITIONS, AND QUANTITIES.
SCOPE OF WORK:
1. TEAR OFF EXISTING ROOF TO DECK
2. CONTRACTOR SHALL IDENTIFY AREAS OF DECK WHICH NEED REPAIR OR REPLACEMENT DURING TEAROFF
3. PROPERLY CLEAN DECK
4. INSTALL (2) LAYERS OF 1” POLYISOCYANURATE INSULATION IN INSUL-LOCK HR INSULATION ADHESIVE
ACCORDING TO WIND UPLIFT CALCULATIONS. STAGGER JOINTS 4'X4' BOARDS
5. INSTALL ½” SIX-SIDED ASPHALT SATURATED COVER BOARD IN INSUL-LOCK HR ACCORDING TO WIND UPLIFT
CALCULATIONS
6. INSTALL STRESSBASE 80 BASE SHEET IN GREEN-LOCK MEMBRANE ADHESIVE
7. INSTALL STRESSPLY PLUS FR MINERAL CAP SHEET IN GREEN-LOCK PLUS MEMBRANE ADHESIVE
8. INSTALL STRESSBASE 80 BASE AND STRESSPLY MINERAL CAP FLASHING IN GREEN-LOCK PLUS FLASHING
ADHESIVE
9. INSTALL GREEN WELD FLASHING AT ALL PIPE PENETRATIONS
10. APPLY TITLE 24 COMPLIANT COATING PYRAMIC PLUS LO.
4 X 4 BOARD PATTERN
STRESSPLY PLUS FRMINERAL CAP SHEET INGREENLOCK PLUSMEMBRANE ADHESIVE
STRESSBASE 80 INGREENLOCK PLUSMEMBRANE ADHESIVE
EXISTING DECK
2 LAYERS POLYISOCYANURATEINSULATION IN INSUL-LOCK HRADHESIVE ACCORDING TOSPECIFICATIONS.
1/2" COVERBOARD ININSUL-LOCK HRACCORDING TO WINDUPLIFT CALCS
1. WIND SPEED: 110 MPH
2. EXPOSURE CATEGORY: B
3. IMPORTANCE FACTOR: III
4. DESIGN ROOF HEIGHT: 15.0'
5. ROOF SLOPE: 1/2 UNITS PER 12
RESULTING WIND UPLIFT PRESSURES:
ZONE 1: 20.8 PSFZONE 2: 27.4 PSFZONE 3: 37.4 PSF
INSULATION BOARD ADHESIVE PATTERN
TYPICAL ASCE 7 WIND PRESSURE ZONES 1, 2, & 3 INSULATION BOARDADHESIVE PATTERN: 12" OC BEADS PER BOARD
4 - 1/2" WIDE ADHESIVE RIBBONSEQUALLY SPACED AT 12" (30.5 cm)O.C. (TYP.)
ADHESIVE RIBBON ENLARGED FOR CLARITY
OFSH
EET:
REVI
SION
:
GA
RLA
ND
PH
ON
E (800) 321-9336 / F
AX
(216) 641-0633
3800 E
AS
T 91st S
TR
EE
T - C
LE
VE
LA
ND
, O
HIO
44105-2197
A S
ubsidiary of G
arland Industries
Design-B
uild S
olutions, Inc.
Ò
GA
RLA
ND
/ D
BS
INC
.
DATE
:CH
K BY
:DW
G BY
:GA
RLAN
D RE
P:
PROJ
ECT
NO:
KING
S BE
ACH
ELEM
ENTA
RY S
CHOO
L ROO
F RE
PLAC
EMEN
T81
25 S
TEEL
HEAD
AVE
, KIN
GS B
EACH
, CA
9614
330
-ES-
2001
3811
.12.20
20TO
SCM
72A
152'-
0"
85'-1"
18'-4
"
12'-10"
210'-3"
127'-11"59'-10"
26'-1
0"
76'-2"
49'-5
"
36'-2
"
140'-6"9'-
0"TY
P.
3'-0"
TYP.
2SHT 6
2SHT 6
1SHT 4
2SHT 6
1SHT 4
2SHT 4
2SHT 4
2SHT 4 ABV
2SHT 5 BELOW
1SHT 6
1SHT 6
1SHT 6
1SHT 6
1SHT 6
3SHT 6
2SHT 4
1SHT 4
1SHT 6
WIND PRESSUREZONE DESIGNATION ZONE TYPE
ZONE 1
ZONE 2
ZONE 3
ARCH. REF.:
ROOF PLAN N
OFSH
EET:
REVI
SION
:
GAR
LAN
D
PHO
NE (8
00) 3
21-9
336
/ FAX
(216
) 641
-063
338
00 E
AST
91st
STR
EET
- CLE
VELA
ND, O
HIO
441
05-2
197
A S
ubsi
diar
y of
Gar
land
Indu
strie
s
Des
ign-
Bui
ld S
olut
ions
, Inc
.ÒG
AR
LAN
D /
DB
S IN
C.
DATE
:CH
K BY
:DW
G BY
:GA
RLAN
D RE
P:
PROJ
ECT
NO:
KING
S BE
ACH
ELEM
ENTA
RY S
CHOO
L ROO
F RE
PLAC
EMEN
T81
25 S
TEEL
HEAD
AVE
, KIN
GS B
EACH
, CA
9614
330
-ES-
2001
3811
.12.20
20TO
SCM
73
SCALE: 1" = 30'-0"
NOTE:CONTRACTOR SHALL FIELD VERIFY ALLDIMENSIONS, CONDITIONS, AND QUANTITIES.
SYMBOL LEGENDMECH UNIT CURB
ROOF HATCHSKYLIGHTROOF DRAIN
EXHAUST FAN
HEAT STACKPLUMBING STACK ROOF PENETRATIONAIR INTAKE
ROOF AREA NOT INSCOPE
1SHT 4
TYPICAL FIELD DETAILSCALE: 1 1/2" = 1'-0"
2SHT 4
PARAPET DETAILSCALE: 1 1/2" = 1'-0"
3SHT 4
ROOF EDGE DETAILSCALE: 1 1/2" = 1'-0"
4SHT 4
AIR HANDLING CURB DETAILSCALE: 1 1/2" = 1'-0"
NOTE:REFERENCE SPECIFICATION FOR SURFACING,MEMBRANE ADHESIVE TYPE, AND INSULATION/COVERBOARD TYPE AND ATTACHMENT METHOD.
4" MIN.
2 LAYERS POLYISOCYANURATEINSULATION
1/2" COVERBOARD
EXISTING WOOD DECK
CAP FLASHING PLY9" MIN. [228mm] ON FIELD
BASE FLASHING PLY6" MIN. [152mm] ON FIELD
STRESSPLY PLUS FR MINERAL CAPSHEETSTRESSBASE 80 BASE PLY
METAL EDGE SET IN ROOF CEMENT, NAILED 3" O.C. [76MM]STAGGERED, PRIME METAL FLANGE PRIOR TO STRIPPING
EXTEND PLY OVER BLOCKINGFASTEN 8" O.C. [203MM]
CONTINUOUS CLEATFASTENED 6" O.C.
[152MM]
SEALANT, REFERENCESPECIFICATION
1"MIN.
RED ROSIN PAPER
METAL COUNTERFLASHING FASTENED 8" O.C.[203MM] SCREW OR RIVET TO FLASHINGRECEIVER ONLY
CANT STRIP
1"MIN.
BASE OF UNIT EXTENDS 1/2" MINIMUM [13MM]BEYOND AND DOWN OVER TOP OF CURB
SEALING MATERIAL-MUST BECONTINUOUS ON THE PERIMETER
WOOD NAILER NOMINAL
FLASHING RECEIVER
8"MIN
UNIT MOUNTING CURB
CAP FLASHING PLY 9" MIN. [228MM] ON FIELD -TERMINATE AT TOP OF NAILER, BUT DO NOTTURN OVER TOP
BASE FLASHING PLY 6" MIN. [152MM] ONFIELD - WRAP UP AND OVER NAILERS
TERMINATION BAR FASTENED @ 8"o.c. MAX. [203mm]THROUGH BUTYL TAPE
SEALANT, REFERENCE SPECIFICATION
NOTE:REFERENCE SPECIFICATION FOR SURFACING,MEMBRANE ADHESIVE TYPE, AND INSULATION/COVERBOARD TYPE AND ATTACHMENT METHOD.
2 LAYERSPOLYISOCYANURATEINSULATION
1/2" COVERBOARD
EXISTING WOOD DECKING
STRESSPLY PLUS FR MINERALCAP SHEETSTRESSBASE 80 BASE PLY
CAP TORCH FLASHING PLY 9" MIN. [228MM] ON FIELD
BASE FLASHING PLY 6" MIN. [152MM] ON FIELD
CANT
6" CONCEALED SPLICE PLATE @ EACHJOINT
COPING COVER X 10'-0"SLOPE PER SPECIFICATION
16 GA. ANCHOR CHAIR
(4) FASTENERS PER ANCHOR CHAIR
SA HIGH TEMP UNDERLAYMENT
2" MIN 2" MIN
V.I.F.
2 LAYERSPOLYISOCYANURATEINSULATION
1/2" COVERBOARD
EXISTING WOOD DECKING
STRESSPLY PLUS FR MINERALCAP SHEETSTRESSBASE 80 BASE PLY
NOTE:REFERENCE SPECIFICATION FOR SURFACING,MEMBRANE ADHESIVE TYPE, AND INSULATION/COVERBOARD TYPE AND ATTACHMENT METHOD.
RED ROSIN PAPER
RED ROSIN PAPER
RED ROSIN PAPER
STRESSPLY PLUS FRMINERAL CAP SHEET INGREENLOCK PLUSMEMBRANE ADHESIVE
STRESSBASE 80 BASE PLY INGREENLOCK PLUSMEMBRANE ADHESIVE
EXISTING WOODDECK
2 LAYERS POLYISOCYANURATEINSULATION MECHANICALLYFASTENED TO DECKACCORDING TOSPECIFICATIONS.
1/2" COVERBOARDMECHANICALLY FASTENED THRUINSULATION ACCORDING TOWIND UPLIFT CALCS
OFSH
EET:
REVI
SION
:
GAR
LAN
D
PHO
NE (8
00) 3
21-9
336
/ FAX
(216
) 641
-063
338
00 E
AST
91st
STR
EET
- CLE
VELA
ND, O
HIO
441
05-2
197
A S
ubsi
diar
y of
Gar
land
Indu
strie
s
Des
ign-
Bui
ld S
olut
ions
, Inc
.ÒG
AR
LAN
D /
DB
S IN
C.
DATE
:CH
K BY
:DW
G BY
:GA
RLAN
D RE
P:
PROJ
ECT
NO:
KING
S BE
ACH
ELEM
ENTA
RY S
CHOO
L ROO
F RE
PLAC
EMEN
T81
25 S
TEEL
HEAD
AVE
, KIN
GS B
EACH
, CA
9614
330
-ES-
2001
3811
.12.20
20TO
SCM
74
1SHT 5
ROOF HATCH DETAILSCALE: 1 1/2" = 1'-0"
2SHT 5
REGLET MOUNTED COUNTERFLASHING DETAILSCALE: 1 1/2" = 1'-0"
3SHT 5
ROOF DRAIN DETAILSCALE: 1 1/2" = 1'-0"
4SHT 5
PLUMBING STACK DETAILSCALE: 1 1/2" = 1'-0"
4" MIN.[102mm]
12" MIN.[305mm]
ROLL DOWN FLASHING 1" MIN [25MM]DOWN INTO PIPE
PLUMBING VENT STACK
SET SOFT METAL FLANGEIN MASTIC, PRIME FLANGEBEFORE STRIPPING
CAP FLASHING PLY 9"MIN. [228MM] ON FIELD
BASE FLASHING PLY 6" MIN. [152MM] ONFIELD
SEALANT, REFERENCESPECIFICATION
ROOF DRAIN
CAP FLASHING PLY9" MIN. [228mm] ON FIELD
BASE FLASHING PLY6" MIN. [152mm] ON FIELD
SOFT METAL FLASHING (30" MIN.) SET IN MASTIC,WRAPPED DOWN 2" MIN., PRIME TOP SURFACE
LEADER
SEALANT, REFERENCE SPECIFICATION
COUNTERFLASHING
TERMINATION BAR FASTENED @ 8"o.c. MAX. [203mm]THROUGH BUTYL TAPE(MIN. 1.5" EMBEDMENT)
CAP FLASHING PLY9" MIN. [228mm] ON FIELD
BASE FLASHING PLY6" MIN. [152mm] ON FIELD
CANT STRIP
NOTE:REFERENCE SPECIFICATION FOR SURFACING,MEMBRANE ADHESIVE TYPE, AND INSULATION/COVERBOARD TYPE AND ATTACHMENT METHOD.
SEALANT, REFERENCE SPECIFICATION
EXPANSION FASTENER
8" MIN[203MM]
SLOPE= 12:12
NOTE:REFERENCE SPECIFICATION FOR SURFACING,MEMBRANE ADHESIVE TYPE, ANDINSULATION/COVER BOARD TYPE AND ATTACHMENTMETHOD.
DRAIN BOWL & CLAMP
CONNECTION HUB
2 LAYERS POLYISOCYANURATEINSULATION
1/2" COVERBOARD
EXISTING WOOD DECK
STRESSPLY PLUS FR MINERAL CAPSHEET
STRESSBASE 80 BASE PLY
RED ROSIN PAPER
2 LAYERS POLYISOCYANURATEINSULATION
1/2" COVERBOARD
EXISTING WOOD DECK
STRESSPLY PLUS FR MINERAL CAPSHEET
STRESSBASE 80 BASE PLY
RED ROSIN PAPER
1/2" COVERBOARD
STRESSPLY PLUS FR MINERAL CAP SHEETSTRESSBASE 80 BASE PLY
INSULATION, FIT TIGHT TO DRAIN
RED ROSIN PAPER
EXISTING WOOD DECK
NOTE:REFERENCE SPECIFICATION FOR SURFACING,MEMBRANE ADHESIVE TYPE, AND INSULATION/COVERBOARD TYPE AND ATTACHMENT METHOD.
TERMINATION BAR FASTENED @ 8"o.c. MAX. [203mm]THROUGH BUTYL TAPE(MIN. 1.5" EMBEDMENT)
CAP FLASHING PLY9" MIN. [228mm] ON FIELDBASE FLASHING PLY6" MIN. [152mm] ON FIELD
CANT STRIP
SEALANT, REFERENCE SPECIFICATION
8" MIN[203MM]
EXISTING ROOF HATCH
NOTE:REFERENCE SPECIFICATION FOR SURFACING,MEMBRANE ADHESIVE TYPE, AND INSULATION/COVERBOARD TYPE AND ATTACHMENT METHOD.
2 LAYERS POLYISOCYANURATEINSULATION
1/2" COVERBOARD
EXISTING WOOD DECKING
STRESSPLY PLUS FR MINERALCAP SHEET
STRESSBASE 80 BASE PLY
NEW COUNTERFLASHING. 1/8" S.S. RIVET(COLOR TO MATCH) @ 12" O.C.
RED ROSIN PAPER
OFSH
EET:
REVI
SION
:
GAR
LAN
D
PHO
NE (8
00) 3
21-9
336
/ FAX
(216
) 641
-063
338
00 E
AST
91st
STR
EET
- CLE
VELA
ND, O
HIO
441
05-2
197
A S
ubsi
diar
y of
Gar
land
Indu
strie
s
Des
ign-
Bui
ld S
olut
ions
, Inc
.ÒG
AR
LAN
D /
DB
S IN
C.
DATE
:CH
K BY
:DW
G BY
:GA
RLAN
D RE
P:
PROJ
ECT
NO:
KING
S BE
ACH
ELEM
ENTA
RY S
CHOO
L ROO
F RE
PLAC
EMEN
T81
25 S
TEEL
HEAD
AVE
, KIN
GS B
EACH
, CA
9614
330
-ES-
2001
3811
.12.20
20TO
SCM
75
1
SHT 6
SURFACE MOUNTED COUNTERFLASHINGSCALE: 1 1/2" = 1'-0"
2
SHT 6
TYPICAL FIELD DETAIL - METAL DECKSCALE: 1 1/2" = 1'-0"
3
SHT 6
PLUMBING STACK DETAILSCALE: 1 1/2" = 1'-0"
4
SHT 6
AIR HANDLING UNIT CURB DETAILSCALE: 1 1/2" = 1'-0"
SEALANT, REFERENCE SPECIFICATION
COUNTERFLASHING FASTENED @ 8"o.c. [203mm]MAX. THROUGH BUTYL TAPE(MIN. 1.5" EMBEDMENT)
SEALANT, REFERENCE SPECIFICATIONTERMINATION BAR FASTENED @ 8"o.c. MAX. [203mm]THROUGH BUTYL TAPE
CAP FLASHING PLY9" MIN. [228mm] ON FIELD
BASE FLASHING PLY6" MIN. [152mm] ON FIELD
CANT STRIP
NOTE:REFERENCE SPECIFICATION FORSURFACING, MEMBRANE ADHESIVE TYPE,AND INSULATION/COVER BOARD TYPE ANDATTACHMENT METHOD.
8" MIN[203MM]
2 LAYERS POLYISOCYANURATEINSULATION
1/2" COVERBOARD
EXISTING WOOD DECK
STRESSPLY PLUS FRMINERAL CAP SHEET
STRESSBASE 80 BASE PLY
RED ROSIN PAPER
STRESSPLY PLUS FRMINERAL CAP SHEET INGREENLOCK PLUSMEMBRANE ADHESIVE
STRESSBASE 80 INGREENLOCK PLUSMEMBRANE ADHESIVE
EXISTING DECK
2 LAYERS POLYISOCYANURATEINSULATION IN INSUL-LOCK HRADHESIVE ACCORDING TOSPECIFICATIONS.
1/2" COVERBOARD ININSUL-LOCK HRACCORDING TO WINDUPLIFT CALCS
4" MIN.[102mm]
12" MIN.[305mm]
ROLL DOWN FLASHING 1" MIN [25MM]DOWN INTO PIPE
PLUMBING VENT STACK
SET SOFT METAL FLANGE INMASTIC, PRIME FLANGEBEFORE STRIPPING
CAP FLASHING PLY 9"MIN. [228MM] ON FIELD
BASE FLASHING PLY 6" MIN. [152MM] ONFIELD
NOTE:REFERENCE SPECIFICATION FOR SURFACING,MEMBRANE ADHESIVE TYPE, AND INSULATION/COVERBOARD TYPE AND ATTACHMENT METHOD.
SEALANT, REFERENCESPECIFICATION
METAL COUNTERFLASHING FASTENED 8" O.C.[203MM] SCREW OR RIVET TO FLASHINGRECEIVER ONLY
CANT STRIP
1"MIN.
BASE OF UNIT EXTENDS 1/2" MINIMUM [13MM]BEYOND AND DOWN OVER TOP OF CURB
SEALING MATERIAL-MUST BECONTINUOUS ON THE PERIMETER
WOOD NAILER NOMINAL
FLASHING RECEIVER
8"MIN
UNIT MOUNTING CURB
CAP FLASHING PLY 9" MIN. [228MM] ON FIELD
BASE FLASHING PLY 6" MIN. [152MM] ON FIELD
TERMINATION BAR FASTENED @ 8"o.c. MAX. [203mm]THROUGH BUTYL TAPE
SEALANT, REFERENCE SPECIFICATION
NOTE:REFERENCE SPECIFICATION FOR SURFACING,MEMBRANE ADHESIVE TYPE, AND INSULATION/COVERBOARD TYPE AND ATTACHMENT METHOD.
STRESSPLY PLUS FR MINERAL CAP SHEET
STRESSBASE 80 BASE PLY
1/2" COVERBOARD
2 LAYERS POLYISOCYANURATE INSULATION
EXISTING DECK
STRESSPLY PLUS FR MINERAL CAP SHEET
STRESSBASE 80 BASE PLY
1/2" COVERBOARD
2 LAYERS POLYISOCYANURATE INSULATION
EXISTING DECK
OFSH
EET:
REVI
SION
:
GA
RLA
ND
PH
ON
E (800) 321-9336 / F
AX
(216) 641-0633
3800 E
AS
T 91st S
TR
EE
T - C
LE
VE
LA
ND
, O
HIO
44105-2197
A S
ubsidiary of G
arland Industries
Design-B
uild S
olutions, Inc.
Ò
GA
RLA
ND
/ D
BS
INC
.
DATE
:CH
K BY
:DW
G BY
:GA
RLAN
D RE
P:
PROJ
ECT
NO:
KING
S BE
ACH
ELEM
ENTA
RY S
CHOO
L ROO
F RE
PLAC
EMEN
T81
25 S
TEEL
HEAD
AVE
, KIN
GS B
EACH
, CA
9614
330
-ES-
2001
3811
.12.20
20TO
SCM
76
1SHT 7
DRIP EDGE DETAILSCALE: 1 1/2" = 1'-0"
2SHT 7
SURFACE MOUNTED COUNTERFLASHING DETAILSCALE: 1 1/2" = 1'-0"
3SHT 7
PARAPET COPING CAP DETAILSCALE: 1 1/2" = 1'-0"
4SHT 7
REGLET MOUNTED COUNTERFLASHING DETAILSCALE: 1 1/2" = 1'-0"
SEALANT, REFERENCE SPECIFICATION
COUNTERFLASHING FASTENED @ 8"o.c. [203mm]MAX. THROUGH BUTYL TAPE(MIN. 1.5" EMBEDMENT)
SEALANT, REFERENCE SPECIFICATIONTERMINATION BAR FASTENED @ 8"o.c. MAX. [203mm]THROUGH BUTYL TAPE
CAP FLASHING PLY9" MIN. [228mm] ON FIELD
BASE FLASHING PLY6" MIN. [152mm] ON FIELD
CANT STRIP8" MIN
[203MM]
4" MIN.
CAP FLASHING PLY9" MIN. [228mm] ON FIELD
BASE FLASHING PLY6" MIN. [152mm] ON FIELD
METAL EDGE SET IN ROOF CEMENT, NAILED 3" O.C. [76MM]STAGGERED, PRIME METAL FLANGE PRIOR TO STRIPPING
EXTEND PLY OVER BLOCKINGFASTEN 8" O.C. [203MM]
CONTINUOUS CLEATFASTENED 6" O.C.
[152MM]
SEALANT, REFERENCESPECIFICATION
SEALANT, REFERENCE SPECIFICATION
COUNTERFLASHING
TERMINATION BAR FASTENED @ 8"o.c. MAX. [203mm]THROUGH BUTYL TAPE(MIN. 1.5" EMBEDMENT)
CAP FLASHING PLY9" MIN. [228mm] ON FIELD
BASE FLASHING PLY6" MIN. [152mm] ON FIELD
CANT STRIP
SEALANT, REFERENCE SPECIFICATION
EXPANSION FASTENER
8" MIN[203MM]
1"MIN.
NOTE:REFERENCE SPECIFICATION FOR SURFACING,MEMBRANE ADHESIVE TYPE, AND INSULATION/COVERBOARD TYPE AND ATTACHMENT METHOD.
NOTE:REFERENCE SPECIFICATION FOR SURFACING,MEMBRANE ADHESIVE TYPE, AND INSULATION/COVERBOARD TYPE AND ATTACHMENT METHOD.
NOTE:REFERENCE SPECIFICATION FOR SURFACING,MEMBRANE ADHESIVE TYPE, AND INSULATION/COVERBOARD TYPE AND ATTACHMENT METHOD.
CAP TORCH FLASHING PLY 9" MIN. [228MM] ON FIELD
BASE FLASHING PLY 6" MIN. [152MM] ON FIELD
CANT
SA HIGH TEMP UNDERLAYMENT
2" MIN
V.I.F.
NOTE:REFERENCE SPECIFICATION FOR SURFACING,MEMBRANE ADHESIVE TYPE, AND INSULATION/COVERBOARD TYPE AND ATTACHMENT METHOD. 6" CONCEALED SPLICE PLATE @ EACH
JOINT
COPING COVER X 10'-0"SLOPE PER SPECIFICATION
16 GA. ANCHOR CHAIR
(4) FASTENERS PER ANCHOR CHAIR
2" MIN
24" MAX
STRESSPLY PLUS FR MINERAL CAP SHEET
STRESSBASE 80 BASE PLY
1/2" COVERBOARD
2 LAYERS POLYISOCYANURATE INSULATION
EXISTING DECK
STRESSPLY PLUS FR MINERAL CAP SHEET
STRESSBASE 80 BASE PLY
1/2" COVERBOARD
2 LAYERS POLYISOCYANURATE INSULATION
EXISTING DECK
STRESSPLY PLUS FR MINERAL CAP SHEET
STRESSBASE 80 BASE PLY
1/2" COVERBOARD
2 LAYERS POLYISOCYANURATE INSULATION
EXISTING DECK
STRESSPLY PLUS FR MINERAL CAP SHEET
STRESSBASE 80 BASE PLY
1/2" COVERBOARD
2 LAYERS POLYISOCYANURATE INSULATION
EXISTING DECK
OFSH
EET:
REVI
SION
:
GAR
LAN
D
PHO
NE (8
00) 3
21-9
336
/ FAX
(216
) 641
-063
338
00 E
AST
91st
STR
EET
- CLE
VELA
ND, O
HIO
441
05-2
197
A S
ubsi
diar
y of
Gar
land
Indu
strie
s
Des
ign-
Bui
ld S
olut
ions
, Inc
.ÒG
AR
LAN
D /
DB
S IN
C.
DATE
:CH
K BY
:DW
G BY
:GA
RLAN
D RE
P:
PROJ
ECT
NO:
KING
S BE
ACH
ELEM
ENTA
RY S
CHOO
L ROO
F RE
PLAC
EMEN
T81
25 S
TEEL
HEAD
AVE
, KIN
GS B
EACH
, CA
9614
330
-ES-
2001
3811
.12.20
20TO
SCM
77