Kingdom of Morocco
Ministry of Land-Use Management, Water and the Environment
The First Carbon Exhibition in North Africa and Middle East Region
Djerba, 22-24 September 2004
Moroccan CDM projectsMoroccan CDM projectsRenewable energy projectsRenewable energy projects
M’hammed EL M’hammed EL MERINIMERINI
SCET MarocSCET Maroc
CD4CDM Project
Renewable energy projectsRenewable energy projects
7 renewable energy projects:• Essaouira 60 MW wind farm (ONE)
• Tangiers 140 MW wind farm (ONE)
• A. Torres 50 MW wind farm (ONE)
• Tan Tan 10 MW wind farm (ONEP)
• Tetouan 10 MW wind farm (LAFARGE)
• Tanafnit 41 MW Hydropower dam (ONE)
• 105,000 photovoltaic kits in rural area (ONE)
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
SummarySummary
Renewable energy projectsRenewable energy projects
Renewable energy projects represent a potential of 9.7 million CER, that is 60% of the total CER of Moroccan approved CDM projects.
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Description and distributionDescription and distribution
• Wind power is for 81% of the CER (7.85 million), then Hydro with 16% (1.59 million), and solar with 3% (0.27 million).
• The projects promoters are ONE (National Office of Electricity) with 94% of the CER (9.19 million), then LAFARGE (private cement factory) with 4% (345,000) and ONEP (National Office of Drinking Water) with 2% (172,400).
Renewable energy projectsRenewable energy projects
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
LocationLocation
Photovoltaic kits
Wind power projects3 full size projects
2 small scale projects
Wind power projects3 full size projects
2 small scale projects
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Essaouira 60 MW wind farmEssaouira 60 MW wind farm
• Full name : Power generation at Essaouira 60 MW wind farm;
• Location : At Cap Sim, 15 km far from Essaouira;
• Category : Renewable energy – Grid connected power generation;
• Project promoter : Office National d’Electricité (ONE), public office;
• Project status : PDD approved;
• Date of operation : 2006;
• First year of CER delivery : 2006;
• Crediting period : 2006-2015;
• Expected CER : 1.5 million.
Project summaryProject summary
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Essaouira 60 MW wind farmEssaouira 60 MW wind farm
• Technical features :
– Installed capacity : 60 MW using the wind power technology;
– Expected production : 210 GWh per year;
– Components : 71 horizontal axis wind turbines of 850 kW each, electronic
devices for regulation and protection, LV/MV and MV/HV transformers, to
supply the national grid at 60 kV.
• Financial issues :
– Total cost of the project : US $ 82.5 million
• Timing :
– Starting of works : end of 2004 ;
– Operation : 2006.
Project descriptionProject description
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Tangiers 140 MW wind farmTangiers 140 MW wind farm
• Full name : Power generation at Tangiers 140 MW wind farm;
• Location : At Beni Mejmel, 12 km to the east of Tangiers and Dhar Saadane, 22 km to the south-east of Tangiers;
• Category : Renewable energy – Grid connected power generation;
• Project promoter : Office National d’Electricité (ONE), public office;
• Project status : PIN approved;
• Date of operation : 2007;
• First year of CER delivery : 2007;
• Crediting period : 2007-2016;
• Expected CER : 4 million.
Project summaryProject summary
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Tangiers 140 MW wind farmTangiers 140 MW wind farm
• Technical features :
– Installed capacity : 140 MW using the wind power technology;
– Expected production : 510 GWh per year;
– Components : 165 horizontal axis wind turbines of 850 kW each, electronic
devices for regulation and protection, LV/MV and MV/HV transformers, to
supply the national grid at 225 kV.
• Financial issues :
– Total cost of the project : US $ 170 million (Euro 148 million)
• Timing :
– Starting of works : May 2004 ;
– Operation : 2007.
Project descriptionProject description
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
A. Torres 50 MW wind farmA. Torres 50 MW wind farm
• Full name : Power generation at A. Torres 50 MW wind farm;
• Location : At Taghramt, 10 km far from Tetouan city;
• Category : Renewable energy – Grid connected power generation;
• Project promoter : Office National d’Electricité (ONE), public office;
• Project status : PIN approved;
• Date of operation : 2007;
• First year of CER delivery : 2007;
• Crediting period : 2007-2016;
• Expected CER : 1.83 million.
Project summaryProject summary
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
A. Torres 50 MW wind farmA. Torres 50 MW wind farm
• Technical features :
– Installed capacity : 50.4 MW using the wind power technology;
– Expected production : 225 GWh per year;
– Components : 84 horizontal axis wind turbines of 600 kW each, electronic
devices for regulation and protection, LV/MV and MV/HV transformers, to
supply the national grid at 225 kV.
• Financial issues :
– Total cost of the project : US $ 62 million
• Timing :
– Starting of works : June 2005 ;
– Operation : 2007.
Project descriptionProject description
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Full size wind farm projectsFull size wind farm projects
• Methodology :
– Used in “Wigton wind farm in Jamaica” and submitted to CDM EB.
– New consolidated methodology ACM0002 will be used in new PDD version.
• Approach :
– Demonstrate that the project is not BAU;
– Determine the most likely scenario in absence of the project;
– Determine the avoided emissions by calculating the Projected Operating
Margin with weighted CEF of the national power plants ;
• Calculations :
– Through the crediting period, the weighted CEF moves down from 0.805
(2006) up to 0.729 (2009) and then increases to 0.777 (2015);
Baseline methodologyBaseline methodology
Tan Tan 10 MW wind farmTan Tan 10 MW wind farm
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
• Full name : 10 MW wind farm for the Tan Tan SWDP;
• Location : At Sidi El Gran, 12 km to the north of Tan Tan city;
• Category : 1-D : Renewable energy production for the grid;
• Project promoter : ONEP – public agency;
• Project status : PIN approved – PDD completed;
• Date of operation : 2007;
• First year of CER delivery : 2007;
• Crediting period : 2007-2016;
• Expected CER : 194,500.
Project summaryProject summary
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Tan Tan 10 MW wind farmTan Tan 10 MW wind farm
• Technical features :
– Installed capacity : 10 MW using the wind power technology;
– Expected production : 22.5 GWh per year;
– Components : 20 horizontal axis wind turbines of 500 kW each, electronic
devices for regulation and protection, LV/MV transformers, to supply the
national grid at 22 kV.
• Financial issues :
– Total cost of the project : US $ 36 million (including the SWDP).
• Timing :
– Starting of works : 2005 ;
– Operation : 2007.
Project descriptionProject description
Tetouan 10 MW wind farmTetouan 10 MW wind farm
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
• Full name : 10.2 MW wind farm for the Lafarge cement factory;
• Location : At Semsa site, to the north-west of Tetouan city;
• Category : 1-D : Renewable energy production for the grid;
• Project promoter : LAFARGE – private company;
• Project status : PIN approved – PDD completed;
• Date of operation : 2007;
• First year of CER delivery : 2007;
• Crediting period : 2007-2016;
• Expected CER : 345,000.
Project summaryProject summary
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Tan Tan 10 MW wind farmTan Tan 10 MW wind farm
• Technical features :
– Installed capacity : 10.2 MW using the wind power technology;
– Expected production : 42.3 GWh per year;
– Components : 12 horizontal axis wind turbines of 850 kW each, electronic
devices for regulation and protection, LV/MV transformers, to supply the
national grid at 22 kV.
• Financial issues :
– Total cost of the project : US $ 10 million.
• Timing :
– Starting of works : 2005 ;
– Operation : 2007.
Project descriptionProject description
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Small scale wind farm projectsSmall scale wind farm projects
• Methodology :
– Described in paragraph 29 of Appendix B of the simplified M&P.
• Approach :
– Demonstrate that the project is not BAU;
– Determine the most likely scenario in absence of the project;
– Determine the avoided emissions by calculating the Combined Operating
Margin with recent additions weighted CEF of the national power plants ;
• Calculations :
– Through the crediting period, the CEF moves down from 0.896 (OM) to
0.836 (RA);
Baseline methodologyBaseline methodology
Other projectsHydropower station
Photovoltaic kits
Other projectsHydropower station
Photovoltaic kits
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Tanafnit hydropower stationTanafnit hydropower station
• Full name : Tanafnit / El Borj 41 MW hydropower station;
• Location : At Tanafit, 40 km to the north-east of Khenifra city;
• Category : Renewable energy – Grid connected power generation;
• Project promoter : Office National d’Electricité (ONE), public office;
• Project status : PIN approved;
• Date of operation : 2007;
• First year of CER delivery : 2007;
• Crediting period : 2007-2016;
• Expected CER : 1.6 million.
Project summaryProject summary
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Tanafnit hydropower stationTanafnit hydropower station
• Technical features :
– Installed power : 41.4 MW;
– Expected production : 206 GWh per year;
– Components : Derivation from dam through a 3 m diameter pipe over 3 km
to Tanafit hydropower station and through a 3.5 m diameter pipe over 10.6
km to El Borj hydropower station.
• Financial issues :
– Total cost of the project : US $ 102.5 million
• Timing :
– Starting of works : end of 2004;
– Operation : 2007.
Project descriptionProject description
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Tanafnit hydropower stationTanafnit hydropower station
• Methodology :
– Projected Operating Margin (as in the wind farm projects).
– New consolidated methodology ACM0002 will be used in new PDD version.
• Approach :
– Demonstrate that the project is not BAU;
– Determine the most likely scenario in absence of the project;
– Determine the avoided emissions by calculating the Projected Operating
Margin with weighted CEF of the national power plants;
• Calculations :
– Through the crediting period, the weighted CEF moves down from 0.809
(2007) up to 0.729 (2009) and then increases to 0.782 (2016);
Baseline methodologyBaseline methodology
Photovoltaic kits in rural areasPhotovoltaic kits in rural areas
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
• Full name : Electricity supply of 105,000 rural houses by photovoltaic kits;
• Location : Around 50 different rural regions in Morocco;
• Category : 1-A : Electrical energy production by the user with no connection to the national grid;
• Project promoter : ONE – public agency;
• Project status : PIN approved – PDD on progress;• Date of operation :
– Phase 1 : 16.000 kits (2.000 in 2003 – 5.000 in 2004 – 7.000 in 2005 – 2.000 in 2006);
– Phase 2 : 12.000 kits (6.000 in 2005 – 6.000 in 2006);
– Phase 3 : 37.000 kits (10.000 in 2005 – 14.000 in 2006 – 13.000 in 2007);
– Phase 4 : 40.000 kits (10.000 per year, from 2006 to 2009).
• First year of CER delivery : 2007;
• Crediting period : 2007-2016;
• Expected CER : 268,000.
Project summaryProject summary
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Photovoltaic kits in rural areasPhotovoltaic kits in rural areas
• Technical features :
– Installed capacity : 14 MW using the solar power technology;
– Expected production : 30.7 GWh per year;
– Components : 105,000 photovoltaic kits of 133 W, operating 6 hrs/d, with
domestic circuits supplying 4 lamps and a plug.
• Financial issues :
– Total cost of the project : US $ 180 million.
• Timing :
– Starting of works : 2003 ;
– Operation : 2006 (phase 1 & 2) – 2007 (phase 3) – 2009 (phase 4).
Project descriptionProject description
The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004
Photovoltaic kits in rural areasPhotovoltaic kits in rural areas
• Methodology :
– Described in paragraphs 4 & 6 of Appendix B of the simplified M&P.
• Approach :
– Demonstrate that the project is not BAU;
– The scenario in absence of the project is Diesel generation units;
– Determine the avoided emissions by calculating the Combined Operating
Margin with recent additions weighted CEF of the national power plants ;
• Calculations :
– Through the crediting period, the CEF moves down from 0.896 (OM) to
0.836 (RA);
Baseline methodologyBaseline methodology
For more informations :
Permanent Secretariat of CDM National Council
Climate Change Unit
Directorate of Partnership, Communication and Cooperation
Ministry of Land-Use Management, Water and the Environment
36 Avenue Al Abtal –Rabat –Morocco
Tel/Fax : +212 37 68 17 59 Tel/Fax : +212 37 77 47 88
www.mdpmaroc.com