King George's Park Plans
Transcript of King George's Park Plans
-
Book of PlansDoc Ref: 2.11 King Georges ParkAPFP Regulations 2009: Regulation 5(2)(k), (o)
Box 61 Folder C January 2013
King
Geo
rge
s Par
k
Thames Tideway Tunnel Thames Water Utilities Limited
Application for Development ConsentApplication Reference Number: WWO10001
Hard copy available in
-
This page is intentionally left blank
-
Application for Development Consent: Book of Plans
List of Volumes
Box Volume Section Location Drawing type or site location 1 Project-wide drawings Works plan and sections
1 2 Project-wide drawings Land acquisition plans
3 Project-wide drawings Land plans
4 Project-wide drawings Crown and special category land plans
5 Site drawings Acton Storm Tanks
6 Site drawings Hammersmith Pumping Station 2 7 Site drawings Barn Elms
61 8 Site drawings Putney Embankment Foreshore 9 Site drawings Carnwath Road Riverside
10 Site drawings Dormay Street
11 Site drawings King Georges Park 3 12 Site drawings Falconbrook Pumping Station
13 Site drawings Cremorne Wharf Depot
14 Site drawings Chelsea Embankment Foreshore
15 Site drawings Kirtling Street
16 Site drawings Heathwall Pumping Station 4 17 Site drawings Albert Embankment Foreshore
18 Site drawings Victoria Embankment Foreshore
19 Site drawings Blackfriars Bridge Foreshore
20 Site drawings Shad Thames Pumping Station 5 21 Site drawings Chambers Wharf
62 22 Site drawings Earl Pumping Station
23 Site drawings Deptford Church Street
24 Site drawings Greenwich Pumping Station
25 Site drawings King Edward Memorial Park Foreshore 6 26 Site drawings Bekesbourne Street
27 Site drawings Abbey Mils Pumping Station
28 Site drawings Beckton Sewage Treatment Works.
29 Project-wide drawings Ventilation columns
This volume is Volume 3
-
Volume 3
List of contents Drawing Title Sheet No. Drawing number
Section 11: King Georges Park Location plan DCO-PP-09X-KNGGP-110001
As existing landscape plan DCO-PP-09X-KNGGP-110002
Access plan DCO-PP-09X-KNGGP-110003
Demolition and site clearance DCO-PP-09X-KNGGP-110004
Site works parameter plan DCO-PP-09X-KNGGP-110005
Site works parameter key plan DCO-PP-09X-KNGGP-110006
Permanent works layout DCO-PP-09X-KNGGP-110007
Proposed site features plan DCO-PP-09X-KNGGP-110008
Proposed landscape plan DCO-PP-09X-KNGGP-110009
Section AA DCO-PP-09X-KNGGP-110010
As existing and proposed west elevation DCO-PP-09X-KNGGP-110011
As existing and proposed south elevation DCO-PP-09X-KNGGP-110012
Kiosk design intent DCO-PP-09X-KNGGP-110013
Construction phases - phase 1 Site setup and shaft construction DCO-PP-09X-KNGGP-110014
Construction phases - phase 2 Construction of other structures DCO-PP-09X-KNGGP-110015
Highway layout during construction (Area 1 work)* DCO-PP-09X-KNGGP-110018
Permanent highway layout - Area 1 work* DCO-PP-09X-KNGGP-110019
* Schedules of associated highway works are located in the Transport Assessment
-
East Putney
Wandsworth Town
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Buckhold R
oad
Wands
worth H
igh Stre
et
Bro
om
hill R
oad
Merto
n R
oad
Neville Gill C
lose
EAST PUTNEY
Wandsworth
London Borough of
River Wandle
Park
King Georges
connection tunnel
Frogmore
connection tunnel
Frogmore
Dormay Street
King Georges Park
Key:
Tunnel
Shaft
Order limits
Notes:
within limits of deviation.
1. The alignment of the tunnels are illustrative
Local authority boundary
London Borough of Wandsworth
King Georges Park
FOR INFORMATION
Location plan
DCO-PP-09X-KNGGP-110001
January 2013
0100m 100m
1:5000 if reproduced at A3
Scale 1:2500 at A1
This drawing
Book of plans - section 11
-
104.0
3
104.0
6
Zoo
El Sub Sta
Arndale W
alk
The Business Village
Lake
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Neville Gill C
lose
Buc
khold
Roa
d
Clinic
Albon House
Longcliff H
ouse
Edwyn House
Park View Court
Shopping Centre
Southside
Jessica House
Park
Main
Entrance
Neville Gill Close
Metal railings along
Brick wall below railings
rubbish bin
Park bench and
around tree
Seating
Nursery
Day Centre
+ 105.67m
+ 105.63m
+ 104.58m
+ 104.68m
+ 105.00m
+ 104.50m
+ 105.43m
+ 105.56m
Multistorey car park
Notes:
been used in the preparation of this drawing.
and the topographic survey base, both of which have
to differences between the Ordnance Survey base
and the parameters marked on the drawings are due
2. Any discrepancy between the location of structures
1. All dimensions and levels are approximate.
Pedestrian crossing
Hard
wicks S
quare
Bro
om
hill R
oad
Electrical box
shown beyond extent of survey
Extent of survey. Trees not
New mixed-use development
entrance area
Concrete paving to
Tarmac paths within park
with metal gates
Secondary Park Entrance
gate to Neville Gill CloseApproximate position of access
+ 105.63m
GrassGrass
Black Poplar tree
Sewer to be intercepted
Approximate position of CSO outlet
(LLAU)
Limits of land to be acquired or used
(by others)
Consented development footprint
(shown in metres above tunnel datum)
Existing levels + 105.40m
Key:
(trunk sizes vary)
Existing trees within surveyed area
London Borough of Wandsworth
King Georges Park
FOR INFORMATION
As existing
Landscape plan
DCO-PP-09X-KNGGP-110002
January 2013
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
Book of plans - section 11
culverted River Wandle
discharges below shopping centre into
Frogmore Storm Relief -Buckhold Road
-
TCB
FB
FB
FBs
FB
Zoo
FB
El Sub Sta
Childrens
Lake
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
agreement
here subject to land owner
Route of temporary diversion
permanent access
crossover(s) for site and
stopped up for construction of
Extent of area to be temporarily
to final landscaping design
Approximate route subject
temporarily stopped up
Area of highway to be
permissive right of way
Provision of permanent
Key:
or used (LLAU)
Limits of land to be acquired
Existing permissive right of way
of right of way
Route of temporary diversion
temporarily stopped up
Existing right of way
(phase 1 construction only)
Route of temporary diversion
(phase 2 construction only)
Route of temporary diversion
permanently stopped up
Existing right of way
access would be located
Highway frontage within which
of the development.
the length of frontage to enable construction
would be moved from time to time within
The point of the construction site access3.
relevant to the project.
are not shown where they cease to be
are shown. The full extents of rights of way
Only rights of way in or close to worksites2.
highway works).
erection, minor utility diversions and minor
diversions of limited duration (eg hoarding
This plan does not show stopping up and1.
Notes:
Square
Hard
wicks
Buckhold Roa
d
Neville Gill C
lose
Bro
om
hill R
oad
(see note 3)
within this length of highway frontage
Construction access would be located
(precise location to be confirmed)
within this length of highway frontage
Permanent access would be located
(phase 2 construction onwards)
Permanently stopped up
London Borough of Wandsworth
King Georges Park
FOR APPROVAL
Access plan
DCO-PP-09X-KNGGP-110003
January 2013
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
Book of plans - section 11
-
Chamber size
not visible
104.0
3
104.0
6
M U L T I - S
T O R E Y C
A R P
A R K
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Key:
or used (LLAU)
Limits of land to be acquired
Trees to be removed
Trees to be pruned
to be removed
Above ground structures
relocated or reinstated
Structure to be removed and
to be relocated
Power meter cabinet
in park if practicable
Railings to be reused elsewhere
Notes:
1.Minor items to be removed (e.g. barriers,
bollards etc.) are not shown.
2.General activities of site clearance such as
removal of hardstanding and foundations,
stripping of topsoil and clearance of minor
vegetation not shown.
later relocation
to be stored for
Bench and litter bin
relocated post construction
Gate to be stored and
post construction
Railings to be reinstated
Buc
khold
Roa
d
Neville Gill C
lose
London Borough of Wandsworth
King Georges Park
FOR APPROVAL
Demolition and site clearance
DCO-PP-09X-KNGGP-110004
January 2013
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
Book of plans - section 11
-
The Business Village
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
would be located
Zone within which Work No. 9a
Table 1
the interception chamber
Ventilation column(s) serving
the shaft
Ventilation column(s) serving
electrical and control kiosk(s)
Integrated ventilation and
Above ground permanent structure
6.0m
8.0m (4.0m)
3.0m
(Minimum heights are in brackets where applicable)
Maximum height above finished ground level
Key:
or used (LLAU)
Limits of land to be acquired
would be located
Zone within which the shaft
landscaping would be located
Zone within which required
site structures would be located
Zone within which all permanent
located (those listed in Table 1)
above ground structures would be
Zone within which permanent
to be acquired or used.
provided they are located within the Limits of land
works may be located within or outside this zone
under-reaming. Shaft construction temporary
construction tolerances) and if applicable
walls (including appropriate allowances for
would include all permanent works including shaft
The zone within which the shaft would be located3.
each zone independently.
2. The Site Works Parameter Key Plan identifies
All dimensions and levels are approximate.1.
Notes:serving the shaft would be located
Zone within which ventilation column(s)
serving the interception chamber would be located
and ventilation kiosk(s) and the ventilation column(s)
Zone within which the intergrated electrical and control
Buck
hold R
oad
Neville Gill C
lose
to be realigned
Highway worksite. Kerb
London Borough of Wandsworth
King Georges Park
FOR APPROVAL
Site works parameter plan
DCO-PP-09X-KNGGP-110005
January 2013
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
Book of plans - section 11
-
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
would be located
Zone within which Work No. 9a
would be located
column(s) serving the shaft
Zone within which ventilationchamber would be located
ventilation column(s) serving the interception
and control and ventilation kiosk(s) and the
Zone within which the intergrated electrical
Key:
would be located
Zone within which the shaft
landscaping would be located
Zone within which required
site structures would be located
Zone within which all permanent
or used (LLAU)
Limits of land to be acquired
Buc
khold
Roa
dBuc
khold
Roa
d
Buc
khold
Roa
d
Buc
khold
Roa
d
Buc
khold
Roa
d
Neville Gill C
lose
Neville Gill C
lose
Neville Gill C
lose
Neville Gill C
lose
Neville Gill C
lose
located
above ground structures would be
Zone within which permanent
to be acquired or used.
provided they are located within the Limits of land
works may be located within or outside this zone
under-reaming. Shaft construction temporary
construction tolerances) and if applicable
walls (including appropriate allowances for
would include all permanent works including shaft
The zone within which the shaft would be located3.
to those shown on the Site works parameter plans.
each zone independently. The zones are identical
The Site Works Parameter Key Plan identifies2.
All dimensions and levels are approximate. 1.
Notes:
London Borough of Wandsworth
King Georges Park
FOR INFORMATION
Site works parameter key plan
DCO-PP-09X-KNGGP-110006
January 2013
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
Book of plans - section 11
-
M U L T I - S
T O R E Y C
A R P
A R K
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Valve chamber
Ventilation duct
105.50
Air treatment chamber
Access for maintenance vehicles
column, 6m high
0.225m internal dia ventilation
4m minimum to 8m maximum height
0.7m internal dia ventilation column,
would be located
Zone within which the shaft
Proposed access cover
Key:
or used (LLAU)
Limits of land to be acquired
Existing sewers
104.50above tunnel datum)
Proposed level (shown in metres
site structures would be located
Zone within which all permanent
be located
above ground structures would
Zone within which permanent
Buckhold Road CSO
Storm Relief,
Existing Frogmore
Connection culvert
chamber
Interception
105.60
105.90
chamber would be located
serving the interception
and ventilation column
Zone within which kiosk
connection tunnel
2.6m up to 3m internal dia
Work No. 7.
Existing ground level+ 104.10
+ 105.65
+ 105.50
+ 104.58
+ 104.74
+ 104.90
104.70
Raised timber seating
104.75
shaft would be located
column serving the CSO drop
Zone within which ventilation
8.5m x 3m x 3m high
and ventilation structure
Intergrated electrical and control kiosk
Buck
hold R
oad
Neville Gill C
lose
risk mitigation
ground levels for flood
Re-contouring of existing
Area of hardstanding
+ 105.51
with local authority (see note 5)
Advanced planting to be agreed
additional tree would be planted in this location.
or the existing tree will be retained and no
advance of these works due to poor health,
been removed by LB of Wandsworth in
it is understood that either the tree will have
planted tree coincides with an existing tree,
Where the location of a proposed advance5.
and/or Proposed site features plan.
are shown on the Proposed landscape plan
only. Landscaping hard works and soft works
This drawing shows permanent site structures3.
in the preparation of this drawing.
survey base, both of which have been used
Ordnance Survey base and topographical
drawings are due to differences between the
structures and the parameters marked on the
Any discrepancy between the location of2.
All dimensions and levels are approximate.1.
Notes:
would be located
Work No. 9a
Zone within which(9.0m internal dia)
CSO drop shaft
Work No. 9a.
London Borough of Wandsworth
King Georges Park
ILLUSTRATIVE
Permanent works layout
DCO-PP-09X-KNGGP-110007
January 2013
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
Book of plans - section 11
-
KIN
G G
EORG
ES PARK, WANDSW
OR
TH
104.0
3
104.0
6
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Lake
Buc
khold
Roa
d
Ventilation column 6m high
4m min. to 8m max. high
Ventilation column
105.60New ramp
be replaced by main entrance gates
Existing gate on this entrance to
Bro
om
hill R
oad
Park View Court
Multistorey car park
Neville Gill C
lose
Edwyn House
Albon House
Nursery
New mixed-use development
Clinic
hardstanding area
Multi-purpose
104.075
104.70
Lake
mitigation
required for flood risk
Sunken garden
over aged existing avenue.
Planted in symetrical avenue to replace
Sargentii Accolade specimen tree.
Advanced planting new trees Prunus
Sewer to be intercepted
and ventilation structure 3m high
Integrated electrical and control kisok
King Georges Park
culverted River Wandle.
discharges below shopping centre into
Frogmore Storm Relief- Buckhold Road
Borough of Wandsworth
3. Landscape proposal to be agreed with London
been used in the preparation of this drawing.
and the topographic survey base, both of which have
to differences between the Ordnance Survey base
and the parameters marked on the drawings are due
2. Any discrepancy between the location of structures
1. All dimensions and levels are approximate.
plan.
are those listed in table 1 of the site works parameter
structures which is illustrative" statement
"save for the layout of the above ground
4.The above ground structures in the
Borough of Wandsworth
3. Landscape proposal to be agreed with London
been used in the preparation of this drawing.
and the topographic survey base, both of which have
to differences between the Ordnance Survey base
and the parameters marked on the drawings are due
2. Any discrepancy between the location of structures
1. All dimensions and levels are approximate.
Notes:
with the local authority (see notes)
Advanced planting by agreement
5.
plan.
are those listed in table 1 of the site works parameter
structures which is illustrative" statement
"save for the layout of the above ground
4.The above ground structures in the
additional tree would be planted in this location.
health, or the existing tree will be retained and no
Wandsworth in advance of these works due to poor
that either the tree will have been removed by LB of
tree coincides with an existing tree, it is understood
Where the location of a proposed advance planted
Proposed trees
Approximate position of CSO outlet
(LLAU)
Limits of land to be acquired or used
(by others)
Consented development footprint
(shown in metres above tunnel datum)
Proposed levels
Thames Water access
105.40
Key:
(trunk sizes vary)
Existing trees within surveyed area
INDICATIVE
London Borough of Wandsworth
King Georges Park
Proposed
Site features plan
DCO-PP-09X-KNGGP-110008
January 2013
Save for layout of above ground structures
which is illustrative
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
Book of plans - section 11
-
KIN
G G
EORG
ES PARK, WANDSW
OR
TH
104.0
3
104.0
6
BUC
KHOLD R
OAD
NE
VIL
LE GIL
L C
LO
SE c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Buc
khold
Roa
d
Neville Gill C
lose
car park
Multistorey
Day Centre
Lake
6m high
Ventilation column
providing vistas over park
New seating area in timber
Re-instate grass
Ramp
+ 104.58m
+ 104.68m
+ 104.74m
+ 105.65m
+ 105.55m
+ 105.52m
+ 105.56m
105.075 105.50
105.90
105.60
105.90
Removable bollards
and perinials
Grass ornamental flowering shrubs
hard landscaping would be removed
landscaping where original park entrance
Existing paving to be replaced with soft
reinforced with additional planting
and Neville Gill Close would be
Park boundary to Buckhold Road
entrance to eastern side of park
New path would connect
here
and rubbish bin relocated
Existing park bench
into layout of the proposed entrance
Retain existing tree and incorporate
adjacent to the boundary fence
Existing electrical kiosk to be relocated
provided by London Borough of Wandsworth
Potential pedestrian crossing to be
Wandsworth
to be relocated by London Borough of
Existing pedestrian crossing potentially
Paving materials
Soft landscaping
Hardstanding
Permeable resin bound gravel
Entrance signage at ground levelNew mixed- use developmentAA
Removable bollards
Perrenial flowering shrubs
Timber seating deck over retaining structure
development proposals oppostie
corner of park to link with new
New park entrance at northern
104.75
104.70
to 8m maximum high
column 4m minimum
Signature ventilation
Multi purpose hardstanding area
cafe/ kiosk
Power and water connection for mobile
Zone within which vent column would be located
King Georges Park
sewer
Frogmore Storm Relief
Centre line of
Park (by agreement)
western entrance to King Georges
installed here at the existing
Gates of original park entrance
Notes:
seating and tree to be retained
Existing memorial bench
be located
interception chamber vent coloumn would
Zone within which integrated kiosk and
Borough of Wandsworth
3. Landscape proposal to be agreed with London
been used in the preparation of this drawing.
and the topographic survey base, both of which have
to differences between the Ordnance Survey base
and the parameters marked on the drawings are due
2. Any discrepancy between the location of structures
1. All dimensions and levels are approximate.
brown roof
ventilation structure 3m high with a planted
Integrated electrical and control kiosk and
5.
plan.
are those listed in table 1 of the site works parameter
structures which is illustrative" statement
"save for the layout of the above ground
4.The above ground structures in the
additional tree would be in this location.
health, or the existing tree will be retained and no
Wandsworth in advance of these works due to poor
that either the tree will have been removed by LB of
tree coincides with an existing tree, it is understood
Where the location of a proposed advance planted
with the local authority (see notes)
Advanced planting in agreement
flood risk mitigation
Sunken garden required for
Proposed trees
(LLAU)
Limits of land to be acquired or used
(by others)
Consented development footprint
ground structures would be located
Zone within which permanent above
(shown in metres above tunnel datum)
Existing levels
(shown in metres above tunnel datum)
Proposed levels
Thames Water access
+ 105.40m
105.40
would be located
Zone within which required landscaping
Key:
(trunk sizes vary)
Existing trees within surveyed area
INDICATIVE
London Borough of Wandsworth
King Georges Park
Proposed
Landscape plan
DCO-PP-09X-KNGGP-110009
January 2013
Save for layout of above ground structures
which is illustrative
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
Book of plans - section 11
-
Arndale W
alk
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
Curved and sloping timber seating/ steps
Buckhold Road
N
Lake
A
A
Ventilation column 6m high
beyond
Interception chamber
to Dormay Street
Connection tunnel
8m maximum high
Ventilation column 4m minimum to
CSO drop shaft
Section AA
with new development proposal
bollards at northern end of park to link
Proposed main entrance with drop down
mitigation
Ground profile lowered for flood risk
Timber deck seating
during construction
Large Poplar tree would be protectedof the below ground infrastructure to be provided.
2. The purpose of this section is to illustrate the scale
1. All dimensions and levels are approximate.
Notes:
during construction
Red oak tree protected
planted brown roof.
and ventilation structure 3m high with
Integrated electrical and control kiosk
London Borough of Wandsworth
King Georges Park
ILLUSTRATIVE
Section AA
DCO-PP-09X-KNGGP-110010
January 2013
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
Book of plans - section 11
-
Def
CR
Arndale W
alk
Boro Const & Ward Bdy
Boro Const & W
ard Bdy
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Existing fencing
Proposed West elevation
West Elevation
Business village Buckhold Road LakeKing Georges Park
New landscaped area within public space
Depth of lake shown notionally
mitigation
Ground profile lowered for flood risk
As existing West elevation
Timber seating
with new development proposal
bollards at northern end of park to link
Proposed main entrance with drop down
to 8m maximum high
Ventilation column 4m minimum
Timber deck seating area
during construction
Large Poplar tree would be protected
Ventilation column 6m high
Notes:
1. All dimensions and levels are approximate.
be protected during construction
Red oak tree would
brown roof
structure 3m high with planted
control kiosk and ventilation
Integrated electrical and
London Borough of Wandsworth
King Georges Park
ILLUSTRATIVE
As existing and proposed
West elevation
DCO-PP-09X-KNGGP-110011
January 2013
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
Book of plans - section 11
-
Arndale W
alk
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
As existing South elevation
South
Elevation
King Georges Park Neville Gill Close Multi-storey car park
N
Main park entrance
shown behind
Ventilation column 6m high
Section cut through car park
Section cut through car park
Area for flood compensation
to 8m maximum high
Ventilation column 4m minimum
Proposed South elevation
New landscape area within public space
Timber deck seatingalign and match existing boundary line.
the existing western entrance. New fencing to
Existing gates to be removed and reinstalled to
kiosk relocated
Existing electrical
Notes:
1. All dimensions and levels are approximate.
Electrical substation
shown dotted
development under construction
Indicative outline of new mixed use
shown dotted
development under construction
Indicative outline of new mixed use
construction
Red oak tree to be protected during
with a planted brown roof
kiosk and ventilation structure 3m high
Integrated electrical and control
London Borough of Wandsworth
King Georges Park
ILLUSTRATIVE
As existing and proposed
South elevation
DCO-PP-09X-KNGGP-110012
January 2013
10m 0 10m
1:400 if reproduced at A3
Scale 1:200 at A1
This drawing
Book of plans - section 11
-
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Roof plan
East elevation
West elevation North elevation
South elevation
Electrical room
Room
MechanicalVentilation room
architectural feature
with grooves and etching for
Fair- faced concrete finish
Planted brown roof
Section AA
for ventilation
Metal grill doors
Plan at ground level
A
A
Gravel edging
Metal grill doors for ventilation
Planted brown roof
architectural feature
with grooves and etching for
Fair-faced concrete finish
Sealed doors
Rainwater downpipe Rainwater downpipe
INDICATIVE
London Borough of Wandsworth
King Georges Park
Kiosk design intent
DCO-PP-09X-KNGGP-110013
January 2013
01m 4m
1:100 if reproduced at A3
Scale 1:50 at A1
This drawing
Book of plans - section 11
-
FB
FB
FBs
FB
Lake
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Offices
Crane
Crane
once the hoarding is erected
footpath is to be maintained
Public access to the lakeside
protection to be provided
extends into the site. Appropriate
The root protection zone of this tree
Kerb to be realigned
aggregate storage area
Concrete batching plant and
Site power structure
Workshop buildings
Storage (open area or containerised)
Shaft
Welfare building
right turn in, left turn out
Construction access,
Security office
and handling area
Excavated material storage
and protected
Tree to be retained
be protected
Shallow sewer to
Key:
Access / haul route
Maximum extent of working area
Site access
Existing sewers
Hoarding
or used (LLAU)
Limits of land to be acquired
Existing permissive right of way
of footway
Route of temporary diversion
Bro
om
hill R
oad
Buckhold Roa
d
Hard
wicks S
quare
Neville Gill C
lose
with local authority (see note 5)
Advanced planting to be agreed
additional tree would be planted in this location.
health, or the existing tree will be retained and no
Wandsworth in advance of these works due to poor
that either the tree will have been removed by LB of
tree coincides with an existing tree, it is understood
5. Where the location of a proposed advance planted
on this drawing.
barriers may be required but is not shown
4. Additional noise mitigation including noise
would be agreed with the relevant utility company.
3. Utility supplies for the construction of the works
arrangements are shown.
appropriate, outline traffic management
appropriate authority for approval. Where
phases of the work would be submitted to the
2. Traffic management plans for construction
submission and approval process.
on layout imposed through the planning
construction methods subject to any controls
construction depending on their preferred
may choose to lay sites out differently during
the principal construction phases. Contractors
prepared to illustrate possible site layouts for
1. These construction phasing plans have been
Notes :
London Borough of Wandsworth
King Georges Park
ILLUSTRATIVE
Construction phases - phase 1
Site setup and shaft construction
DCO-PP-09X-KNGGP-110014
January 2013
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
Book of plans - section 11
-
Chamber size
not visible
104.0
0
104.0
0
104.0
0
104.0
0
104.0
2
104.0
3
104.0
4
104.0
6
104.3
6 104.4
0
104.44
104.47
104.49
104.54
104.5
4
104.58
104.6
7
Stn K8
104.677
104.7
2
104.73
104.7
8104.8
1104.8
1
CL104.951
105.02
105.03
105.18
Stn K9
105.398
105.42
105.4
3
105.43
105.44
105.44
105.45
105.46
Stn K5
105.458
105.48
105.5
1
105.51
Stn K7
105.642
Stn K6
105.660
105.67
105.7
3
105.7
5
105.7
6
FB
FB
FBs
FB
Lake
c Thames Water Utilities Ltd 2008
Keyplan:
Survey licence number 100019345
Database right 2012. All rights reserved. Ordance
Survey on behalf of HMSO. ' Crown Copyright and
Mapping reproduced by permission of Ordnance
N
Location
Document Information
Datum Newlyn.
Tunnel Datum which is 100 metres below Ordnance
OSGB36. All levels are in metres and relate to the
Coordinates are to be Ordance Survey Datum
Application for Development Consent
N
Crane
Offices
protection to be provided.
extends into the site. Appropriate
The root protection zone of this tree
Kerb to be reinstated post construction
Shaft
Site power structure
Workshop buildings
or containerised)
Storage (open area
Welfare building
Security office
right turn in, left turn out
Construction access,
and handling area
Excavated material storage
and protected
Tree to be retained
be protected
Shallow sewer to
Key:
Access / haul route
Maximum extent of working area
Site access
Existing sewers
Hoarding
or used (LLAU)
Limits of land to be acquired
Existing permissive right of way
of footway
Route of temporary diversion
Connection tunnelBro
om
hill R
oad
Buckhold Roa
d
Neville Gill C
lose
Hard
wicks S
quare
with local authority (see note 5)
Advanced planting to be agreed
additional tree would be planted in this location.
health, or the existing tree will be retained and no
Wandsworth in advance of these works due to poor
that either the tree will have been removed by LB of
tree coincides with an existing tree, it is understood
5. Where the location of a proposed advance planted
on this drawing.
barriers may be required but is not shown
4. Additional noise mitigation including noise
would be agreed with the relevant utility company.
3. Utility supplies for the construction of the works
arrangements are shown.
appropriate, outline traffic management
appropriate authority for approval. Where
phases of the work would be submitted to the
2. Traffic management plans for construction
submission and approval process.
on layout imposed through the planning
construction methods subject to any controls
construction depending on their preferred
may choose to lay sites out differently during
the principal construction phases. Contractors
prepared to illustrate possible site layouts for
1. These construction phasing plans have been
Notes :
London Borough of Wandsworth
King Georges Park
ILLUSTRATIVE
Construction phases - phase 2
Construction of other structures
DCO-PP-09X-KNGGP-110015
January 2013
10m 0 40m
1:1000 if reproduced at A3
Scale 1:500 at A1
This drawing
Book of plans - section 11
-
Multistorey Car Park
103
SouthsideShopping Ce
BUCK
HOLD
RO
A
Traders Hall
The Business Village
1 to 8
Works
King George'sPark
20 to 3
0
5.4m
TCB
Works
B
Traders Hall
BUCK
HOLD
ROAD
House
NEVILLE G
ILL CLO
SE
Cockpen
Children's
81
Lake
5.5m
5.7m
DayCentre
Nursery
Zoo
NEVILLE G
ILL CLO
SE
55
Clinic
9 to 20
House
House
1 to 72
El Sub Sta
Sub Sta
Albon1 to 72
Edwyn
El
27
1 to 48
17
1 to
40
FB
231 to 14
Welsbach House
2
6
8
Disabled badge holders
Disabled badge holders
Loading bay
Multistorey Car Park
103
SouthsideShopping Ce
BUCK
HOLD
RO
A
Traders Hall
The Business Village
1 to 8
Works
King George'sPark
20 to 3
0
5.4m
TCB
Works
B
Traders Hall
BUCK
HOLD
ROAD
House
NEVILLE G
ILL CLO
SE
Cockpen
Children's
81Lake
5.5m
5.7m
DayCentre
Nursery
Zoo
NEVILLE G
ILL CLO
SE
55
Clinic
9 to 20
House
House
1 to 72
El Sub Sta
Sub Sta
Albon1 to 72
Edwyn
El
27
1 to 48
17
1 to
40
FB
231 to 14
Welsbach House
2
6
8PWH3X_C02
PWH3X_C01
PWH3X_C03
PWH3X_C04
Highway layout during constructionConstruction base casehighway layout NN
On street parkingDisabled badge holders - At any timeLoading bay - No loading Mon - Sat 7:00am - 7:00pm
Standards
Design Manual For Roads And Bridges, Dft, 1992Traffic Signs Regulations & General Directions, Tso, 2002Traffic Signs Manual, Dft, 2006Manual For Streets, Dft, 2007Manual For Streets 2, Ciht, 2010Designing For Deliveries, Fta, 1998Cycle Infrastructure Design Ltn 2/08, Dft, 2008Design Of Pedestrian Crossings Ltn 2/95, Dft, 1995Guidance For The Use Of Tactile Paving, Dft, 1998Accessible Bus Stop Design Guidance, Tfl, 2006
This drawing
Parking restrictionsOn street parkingBus stop / standPedestrian crossing
RevisedRemoval of footpathsIllustrative on-site manoeuvring zoneSite hoardingSite hutAccess gateVisibility splay - 2.4m x 43m(ssd adjust for bonnet Length)Limit of land to be acquired or used (LLAU)See schedule of worksPWH3X_00
KeyExisting
StagePhase 2
Keyplan:
Mapping reproduced by permission of OrdnanceSurvey on behalf of HMSO. Crown Copyright andDatabase right 2012. All rights reserved. OrdnanceSurvey licence number 100019345
N
Coordinates are to be Ordnance Survey DatumOSGB36. All levels are in metres and relate to theTunnel Datum which is 100 metres below OrdnanceDatum Newlyn.
10m 0 40m
Scale 1:500 at A11:1000 if reproduced at A3
c Thames Water Utilities Ltd 2008
Application for Development Consent
Location
Document Information
DCO-PP-09X-KNGGP-110018
(Area 1 work)Highway layout during construction
ILLUSTRATIVE
King Georges ParkLondon Borough of Wandsworth
January 2013
-
Multistorey Car Park
SouthShopping
BUCK
HOLD
R
Traders Hall1 to 8 King George'sPark
5.4m
TCB
Traders Hall
HARDWIC
urt
BUCK
HOLD
ROAD
NEVILLE G
ILL CLO
SE
Children's
69
Lake
5.5m
5.7m
DayCentre
Nursery
Zoo
NEVILLE G
ILL CLO
SE
55
Clinic
9 to 20
House
House
1 to 72
El Sub Sta
Sub Sta
Albon1 to 72
Edwyn
El
27
1 to 48
17
1 to
40
231 to 14
2
6
8
2422ouse
Disabled badge holders
Disabled badge holders
Loading bay
New residential development
Multistorey Car Park
SouthShopping
BUCK
HOLD
R
Traders Hall1 to 8 King George'sPark
5.4m
TCB
Traders Hall
HARDWIC
urt
BUCK
HOLD
ROAD
NEVILLE G
ILL CLO
SE
Children's
69
Lake
5.5m
5.7m
DayCentre
Nursery
Zoo
NEVILLE G
ILL CLO
SE
55
Clinic
9 to 20
House
House
1 to 72
El Sub Sta
Sub Sta
Albon1 to 72
Edwyn
El
27
1 to 48
17
1 to
40
231 to 14
2
6
8
2422ouse
New residential development
PWH3X_P03PWH3X_P02
PWH3X_P01
PWH3X_P04
Permanent highway layoutConstruction base casehighway layout
NN
This drawing
On street parkingDisabled badge holders - At any timeLoading bay - No loading Mon - Sat 7:00am - 7:00pm
Standards
Design Manual For Roads And Bridges, Dft, 1992Traffic Signs Regulations & General Directions, Tso, 2002Traffic Signs Manual, Dft, 2006Manual For Streets, Dft, 2007Manual For Streets 2, Ciht, 2010Designing For Deliveries, Fta, 1998Cycle Infrastructure Design Ltn 2/08, Dft, 2008Design Of Pedestrian Crossings Ltn 2/95, Dft, 1995Guidance For The Use Of Tactile Paving, Dft, 1998Accessible Bus Stop Design Guidance, Tfl, 2006
RevisedIllustrative on-site manoeuvring zoneReinstated footwaySee schedule of works
Parking restrictionsOn street parkingBus stop / standPedestrian crossing
PWH3X_P00
KeyExisting
StagePermanent phase
Keyplan:
Mapping reproduced by permission of OrdnanceSurvey on behalf of HMSO. Crown Copyright andDatabase right 2012. All rights reserved. OrdnanceSurvey licence number 100019345
N
Coordinates are to be Ordnance Survey DatumOSGB36. All levels are in metres and relate to theTunnel Datum which is 100 metres below OrdnanceDatum Newlyn.
10m 0 40m
Scale 1:500 at A11:1000 if reproduced at A3
c Thames Water Utilities Ltd 2008
Application for Development Consent
Location
Document Information
DCO-PP-09X-KNGGP-110019
Area 1 workPermanent highway layout
ILLUSTRATIVE
King Georges ParkLondon Borough of Wandsworth
January 2013
-
Copyright notice Copyright Thames Water Utilities Limited January 2013. All rights reserved. Any plans, drawings, designs and materials (materials) submitted by Thames Water Utilities Limited (Thames Water) as part of this application for Development Consent to the Planning Inspectorate are protected by copyright. You may only use this material (including making copies of it) in order to (a) inspect those plans, drawings, designs and materials at a more convenient time or place; or (b) to facilitate the exercise of a right to participate in the pre-examination or examination stages of the application which is available under the Planning Act 2008 and related regulations. Use for any other purpose is prohibited and further copies must not be made without the prior written consent of Thames Water. Thames Water Utilities LimitedClearwater Court, Vastern Road, Reading RG1 8DB The Thames Water logo and Thames Tideway Tunnel logo are Thames Water Utilities Limited. All rights reserved. DCO-DT-000-ZZZZZ-021100