King George's Park Plans

22
Book of Plans Doc Ref: 2.11 King George’s Park APFP Regulations 2009: Regulation 5(2)(k), (o) Box 61 Folder C January 2013 Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Hard copy available in

Transcript of King George's Park Plans

  • Book of PlansDoc Ref: 2.11 King Georges ParkAPFP Regulations 2009: Regulation 5(2)(k), (o)

    Box 61 Folder C January 2013

    King

    Geo

    rge

    s Par

    k

    Thames Tideway Tunnel Thames Water Utilities Limited

    Application for Development ConsentApplication Reference Number: WWO10001

    Hard copy available in

  • This page is intentionally left blank

  • Application for Development Consent: Book of Plans

    List of Volumes

    Box Volume Section Location Drawing type or site location 1 Project-wide drawings Works plan and sections

    1 2 Project-wide drawings Land acquisition plans

    3 Project-wide drawings Land plans

    4 Project-wide drawings Crown and special category land plans

    5 Site drawings Acton Storm Tanks

    6 Site drawings Hammersmith Pumping Station 2 7 Site drawings Barn Elms

    61 8 Site drawings Putney Embankment Foreshore 9 Site drawings Carnwath Road Riverside

    10 Site drawings Dormay Street

    11 Site drawings King Georges Park 3 12 Site drawings Falconbrook Pumping Station

    13 Site drawings Cremorne Wharf Depot

    14 Site drawings Chelsea Embankment Foreshore

    15 Site drawings Kirtling Street

    16 Site drawings Heathwall Pumping Station 4 17 Site drawings Albert Embankment Foreshore

    18 Site drawings Victoria Embankment Foreshore

    19 Site drawings Blackfriars Bridge Foreshore

    20 Site drawings Shad Thames Pumping Station 5 21 Site drawings Chambers Wharf

    62 22 Site drawings Earl Pumping Station

    23 Site drawings Deptford Church Street

    24 Site drawings Greenwich Pumping Station

    25 Site drawings King Edward Memorial Park Foreshore 6 26 Site drawings Bekesbourne Street

    27 Site drawings Abbey Mils Pumping Station

    28 Site drawings Beckton Sewage Treatment Works.

    29 Project-wide drawings Ventilation columns

    This volume is Volume 3

  • Volume 3

    List of contents Drawing Title Sheet No. Drawing number

    Section 11: King Georges Park Location plan DCO-PP-09X-KNGGP-110001

    As existing landscape plan DCO-PP-09X-KNGGP-110002

    Access plan DCO-PP-09X-KNGGP-110003

    Demolition and site clearance DCO-PP-09X-KNGGP-110004

    Site works parameter plan DCO-PP-09X-KNGGP-110005

    Site works parameter key plan DCO-PP-09X-KNGGP-110006

    Permanent works layout DCO-PP-09X-KNGGP-110007

    Proposed site features plan DCO-PP-09X-KNGGP-110008

    Proposed landscape plan DCO-PP-09X-KNGGP-110009

    Section AA DCO-PP-09X-KNGGP-110010

    As existing and proposed west elevation DCO-PP-09X-KNGGP-110011

    As existing and proposed south elevation DCO-PP-09X-KNGGP-110012

    Kiosk design intent DCO-PP-09X-KNGGP-110013

    Construction phases - phase 1 Site setup and shaft construction DCO-PP-09X-KNGGP-110014

    Construction phases - phase 2 Construction of other structures DCO-PP-09X-KNGGP-110015

    Highway layout during construction (Area 1 work)* DCO-PP-09X-KNGGP-110018

    Permanent highway layout - Area 1 work* DCO-PP-09X-KNGGP-110019

    * Schedules of associated highway works are located in the Transport Assessment

  • East Putney

    Wandsworth Town

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Buckhold R

    oad

    Wands

    worth H

    igh Stre

    et

    Bro

    om

    hill R

    oad

    Merto

    n R

    oad

    Neville Gill C

    lose

    EAST PUTNEY

    Wandsworth

    London Borough of

    River Wandle

    Park

    King Georges

    connection tunnel

    Frogmore

    connection tunnel

    Frogmore

    Dormay Street

    King Georges Park

    Key:

    Tunnel

    Shaft

    Order limits

    Notes:

    within limits of deviation.

    1. The alignment of the tunnels are illustrative

    Local authority boundary

    London Borough of Wandsworth

    King Georges Park

    FOR INFORMATION

    Location plan

    DCO-PP-09X-KNGGP-110001

    January 2013

    0100m 100m

    1:5000 if reproduced at A3

    Scale 1:2500 at A1

    This drawing

    Book of plans - section 11

  • 104.0

    3

    104.0

    6

    Zoo

    El Sub Sta

    Arndale W

    alk

    The Business Village

    Lake

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Neville Gill C

    lose

    Buc

    khold

    Roa

    d

    Clinic

    Albon House

    Longcliff H

    ouse

    Edwyn House

    Park View Court

    Shopping Centre

    Southside

    Jessica House

    Park

    Main

    Entrance

    Neville Gill Close

    Metal railings along

    Brick wall below railings

    rubbish bin

    Park bench and

    around tree

    Seating

    Nursery

    Day Centre

    + 105.67m

    + 105.63m

    + 104.58m

    + 104.68m

    + 105.00m

    + 104.50m

    + 105.43m

    + 105.56m

    Multistorey car park

    Notes:

    been used in the preparation of this drawing.

    and the topographic survey base, both of which have

    to differences between the Ordnance Survey base

    and the parameters marked on the drawings are due

    2. Any discrepancy between the location of structures

    1. All dimensions and levels are approximate.

    Pedestrian crossing

    Hard

    wicks S

    quare

    Bro

    om

    hill R

    oad

    Electrical box

    shown beyond extent of survey

    Extent of survey. Trees not

    New mixed-use development

    entrance area

    Concrete paving to

    Tarmac paths within park

    with metal gates

    Secondary Park Entrance

    gate to Neville Gill CloseApproximate position of access

    + 105.63m

    GrassGrass

    Black Poplar tree

    Sewer to be intercepted

    Approximate position of CSO outlet

    (LLAU)

    Limits of land to be acquired or used

    (by others)

    Consented development footprint

    (shown in metres above tunnel datum)

    Existing levels + 105.40m

    Key:

    (trunk sizes vary)

    Existing trees within surveyed area

    London Borough of Wandsworth

    King Georges Park

    FOR INFORMATION

    As existing

    Landscape plan

    DCO-PP-09X-KNGGP-110002

    January 2013

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    Book of plans - section 11

    culverted River Wandle

    discharges below shopping centre into

    Frogmore Storm Relief -Buckhold Road

  • TCB

    FB

    FB

    FBs

    FB

    Zoo

    FB

    El Sub Sta

    Childrens

    Lake

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    agreement

    here subject to land owner

    Route of temporary diversion

    permanent access

    crossover(s) for site and

    stopped up for construction of

    Extent of area to be temporarily

    to final landscaping design

    Approximate route subject

    temporarily stopped up

    Area of highway to be

    permissive right of way

    Provision of permanent

    Key:

    or used (LLAU)

    Limits of land to be acquired

    Existing permissive right of way

    of right of way

    Route of temporary diversion

    temporarily stopped up

    Existing right of way

    (phase 1 construction only)

    Route of temporary diversion

    (phase 2 construction only)

    Route of temporary diversion

    permanently stopped up

    Existing right of way

    access would be located

    Highway frontage within which

    of the development.

    the length of frontage to enable construction

    would be moved from time to time within

    The point of the construction site access3.

    relevant to the project.

    are not shown where they cease to be

    are shown. The full extents of rights of way

    Only rights of way in or close to worksites2.

    highway works).

    erection, minor utility diversions and minor

    diversions of limited duration (eg hoarding

    This plan does not show stopping up and1.

    Notes:

    Square

    Hard

    wicks

    Buckhold Roa

    d

    Neville Gill C

    lose

    Bro

    om

    hill R

    oad

    (see note 3)

    within this length of highway frontage

    Construction access would be located

    (precise location to be confirmed)

    within this length of highway frontage

    Permanent access would be located

    (phase 2 construction onwards)

    Permanently stopped up

    London Borough of Wandsworth

    King Georges Park

    FOR APPROVAL

    Access plan

    DCO-PP-09X-KNGGP-110003

    January 2013

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    Book of plans - section 11

  • Chamber size

    not visible

    104.0

    3

    104.0

    6

    M U L T I - S

    T O R E Y C

    A R P

    A R K

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Key:

    or used (LLAU)

    Limits of land to be acquired

    Trees to be removed

    Trees to be pruned

    to be removed

    Above ground structures

    relocated or reinstated

    Structure to be removed and

    to be relocated

    Power meter cabinet

    in park if practicable

    Railings to be reused elsewhere

    Notes:

    1.Minor items to be removed (e.g. barriers,

    bollards etc.) are not shown.

    2.General activities of site clearance such as

    removal of hardstanding and foundations,

    stripping of topsoil and clearance of minor

    vegetation not shown.

    later relocation

    to be stored for

    Bench and litter bin

    relocated post construction

    Gate to be stored and

    post construction

    Railings to be reinstated

    Buc

    khold

    Roa

    d

    Neville Gill C

    lose

    London Borough of Wandsworth

    King Georges Park

    FOR APPROVAL

    Demolition and site clearance

    DCO-PP-09X-KNGGP-110004

    January 2013

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    Book of plans - section 11

  • The Business Village

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    would be located

    Zone within which Work No. 9a

    Table 1

    the interception chamber

    Ventilation column(s) serving

    the shaft

    Ventilation column(s) serving

    electrical and control kiosk(s)

    Integrated ventilation and

    Above ground permanent structure

    6.0m

    8.0m (4.0m)

    3.0m

    (Minimum heights are in brackets where applicable)

    Maximum height above finished ground level

    Key:

    or used (LLAU)

    Limits of land to be acquired

    would be located

    Zone within which the shaft

    landscaping would be located

    Zone within which required

    site structures would be located

    Zone within which all permanent

    located (those listed in Table 1)

    above ground structures would be

    Zone within which permanent

    to be acquired or used.

    provided they are located within the Limits of land

    works may be located within or outside this zone

    under-reaming. Shaft construction temporary

    construction tolerances) and if applicable

    walls (including appropriate allowances for

    would include all permanent works including shaft

    The zone within which the shaft would be located3.

    each zone independently.

    2. The Site Works Parameter Key Plan identifies

    All dimensions and levels are approximate.1.

    Notes:serving the shaft would be located

    Zone within which ventilation column(s)

    serving the interception chamber would be located

    and ventilation kiosk(s) and the ventilation column(s)

    Zone within which the intergrated electrical and control

    Buck

    hold R

    oad

    Neville Gill C

    lose

    to be realigned

    Highway worksite. Kerb

    London Borough of Wandsworth

    King Georges Park

    FOR APPROVAL

    Site works parameter plan

    DCO-PP-09X-KNGGP-110005

    January 2013

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    Book of plans - section 11

  • c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    would be located

    Zone within which Work No. 9a

    would be located

    column(s) serving the shaft

    Zone within which ventilationchamber would be located

    ventilation column(s) serving the interception

    and control and ventilation kiosk(s) and the

    Zone within which the intergrated electrical

    Key:

    would be located

    Zone within which the shaft

    landscaping would be located

    Zone within which required

    site structures would be located

    Zone within which all permanent

    or used (LLAU)

    Limits of land to be acquired

    Buc

    khold

    Roa

    dBuc

    khold

    Roa

    d

    Buc

    khold

    Roa

    d

    Buc

    khold

    Roa

    d

    Buc

    khold

    Roa

    d

    Neville Gill C

    lose

    Neville Gill C

    lose

    Neville Gill C

    lose

    Neville Gill C

    lose

    Neville Gill C

    lose

    located

    above ground structures would be

    Zone within which permanent

    to be acquired or used.

    provided they are located within the Limits of land

    works may be located within or outside this zone

    under-reaming. Shaft construction temporary

    construction tolerances) and if applicable

    walls (including appropriate allowances for

    would include all permanent works including shaft

    The zone within which the shaft would be located3.

    to those shown on the Site works parameter plans.

    each zone independently. The zones are identical

    The Site Works Parameter Key Plan identifies2.

    All dimensions and levels are approximate. 1.

    Notes:

    London Borough of Wandsworth

    King Georges Park

    FOR INFORMATION

    Site works parameter key plan

    DCO-PP-09X-KNGGP-110006

    January 2013

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    Book of plans - section 11

  • M U L T I - S

    T O R E Y C

    A R P

    A R K

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Valve chamber

    Ventilation duct

    105.50

    Air treatment chamber

    Access for maintenance vehicles

    column, 6m high

    0.225m internal dia ventilation

    4m minimum to 8m maximum height

    0.7m internal dia ventilation column,

    would be located

    Zone within which the shaft

    Proposed access cover

    Key:

    or used (LLAU)

    Limits of land to be acquired

    Existing sewers

    104.50above tunnel datum)

    Proposed level (shown in metres

    site structures would be located

    Zone within which all permanent

    be located

    above ground structures would

    Zone within which permanent

    Buckhold Road CSO

    Storm Relief,

    Existing Frogmore

    Connection culvert

    chamber

    Interception

    105.60

    105.90

    chamber would be located

    serving the interception

    and ventilation column

    Zone within which kiosk

    connection tunnel

    2.6m up to 3m internal dia

    Work No. 7.

    Existing ground level+ 104.10

    + 105.65

    + 105.50

    + 104.58

    + 104.74

    + 104.90

    104.70

    Raised timber seating

    104.75

    shaft would be located

    column serving the CSO drop

    Zone within which ventilation

    8.5m x 3m x 3m high

    and ventilation structure

    Intergrated electrical and control kiosk

    Buck

    hold R

    oad

    Neville Gill C

    lose

    risk mitigation

    ground levels for flood

    Re-contouring of existing

    Area of hardstanding

    + 105.51

    with local authority (see note 5)

    Advanced planting to be agreed

    additional tree would be planted in this location.

    or the existing tree will be retained and no

    advance of these works due to poor health,

    been removed by LB of Wandsworth in

    it is understood that either the tree will have

    planted tree coincides with an existing tree,

    Where the location of a proposed advance5.

    and/or Proposed site features plan.

    are shown on the Proposed landscape plan

    only. Landscaping hard works and soft works

    This drawing shows permanent site structures3.

    in the preparation of this drawing.

    survey base, both of which have been used

    Ordnance Survey base and topographical

    drawings are due to differences between the

    structures and the parameters marked on the

    Any discrepancy between the location of2.

    All dimensions and levels are approximate.1.

    Notes:

    would be located

    Work No. 9a

    Zone within which(9.0m internal dia)

    CSO drop shaft

    Work No. 9a.

    London Borough of Wandsworth

    King Georges Park

    ILLUSTRATIVE

    Permanent works layout

    DCO-PP-09X-KNGGP-110007

    January 2013

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    Book of plans - section 11

  • KIN

    G G

    EORG

    ES PARK, WANDSW

    OR

    TH

    104.0

    3

    104.0

    6

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Lake

    Buc

    khold

    Roa

    d

    Ventilation column 6m high

    4m min. to 8m max. high

    Ventilation column

    105.60New ramp

    be replaced by main entrance gates

    Existing gate on this entrance to

    Bro

    om

    hill R

    oad

    Park View Court

    Multistorey car park

    Neville Gill C

    lose

    Edwyn House

    Albon House

    Nursery

    New mixed-use development

    Clinic

    hardstanding area

    Multi-purpose

    104.075

    104.70

    Lake

    mitigation

    required for flood risk

    Sunken garden

    over aged existing avenue.

    Planted in symetrical avenue to replace

    Sargentii Accolade specimen tree.

    Advanced planting new trees Prunus

    Sewer to be intercepted

    and ventilation structure 3m high

    Integrated electrical and control kisok

    King Georges Park

    culverted River Wandle.

    discharges below shopping centre into

    Frogmore Storm Relief- Buckhold Road

    Borough of Wandsworth

    3. Landscape proposal to be agreed with London

    been used in the preparation of this drawing.

    and the topographic survey base, both of which have

    to differences between the Ordnance Survey base

    and the parameters marked on the drawings are due

    2. Any discrepancy between the location of structures

    1. All dimensions and levels are approximate.

    plan.

    are those listed in table 1 of the site works parameter

    structures which is illustrative" statement

    "save for the layout of the above ground

    4.The above ground structures in the

    Borough of Wandsworth

    3. Landscape proposal to be agreed with London

    been used in the preparation of this drawing.

    and the topographic survey base, both of which have

    to differences between the Ordnance Survey base

    and the parameters marked on the drawings are due

    2. Any discrepancy between the location of structures

    1. All dimensions and levels are approximate.

    Notes:

    with the local authority (see notes)

    Advanced planting by agreement

    5.

    plan.

    are those listed in table 1 of the site works parameter

    structures which is illustrative" statement

    "save for the layout of the above ground

    4.The above ground structures in the

    additional tree would be planted in this location.

    health, or the existing tree will be retained and no

    Wandsworth in advance of these works due to poor

    that either the tree will have been removed by LB of

    tree coincides with an existing tree, it is understood

    Where the location of a proposed advance planted

    Proposed trees

    Approximate position of CSO outlet

    (LLAU)

    Limits of land to be acquired or used

    (by others)

    Consented development footprint

    (shown in metres above tunnel datum)

    Proposed levels

    Thames Water access

    105.40

    Key:

    (trunk sizes vary)

    Existing trees within surveyed area

    INDICATIVE

    London Borough of Wandsworth

    King Georges Park

    Proposed

    Site features plan

    DCO-PP-09X-KNGGP-110008

    January 2013

    Save for layout of above ground structures

    which is illustrative

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    Book of plans - section 11

  • KIN

    G G

    EORG

    ES PARK, WANDSW

    OR

    TH

    104.0

    3

    104.0

    6

    BUC

    KHOLD R

    OAD

    NE

    VIL

    LE GIL

    L C

    LO

    SE c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Buc

    khold

    Roa

    d

    Neville Gill C

    lose

    car park

    Multistorey

    Day Centre

    Lake

    6m high

    Ventilation column

    providing vistas over park

    New seating area in timber

    Re-instate grass

    Ramp

    + 104.58m

    + 104.68m

    + 104.74m

    + 105.65m

    + 105.55m

    + 105.52m

    + 105.56m

    105.075 105.50

    105.90

    105.60

    105.90

    Removable bollards

    and perinials

    Grass ornamental flowering shrubs

    hard landscaping would be removed

    landscaping where original park entrance

    Existing paving to be replaced with soft

    reinforced with additional planting

    and Neville Gill Close would be

    Park boundary to Buckhold Road

    entrance to eastern side of park

    New path would connect

    here

    and rubbish bin relocated

    Existing park bench

    into layout of the proposed entrance

    Retain existing tree and incorporate

    adjacent to the boundary fence

    Existing electrical kiosk to be relocated

    provided by London Borough of Wandsworth

    Potential pedestrian crossing to be

    Wandsworth

    to be relocated by London Borough of

    Existing pedestrian crossing potentially

    Paving materials

    Soft landscaping

    Hardstanding

    Permeable resin bound gravel

    Entrance signage at ground levelNew mixed- use developmentAA

    Removable bollards

    Perrenial flowering shrubs

    Timber seating deck over retaining structure

    development proposals oppostie

    corner of park to link with new

    New park entrance at northern

    104.75

    104.70

    to 8m maximum high

    column 4m minimum

    Signature ventilation

    Multi purpose hardstanding area

    cafe/ kiosk

    Power and water connection for mobile

    Zone within which vent column would be located

    King Georges Park

    sewer

    Frogmore Storm Relief

    Centre line of

    Park (by agreement)

    western entrance to King Georges

    installed here at the existing

    Gates of original park entrance

    Notes:

    seating and tree to be retained

    Existing memorial bench

    be located

    interception chamber vent coloumn would

    Zone within which integrated kiosk and

    Borough of Wandsworth

    3. Landscape proposal to be agreed with London

    been used in the preparation of this drawing.

    and the topographic survey base, both of which have

    to differences between the Ordnance Survey base

    and the parameters marked on the drawings are due

    2. Any discrepancy between the location of structures

    1. All dimensions and levels are approximate.

    brown roof

    ventilation structure 3m high with a planted

    Integrated electrical and control kiosk and

    5.

    plan.

    are those listed in table 1 of the site works parameter

    structures which is illustrative" statement

    "save for the layout of the above ground

    4.The above ground structures in the

    additional tree would be in this location.

    health, or the existing tree will be retained and no

    Wandsworth in advance of these works due to poor

    that either the tree will have been removed by LB of

    tree coincides with an existing tree, it is understood

    Where the location of a proposed advance planted

    with the local authority (see notes)

    Advanced planting in agreement

    flood risk mitigation

    Sunken garden required for

    Proposed trees

    (LLAU)

    Limits of land to be acquired or used

    (by others)

    Consented development footprint

    ground structures would be located

    Zone within which permanent above

    (shown in metres above tunnel datum)

    Existing levels

    (shown in metres above tunnel datum)

    Proposed levels

    Thames Water access

    + 105.40m

    105.40

    would be located

    Zone within which required landscaping

    Key:

    (trunk sizes vary)

    Existing trees within surveyed area

    INDICATIVE

    London Borough of Wandsworth

    King Georges Park

    Proposed

    Landscape plan

    DCO-PP-09X-KNGGP-110009

    January 2013

    Save for layout of above ground structures

    which is illustrative

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    Book of plans - section 11

  • Arndale W

    alk

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    Curved and sloping timber seating/ steps

    Buckhold Road

    N

    Lake

    A

    A

    Ventilation column 6m high

    beyond

    Interception chamber

    to Dormay Street

    Connection tunnel

    8m maximum high

    Ventilation column 4m minimum to

    CSO drop shaft

    Section AA

    with new development proposal

    bollards at northern end of park to link

    Proposed main entrance with drop down

    mitigation

    Ground profile lowered for flood risk

    Timber deck seating

    during construction

    Large Poplar tree would be protectedof the below ground infrastructure to be provided.

    2. The purpose of this section is to illustrate the scale

    1. All dimensions and levels are approximate.

    Notes:

    during construction

    Red oak tree protected

    planted brown roof.

    and ventilation structure 3m high with

    Integrated electrical and control kiosk

    London Borough of Wandsworth

    King Georges Park

    ILLUSTRATIVE

    Section AA

    DCO-PP-09X-KNGGP-110010

    January 2013

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    Book of plans - section 11

  • Def

    CR

    Arndale W

    alk

    Boro Const & Ward Bdy

    Boro Const & W

    ard Bdy

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Existing fencing

    Proposed West elevation

    West Elevation

    Business village Buckhold Road LakeKing Georges Park

    New landscaped area within public space

    Depth of lake shown notionally

    mitigation

    Ground profile lowered for flood risk

    As existing West elevation

    Timber seating

    with new development proposal

    bollards at northern end of park to link

    Proposed main entrance with drop down

    to 8m maximum high

    Ventilation column 4m minimum

    Timber deck seating area

    during construction

    Large Poplar tree would be protected

    Ventilation column 6m high

    Notes:

    1. All dimensions and levels are approximate.

    be protected during construction

    Red oak tree would

    brown roof

    structure 3m high with planted

    control kiosk and ventilation

    Integrated electrical and

    London Borough of Wandsworth

    King Georges Park

    ILLUSTRATIVE

    As existing and proposed

    West elevation

    DCO-PP-09X-KNGGP-110011

    January 2013

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    Book of plans - section 11

  • Arndale W

    alk

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    As existing South elevation

    South

    Elevation

    King Georges Park Neville Gill Close Multi-storey car park

    N

    Main park entrance

    shown behind

    Ventilation column 6m high

    Section cut through car park

    Section cut through car park

    Area for flood compensation

    to 8m maximum high

    Ventilation column 4m minimum

    Proposed South elevation

    New landscape area within public space

    Timber deck seatingalign and match existing boundary line.

    the existing western entrance. New fencing to

    Existing gates to be removed and reinstalled to

    kiosk relocated

    Existing electrical

    Notes:

    1. All dimensions and levels are approximate.

    Electrical substation

    shown dotted

    development under construction

    Indicative outline of new mixed use

    shown dotted

    development under construction

    Indicative outline of new mixed use

    construction

    Red oak tree to be protected during

    with a planted brown roof

    kiosk and ventilation structure 3m high

    Integrated electrical and control

    London Borough of Wandsworth

    King Georges Park

    ILLUSTRATIVE

    As existing and proposed

    South elevation

    DCO-PP-09X-KNGGP-110012

    January 2013

    10m 0 10m

    1:400 if reproduced at A3

    Scale 1:200 at A1

    This drawing

    Book of plans - section 11

  • c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Roof plan

    East elevation

    West elevation North elevation

    South elevation

    Electrical room

    Room

    MechanicalVentilation room

    architectural feature

    with grooves and etching for

    Fair- faced concrete finish

    Planted brown roof

    Section AA

    for ventilation

    Metal grill doors

    Plan at ground level

    A

    A

    Gravel edging

    Metal grill doors for ventilation

    Planted brown roof

    architectural feature

    with grooves and etching for

    Fair-faced concrete finish

    Sealed doors

    Rainwater downpipe Rainwater downpipe

    INDICATIVE

    London Borough of Wandsworth

    King Georges Park

    Kiosk design intent

    DCO-PP-09X-KNGGP-110013

    January 2013

    01m 4m

    1:100 if reproduced at A3

    Scale 1:50 at A1

    This drawing

    Book of plans - section 11

  • FB

    FB

    FBs

    FB

    Lake

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Offices

    Crane

    Crane

    once the hoarding is erected

    footpath is to be maintained

    Public access to the lakeside

    protection to be provided

    extends into the site. Appropriate

    The root protection zone of this tree

    Kerb to be realigned

    aggregate storage area

    Concrete batching plant and

    Site power structure

    Workshop buildings

    Storage (open area or containerised)

    Shaft

    Welfare building

    right turn in, left turn out

    Construction access,

    Security office

    and handling area

    Excavated material storage

    and protected

    Tree to be retained

    be protected

    Shallow sewer to

    Key:

    Access / haul route

    Maximum extent of working area

    Site access

    Existing sewers

    Hoarding

    or used (LLAU)

    Limits of land to be acquired

    Existing permissive right of way

    of footway

    Route of temporary diversion

    Bro

    om

    hill R

    oad

    Buckhold Roa

    d

    Hard

    wicks S

    quare

    Neville Gill C

    lose

    with local authority (see note 5)

    Advanced planting to be agreed

    additional tree would be planted in this location.

    health, or the existing tree will be retained and no

    Wandsworth in advance of these works due to poor

    that either the tree will have been removed by LB of

    tree coincides with an existing tree, it is understood

    5. Where the location of a proposed advance planted

    on this drawing.

    barriers may be required but is not shown

    4. Additional noise mitigation including noise

    would be agreed with the relevant utility company.

    3. Utility supplies for the construction of the works

    arrangements are shown.

    appropriate, outline traffic management

    appropriate authority for approval. Where

    phases of the work would be submitted to the

    2. Traffic management plans for construction

    submission and approval process.

    on layout imposed through the planning

    construction methods subject to any controls

    construction depending on their preferred

    may choose to lay sites out differently during

    the principal construction phases. Contractors

    prepared to illustrate possible site layouts for

    1. These construction phasing plans have been

    Notes :

    London Borough of Wandsworth

    King Georges Park

    ILLUSTRATIVE

    Construction phases - phase 1

    Site setup and shaft construction

    DCO-PP-09X-KNGGP-110014

    January 2013

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    Book of plans - section 11

  • Chamber size

    not visible

    104.0

    0

    104.0

    0

    104.0

    0

    104.0

    0

    104.0

    2

    104.0

    3

    104.0

    4

    104.0

    6

    104.3

    6 104.4

    0

    104.44

    104.47

    104.49

    104.54

    104.5

    4

    104.58

    104.6

    7

    Stn K8

    104.677

    104.7

    2

    104.73

    104.7

    8104.8

    1104.8

    1

    CL104.951

    105.02

    105.03

    105.18

    Stn K9

    105.398

    105.42

    105.4

    3

    105.43

    105.44

    105.44

    105.45

    105.46

    Stn K5

    105.458

    105.48

    105.5

    1

    105.51

    Stn K7

    105.642

    Stn K6

    105.660

    105.67

    105.7

    3

    105.7

    5

    105.7

    6

    FB

    FB

    FBs

    FB

    Lake

    c Thames Water Utilities Ltd 2008

    Keyplan:

    Survey licence number 100019345

    Database right 2012. All rights reserved. Ordance

    Survey on behalf of HMSO. ' Crown Copyright and

    Mapping reproduced by permission of Ordnance

    N

    Location

    Document Information

    Datum Newlyn.

    Tunnel Datum which is 100 metres below Ordnance

    OSGB36. All levels are in metres and relate to the

    Coordinates are to be Ordance Survey Datum

    Application for Development Consent

    N

    Crane

    Offices

    protection to be provided.

    extends into the site. Appropriate

    The root protection zone of this tree

    Kerb to be reinstated post construction

    Shaft

    Site power structure

    Workshop buildings

    or containerised)

    Storage (open area

    Welfare building

    Security office

    right turn in, left turn out

    Construction access,

    and handling area

    Excavated material storage

    and protected

    Tree to be retained

    be protected

    Shallow sewer to

    Key:

    Access / haul route

    Maximum extent of working area

    Site access

    Existing sewers

    Hoarding

    or used (LLAU)

    Limits of land to be acquired

    Existing permissive right of way

    of footway

    Route of temporary diversion

    Connection tunnelBro

    om

    hill R

    oad

    Buckhold Roa

    d

    Neville Gill C

    lose

    Hard

    wicks S

    quare

    with local authority (see note 5)

    Advanced planting to be agreed

    additional tree would be planted in this location.

    health, or the existing tree will be retained and no

    Wandsworth in advance of these works due to poor

    that either the tree will have been removed by LB of

    tree coincides with an existing tree, it is understood

    5. Where the location of a proposed advance planted

    on this drawing.

    barriers may be required but is not shown

    4. Additional noise mitigation including noise

    would be agreed with the relevant utility company.

    3. Utility supplies for the construction of the works

    arrangements are shown.

    appropriate, outline traffic management

    appropriate authority for approval. Where

    phases of the work would be submitted to the

    2. Traffic management plans for construction

    submission and approval process.

    on layout imposed through the planning

    construction methods subject to any controls

    construction depending on their preferred

    may choose to lay sites out differently during

    the principal construction phases. Contractors

    prepared to illustrate possible site layouts for

    1. These construction phasing plans have been

    Notes :

    London Borough of Wandsworth

    King Georges Park

    ILLUSTRATIVE

    Construction phases - phase 2

    Construction of other structures

    DCO-PP-09X-KNGGP-110015

    January 2013

    10m 0 40m

    1:1000 if reproduced at A3

    Scale 1:500 at A1

    This drawing

    Book of plans - section 11

  • Multistorey Car Park

    103

    SouthsideShopping Ce

    BUCK

    HOLD

    RO

    A

    Traders Hall

    The Business Village

    1 to 8

    Works

    King George'sPark

    20 to 3

    0

    5.4m

    TCB

    Works

    B

    Traders Hall

    BUCK

    HOLD

    ROAD

    House

    NEVILLE G

    ILL CLO

    SE

    Cockpen

    Children's

    81

    Lake

    5.5m

    5.7m

    DayCentre

    Nursery

    Zoo

    NEVILLE G

    ILL CLO

    SE

    55

    Clinic

    9 to 20

    House

    House

    1 to 72

    El Sub Sta

    Sub Sta

    Albon1 to 72

    Edwyn

    El

    27

    1 to 48

    17

    1 to

    40

    FB

    231 to 14

    Welsbach House

    2

    6

    8

    Disabled badge holders

    Disabled badge holders

    Loading bay

    Multistorey Car Park

    103

    SouthsideShopping Ce

    BUCK

    HOLD

    RO

    A

    Traders Hall

    The Business Village

    1 to 8

    Works

    King George'sPark

    20 to 3

    0

    5.4m

    TCB

    Works

    B

    Traders Hall

    BUCK

    HOLD

    ROAD

    House

    NEVILLE G

    ILL CLO

    SE

    Cockpen

    Children's

    81Lake

    5.5m

    5.7m

    DayCentre

    Nursery

    Zoo

    NEVILLE G

    ILL CLO

    SE

    55

    Clinic

    9 to 20

    House

    House

    1 to 72

    El Sub Sta

    Sub Sta

    Albon1 to 72

    Edwyn

    El

    27

    1 to 48

    17

    1 to

    40

    FB

    231 to 14

    Welsbach House

    2

    6

    8PWH3X_C02

    PWH3X_C01

    PWH3X_C03

    PWH3X_C04

    Highway layout during constructionConstruction base casehighway layout NN

    On street parkingDisabled badge holders - At any timeLoading bay - No loading Mon - Sat 7:00am - 7:00pm

    Standards

    Design Manual For Roads And Bridges, Dft, 1992Traffic Signs Regulations & General Directions, Tso, 2002Traffic Signs Manual, Dft, 2006Manual For Streets, Dft, 2007Manual For Streets 2, Ciht, 2010Designing For Deliveries, Fta, 1998Cycle Infrastructure Design Ltn 2/08, Dft, 2008Design Of Pedestrian Crossings Ltn 2/95, Dft, 1995Guidance For The Use Of Tactile Paving, Dft, 1998Accessible Bus Stop Design Guidance, Tfl, 2006

    This drawing

    Parking restrictionsOn street parkingBus stop / standPedestrian crossing

    RevisedRemoval of footpathsIllustrative on-site manoeuvring zoneSite hoardingSite hutAccess gateVisibility splay - 2.4m x 43m(ssd adjust for bonnet Length)Limit of land to be acquired or used (LLAU)See schedule of worksPWH3X_00

    KeyExisting

    StagePhase 2

    Keyplan:

    Mapping reproduced by permission of OrdnanceSurvey on behalf of HMSO. Crown Copyright andDatabase right 2012. All rights reserved. OrdnanceSurvey licence number 100019345

    N

    Coordinates are to be Ordnance Survey DatumOSGB36. All levels are in metres and relate to theTunnel Datum which is 100 metres below OrdnanceDatum Newlyn.

    10m 0 40m

    Scale 1:500 at A11:1000 if reproduced at A3

    c Thames Water Utilities Ltd 2008

    Application for Development Consent

    Location

    Document Information

    DCO-PP-09X-KNGGP-110018

    (Area 1 work)Highway layout during construction

    ILLUSTRATIVE

    King Georges ParkLondon Borough of Wandsworth

    January 2013

  • Multistorey Car Park

    SouthShopping

    BUCK

    HOLD

    R

    Traders Hall1 to 8 King George'sPark

    5.4m

    TCB

    Traders Hall

    HARDWIC

    urt

    BUCK

    HOLD

    ROAD

    NEVILLE G

    ILL CLO

    SE

    Children's

    69

    Lake

    5.5m

    5.7m

    DayCentre

    Nursery

    Zoo

    NEVILLE G

    ILL CLO

    SE

    55

    Clinic

    9 to 20

    House

    House

    1 to 72

    El Sub Sta

    Sub Sta

    Albon1 to 72

    Edwyn

    El

    27

    1 to 48

    17

    1 to

    40

    231 to 14

    2

    6

    8

    2422ouse

    Disabled badge holders

    Disabled badge holders

    Loading bay

    New residential development

    Multistorey Car Park

    SouthShopping

    BUCK

    HOLD

    R

    Traders Hall1 to 8 King George'sPark

    5.4m

    TCB

    Traders Hall

    HARDWIC

    urt

    BUCK

    HOLD

    ROAD

    NEVILLE G

    ILL CLO

    SE

    Children's

    69

    Lake

    5.5m

    5.7m

    DayCentre

    Nursery

    Zoo

    NEVILLE G

    ILL CLO

    SE

    55

    Clinic

    9 to 20

    House

    House

    1 to 72

    El Sub Sta

    Sub Sta

    Albon1 to 72

    Edwyn

    El

    27

    1 to 48

    17

    1 to

    40

    231 to 14

    2

    6

    8

    2422ouse

    New residential development

    PWH3X_P03PWH3X_P02

    PWH3X_P01

    PWH3X_P04

    Permanent highway layoutConstruction base casehighway layout

    NN

    This drawing

    On street parkingDisabled badge holders - At any timeLoading bay - No loading Mon - Sat 7:00am - 7:00pm

    Standards

    Design Manual For Roads And Bridges, Dft, 1992Traffic Signs Regulations & General Directions, Tso, 2002Traffic Signs Manual, Dft, 2006Manual For Streets, Dft, 2007Manual For Streets 2, Ciht, 2010Designing For Deliveries, Fta, 1998Cycle Infrastructure Design Ltn 2/08, Dft, 2008Design Of Pedestrian Crossings Ltn 2/95, Dft, 1995Guidance For The Use Of Tactile Paving, Dft, 1998Accessible Bus Stop Design Guidance, Tfl, 2006

    RevisedIllustrative on-site manoeuvring zoneReinstated footwaySee schedule of works

    Parking restrictionsOn street parkingBus stop / standPedestrian crossing

    PWH3X_P00

    KeyExisting

    StagePermanent phase

    Keyplan:

    Mapping reproduced by permission of OrdnanceSurvey on behalf of HMSO. Crown Copyright andDatabase right 2012. All rights reserved. OrdnanceSurvey licence number 100019345

    N

    Coordinates are to be Ordnance Survey DatumOSGB36. All levels are in metres and relate to theTunnel Datum which is 100 metres below OrdnanceDatum Newlyn.

    10m 0 40m

    Scale 1:500 at A11:1000 if reproduced at A3

    c Thames Water Utilities Ltd 2008

    Application for Development Consent

    Location

    Document Information

    DCO-PP-09X-KNGGP-110019

    Area 1 workPermanent highway layout

    ILLUSTRATIVE

    King Georges ParkLondon Borough of Wandsworth

    January 2013

  • Copyright notice Copyright Thames Water Utilities Limited January 2013. All rights reserved. Any plans, drawings, designs and materials (materials) submitted by Thames Water Utilities Limited (Thames Water) as part of this application for Development Consent to the Planning Inspectorate are protected by copyright. You may only use this material (including making copies of it) in order to (a) inspect those plans, drawings, designs and materials at a more convenient time or place; or (b) to facilitate the exercise of a right to participate in the pre-examination or examination stages of the application which is available under the Planning Act 2008 and related regulations. Use for any other purpose is prohibited and further copies must not be made without the prior written consent of Thames Water. Thames Water Utilities LimitedClearwater Court, Vastern Road, Reading RG1 8DB The Thames Water logo and Thames Tideway Tunnel logo are Thames Water Utilities Limited. All rights reserved. DCO-DT-000-ZZZZZ-021100