Technical Report (Kimbutan MHP Project Upgrading)
![Page 2: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/2.jpg)
Objectives:
• Conduct a watershed management training and nursery building.
• Complete the civil works of MHP upgrading (Forebay, Powerhouse, Intake, Spillway and Line Post).
• Installation of the electro-mechanical components and hauling of electrical materials into the site.
![Page 3: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/3.jpg)
Introduction:
The target outputs for the period are to complete the civil works of the system and initiate watershed rehabilitation through a training and building up of the nursery as part of laying down the integration of renewable energy development and sustainable agriculture work.
![Page 4: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/4.jpg)
Actual Outputs
Watershed
• Conducted 1 training and orientation activity to 15 PO members.
• Constructed the community central nursery.
• Collected 800 assorted wildlings of forest tree species some of which are (rattan,tuwel,red lawaan, alimit).
• Watershed assessment survey conducted
![Page 5: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/5.jpg)
MHP
• Forebay completed which included trashrack installation, spillway expansion, drainage improvement and size expansion
• Powerhouse modified which included gate valve replacement, floor tiling, repainting of electro-mechanical components, re-wirings of electrical connections, interior wash area construction, and installation of door and windows and painting of walls
• Intake reconstruction which include installation of screen and breather.
![Page 6: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/6.jpg)
• Installation of steel posts for transmission lines, currently completed 15 G.I. Pipe 3” x 6 replacements
![Page 7: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/7.jpg)
Community workplanning session focused on developing a workplan for the watershed trainings, civil and electrical works .
![Page 8: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/8.jpg)
Saying a prayer before starting the community planning meeting
![Page 9: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/9.jpg)
Watershed Management Training
SIBAT’s Sustainable Agriculture staff explaining the components of watershed and its significance in relations to a balanced ecosystem, food security, biodiversity, health and conserving water particulalry for MHP use
![Page 10: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/10.jpg)
The MHP powers the LCD projector and computer during the nightly community meetings
![Page 11: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/11.jpg)
Brownish flowing water showed excessive siltation indicating there are denuded spots inside the
watershed perimeters
![Page 12: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/12.jpg)
Nursery Building
Soil media are being processed to fill a thousand poly-ethylene bags for the collected wildlings of assorted forest tree species
![Page 13: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/13.jpg)
Women power at work in the construction of the central nursery station
![Page 14: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/14.jpg)
Civil Works in MHP System
The people from the community working on the powerhouse foundation
![Page 15: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/15.jpg)
Powerhouse Modification
![Page 16: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/16.jpg)
Remodeling the power house from wooden to concrete make .
![Page 17: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/17.jpg)
Our technician prepared all the pipes for the electrical works.
![Page 18: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/18.jpg)
Installing electro-mechanical components
![Page 19: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/19.jpg)
Valve Replacement
![Page 20: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/20.jpg)
New butterfly valve(Geared type) was installed and existing turbine repainted .
![Page 21: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/21.jpg)
Cleaning and checking the ball bearings in the turbine.
![Page 22: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/22.jpg)
Sharing of knowledge on how to install tiles in the floor.
![Page 23: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/23.jpg)
Continuation of tiling works
![Page 24: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/24.jpg)
Installing the electrical connections inside the powerhouse.
![Page 25: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/25.jpg)
Near-finished powerhouse remodeling work
![Page 26: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/26.jpg)
SIBAT Technicians and Kimbutan PO partners after interior painting works
![Page 27: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/27.jpg)
Electro-mechanical devices getting a face-lift after repainting
![Page 28: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/28.jpg)
Forebay Expansion
Women power at work : helping out in bringing sand and gravel to the forebay being expanded
![Page 29: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/29.jpg)
Installing the trashrack in the forebay tank for the protection of the turbine.
![Page 30: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/30.jpg)
Before After
![Page 31: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/31.jpg)
Expanded Forebay
![Page 32: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/32.jpg)
Intake
![Page 33: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/33.jpg)
Installing a breather from the headrace pipe going to the forebay.
![Page 34: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/34.jpg)
Installing a fabricated screen to the intake for the protection of the headrace pipe going
to the forebay tank.
![Page 35: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/35.jpg)
Line Posts: replacing previous wooden ones with GI steel
![Page 36: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/36.jpg)
MHP electricity powering the drilling and grinding machines
![Page 37: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/37.jpg)
Preparing the GI Pipes that would replace existing wooden posts
![Page 38: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/38.jpg)
Preparing the foundation of the steel posts .
![Page 39: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/39.jpg)
Carrying the GI pipes to the designated areas for installation
![Page 40: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/40.jpg)
Installing the insulators from the steel posts
![Page 41: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/41.jpg)
![Page 42: (Kimbutan MHP Project Upgrading) - GlobalGiving · PDF fileTechnical Report (Kimbutan MHP Project Upgrading) Objectives: •Conduct a watershed management training ... Cleaning and](https://reader031.fdocuments.in/reader031/viewer/2022030500/5aac81c47f8b9a8f498d1f76/html5/thumbnails/42.jpg)
Thank You
Prepared by: Marcelo Isla, ME Project Team Leader