Schlumberger Private Key technologies and solutions in providing reliable and efficient CO2 geological storage services Geneva, 27 th of November, 2007 Presenter Hanspeter Rohner Vice President Schlumberger Carbon Services, Europe & Australia

Transcript of Key technologies and solutions in providing reliable and ... · Schlumberger Private Key...

Schlumberger Private

Key technologies and solutions in providing reliable and efficient CO2 geological storage services

Geneva, 27th of November, 2007Presenter Hanspeter RohnerVice President Schlumberger Carbon Services, Europe & Australia

2

Schlumberger Private

Schlumberger Carbon Services

CO2 Streams• Coal and Gas Power Plants• Associated gas production• LNG process• Gas-to-Liquid process• Heavy Oil production• Coal-to-Liquid process• Hydrogen

• Refineries• Heavy industry

• Steel mills• Cement factories• Aluminum mills

Saline Aquifers

CO2 Capture and Geological Storage

3

Schlumberger Private

Schlumberger Carbon Services

The CCS Cost (or Value!) Chain

$20 - 50/t CO2 $1 - 10/t CO2 $2 - 10/t CO2 $0.1 - 0.3/t CO2

Capture MonitoringStorageTransport

IPCC Estimations:NGCC $44/t CO2PC $29/t CO2IGCC $20/t CO2

Sensitive to Energy prices

IPCC:(500km)Ships $10/t CO2

Hydro:(250km)Pipeline: 230M$University of NewcastlePipeline 570M$/y

Distancedependant

IPCC: Aquifer$0.5 - 8/t CO2

Pöyry: Aquifer$2/t CO2Gas or oil field$9.5/t CO2

Sensitive to Reservoir quality

IPCC:$0.1 - 0.3/t CO2

Benson et Al 2006$0.16/t CO2

Remediation not included

4

Schlumberger Private

Schlumberger Carbon Services

An Integrated Solution to CO2 StorageSite Selection Site Characterization (SCP) Field Design

/ Site PreparationSite Construction Injection

Per

form

ance

& R

isk

M

anag

emen

t Sys

tem

(PR

MS

)C

omm

unic

atio

n an

d P

ublic

Acc

epta

nce

SEVERITY

-11 L

-21 S

-41 C

-31 M

-51 M C

-22 L

-41 S

-62 M

-82 C

-1 02 M C

-33 L

-63 S

-93 M

-1 23 C

-1 53 M C

-44 L

-55 L

-84 S

-1 24 M

-1 64 C

-2 04 M C

- 1 05 S

- 1 55 M

- 2 05 C

- 2 55 M C

-1Lig h t

-2

-3

-4

-5

S e rio u s

M a jo r

C a ta s tro p h ic

M u lti-C a ta s tro p h ic

321

Possible

Unlikely

Improbable

5

Probable

4

Likely

L IK E L IH O O D

W h ite a rro w ind ic a te s d e c re a s in g ris k

P R E V E N TIO N

M IT IG AT IO N

C o n tro lM e a s u re s

R E D

B L U E

Y E L L O WG R E E N

IN T O LE R A B LE : D o n o t t ak e th is ri sk

U N D E S IR A B LE : D em on stra te A LA R P be fo re p ro cee d in g

A C C E P T A B LE : P roc eed ca re fu lly , w ith co n tin uou s im p rove m e nt

N E G LIG IB L E : S a fe to p roc eed

-16 to -1 0

-9 to -5

-4 to -2

-1

B L A C K N O N -O P E R A B LE : E v ac ua te th e z on e a nd or a rea /co un try-25 to -2 0

Pre-Operation Phase

~ 10-50 years

~ 2-5 year

Operation Phase

~50-100+years

Post-Injection Phase

Site Retirement Programme(SRP)

Monitoring (M&V)• Operation

• Verification

• Environmental

5

Schlumberger Private

Schlumberger Carbon Services

ModelingMeasurement forCharacterization

Construction Technologies& Interventions

Monitoring Measurements

Performance & Risk Management System

Performance & Risk Assessment• Capacity• Injectivity• Containment

• Cost• Environment• Heath & Security• Image

Functions / Stakes

Risk TreatmentPreventionRemediation

RegulatoryFramework

6

Schlumberger Private

Schlumberger Carbon Services

Initial Assessment – Site Characterization

Data Collection & QC

Sequence, Stratigraphy & Property ModelDynamic Modeling

(flow, geomechanics, geochemistry)

CapacityInjectivity

– Geophysics / Geology– Petrophysics / Mineralogy– Geomechanics– Fluid Properties– Well Integrity

From CO2CRC – Latrobe Valley Study

Containment

7

Schlumberger Private

Schlumberger Carbon Services

Building a Static Model – Structure & PropertiesGeophysics

Geology Geomechanics

PetrophysicsMineralogy

Flow / TransportSeismic

Well Correlation

Fault Modeling

Zonation and Layering

Facies Modeling

Petrophysical Modeling

Model needs to include overburden

PETREL

8

Schlumberger Private

Schlumberger Carbon Services

CO2 Injection Dynamic Modeling

CO2 Concentration in Water

Thermodynamics Geochemistry

Thermal Modeling

Monitoring Data

Geomechanics Simulator

Upscaling

3D Full CompositionalFlow Simulator

ECLIPSE – E300Calibration on monitoring measurements(History match)

9

Schlumberger Private

Schlumberger Carbon Services

Capacity – MeasurementsStructure

High-Resolution Seismic, VSP’s and Sonic

PropertiesBorehole imagers Formation Evaluation

Gamma Ray (GR)0 (GAPI) 200

Micronormal (HMNO)20 0Microinverse (HMIN)20 0

Caliper6 (IN) 16SP-100 (MV) 0

Pad1:200M

RSOZDSOZ

RT

HALS Deep Resistivity (HLLD)1 (OHMM)100

0

1 (OHMM)1000

1 (OHMM) 10001 (OHMM)1000

HALS Shallow Resistivity (HLLS)MCFL Rxo (RX18)

High Resolution Density (RHOZ)1.95 (G/C3) 2.95Neutron Porosity

(NPOR)Crossplot Porosity

(PXND)PEF

45 (PU) -15

45 (PU) -15

0 10

1500

1475

Mineralogy

10

Schlumberger Private

Schlumberger Carbon Services

Injectivity

Permeability– Core– Logs– Formation testers– Well tests

Injection induced near-wellbore effects– Dry-out– Salt precipitation – Carbonate dissolution

Optimization – Injection well design, placement and number– Hydraulic fracturing

The Reservoir Dry-out Simulation near the Wellbore is crucial for Injectivity Prediction

Dry-out Zone

CO2 Reactive Transport Fluid Phases Equilibration

0 10.5Gas Saturation

11

Schlumberger Private

Schlumberger Carbon Services

Injectivity - Measurements

Permeability from Wireline Logging Permeability from Well Testing

12

Schlumberger Private

Schlumberger Carbon Services

Containment

(from Damen et al, 2003)

Caprock & Overburden– Hydrostratigraphy– Composition– Mechanical properties– Flow properties

Faults– Transmissibility– Mechanical Properties

Wells– Completions state– Isolation issues– Degradation mechanisms

(from Latrobe Valley study, CO2CRC, 2005)

Importance of reservoir geomechanicsand evaluation of wells

Mode

ling t

o Sur

face

13

Schlumberger Private

Schlumberger Carbon Services

Containment – Measurements for Geomechanics

Along the wellbore trajectory:

Strength

UCS Φ

20 400

0 70

UCS

Friction Angle

Earth Stress & Pore Pressure

Pp S h S H S V

MPa0 200Stress W N E

Stress Direction Sh

fault ?

Regional Trend

PR Ε

1Poisson’sRatio

Young’s Modulus 100

Elastic

0

10

14

Schlumberger Private

Schlumberger Carbon Services

Containment – Integrity of Wells (1)

CharacterisationCement logs

Drilling reportsWell geometry

Cement degradationCasing corrosionCO2 migration

Limit conditions

1

23

4

56

7

8

9

1 0

1 1

1 2

1

23

4

56

7

8

9

1 0

1 1

1 2

1

23

4

56

7

8

9

1 0

1 1

1 2

1

23

4

56

7

8

9

1 0

1 1

1 2

1

23

4

56

7

8

9

1 0

1 1

1 2

1

23

4

56

7

8

9

1 0

1 1

1 2

Data & input

K(t)

1

1110

9

8

7

6

5

4

3

2

CO2(t)H2O(t)

Dynamic model

Leak amount & probability

>20 M€

<20 M€

<5 M€<1 M€

<0,2 M€

FFinancial

Envir.3rd-PPeople

CSAFETY

6 : Catastr.

5 : Critical

4 : Major3 : Serious

2 : Marginal

1 : Minor

…B

AssetA

Reliability &availability.

Stakes

Level

>20 M€

<20 M€

<5 M€<1 M€

<0,2 M€

FFinancial

Envir.3rd-PPeople

CSAFETY

6 : Catastr.

5 : Critical

4 : Major3 : Serious

2 : Marginal

1 : Minor

…B

AssetA

Reliability &availability.

Stakes

Level

Consequence grid & transfert fonction

Static model

666564636261656555453525154645444342414363534333231326252423222121615141312111654321

DetectionEvolution

Conclusions

811

13

5

00

5

10

15

20

minor weak middle high critical

B = 50

Sensitivity analysisRisk mitigation optionsCost / Benefits ranking

Can we re-use existing wells ?More data needed ?

Probability of leakageType of leakage to expect X

=

An Integrated Solution to:• Leakage and Degradation Modeling• Leakage scenarios• Risk criticality estimation

15

Schlumberger Private

Schlumberger Carbon Services

Prevention EvaluationSonic ScannerIsolation Scanner

Good drilling practices

Cement job planning

GeoS

teer

ing

Ston

efis

h

Materials

2 days 6 weeks1 week

MetallurgyCO2-Resistant cement

+ +

Wel

lCLE

AN

Optimal Well Placement

Containment – Integrity of Wells (2)

16

Schlumberger Private

Schlumberger Carbon Services

Monitoring and Verification during CO2 Injection

Geophysical techniques: Seismic, VSP’s, EM techniques, microseismicityLogging: Saturation (Resistivity, Sigma), Well integrity (Casing corrosion, cement bond)Sampling: Pressure, Fluid properties, CO2 concentrationPermanent sensors: Pressure, Temperature

17

Schlumberger Private

Schlumberger Carbon Services

CO2 Displacement from Seismic - Sleipner

1994

1999 2001 2002

Baseline Survey

CO2 Injection Start: Sept 19964D Seismic Survey

CO2 Injector Well CO2 below shale layers

Interpretation of flow patterns (CO2 displacement and trapping)Verification of cap rock integrity

Courtesy of Statoil

18

Schlumberger Private

Schlumberger Carbon Services

Well Logging for CO2 Breakthrough – Frio

(*) Sakurai et al. , SPWLA 46th – June 26-29th - 2005

CO2 saturation measurement along a monitoring wellFrio brine experiment in Texas: Changes of Σ from time lapse logs

Injection start: Oct 4th,

Injection duration: 10 days

19

Schlumberger Private

Schlumberger Carbon Services

Cap Rock & Fault IntegrityMicroseismicity events are micro cracks occurring in the formation due to pressure increaseListening to these cracks is a powerful monitoring technique

Detection, Location in 3D and Classification of Microseismicity EventsControl of Pumping Rate to Avoid Fracturing the Cap RockDetection of Fault Reactivation

20

Schlumberger Private

Schlumberger Carbon Services

Schlumberger involved CO2 Storage Projects

IdF

CCP2

MGSC

Mountaineer

PCORMRSCP

Frio

Weyburn II

Gorgon

OtwayCO2CRC

Callide

COACH

InSalah Hassi Touareg

KarniowKetzinSleipner

MOVECBM

PETRONAS

21

Schlumberger Private

Schlumberger Carbon Services

Conclusions

• The Technology is ready !• But continuous investment in Engineering and Learning While Doing

• Key Technologies focus on:• Capacity-Injectivity-Containment • Long term storage integrity

• Key Technologies are• Measurement (surface and downhole in wells)• Modeling (static-dynamic-predictive)• Well Construction (drilling, cementing, completions, remediation)