KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a...

18
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas Nelson, Jr., P.E. Division Administrator – Kentucky Federal Highway

Transcript of KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a...

Page 1: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

KEY PROVISIONS OFTHE DRIVE* ACTH.R. 22, as passed by the Senate on July 30, 2015

*Developing a Reliable and Innovative Vision for the Economy

Thomas Nelson, Jr., P.E.

Division Administrator – Kentucky

Federal Highway Administration

Page 2: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

2

Key Highway Facts• 6-year surface transportation reauthorization proposal

covering FYs 2016-2021 with 3 years paid for

• Total highway funding – $276.6 billion

• Contract authority - $274.0 billion

• Subject to appropriation - $2.6 billion

• 5 new programs

• Continued focus on accelerating project delivery

Page 3: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

3

DRIVE Act Themes - Highway• Long-term funding certainty to support multi-year project

investments

• Increased funding for existing programs to provide a strong Federal partner to State & local governments

• New freight program to help state deliver projects that more freight safely, efficiently, and reliably

• Targeted funds for major projects

• Greater efficiency in the project delivery process

• Increased priority for the Interstate, NHS and bridges

• Greater transparency to reinforce public trust

• Support for innovative finance tools, particularly in rural areas

Page 4: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

4

Increased funding, but less than GROW

FY 2015 GROW AMERICA Act DRIVE Act0

10

20

30

40

50

60

Average Annual Highway Authorizations (bil-lions)

12.1% higher than FY 2015

$46.1B $52.8 B$41.1 B

Page 5: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

5

Growth varies by programProgram DRIVE Act Growth

over FY 2015

National Highway Performance Program +10.2%

Surface Transportation Program +6.8%

Congestion Mitigation & Air Quality Improvement Prog. +7.9%

Highway Safety Improvement Program -8.4%

Railway-Highway Crossings Program +0%

Metropolitan Planning +13.2

National Freight Program +100% (new)

Assistance to Major Projects Program +100% (new)

TIFIA -70.0%

Tribal Transportation Program +8.9%

Federal Lands Transportation Program +5.8%

Federal Lands Access Program +5.0%

Page 6: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

6

92.6% of highway funds are apportioned

National Highway Per-formance Program

Surface Transporta-tion Program

HSIP

Freight

Metro Planning

$256.2 billion over 6 years

Transportation Alternatives

CMAQ

Grade Crossings

NEW

Page 7: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

NEW PROGRAMS

7

Page 8: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

Freight Policy and Grants

Combining the provisions from the EPW and Commerce Committees produced overlapping freight policies and programs—

• Designation of National Multimodal Freight Network and a National Highway Freight Network

• A highway-centric National Highway Freight Program and a more comprehensive competitive grant program providing assistance to freight projects

8

Page 9: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

National Highway Freight Program• Purpose: to improve the efficient movement of freight on the

National Highway Freight Network made up of—• Primary highway freight system (PHFS) (up to 30,000 miles)• Critical rural freight corridors• Critical urban freight corridors NEW• Any remaining Interstate routes (including future routes designated as of

enactment)

• Average of $1.9 billion per year apportioned based on States’ total apportionments.

• Highway focused - Maximum of 10% of State’s freight funds may be used for public or private freight rail, water facilities (including ports) and intermodal facilities

9

Page 10: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

National Highway Freight Program• Freight plan and performance

• State must have a State freight plan within 2 years to continue participation in the Freight Program.

• State freight advisory committee is also required.• State must develop a freight performance improvement plan if not

making significant progress within 2 years of setting performance targets.

• Redesignation of the Highway Freight Network will still be challenging.• Requires redesignation of the PHFS 1 year after enactment and

every 5 years there after without regard to connectivity of PHFS• States/MPOs may add both rural and urban corridors to the

National Freight Network

10

Page 11: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

Assistance for Major Projects Program

• Average of $350 million per year from HTF aimed at critical, high-cost nationally and regionally beneficial projects.

• States, locals, tribes, transit agencies, public authorities and FLMAs (in conjunction with State) eligible to apply.

• Capital projects that are eligible for financial assistance under title 23 or chapter 53 of title 49

• Generally for projects over $350 million with minimum grant of $50 million, but reduced thresholds for rural states, Federal lands projects.

11

Page 12: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

Regional Infrastructure Accelerator Demo

• To assist entities in develop improved infrastructure priorities and financing strategies for accelerated development of TIFIA-eligible projects.

• DOT to establish regional accelerators to—• Evaluate and promote innovative financing methods for local projects,

including TIFIA• Build capacity of State, local, tribal governments to evaluate &

structure projects• Bundle small scale and rural projects to make them more attractive

for investment.• Reduce transaction costs for public sponsors

• $12 million from General Fund over 6 years to fund Demo

12

Page 13: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

OTHER PROVISIONS

13

Page 14: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

Every Day Counts• Codifies FHWA’s successful innovation initiative, Every Day

Counts

• FHWA Administrator to work with States, local transportation agencies, and industry stakeholders to identify and deploy proven innovations that—• Accelerate innovation deployment• Shorten the project delivery process• Improve environmental sustainability• Enhance roadway safety• Reduce congestion

• FHWA to collaborate to identify new innovations for deployment at least every 2 years.

14

Page 15: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

Tolling & HOV• ISRRP – Streamlines the application process and sets

standards to reduce the time that a slot can be held without progress

• HOV – Timeline for addressing HOV facilities with degraded performance

• Toll credits – pilot allowing States with toll credits to sell them to other States to be used in lieu of match

15

Page 16: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

Other Provisions• Bundling bridge projects – specifically allowing multiple

bridge projects to be handled as a single project.

• Responsibility for bridge closure or load restrictions – adopts the GROW AMERICA Act proposal

• State flexibility for NHS modifications

• National electric vehicle charging and natural gas corridors to be designated

16

Page 17: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.

Highway Trust Fund• Extends highway taxes at current rates through FY 2023

(heavy vehicle use tax through FY 2024)

• Extends expenditure authority through FY 2021

• There are solvency provisions• Revenue supplements and offsets in the bill cover FYs 2016-2018.

To prevent shortfalls in the outyears--

17

Page 18: KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.