Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most...

20
Ključne brojke 2013 Key Figures ISSN: 1848-0993

Transcript of Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most...

Page 1: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

Ključnebrojke2013

Key FiguresISSN: 1848-0993

Page 2: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

Duljina mreže po broju trakova/Length by number of lanes

61,2 km 1.206,5 km 20,8 km

1.288,5 kmAutoceste/poluautoceste u prometuMotorways/semi-motorways in service

Nove autoceste otvorene u 2013.New motorways opened in 2013

Dopuna do punog profila u 2013.Upgrade to full profile in 2013

Nove autoceste - otvorenje u 2014.New motorways scheduled in 2014

32,5 km

0,0 km

1 1 ,0 km

2

MREŽA AUTOCESTA/MOTORWAY NETWORK

20,8 km 2 X 3 traka/lanes

6 1 ,2 km 2 X 1 trak/lane

1.206,5 km 2 X 2 traka/lanes

Page 3: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

3

Razvoj mreže po godinama (km)Development of network by years (km)

Otvoreno novih autocesta po godinama (km)New motorways opened to traffic by years (km)

MREŽA AUTOCESTA/MOTORWAY NETWORK

Page 4: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

4

Mala Kapela A1

47,3 kmUkupna duljina tunelaTotal length of tunnels

3,6 %Udio tunela u ukupnoj mrežiPortion of tunnels in total network

5,8 kmNajduži tunelThe longest tunnel

733

> 1 km

> 2 km

> 5 km

MREŽA AUTOCESTA/MOTORWAY NETWORK

45

6

51Ukupan broj tunelaTotal number of tunnels

70 3,2 %Broj nezgoda u tunelimaNumber of accidents in tunnels

Udio nezgoda u tunelimaPortion of accidents in tunnels

Page 5: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

5

Dijelom autoceste A1 od Zagreba do Bosiljeva upravlja ARZ/Part of the motorway A1 from Zagreb to Bosiljevo is operated by ARZ

A1*

U planiranjuIn project

U izgradnjiIn construction

U prometuIn service

A2

A9A1

A10

A11 A5

A4

A3

A8A6

A7

A1*

A3

A1

A1

MostDrava

MREŽA AUTOCESTA/MOTORWAY NETWORK

A10A11

Most KRKBridge Krk] [

HAC 900,5 km

ARZ 1 87,0 km

Bina Istra 1 4 1 ,0 km

AZM 60,0 km

A1 A4A5A3

A1* A6A7

A2

A8A9

UKUPNO/TOTAL: 1.288,5 km

MostSava

A9

Page 6: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

A2: Zagreb – MaceljZagreb – Krapina Krapina – Macelj Dio dionice Krapina – Đurmanec

60,0042,8013,40*3,80

–––-

–––-

––––

60,0042,8013,40*3,80

–––-

UKUPNO/TOTAL: 60,00 – – – 60,00 –

A1: Bosiljevo 2 – Split – Dubrovnik Vrgorac – č. Ploče Č. Ploče – spoj Metković

416,0011,006,00

–11,006,00

–––

–––

416,00––

–––

DC 532: Spojna cesta Zagvozd - Baška Voda* 8,00 8,00 – – 8,00 –

A3: Bregana – Zagreb – Lipovac 307,00 – – – 307,00 –

A4: Zagreb – Goričan 97,00 – – – 97,00 –

A5: Beli Manastir – Osijek – GP sa BiHB. Manastir – Osijek (samo most Drava) Sredanci – granica BiH (Svilaj)

56,00––

–––

–2,503,00

–––

61,50––

– ––

A10: Granica sa BiH – Metković - č. Ploče 7,50 7,50 – – 7,50 –

A11: Zagreb – SisakJakuševec – Velika Gorica jug Buševec – Lekenik

9,00––

–––

–10,0011,00

–––

30,00––

––

11,00

UKUPNO/TOTAL: 900,50 – 26,50 – 927,00 11,00

A1: Bosiljevo 2 – Zagreb 65,25 – – – 65,25 –A6: Rijeka – Bosiljevo 2 81,25 – – – 81,25 –A7: Rupa – Matulji – Diračje – Orehovica 28,00 – – – 28,00 –D10: Most Krk i pristupne ceste 12,53 – – – 12,53 –

UKUPNO/TOTAL: 187,03 – – – 187,03 –

A8: Kanfanar – MatuljiKanfanar – Pazin (č. Rogovići)Pazin – Matulji*

64,2118,13

46,08

–––

–––

––

**10,68

64,2118,13

46,08

–––

A9: Umag – PulaUmag – MedakiMedaki – KanfanarKanfanar – Vodnjan jugVodnjan jug – Pula

76,8041,847,36

20,706,90

–– –––

–––––

–––––

76,8041,847,36

20,706,90

–––––

UKUPNO/TOTAL: 141,01 – – **10,68 141,01 –

Autocesta/poluautocestaMotorway/semi motorway

U prometuIn service 01/01/2014

OtvorenoOpen in 2013

U izgradnji/In constructi-on 01/01/2014

Početak izgradnjeStart of const. in 2014

UkupnoTotal

OtvaranjeOpening in 2014

UKUPNO HRVATSKA/TOTAL CROATIA: 1.288,54 32,50 26,50 **10,68 1.315,04 11,00

* poluautocesta/brza cesta // semi motorway/fast road

HRVATSKE AUTOCESTE d.o.o.

UKUPNO SVE AUTOCESTE/TOTAL ALL MOTORWAYS

AUTOCESTA ZAGREB - MACELJ d.o.o.

AUTOCESTA RIJEKA - ZAGREB d.d.

BINA - ISTRA d.d.

MREŽA AUTOCESTA/MOTORWAY NETWORK

Page 7: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

A2: Zagreb – MaceljZagreb – Krapina Krapina – Macelj Dio dionice Krapina – Đurmanec

60,0042,8013,40*3,80

–––-

–––-

––––

60,0042,8013,40*3,80

–––-

UKUPNO/TOTAL: 60,00 – – – 60,00 –

A1: Bosiljevo 2 – Split – Dubrovnik Vrgorac – č. Ploče Č. Ploče – spoj Metković

416,0011,006,00

–11,006,00

–––

–––

416,00––

–––

DC 532: Spojna cesta Zagvozd - Baška Voda* 8,00 8,00 – – 8,00 –

A3: Bregana – Zagreb – Lipovac 307,00 – – – 307,00 –

A4: Zagreb – Goričan 97,00 – – – 97,00 –

A5: Beli Manastir – Osijek – GP sa BiHB. Manastir – Osijek (samo most Drava) Sredanci – granica BiH (Svilaj)

56,00––

–––

–2,503,00

–––

61,50––

– ––

A10: Granica sa BiH – Metković - č. Ploče 7,50 7,50 – – 7,50 –

A11: Zagreb – SisakJakuševec – Velika Gorica jug Buševec – Lekenik

9,00––

–––

–10,0011,00

–––

30,00––

––

11,00

UKUPNO/TOTAL: 900,50 – 26,50 – 927,00 11,00

A1: Bosiljevo 2 – Zagreb 65,25 – – – 65,25 –A6: Rijeka – Bosiljevo 2 81,25 – – – 81,25 –A7: Rupa – Matulji – Diračje – Orehovica 28,00 – – – 28,00 –D10: Most Krk i pristupne ceste 12,53 – – – 12,53 –

UKUPNO/TOTAL: 187,03 – – – 187,03 –

A8: Kanfanar – MatuljiKanfanar – Pazin (č. Rogovići)Pazin – Matulji*

64,2118,13

46,08

–––

–––

––

**10,68

64,2118,13

46,08

–––

A9: Umag – PulaUmag – MedakiMedaki – KanfanarKanfanar – Vodnjan jugVodnjan jug – Pula

76,8041,847,36

20,706,90

–– –––

–––––

–––––

76,8041,847,36

20,706,90

–––––

UKUPNO/TOTAL: 141,01 – – **10,68 141,01 –

Autocesta/poluautocestaMotorway/semi motorway

U prometuIn service 01/01/2014

OtvorenoOpen in 2013

U izgradnji/In constructi-on 01/01/2014

Početak izgradnjeStart of const. in 2014

UkupnoTotal

OtvaranjeOpening in 2014

UKUPNO HRVATSKA/TOTAL CROATIA: 1.288,54 32,50 26,50 **10,68 1.315,04 11,00

** dopuna do punog profila autoceste // upgrade to full motorway profile

MREŽA AUTOCESTA/MOTORWAY NETWORK

Page 8: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

8

OdmorištaRest areas

123 svakih/every

20 km

USLUGE/SERVICES

Benzinske postajeFilling stations

75 svakih/every

29 km

Cafe baroviCaffe bars

30 svakih/every

23 km

RestoraniRestaurants

16 svakih/every

76 km

HoteliHotels

8

Prijelazi za divlje životinjeCrossings for wild animals80

Broj dinamičkih informacijskih panelaNumber of VMS130

COKP/MTCCCentri održ. i kont. prometaMaint. & Traffic Control Centres23

Page 9: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

9

TvrtkaCompany

%(13/12)

%(13/12)

Total %(13/12)

HAC 27.946.068 -0,06 4.098.52 5 4,70 0,5 3

ARZ 1 6.7 1 2 . 976 -0,66 1 .678 .786 0,93 -0,5 2

Bina-Istra 7.2 1 1 . 4 3 3 2 ,70 6 53 .493 4, 35 2,84

AZM 6.2 2 3. 3 2 7 3,20 7 6 1 .870 14,67 4, 3 4

UkupnoSubtotal: 58.093.804 0,44 7. 1 92.674 4,72

SveukupnoTotal: 65.286.478 0,90

Udio LV i TV u ukupnom broju vozilaPortion of LV & HV in total no. of vehicles

2013/2012

PROMET/TRAFFIC

0,9 %Rast broja vozila u područjima naplate

Increase in number of vehicles in toll collection zones

Broj vozila u područjima naplate

Number of vehicles in toll collection zones

65,3 milmio

89 %

1 1 %

Page 10: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

10

PGDP po tvrtkama/AADT by companies

DruštvoCompany

HAC 10.408 1 .6 8 8 1 2.0 9 6

ARZ 14.4 3 9 1 . 9 7 6 1 6. 4 1 5

Bina-Istra* 19. 7 5 7 1 . 7 9 0 2 1 . 5 4 8

AZM 9. 5 1 3 1 . 1 6 9 1 0.6 8 2

Ukupno/total: 1 1 .9 1 8 1 .709 1 3.627

Broj vozila u područjima naplate 2011. - 2013. (u mil. voz.)Number of vehicles in toll collection zones 2011 - 2013 (in mio veh.)

6.409,1 106 x km

PROMET/TRAFFIC

Broj voznih kilometaraNumber of km travelled

1 .1 09,0 BINA ISTRA

234,0 AZM

1 .090,4 ARZ

3.975,7 HAC

* Navedene brojke predstavljaju prosječni dnevni broj transakcija. Kako je Istarski ipsilon specifičan (nije jednolična cestovna mreža već se dijeli na tri kraka sa nadprosječnim brojem čvorova), PGDP ne omogućuje prikaz realnog broja korisnika.

* These figures represent average daily transactions. As Istrian Y is specific (it is not uniform road network but consists of 3 branches with very high number of interchanges), AADT does not allow to present realistic figures.

Page 11: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

11

Nezgode po vrstama/Accidents by type

2010 2011 2012 2013S poginulimaWith fatalities 39 28 29 31

S ozlijeđenimaWith injuries 407 367 346 308

S materijalnom štetomWith material damage 2.245 1.971 1.839 1.823

Ukupno nezgodeTotal number of accidents 2.691 2.366 2.214 2.162

Nezgode po tvrtkama/Accidents by companies

SIGURNOST/SAFETY

2013/20122,4 %

Pad prometnih nezgodaDecrease in traffic accidents

Ukupno prometne nezgodeTotal traffic accidents

2.162

2.847 Broj vozila koja su sudjelovala u nesrećamaNumber of vehicles involved in accidents

96 BINA ISTRA

1 1 4 AZM

386 ARZ

1 566 HAC

Page 12: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

12

Ukupno poginuli/Total of fatalities 2010 - 2013

SIGURNOST/SAFETY

Poginuli prema porijeklu registarske pločice vozilaFatalities by origin of vehicle registration plates

6,1 Koeficijent poginulih (109 voz. km)Rate of dead (109 km travelled)

Vozila registrirana u RHCroatian registration plates

Vozila registrirana izvan RHInternational registration plates

13

26

2013/2012-13,3 %

Pad broja poginulihDecrease in fatalities

Ukupno poginuliTotal of fatalities

39

Page 13: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

13

Prekoračenje brzine/Excees speedNepažnja vozača/Driver negligence

Najčešći uzrociMost frequent causes

Koeficijenti sigurnosti (na 109 voz. km)/Safety ratios (per 109 km travelled)

HAC ARZ Bina- Istra AZM RH

CroatiaRH % 13./12.

Nezgoda s ozlije đenimaPersonal injury rate 49,22 83 1,62 40,11 51,48 -5,33

Nezgoda s poginulimaFatal accident rate

5,76 4,72 0 11,46 4,84 6,07

Koeficijent poginulihRate of dead

7,33 6,60 0 11,46 6,09 -13,93

Petak/Friday

Najkritičniji danThe most critical day

Materijalna štetaMaterijal damage

Najčešće posljediceMost frequent consequences

Ukupno prom. nez. službe održavanjaTotal traffic accidents. of Maint. Service Staff

Lakše ozlijeđeni/Injuries without hospitalisation

Poginuli/Fatalities

SIGURNOST/SAFETY

500{

Utorak/Tuesday

Najsigurniji danThe safest day

Srpanj/July

Najkritičniji mjesecThe most critical month

960 Broj nesreća pri idealnim uvjetima vožnjeThe number of accidents in ideal driving conditions

Page 14: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

14

EKONOMIJA/ECONOMY

Trakovi za naplatuToll lanes

686

Pokriveno ENC-omCovered by ETC

1.228 km

Naplatne postajeToll plazas

105

Trakovi za ENCETC lanes

466

2013/20125,6 %

Porast prihoda od cestarineIncrease in toll revenues

Prihodi od cestarine (bez PDV-a)Toll revenues (without VAT)

296,7milmio €

25,6 BINA ISTRA

26,3 AZM

64,8 ARZ

180,0 HAC

u mil/in mio EUR

351.825ENC Uređaji/OBUs

2013/201215,7 %

Povećanje/Increase

229.303ENC Pretplatnici/ETC Subscribers

2013/20123,2 %

Povećanje/Increase

1 EUR = 7,57 KN (Godišnji prosjek srednjeg deviznog tečaja Hrvatske narodne banke za 2013. Annual average exchange rate in 2013, Source: Croatian National Bank)

Page 15: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

15

Udio načina plaćanja u ukupnim transakcijama Breakdown of transactions by payment mode

EKONOMIJA/ECONOMY

Ukupno investicijeTotal investments

65,3 Ukupan broj transakcija Total number of transactions

milmio

Prihodi od cestarine/Toll revenues 2011 - 2013 u mil KN/in mio KN

1 % OSTALO/OTHER

23 % ENC/ETC

16 % KREDITNE KARTICE/CREDIT CARDS

58 % GOTOVINA/CASH

2 % SMART KARTICE/SMART CARDS

244,3 milmio €

1 EUR = 7,57 KN

u mil/in mio EUR

U nove dioniceInto new sections

U izgradene dioniceInto existing sections

36,0

208,3

Page 16: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

16

Ukupno investicije/Total investments 2011 - 2013 u mil KN/in mio KN

208,3 Investicije u nove dionice*Investments into new sections*

milmio €

* AZM, ARZ i BINA ISTRA nisu imale investicija u nove dionice* AZM, ARZ and BINA ISTRA had no investments into new sections

EKONOMIJA/ECONOMY

1 EUR = 7,57 KN (Godišnji prosjek srednjeg deviznog tečaja Hrvatske narodne banke za 2013. Annual average exchange rate in 2013, Source: Croatian National Bank)

36,0 Investicije u izgrađene dioniceInvestments into existing sections

milmio €

u mil/in mio EUR

3,2 BINA ISTRA

3,3 AZM

3,0 ARZ

26,5 HAC

160,6U nove dioniceInto new sections

48,3U izgrađene dioniceInto existing sections

milmio € mil

mio €

Plan investicija/Investment Plan208, 9 milmio€ 2014

Page 17: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

17

Podjela zaposlenika po društvimaBreakdown of workforce by companies

Podjela zaposlenika po spolu/Breakdown of workforce by gender

ZAPOSLENICI/WORKFORCE

3.571

1.522 1.548Broj nadzornih video kameraNumber of CCTV cameras

Broj intervencija vatrogasnih jedinicaNumber of firebrigade interventions

Stalno zaposleniPermanent Workforce

745 Žene/Women

2.826 Muškarci/Men

1 3 1 AZM

225 BINA ISTRA

722 ARZ

2.493 HAC

Page 18: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

18

Podjela zaposlenika po poslovimaBreakdown of workforce by job function

ZAPOSLENICI/WORKFORCE

Broj ralicaNumber of snowplowers

20229,1 km

Broj mostova i ukupna duljinaNumber and total length of bridges

149

Broj parkirališnih mjestalakih vozilaNumber of parking placeslight vehicles

6.580Broj parkirališnih mjestateških vozilaNumber of parking placesheavy vehicles

2.056

Ukupan broj parkirališnih mjestaTotal number of parking places

8.636Duljina zidova za zaštitu od bukeLength of noise protection walls

156,7 km

1 . 1 0 7 Naplata/Toll collection

1 .690 Održavanje (bez ophodara)Maintenance staff (without patrol service)

1 9 7 Ophodari/Patrol service

5 6 7 Ostali/Other

1 0 Uprava/Management board

Page 19: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

Članovi/Members

Bina-IstraT: +385 1 61 38 300 • F: +385 1 61 38 301E: [email protected] • www.bina-istra.hr

David GABELICAGlavni direktor/General Manager

Charles PARADISPredsjednik Nadzornog odbora/President of the Supervisory Board

AZMT: +385 1 36 89 611 • F: +385 1 36 89 620E: [email protected] • www.azm.hr

Miloš SAVIĆPredsjednik Uprave/President of the Managing Board

Dominik SUGNETIĆČlan Uprave/Member of the Managing Board

Thomas WERNER HOEFNERPredsjednik Nadzornog odbora/President of the Supervisory Board

HACT: +385 1 46 94 444 • F: +385 1 46 94 500E: [email protected] • www.hac.hr

Davor MIHOVILIĆ Predsjednik Uprave/President of the Managing Board

Marijan SENTEČlan uprave/Member of the Managing Board

Igor CIGULAPredsjednik Nadzornog odbora/President of the Supervisory Board

ARZT: +385 1 65 15 111 • F: +385 1 65 15 110E: [email protected] • www.arz.hr

Josip ŠALAPredsjednik Uprave/President of the Managing Board

Melita RAUKARPredsjednica Nadzornog odbora/President of the Supervisory Board

Hrvatska udruga koncesionara za autoceste s naplatom cestarine/Croatian association of toll motorways concessionaires

KOTURAŠKA CESTA 43, HR-10000 ZAGREB • T: +385 1 65 15 375F: +385 1 65 15 377 • E: [email protected] • www.huka.hr

Izdavač/Publisher: HUKAUređivački odbor/Editorial Board:

David GabelicaGlavni i odgovorni urednik/Editor in Cheif;

Brankica BajićTehnička urednica/Technical editor;

Diana BenkovićPomoćnica tehničke urednice/Technical editor assistant;

Hrvoje Vražić, Studio Domino dizajnGrafičko oblikovanje/Graphic design:

Datum izdanja/Published: svibanj 2014./May 2014

IMPRESSUM ISSN: 1848-0993

Davor MIHOVILIĆPotpredsjednik/Vice-President

David GABELICAPredsjednik/President

Širolina 4,HR-10000 ZAGREB

Velika Ves 116/a, LepajciHR-49000 KRAPINA

Širolina 4,HR-10000 ZAGREB

Savska 106/4,HR-10000 ZAGREB

Page 20: Key Figures - Domino dizajn d.o.o. · Most Drava MREŽA AUTOCESTA/MOTORWAY NETWORK A10 A11 Most KRK] [Bridge Krk HAC 900,5 km ARZ 187,0 km Bina Istra 1 4 1,0 km AZM 60,0 km A1 A4

HRVA

TSKA

UDR

UGA

KONC

ESIO

NARA

ZA

AUTO

CEST

E S

NAPL

ATOM

CES

TARI

NE/C

ROAT

IAN

ASSO

CIAT

ION

OF T

OLL

MOT

ORW

AYS

CONC

ESSI

ONAI

RES

www.huka.hr