KEY ELEMENTS. LOCAL APPLICATIONS MUST ADDRESS THE REQUIREMENTS OF SECTION 134 OF PERKINS OPTIONS A....

9
KEY ELEMENTS KEY ELEMENTS

Transcript of KEY ELEMENTS. LOCAL APPLICATIONS MUST ADDRESS THE REQUIREMENTS OF SECTION 134 OF PERKINS OPTIONS A....

Page 1: KEY ELEMENTS. LOCAL APPLICATIONS MUST ADDRESS THE REQUIREMENTS OF SECTION 134 OF PERKINS OPTIONS A. THROUGH 5-YEAR LOCAL APPLICATIONS & ANNUAL UPDATES.

KEY ELEMENTSKEY ELEMENTS

Page 2: KEY ELEMENTS. LOCAL APPLICATIONS MUST ADDRESS THE REQUIREMENTS OF SECTION 134 OF PERKINS OPTIONS A. THROUGH 5-YEAR LOCAL APPLICATIONS & ANNUAL UPDATES.

LOCAL APPLICATIONS MUST ADDRESS THE

REQUIREMENTS OF SECTION 134 OF PERKINS

OPTIONS A. THROUGH 5-YEAR LOCAL APPLICATIONS &

ANNUAL UPDATES

B. THROUGH ANNUAL LOCAL APPLICATIONS

REQUIREMENTS

Page 3: KEY ELEMENTS. LOCAL APPLICATIONS MUST ADDRESS THE REQUIREMENTS OF SECTION 134 OF PERKINS OPTIONS A. THROUGH 5-YEAR LOCAL APPLICATIONS & ANNUAL UPDATES.

A. PROGRAMMATIC

B. FISCAL

C. ACCOUNTABILITY

LOCAL APPLICATION CONTENTS

Page 4: KEY ELEMENTS. LOCAL APPLICATIONS MUST ADDRESS THE REQUIREMENTS OF SECTION 134 OF PERKINS OPTIONS A. THROUGH 5-YEAR LOCAL APPLICATIONS & ANNUAL UPDATES.

A. NOT MERELY A MECHANISM TO INSTITUTE

THE FLOW OF FEDERAL PERKINS FUNDS FROM THE STATE TO ELIGIBLE RECIPIENTS

B. SHOULD EMBODY THE STATE AND LOCAL VISIONS FOR CTE

C. UNIFICATION OF THE PROGRAMMATIC, THE FISCAL AND THE ACCOUNTABILITY ASPECTS

PURPOSE OF LOCAL APPLICATIONS

Page 5: KEY ELEMENTS. LOCAL APPLICATIONS MUST ADDRESS THE REQUIREMENTS OF SECTION 134 OF PERKINS OPTIONS A. THROUGH 5-YEAR LOCAL APPLICATIONS & ANNUAL UPDATES.

A. USE FUNDING FLOORS AND CEILINGS B. FUNDING FLOORS

1. 6% OF ALLOCATION FOR GUIDANCE 2. 10% FOR SPECIAL POPULATIONS

C. FUNDING CEILINGS 1. NO MORE THAN 30% OF ALLOCATION FOR

EQUIPMENTD. RESERVE

LOCAL APPLICATION TOOLS --- 1

Page 6: KEY ELEMENTS. LOCAL APPLICATIONS MUST ADDRESS THE REQUIREMENTS OF SECTION 134 OF PERKINS OPTIONS A. THROUGH 5-YEAR LOCAL APPLICATIONS & ANNUAL UPDATES.

A. SIZE, SCOPE, AND QUALITY

B. SIZE --- MUST HAVE X NUMBER OF STUDENTS

C. SCOPE --- MUST BE A PROGRAM OF STUDY; SEQUENCE OF COURSES; CAREER PATHWAY

D. QUALITY --- MET CORE INDICATORS

LOCAL APPLICATION TOOLS --- 2

Page 7: KEY ELEMENTS. LOCAL APPLICATIONS MUST ADDRESS THE REQUIREMENTS OF SECTION 134 OF PERKINS OPTIONS A. THROUGH 5-YEAR LOCAL APPLICATIONS & ANNUAL UPDATES.

A. BUDGET TABLE FORMAT B. ACCOUNTING CATEGORIES

C. PROGRAM CATEGORIES

D. BUDGET MATRIX

LOCAL APPLICATION TOOLS --- 3

Page 8: KEY ELEMENTS. LOCAL APPLICATIONS MUST ADDRESS THE REQUIREMENTS OF SECTION 134 OF PERKINS OPTIONS A. THROUGH 5-YEAR LOCAL APPLICATIONS & ANNUAL UPDATES.

SALARY FRINGES SUPPLIES TOTAL

PROF. DEV.

NON-TRAD

INSTRUCT.

GUIDANCE

ADMIN

TOTAL

Page 9: KEY ELEMENTS. LOCAL APPLICATIONS MUST ADDRESS THE REQUIREMENTS OF SECTION 134 OF PERKINS OPTIONS A. THROUGH 5-YEAR LOCAL APPLICATIONS & ANNUAL UPDATES.

A. ELIGIBLE RECIPIENTS CAN USE MANY OF

THE SAME TOOLS TO STRENGTHEN LOCAL IMPLEMENTATION OF CTE PROGRAMS 1. SSQ 2. FLOORS AND CEILINGS 3. A BUDGET MATRIX 4. RESERVE

LOCAL APP. TOOLS AT LOCAL LEVEL