KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT
CORPORATION (A Statutory Body of Government of Kerala
REQUEST FOR PROPOSAL (RFP)
FOR SELECTION OF A CONSULTANTFOR PREPARATION OF
DETAILED PROJECT REPORT (DPR) FOR PETROCHEMICAL
INDUSTRIALPARK , AT AMBALAMUGAL, KOCHI
KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION
(A Statutory Body of Government of Kerala)
KINFRA Corporate Head Office, KINFRA House, TC 31/2312, Sasthamangalam P.O, Thiruvananthapuram, Kerala, India -
695010
|Tel: 0471-2726585 | Fax: 0471-2724773 | Web: www.kinfra.org |
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
2
CONTENTS
1 Introduction and background 06
2 Invitation for Bidding 06
3 About the Project 08
4 Terms of Reference 09
5 Deliverables 11
6 Directives to Bidders 12
7 Evaluation of proposals and process of selection 19
8 Formats of Technical Bid and Financial bid 27
9 Completion schedule 29
10 Annexure 31
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
3
DISCLAIMER
• This RFP is not an agreement and is neither an offer nor invitation by Client
(KINFRA) to the prospective applicant (Bidder) or any other person. The purpose of
this RFP is to provide interested applicants with information that may be useful in
the formulation of proposal pursuant to this RFP. The information is not intended
to be exhaustive. Bidders are required to make their own inquiries and satisfy
themselves regarding the completeness and reliability of the information and not to
rely solely on the information in this document.
• Neither KINFRA nor their employees, consultants, advisors or agencies make any
representation or warranty as to the accuracy, adequacy, correctness,
completeness or reliability of the RFP and any assessment, assumption, statement
or information contained therein or deemed to form part of this RFP. Each
prospective applicant should conduct its own investigations and analysis and check
the accuracy, adequacy, correctness, completeness or reliability of the information
in this RFP document and obtain independent advice from appropriate source
before submission of the proposal against this RFP.
• KINFRA may, in its absolute discretion but without being under any obligation to do
so, update, amend or supplement the information, assessment or assumptions
contained in this RFP.
• Neither KINFRA nor their employees, consultants, advisors or agencies will have any
liability to any prospective bidder or any other person under the law of contract, for
any loss, expense or damage which may arise from or be incurred or suffered in
connection with anything contained in this RFP document.
• KINFRA reserves the right to reject any or all of the proposals submitted in response
to this RFP document at any stage without assigning any reason whatsoever.
KINFRA also reserves the right to hold, withdraw or cancel the process at any stage
under intimation to the applicants who submit the proposal against this RFP.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
4
• KINFRA reserves the right to modify or amend or add to any or all of the provisions
of this RFP document or cancel the present invitation and call for fresh invitations.
• Neither KINFRA nor their employees, consultants, advisors or agencies will have any
liability in case of non-receipt of any correspondence from them to the applicants
due to postal delays.
• The applicable laws for the purpose are the laws of INDIA. Courts of Kerala will have
the jurisdiction concerning or arising out of this RFP document.
• The applicants are expected to know the relevant rules and regulations of the
respective local authorities concerning the site, master plan and the construction
works.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
5
DEFINITIONS
• Application/Bid shall mean the response to this RFP with all documents as
specified.
• Client shall mean KINFRA, its authorized agencies and assignees.
• Applicant(s)/Bidder(s) shall mean all Companies/Firms who respond against this
RFP.
• KINFRA shall mean Kerala Industrial Infrastructure Development Corporation, a
statutory body formed by the Government of Kerala (GoK), represented by its
Managing Director which expression unless it be repugnant to the context or
meaning thereof, deemed to mean and include its successors and assignees.
• Consultant shall have the same meaning as successful bidder and with whom the
contract agreement would be signed.
• Consortium means an association of not more than three companies/Firms which
is treated as single entity.
• LOA (Letter of Award) shall mean the letter issued by KINFRA to the successful
bidderinviting him to sign the contract agreement.
• Contract Agreement shall mean the agreement to be signed between the
Consultant and KINFRA for the execution of the project.
• Site shall mean the place where the location of the Petrochemical Park for which
the services as mentioned under the scope of work for the project are to be carried
out.
• Bid Evaluation Committee (BEC) shall mean a team of Technical/Financial/Legal or
any other expert constituted by KINFRA for evaluation of documents /presentations
submitted by the applicants in response to the RFP.
• The Project means development of Petrochemical Park with all enabling facilities.
• The Marketingofallottable land means Confirmed allotment.Confirmed allotment
meansallottee remits 10 % of the lease premium as EMD proportionate to the land
allotted to them and also remitting minimum 50 % of the lease premium as down
payment & executing the license agreement with KINFRA.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
6
1. INTRODUCTION AND BACKGROUND
1.1 Kerala Industrial Infrastructure Development Corporation (KINFRA) is a statutory body
formed by the Government of Kerala in 1993, by an Act of State Legislature for
facilitating the development of industrial infrastructure in the State. KINFRA has
played a pioneer role in developing industrial infrastructure in the State of Kerala.
1.2 KINFRA has a very successful track record in setting up 22 industrial parks across Kerala
for facilitating development of the industry in the State.
1.3 KINFRA has taken the initiative of promoting the concept of ‘Theme Based Parks’ since
its inception in 1993. After understanding the needs of a particular industry, KINFRA
identifies common needs and accordingly provide common facilities to promote the
concept of ‘shared infrastructure’ as a facilitating measure to attract investors of that
particular industry. Theme Based Parks already commissioned by KINFRA include
Industrial Parks for Garments, Entertainment, Footwear, Exports based industry,
Biotechnology, Food processing and SME industrial sector etc.
1.4 KINFRA promotes a proactive approach to environmental protection and Pollution-
free ecosystem in all their parks.
1.5 KINFRA also provides exclusive single window clearance facility for units in its Parks for
obtaining regulatory licenses and clearances.
2. INVITATION FOR BIDDING
2.1 KINFRA intends to select a Consultant through a transparent, competitive bidding
process and invites Technical and Financial Bids from reputed consultants in
accordance with this “Request for Proposal” to prepare Detailed Project Report (DPR)
and marketing of 30% of the allottable land in the Park..
2.2 The document can be downloaded from our website at www.kinfra.org. A non-
refundable Bid Document fee ofRs.15000/- + tax (Fifteen Thousand + tax ) should be
enclosed with the application (Technical Bid) by DD, in favour of The Managing
Director, KINFRA, payable at Trivandrum, in a cover super scribed “ Bid Document Fee
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
7
for Petrochemical Park, Kochi”. Applications not accompanied with Bid Document fees
will be summarily rejected.
2.4 The Bidders have to submit their Technical Bid and Financial Bid in the prescribed
format as per this RFP. Cost of preparation of bids and related expenses has to be
borne by the Bidder. The bidders also will not be eligible for reimbursement of any
travel expenses for attending meetings, for making presentation or any other purposes.
2.5 The Bidder shall also furnish an Earnest Money Deposit (EMD) of Rupees Five Lakhs
only (Rs:5,00,000/-) by way of Demand Draft drawn in favour of Managing Director,
KINFRA payable at Trivandrum along with the Technical Bid in a cover
superscribed“Earnest Money Deposit”.
2.6 The Technical Bid and Financial Bid in the prescribed formats along with
supporting documents and the EMD should be submitted to Managing Director,
KINFRA KINFRA House, 31/2312, Sasthamangalam, Thiruvananthapuram-695010,
Kerala, Tel 0471 2726585, Fax 0471 2724773 Email: [email protected] per the schedule
given below. Bids not in the format as prescribed in this RFP document and not
accompanied by EMD will be summarily rejected.
2.7 An agreement (Annexure D) will be executed with the successful bidder to proceed
with the engagement of Consultant
2.8 The Bidders shall be deemed to have conducted a due diligence exercise and satisfied
themselves with respect to all aspects of the project, including site visit, when they
submit the bids. Interested parties shall visit and inspect the site at their own expense.
2.9 Correspondence in response to this RFP as well as related queries must be addressed to
Managing Director, KINFRA, KINFRA House, 31/2312, Sasthamangalam,
Thiruvananthapuram-695010, Kerala, Tel 0471 2726585, Fax 0471 2724773 Email:
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
8
3. ABOUT THE PROJECT
• KINFRA intends to develop a Petrochemical Park of international standards at
Ambalamughal, in Ernakulam District Kerala. The project is intended to create an
Industrial Park with all modern facilities exclusive for the Petrochemical Industry.
• The Petrochemical Park is proposed to be established in approximately 450 acres
of land in FACT premises at Ambalamughal, in Kochi to be transferred to KINFRA.
This land already has, near to it, a large refinery, fertiliser and chemical factories,
LNG Terminal & Gas Pipeline Network being established, a Bulk Terminal and
International Container Transhipment Terminal (ICTT). The proposal assumes
significance in view of the expansion proposal of BPCL, nearness to the Port and
Natural Gas infrastructure at the location.
• The Industrial units in the Park will be provided with all infrastructure facilities. The
infrastructure facilities in the proposed Petrochemical Park includes dedicated
power, continuous water supply, roads, plots for establishing industries and offers
plug and play arrangement for easy start-up of Industrial units at minimum cost and
time.
• Infrastructural components proposed for the Petrochemical Park include the
following components
CATEGORY
DETAILS Common Infrastructure Facilities • Internal Roads, culverts &
drainage • Water supply and
distribution including water treatment plant.
• Dedicated Sub-station & Power distribution System
• Street lighting
• Telecom & communication systems
• Sewerage network
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
9
• Common Effluent Treatment Plant (CETP) for Industrial Wastewater treatment;
• Rainwater harvesting
• Greenery
Social Amenities • Canteen • Clinic
• Recreational facilities
• Bank / ATM
• Logistics movement
support
• KINFRA now intends to select a Consultant for the DPR preparation and marketing
of the project as per the “Terms of Reference” given below.
3.6ESTIMATED PROJECT COST
The estimated cost of the project is Rs.450 Crores.
4. TERMS OF REFERENCE
• The Consultant shall be entrusted with preparation of Detailed Project Report (DPR)
and marketing of the project. The DPR should be prepared according to the guidelines
of Kerala Industrial Infrastructure Fund Board (KIIFB); the components of DPR is given
as Annexure A.
• The Consultant should prepare legible layout of the proposed site, carry out site
analysis for elements like soil analysis, surveyed site plan and site soil particulars
including spot levels/contours, flood history, on-site features etc. for realistic cost
estimates of land development and construction.
• The Consultant is responsible for entire architectural component of the project work.
The Consultant should also provide the details regarding the common facilities and
common technical infrastructure required with estimated investments therein. This
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
10
would include the developing of the Master Plan along with sectional drawings and
building plan with legends giving clear picture /title of drawings and other relevant
details. This would also include detailed engineering and design including preparation
of detailed cost estimates for various project components/facilities envisaged in the
Petrochemical Park Project. The cost estimates shall be according to the latest CPWD
rates;wherever it is not available, market rates to be considered.The cost estimates for
plant and machinery shall be backed by quotations from reputed equipment and
machinery suppliers in line with scheme requirements.
• The above clause shall be broadly divided as follows:
• Master Plan: To be based on the broad concept design and cost in
consultation with KINFRA
• Preliminary Drawings and estimate: Rates to be calculated based on Delhi
Plinth Area rates
• Detailed Drawings and estimate: Latest Delhi schedule of rates to be
followed. Wherever it is not available, market rates to be considered.
• The Consultant shall prepare all relevant documents related to statutory approvals for
the Project.
• The consultant shall prepare and submit all Bid documents required for tender
purpose.
• The Consultant shall work out the implementation schedule with milestones for the
project.
• The Consultant shall abide by all the clauses in the Agreement to be entered in to with
KINFRA .The draft agreement is attached as Annexure D.
• Ten copies of DPR and all the deliverables are to be submitted along with the soft
copy.
• Consultant shall,on their own (If approved agency) or through another approved
Agency,carry out Environment Impact Assessment (EIA). The Consultant shall co-
ordinate with the Agency for timely completion of the EIA and also follow up with the
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
11
appropriate authorities for getting clearance. The cost towards EIAshall also be
included in the financial quote.
• The structural design submitted by the Consultant will be proof checked if necessary
by KINFRA through a third party .If these designs are acceptable and needs no
correction/modification as required in the relevant BIS codes/KMBR, the cost of proof
checking shall be borne by KINFRA. In case correction/modifications are required in
the design and drawing the entire charges for proof checking shall be borne by the
Consultant.
• The consultant shall prepareand submit allbid documentsrequired for the selection of
contractors for the implementation of the project.
• The Consultant shall ensure marketing of 30% of the allottable land to industrial units.
All costs relating to marketing shall be borne by the Consultant
5. DELIVERABLES:
5.1 Detailed Project Report
DPR should be prepared with all the components mentioned in Annexure A.
5.2 Master Plan shall include the following:
• Site analysis Report for elements like soil analysis,surveyed site plan and site soil
particulars including spot levels/contours, flood history, on-site features etc. for
realistic cost estimates of land development and construction
• Layout incorporating the individual components in surveyed map
• Preliminary Drawings
• Preliminary Estimates
5.3 Detailed Estimate including the following:
• Detailed Drawings
• Detailed Estimates including BoQs for all components of the work including
electrical, Air conditioning, fire-fighting and Environmental engineering
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
12
requirements. This will include structural drawings forcivil and drawings and
designs for electrical, fire-fighting and water supply and sanitary installations works
as mentioned.
• Structural Drawings and Designs for all components of the work
5.4Financial Planning Report for the project in accordance with requirements.
5.5 Submission of all Bid documents required for tender purpose.
5.6Submission of all relevant documents related to statutory approvals
5.7Submission of implementation schedule as per the overall plan.
Note: Clause 5 Deliverables shall be read in conjunction with clause 4 Terms of Reference
6. DIRECTIVES TO BIDDERS FOR THE SUBMISSION OF RFP
6.1 PRE-BID MEETING
6.1.1 In order to clarify any queries and discuss the issues with respect to the Project, a pre-
bid meeting shall be held with the bidders as per the schedule given below, at the
conference hall of KINFRA Head office, Sasthamangalam, Trivandrum-695010
6.2 ENQUIRIES CONCERNING THE RFP
6.2.1 All enquiries should be submitted on the following address in writing, by letter or e-
mail or facsimile transmission:
ADDRESS: Managing Director,
KINFRA,
KINFRA house, 31/2312,
Sasthamangalam,
Thiruvananthapuram- 695010,
Kerala
Tel: 0471 2726585
Fax: 0471 2724773
Email:[email protected].
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
13
Note: All the communication from KINFRA will be through email only. Any
corrigendum/addendum /Clarification to the RFP will be published in the website of KINFRA
only.
6.3 VALIDITY OF BID
Each bid shall indicate that it will remain valid for a period not less than 180 days
from the due date of the submission of the bid (Bid due date). KINFRA reserves the right to
reject any bid, which does not meet this bid validity requirement.
6.4 TENTATIVE SCHEDULE FOR BIDDING PROCEDURE
The tentative schedule of the bidding procedure is as follows. The schedule is
subjected to change at the discretion of KINFRA
SL. No. Milestone DATE
1 Release of Bid 28th September 2017
2 Receipt of Queries if any 9thOctober 2017
3 Pre- Bid Meeting 13rdOctober 2017
4 Submission of Bid 23rdOctober2017
5 Technical Bid opening 23rdOctober 2017
6 Technical Presentation by
prequalified bidders.
(Tentative date)
3rd November 2017
7 Opening of financial bid.
(Tentative date)
6th November 2017
6.5 SUBMISSION OF BID
The Technical Bid and Financial Bid should be submitted by the bidders, along with
supporting documents, EMD and the Bid Document fee to Managing Director, KINFRA on
or before due date, at the address provided in the RFP document. Bids submitted by
facsimile or E-Mail will not be accepted.
6.6 EARNEST MONEY DEPOSIT
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
14
6.6.1 The bidder must submit an interest free Earnest Money Deposit (EMD) of Rs.
5,00,000.00(Rupees Five Lakhs only) by way of Demand Draft (DD) drawn in favour of
Managing Director, KINFRA payable at Trivandrum along with the Technical bid in a
cover super scribed “Earnest Money Deposit”. The bids not accompanied by EMD will
be summarily rejected.
6.6.2 The EMD of all unsuccessful bidders will be refunded within a period of thirty (30) days
from the date of awarding work to the successful bidder. The EMD of any bidder,
whose bid is rejected on account of being non-responsive or non-reasonable in
accordance with the RFP, will be refunded within a period of thirty (30) days from the
date of intimating the rejection of bid by KINFRA to the bidder.
6.7 FORMAT AND SIGNING OF BIDS
6.7.1 The Technical Bids and Financial Bids are to be submitted as per the prescribed
formats in Annexure B. The proposal shall be typed and printed in indelible ink and
shall be signed by the Bidder or a person duly authorized to bind the applicant
organization to the contract. All pages of the proposal including all Photostat copies
shall be attested by the person signing the proposal. Any interlineations, erasures or
overwriting shall be valid only if it is attested by the person signing the proposal.
6.7.2 The intending firms shall also submit the list of such projects, where, due to any disputes
litigation/arbitration was invoked and/or the consultancy services were
abandoned/suspended by the Consultant(s). Suppression of any information in this regard
may lead to disqualification of the Applicant(s) concerned, if such information comes to the
notice of KINFRA. Incomplete applications will be summarily rejected. Applicants should give
an undertaking certifying that the firm or its Associates / Subsidiaries has not been
blacklisted or debarred by any Central/State Governments/Govt Departments/ Govt
Bodies/PSU’s.
6.7.3 The cost of preparation of bids and related expenses has to be borne by the Bidder.
The bidders will not be eligible for reimbursement of any travel expenses for
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
15
attending pre bid meeting and othermeetings for making presentation or any other
purposes.
6.7.4 Any addendum/corrigendum/clarification to this RFP document shall only be uploaded
on the website of KINFRA and may not be communicated otherwise. Prospective
bidders are therefore advised to visit KINFRA website and get updated on the latest
status.
6.8 SEALING AND MARKING OF BIDS
6.8.1 The bidder would provide all the information as per this RFP, and KINFRA would
evaluate only the bids received in the required format. The Technical Bid and
Financial Bid should be separately submitted in sealed envelopes, super scribed
“Technical Bid” and “Financial Bid” respectively in separate envelopes. In the
envelope super scribed ‘Technical Bid’ should contain Pre-qualification Criteria and
Technical Evaluation Criteria in two separate sealed covers, and the Bidder should
enclose the envelope containing the EMD and Bid Document Fee in this envelope.
Both these envelopes (envelope super scribed ‘Technical Bid’ and envelope super
scribed Financial Bid’) should be enclosed in another sealed envelope super scribed
“Selection of Consultant for Petrochemical Park at Kochi”.
6.8.2 The envelope shall be addressed to:
ADDRESS: The
Managing Director,
KINFRA, KINFRA House, 31/2312
Sasthamangalam, Thiruvananthapuram-695010
Kerala,India.
Tel No: 0471 2726585
6.8.3 KINFRA assumes no responsibility for the misplacement or premature opening of the
bids submitted, if the Sealing and Marking is not as per the requirement. KINFRA will
not be responsible for any postal delays or delay in transit for submitting the Bids.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
16
6.9 RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
Notwithstanding anything contained in this RFP, KINFRA reserves the right to accept or
reject any Bid/ all Bids and to annul the bidding process and reject all bids, at any time
prior to the signing of the agreement without assigning any reason and without incurring
any liability to the rejected Bidder/ Bidders or any obligation to inform the affected
Bidder/ Bidders of the grounds for rejection.
6.10 SUCCESSFUL BIDDER
6.10.1 The successful bidder shall be selected based on the evaluation and scoring of the bid
and presentation.
6.10.2 The work will be awarded to the successful bidder and theselected bidder would be
required to execute the agreement with KINFRA within 15 days from award of work.
6.11 DEFAULT AND FORFEITURE OF EMD
6.11.1 The EMD will be forfeited under the following circumstances:
If the successful bidder fails to execute the agreement in prescribed time.
If the bidder withdraws his offer during the Bid validity period
If the successful bidder fails to furnish the Bank guarantee / performance
guarantee with in time stipulated in work order / letter of intent.
6.12 DEFINITION OF TERMS & PAYMENT TERMS
6.12.1 Definition of “Completion of work”: It is defined as completion of all the work as
mentioned in the terms of reference and the marketing of 30% of the allottable land
to industrial units and approval by KINFRA of the Completion Report submitted by
the Consultant
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
17
6.12.2 The Payment Schedule will be as follows –
20% as initial payment on execution of agreement against Bank Guarantee for
equivalent amount from a Nationalised bank. This BG is initially for a period of 24
months. This BG will be released after the final payment on submission of
Performance BG for an amount equivalent to 10% of total value of the consultancy
charge and valid for 12 months
10% on submission of masterplan, preliminary reports and preliminary drawings and
on approval by KINFRA .
10% on submission and approval of engineering designs, drawings, plans, detailed
estimates.
15% on submission of the final DPR and acceptance by KINFRA .
10% on approval of the DPR by KIIFB.
10% on submission of all Bid documents for Tender purpose by the Consultant and
acceptance of the same by KINFRA.
10% on allotment of 15% of the allottable land by the marketing effort of the
Consultant.
15% on allotment of remaining 15% of the allotable land by the marketing efforts by
the Consultant
10% of the quoted amount will be given as incentive on allotment of every
additional 10% of the land within 24 months by the marketing efforts of the
Consultant.
Note: All payments shall be subject to “Tax Deduction at Source” (TDS) and
such other statutory deductions as may be applicable from time to time.
6.13 LIQUIDATED DAMAGES
6.13.1 In the event of a delay in completion of work as per the completion Schedule for
which the consultant is responsible, the consultant shall pay Liquidated Damages to
KINFRA at the rateof half percent (0.5%) per week of delay, subject to a maximum
of ten percent (10%) of the consultancy fees.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
18
• Such Liquidated Damages shall be deemed to be a genuine pre-estimate of the
foreseeable damages incurred by KINFRA due to delay and shall be KINFRA's sole
recourse for late performance by the consultant under the agreement.
6.14 Conflict of Interest
6.14.1 KINFRA requires that consultants should provide professional, objective and
impartial advice and at all times hold the client’s interest paramount, strictly avoid
conflicts with other Assignment/jobs or their own corporate interests and act
without any consideration for future work. The consultant and any of their
affiliates shall be considered to have a conflict of interest and shall not be hired
under any of the circumstances given below: (a) Conflicting activities or assignment
i.e. providing goods or works or assignment other than consulting assignment (b)
Conflicting relationship i.e. business/relationship with a member of client’s staff
involved in the job. (c) The consultants shall be required to observe the highest
standard of ethics during rendering of professional services.
6.15 Fraud and Corruption
6.15.1 KINFRA requires that the bidders against this RFP shall observe the highest
standard of ethics and shall not indulge in corrupt , fraudulent and collusive
practices which would result in rejection of bids and cancellation of award of
contract. In pursuit of this policy, the following are defined:
6.15.2 Corrupt practice means the offering, giving, receiving or soliciting, directly or
indirectly, of anything of value to influence the action of a public official in the
bidding process or in contract execution.
6.15.3 Fraudulent practice means a misrepresentation or omission of facts in order to
influence the bidding process or the execution of contract.
6.15.4 Collusive practice means a scheme or arrangement between two or more bidders,
with or without the knowledge of the client/KINFRA, designed to establish bid
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
19
prices at artificial, non-competitive levels and Coercive practice means harming or
threatening to harm, directly or indirectly, persons or their property to influence
their participation in the bidding process or affect the execution of contract.
• SUB-CONTRACTING & SUB-CONSULTANT
6.16.1 The Consultant shall not subcontract whole of the work. However they may
subcontract any part of the work after duly notifying and obtaining prior approval
from KINFRA.
6.16.2 The Consultant shall indicate the name of sub- consultants if any for any services
with their organization details, qualification and experience of the main personnel
and shall obtain prior approval of KINFRA before their engagement for the
consultancy. Such Sub consultant approved by KINFRA shall be associated from
the preliminary drawing stage to the final design work. However, the consultant
shall be fully responsible for the correctness and accuracy of the designs prepared
by sub-consultants and shall indemnify KINFRA for damage or loss caused due to
any negligence of sub-consultant(s). The copy of the agreement between sub-
consultant and the consultant shall be submitted to KINFRA.
7. EVALUATION OF PROPOSALS AND PROCESS OF SELECTION.
7.1 The bidder shall submit the Technical Bid and Financial Bid for evaluation. The
prequalified bidders will be invited for the presentation of their proposal before the
Selection Committee.
7.2 PRE-QUALIFICATION CRITERIA
• Experience in providing consultancy services for a minimum period of 7 years in
similar projects or assignments.
• Experience as Consultant in the preparation of DPR in at least one fully implemented
Industrial Park Project/ similar project with project cost of Rs.360 Crore and above.
OR
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
20
Experience as Consultant in the preparation of DPR in at least two fully implemented
Industrial Park Project/ similar project with project cost of Rs.270 Crore.
OR
Experience as Consultant in the preparation of DPR in at least three fully
implemented Industrial Park Project/ similar project with project cost of Rs.180
Crore.
Note: In the case of Consortium(maximum 3 members), Lead partner should have
this experience. [Signed, dated and sealed copies of work orders and the work
completion certificate/client certificate shall be submitted. Projects mentioned
without supporting documents will not be considered]
• The bidder/Lead partner should have experience as consultant in completing a
government project either state or central government or PSUs with a project cost of
180 crores and above.
• The sole bidder/ lead partner of the bidding consortium should have annual Profit in
each of the preceding 3 years starting from 2014-2015 onwards. [The Bidder
shall provide copies of Audited Statement of Accounts and Balance Sheets. In case
audited balance sheet is not available for the year 2016-2017, Chartered Accountant
certified balance sheet shall be provided].
• The sole bidder/ lead partner of the bidding consortium should have positive net-
worth in the preceding 3 years. [The details of annual turnover and annual profits
may be separately provided. Copies of PAN card, Income Tax Returns related
documents; Service Tax returns filed shall also be enclosed]
Net worth shall be calculated as below:
Net worth = Share Capital + Reserves & Surplus - Miscellaneous expenditure to the
extent not written off
OR
Net worth = Total Assets - External Liabilities
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
21
• Consultant or its Associates / Subsidiaries should not have been debarred/blacklisted
by any Central/State Governments/Govt Departments/ Govt Bodies/PSU’s. *An
undertaking in Company letter head, signed by the Authorised signatory in this
regard should be submitted. In the case of Consortium, all entities should submit this
undertaking]
EVALUATION CRITERIA
The Technical bids of Bidders will be evaluated based on
7.3.1 BIDDER’S EXPERIENCE AS A PROJECT CONSULTANT
• Experience in providing consultancy services for a minimum period of 7 years and
above in doing similar projects or assignments.
• Experience as Consultant in the preparation of DPR in at least one fully implemented
Industrial Park Project/ similar project with project cost of Rs.360 Crore and above.
OR
Experience as Consultant in the preparation of DPR in at least two fully implemented
Industrial Park Project/ similar project with project cost of Rs.270 Crore.
OR
Experience as Consultant in the preparation of DPR in at least three fully
implemented Industrial Park Project/ similar project with project cost of Rs.180
Crore.
Note: In the case of Consortium (maximum 3 members), Lead partner should have
this experience. [Signed, dated and sealed copies of work orders and the work
completion certificate/client certificate shall be submitted. Projects mentioned
without supporting documents will not be considered]
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
22
• Experience as PMC/consultant in the preparation of DPR in fully implemented
Industrial Park/similar projects with an area more than 100 acres.
• The experience of undertaking an Industrial Park Project as Consultant/Project
Management Consultant(PMC), in similar Infrastructure development Projects for
Industrial Parks in petrochemical and/or pharmaceutical sector will be an added
advantage
7.3.2 KEY PERSONNEL
Conditions of Eligibility for Key Personnel: Each of the Key Personnel must fulfil the
Conditions of Eligibility as specified below:
S. No. Position Educational Qualifications
Length of Professional Experience
1 Team Leader Relevant Degree in Urban Planning / Civil Engineering / Mechanical Engineering/ Electrical Engineering/Chemical Engineering
More than 20 years
2 Chief Architect Degree in Architecture More than 15 years
3 Market Analyst/ Industry Analyst Expert
MBA or equivalent More than 10 years
4 Civil Engineer B. Tech (Civil Engineering)
More than 08 years
5 Urban Planner Relevant Post Graduate Degree in Urban Planning / Design
More than 08 years
6 Structural Engineer M. Tech (Structures) More than 08 years
7 Finance Expert CA/CFA/CMA or equivalent
More than 10 years
8 Environmental Specialist Relevant Post Graduate degree in
More than 08 years
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
23
Environmental Engineering / Planning
7.3.3 The bidder/Lead partner should have experienceas consultant in completing a
government project either state or central govt or PSUs. with a project cost of 180
crores and above.
7.3.4 Whether Bidder has existing office facilities located in Kerala.
7.3.5 Whether Bidder has attained Quality Management System Certification (ISO).
7.3.6 Whether the firm has experience in designing as per Green Building norms
7.3.7 Technical Presentation on Proposed “Methodology and Work Plan” to be adopted by
the Bidder for, accomplishment of the assigned task, to be made by the prequalified
Bidder before the Selection Committee.
7.3.8 The technical evaluation, applying criteria mentioned above and corresponding
points rating are listed as below:
SI No: Evaluation Criteria Maximum Marks
1 Experience in providing consultancy services for a
minimum period of 7 years and above in doing similar
projects or assignments.
Experience up to 7 years : 4 marks
Experience above 7 years up to 10 years : 5marks
Experience above 10 years up to 15years : 6 marks
Experience above 15 years : 7 marks
7
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
24
2. In providing consultancy service for design and DPR
preparation of large scale industrial Park/similar
projects .
• 1 project with project cost of Rs.360Cr-12 marks
• 2 projects with project cost of Rs.270Cr-12 marks
• 3 projects with project cost of Rs.180Cr-12 marks
For each additional project in the above three
categories, a maximum of 6 marks shall be given as
follows.
Each project of cost more than Rs.360 crores : 3
marks each
Each project of cost Rs.270- 360crores:2 marks each
Each project of cost Rs.180 – 270 crores : 1 mark
each
18
3. Experience as Consultant/PMC in the preparation of DPR
in fully implemented Industrial Park/ /similar Industrial
Projects in an area of100 acres and above.
• 2 or more projects-10
• One project-5
10
4. The experience of undertaking an Industrial Park
Project as Consultant/Project Management
Consultant(PMC), in similar Infrastructure development
Projects for Industrial Parks in petrochemical and
pharmaceutical sector.
• one project – 10 Marks
10
5. Key personnel
1.Team Leader -04
• 20 years of experience -3 Mark
20
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
25
For each of the additional 5 years of experience 0.5
marks will be given limited to a maximum of one mark.
2. Chief Architect -03
• 15 years of experience -2 Marks
For each of the additional 5 years of experience 0.5
marks will be given limited to a maximum of one mark.
3. Market Analyst/ Industry Analyst Expert -03
• 10 years of experience -2 Marks
For each of the additional 5 years of experience 0.5
marks will be given limited to a maximum of one mark
4. Finance Expert -03
• 10 years of experience -2 Marks
For each of the additional 5 years of experience 0.5
marks will be given limited to a maximum of one
mark.5.Civil Engineer -02
• 8 years of experience -1 Marks
For each of the additional 3 years of experience 0.5
marks will be given limited to a maximum of one mark
6. Urban Planner -02
• 8 years of experience -1 Marks
For each of the additional 3 years of experience 0.5
marks will be given limited to a maximum of one mark
7. Structural Engineer-02
• 8 years of experience -1 Marks
For each of the additional 3 years of experience 0.5
marks will be given limited to a maximum of one mark
8.Environmental Specialist-01
• 8 years of experience -0.5 Marks
• For each of the additional 2 years of experience
0.5 marks will be given.
6. Assignments/Projects undertaken for Govt. of India
/ State Governments / PSUs with a project cost of 180
04
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
26
crores and above.
7. Office facilities in Kerala 01
8. Quality Management System Certification (ISO) 02
9. Knowledge and Experience in developing and executing
‘Green’ parks/institutions/industrial areas as per IGBC
guidelines
03
10. Presentation on “Methodology and Work Plan” to be
adopted and deployment of ‘Project Team’.
• Methodology – 10 Marks.
• Work Plan – 10 Marks.
• Deployment of manpower – 5 Marks.
25
TOTAL 100
Note: Cancelled/failed/not completed projects will not be considered for the evaluation.
7.3.9 The total technical score (TS) would be an arithmetic sum of scores obtained by the
bidder for each of prescribed parameters. The total technical score would include 75
marks based on documents submitted by the bidder showing conformance to the
parameters shown above and 25 marks based on presentation made by the
prequalified bidder before the selection committee. Based on the Technical Score
(TS) bidder will be shortlisted for the next stage.
7.3.10 The bidders are requested to quote the amount in Indian Rupees for undertaking the
assignment.
7.3.11 Following methodology is used for arriving at the Financial Score (FS)
FS = LF/FB X100
Where LF = Lowest Financial Bid Amount
FB = Financial Bid Amount for which FS is to be evaluated.
7.3.12 Final evaluation of combined technical and financial bid shall be based on the “Final
Weighted Score”.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
27
7.3.13 In order to arrive at the “Final Weighted Score”, a weightage of 80% will be assigned
for the Technical Score (marks/points scored in technical bid evaluation) and
weightage of 20% will be assigned for Financial Score.
The “Final Weighted Score” will be as follows:
S= (0.8xTS) + (0.2xFS)
Where S= Final Weighted Score,TS= Technical Score,FS=
Financial Score
7.3.14 The bidder scoring the highest “Final Weighted Score” shall be awarded the project.
7.3.15 KINFRA however reserves the right to reject any or all bids received, without
assigning any reasons and without any liability to KINFRA.
8. FORMAT OF TECHNICAL BID AND FINANCIAL BID (As per Annexure B)
THE TECHNICAL BID SHALL INCLUDE:
8.1 Pre-Qualification details as per enclosed Format.
8.2 The Technical Bid should have a covering letter which provides information on the
firm/company interested in taking up consultancy for Petrochemical Park, Kochi.
8.3 The bidder shall provide all necessary documents like MoU / AoA and completion
certificate from the Client with total cost of each project on the experience in
providing consultancy services for a minimum period of 7 years and above in doing
similar projects or assignments.
8.4 The Bidder shall provide specific information on experience of the organization in
providing consultancy services, particularly for DPR preparation of large projects,
which have been fully implemented. Signed, dated and sealed copies of work orders
and the work completion certificate/client certificate shall be submitted. Projects
mentioned without supporting documents will not be considered.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
28
8.5 The Bidder shall provide specific information on experience as Consultant/PMC in
Industrial Park/Industrial Estate/Industrial Projects completed (fully implemented),
in an area of 100 acres or more as evidence of the organization’s ability to
successfully conceptualize, implement and complete large projects in Industrial
Infrastructure development including DPR preparation. Signed, dated and sealed
copies of work orders and the work completion certificate/client certificate shall be
submitted. Projects mentioned without supporting documents will not be
considered.
8.6 The Bidder shall provide information on projects undertaken as Consultant/PMC in
similar Infrastructure development Projects for Industrial Parks in petrochemical and
pharmaceutical sector. The assignments may be in the nature of consultancy projects
for pre-feasibility reports, detailed project reports or similar activities. Copy of work
orders/completion certificate from the client to be submitted.
8.6 The Bidder shall provide details of existing local offices in Kerala, if any. The details
such as contact address details, number of staff, and office hierarchy structure may
be provided.
8.7 The Bidder shall provide details of certifications of Quality Management System
(ISO), attained by them. Copy of the certificates to be enclosed showing validity
dates.
8.8 The Bidder shall provide details of Experience in developing and executing ‘Green’
parks/institutions/industrial areas as per IGBC guidelines. Relevant Documents as
proof to be submitted.
8.9 In the case of Consortium, scope of work of each consortium member to be clearly
mentioned.
8.10 The Bidder shall make a presentation on ‘Methodology and Work Plan’ as well as the
‘Deployment of Proposed Team’ earmarked for this assignment. The presentation on
Methodology and Work Plan shall include various aspects of Detailed Estimate
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
29
preparation as well as market survey, risk analysis, cost benefit analysis etc. The
presentation should illustrate the proposed methodology to be adopted by the
Bidder and should cover all aspects under ‘terms of reference ‘.
THE FINANCIAL BID SHALL INCLUDE:
8.13 The Bidder should quote in the Financial Bid theconsultancy fees in Indian Rupees.
The Financial Bid should have the Total Price inclusive of all taxes.
8.14 No subjective condition will be accepted in the Financial Bid.
8.15 The formats for Technical Bid and Financial Bid are provided at Annexure B. The
format in which presentations are to be made is given in Annexure C. The Bidders
will strictly adhere to the presentation formats provided and number of slides for
presentation shall not exceed 10 numbers. Time allowed for presentation is
maximum 20 minutes.
9. COMPLETION SCHEDULE
9.1 The “Completion Schedule” in brief for completion of this assignment with indicative
dates is given below.
Award of work to PMC- D1
Submission of masterplan,
preliminary report by consultant
for approval-D2
D1+45 days
Submission of engineering
designs, drawings, plans,
detailed estimates by
consultant.-D3
D2+15 days
Submission of final DPR by D1+90 days
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
30
consultant-D4
Submission of Bid document-D5 D1+105 days
Marketing of 15% of the
allottable land by consultant-D6
D1+540 days
Marketing of remaining 15% of
the allottable land by consultant-
D7
D1+720 days
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
31
ANNEXURE A
DETAILED PROJECT REPORT
FOR
THE DEVELOPMENT OF PETROCHEMICAL PARK AT KOCHI
TABLE OF CONTENTS
SALIENT FEATURES (as per attached format)
CHAPTERS:
Executive Summary:
• This section shall contain brief of all relevant details discussed in the following
chapters.
INTRODUCTION
• This section must provide a general introduction of the project being submitted.
• General introduction shall include write up on: location of the petrochemical park,
general description and historical background of the project, need for the project,
etc.
• Aims and objectives of the project shall also be briefed in the section.
STATUS FEASIBILITY STUDIES
• Description of any feasibility study conducted earlier and their outcome shall be
discussed in this section.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
32
REQUIREMENT/ DEMAND ANALYSIS
• This section should present the specific problem(s) or issue(s) faced by
stakeholders like citizens, businesses or governments that would be addressed by
means of provision of improved services through the proposed project.
• In this section, the rationale behind the project proposed shall be described with
clear focus on the existing condition and how it will help in improving the
situation and bring benefits to the stakeholders.
• The rationale could be broad based and supplemented with facts and figures.
Information based on objective research, not subjective impressions, should be
provided to justify the need or problem. The rationale should be written in a way
that would lead to objectives.
• Need of petrochemical park in the identified area should be explained in this
section. Detailed market study to accompany the demand analysis and potential
to attract customers to be evaluated in proper.
FUNCTIONAL DESIGN
• This section should present an analysis of different options available to achieve
the objective and the reasons for selecting the proposed option should be
substantiated.
• The functional design of the project is mainly achieved through field study and
documentation using existing information and specifications from various
standards.
• Area quantification of the requirements should be mentioned in the report; also
the methodology adopted in arriving at the total area should be clearly specified.
• The location of the petrochemical park depends on several factors like the
availability of land area and raw materials, facilities for transportation, availability
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
33
and adequacy of electricity and water, existence of a growing marketing potential
etc.
• History of functioning of existing/nearby industrial park in the region, if any shall
be considered.
• The infrastructure shall be planned as to get the most economical design and at
the same time satisfy specific requirements, if any.
• The design of the infrastructure shall be considered as one which results in
minimum construction cost with respect to the actual site conditions like
topographical features, geotechnical features etc.
• The general layout of the petrochemical park shall be planned as per the site
conditions and the requirements of facilities to be provided.
• The layout of different plot sizes along with the infrastructures being provided
shall be prepared as per the general requirement and at the same time, the plots
shall be flexible for purchase.
• The project proposed shall satisfy all the rules and regulations laid down in the
respective codes and manuals.
ENGINEERING DESIGN
• This section should elaborate the technology choices, structural aspects and
evaluation of the technology option, as well as the basis for the technology for the
proposed project.
• A detailed layout of the industrial park area shall be prepared in a master plan
manner showing the allocation of different plots, internal and external
infrastructures, if any .etc
• Designs of Standard Design Factories (SDF) shall be supplemented with
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
34
• New innovations like green building concept may be incorporated in the design of
the buildings.
FINANCIAL ESTIMATES & COST PROJECTIONS
• This section should focus on the cost estimates, budget for the project, means of
financing and phasing of expenditure.
• Cost estimates have to be worked out on the basis of detailed bill of quantities
(with detailed measurements of length, breadth, and depth / height for each
item), using the current Schedule of Rates of the State Government (PRICE) or
relevant SoR as applicable.
• Applicable taxes, contingencies, investigation charges including any O&M cost for
a specific period shall be clearly specified.
• Lump sum provisions for land acquisition etc. shall be explained in detail and
justified.
REVENUE STREAMS
• Options for cost recovery, if any, should be explored
• Innovative ideas for additional revenue generation may be indicated.
• Sensitivity analysis from the revenue streams to be incorporated
COST BENEFIT ANALYSIS& INVESTMENT CRITERIA
• Cost Benefit Analysis (CBA) is a technique whereby the costs of and benefits from
a scheme are quantified over a selected time horizon and evaluated by a common
yardstick.
• Financial and economic cost benefit analysis of the project should be undertaken
wherever such returns are quantifiable.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
35
• Cost Benefit Ratio (CBR - benefit to cost ratio), EIRR (Economic Internal Rate of
Return) etc. shall be worked out in detail with all supporting primary and
secondary data.
• The project cash flow projections for the life cycle along with underlying
assumptions have to be presented.
ENVIRONMENTAL & SUSTAINABILITY ASPECTS
• An Environmental Management Plan (EMP) is to be developed explaining the
possible environmental issues which may arise during the construction and
operation of the infrastructure and associated facilities depending upon the size
of the project.
• Environmental impact assessment study if mandatory and measures identified to
mitigate the adverse impact, if any shall be conducted and documented in detail.
• Issues relating to land acquisition, diversion of forest land, wildlife clearances,
rehabilitation and resettlement should be addressed in this section.
• Inclusion of international best practices in sustainable infrastructure management
including green building concept, potential low carbon, low energy, zero pollution
etc. are desirable.
RISK ASSESSMENT AND MITIGATION MEASURES
• For those projects which involve large capital outlay and various issues relating to
land acquisition, environmental aspects, a detailed and systematic risk analysis
may be resorted to.
• Identification and assessment of implementations risks which can lead to time
overrun, cost escalation, scope reduction etc. is the primary stage in risk
assessment.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
36
• Risk analysis could include legal/contractual risks, environmental risks, revenue
risks, project management risks, regulatory risks etc.
• The mitigation plans including risk avoidance, risk transfer, and risk elimination
are to be well analysed and documented.
• For complex projects with multiple risk profiles, numerical modelling and
simulation may be adopted.
PROJECT MANAGEMENT ORGANISATION
• Responsibilities of different agencies for project management of the said project
should be elaborated. The organization structure at various levels, human
resource requirements, as well as monitoring arrangements should be clearly
spelt out.
• Management strategy for the institutional structures and mechanisms would be
well chartered for ensuring effective project management.
• The involvement of external consultant if any shall be documented
CONTRACT MANAGEMENT STRATEGY
• Contracting methodology whether item rate, lump sum, design and execute, EPC
etc. must be specified in detail for the execution of the project.
• The system followed in the bidding document and manuals of reference etc. like
PWD/CPWD/ FIDIC shall be explained.
• Any variation proposed from the current practices acceptable under government
of Kerala (Arbitration, escalation etc.) in the system due to any specific technical
aspects associated with the project need to be explained with justification.
• Any contract clause which may likely to lead to additional financial liability shall be
identified and reported with suggestions to overcome such issues.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
37
IMPLEMENTATION SCHEDULE & WBS
• The time bound work schedule is an important part of every project because it
helps in better handling of projects in planning, implementation etc.
• This section should indicate the proposed zero date of commencement and also
provide a Bar chart / Project Schedule, wherever relevant.
• Phasing of project activities, proposed contract packages and schedule of
implementation for each phase.
• Identify critical dependencies in the project and expected timelines for
completion of key milestones and associated process indicators for the same.
• The DPR should provide a time-bound action plan including tendering,
appointment of contractors, construction schedule, quality assurance & quality
control and post-construction activities, including project delivery
STATUTORY CLEARANCES
• This section should elaborate the statutory clearances to be obtained from the
various authorities.
• Statutory approvals as per bye laws, master plan, fire safety norms,
environmental clearance etc. as applicable for the project are to be taken.
QUALITY MANAGEMENT PLAN
• The DPR shall include information relating to the institution to be engaged in the
quality assurance & quality control of the project execution.
• Methodology to be adopted to ensure the quality of construction should be
clearly mentioned in the report.
• Quality management plan including the internal inspection and testing procedure
shall be documented.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
38
• If third party quality control mechanism is adopted, the structure of the same
shall be specified in detail.
OPERATIONS & MAINTENANCE PLAN
• The DPR shall incorporate/include information relating to the institution to be
engaged in the O&M of the created infrastructure asset/enhanced infrastructure
assets.
• Brief description/analysis of the key issues and obstacles in regard to O&M
(including billing/collection issues) and proposed countermeasures to overcome
them for the project should be contained.
• Requirement of funds for operation and maintenance of assets should also be
included in the report.
ANNEXURES
• MARKET STUDY DOCUMENT
• ARCHITECTURAL MASTER PLAN
• TOPOGRAPHY DRAWINGS & GEOTECHNICAL INVESTIGATION REPORTS
• DETAILED LAYOUT OF PETROCHEMICAL PARK
• DETAILED ESTIMATE
• DESIGN FOR SDFs and DETAILED ESTIMATE
• COPIES OF STATUTORY APPROVALS OBTAINED
SALIENT FEATURES
• Title of the project
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
39
• Details of project location
• District
• Taluk
• Corporation/Municipality/Panchayath
• Assembly Constituency
• Implementing agency/SPV
• DPR prepared by
• Project outlay
• Budget provision
• Budget speech reference
• Administrative sanction
• Present status of existing parks, if any in
project location
• Need for the project
• Details of industrial park
• Area of land required
• Infrastructures proposed
• Other details
• Details of investigations/surveys conducted
• Total estimated cost and item wise cost
break up and details of Schedule of Rates
Whether detailed estimate attached?
• Details of revenue streams
• Details of Cost Benefit Analysis (CBR value)
• Details of project risks
• Details of project management organisation
strategy
• Details of contract management strategy
• Details of Project Implementation Schedule
(PIS) & Work Breakdown Schedule (WBS) -
Proposed duration to complete the project
• Details of statutory clearances
• Quality control infrastructure and
Mechanism
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
40
• Operations & Maintenance (O&M)
arrangements of the project after
Completion
• Details of attached drawings
• Other attachments
ANNEXURE B
I. PRE-QUALIFICATION FORMAT
Experience in providing consultancy services for a minimum period of 7 years and
above in doing similar projects or assignments.
SI No. Parameter Details
1 Year of establishment
2 Status of Firm (Proprietorship
/Partnership/Any other)
3 Details of establishment as consultancy firm
4 Empanelment with Govt. Organizations
(mention names along with copies of
empanelment letters)
5 Name,Designation,Academic Qualification,
Experience of Head of the organization.
6 Address and phone numbers of Head/Key
Personnel
• Experience as Consultant in the preparation of DPR in at least one fully implemented
Industrial Park Project/similar projects with project cost of Rs.360 Crore and above OR
2 projects of Cost Rs.270-360crores OR 3 projects of cost Rs 180-270 crores.
Name of Client(Promoters)
• Location of Project (also include
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
41
District/ State)
• Project Cost
• Project Details (Descriptions)
• Date of Work Order issued
• Date of Completion of Project
• Documents Submitted
• Work Order
• Client Certificate/Completion
Certificate
YES/NO
YES/NO
Experience in undertaking assignments/Projects undertaken for Govt. of India / State
Governments / PSUs with a project cost of 180 crores and above.
Name of Client(Promoters)
• Location of Project (also include
District/ State)
• Project Cost
• Project Details (Descriptions)
• Date of Work Order issued
• Date of Completion of Project
• Documents Submitted
• Work Order
• Client Certificate/Completion
Certificate
YES/NO
YES/NO
• Financial Details
Year Annual
Turnover
Annual Profit Net Worth Copy Enclosed
2014-15 YES/NO
2015-16 YES/NO
2016-17 YES/NO
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
42
Note: Net worth to be calculated as defined in the Pre-Qualification Criteria clause and
the above statement to be certified by a Chartered Accountant and
countersigned by Authorised signatory.
• Undertaking on whether the Firm or its Associates / Subsidiaries is debarred /
blacklisted by any Central/State Governments/Govt Departments/ Govt
Bodies/PSU’s or Not
Certificate as per the below draft to be signed by the Authorised Signatory and to be
provided in the Company Letter Head by all Consortium Partners.
“This is to certify that <Company Name> and its Associates / Subsidiaries has not been
debarred / black listed by any Central / State Governments / Government departments /
Government bodies / PSUs”
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
43
I. TECHNICAL BID FORMAT
Note: In case of Consortium the following details shall be furnished by each member of
the consortium.
• Name of the organization :
Address with contact details :
Experience in providing consultancy services for a minimum period of 7 years and
above in doing similar projects or assignments.
SI No. Parameter Details
1 Year of establishment
2 Status of Firm (Proprietorship
/Partnership/Any other)
3 Details of establishment as consultancy firm
4 Empanelment with Govt. Organizations
(mention names along with copies of
empanelment letters)
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
44
5 Name, Designation, Academic Qualification,
Experience of Head of the organization.
6 Address and phone numbers of Head/Key
Personnel
• Experience as Consultant in the preparation of DPR in at least one fully
implemented Industrial Park Project/similar projects with project cost of Rs.360
Crore and above OR 2 projects of Cost Rs.270-360crores OR 3 projects of cost Rs
180-270 crores.
• Name of Client(Promoters)
• Location of Project (also include
• District/ State)
• Project Cost
• Project Details (Descriptions)
• Date of Work Order issued
• Date of Completion of Project
• Documents Submitted
• Work Order
• Client Certificate/
Completion Certificate
YES/NO
YES/NO
[Note: Repeat above data for each project]
Experience as Consultant/PMC in the preparation of DPR in fully implemented
Industrial Park/ /similar Industrial Projects in an area of 100 acres and above.
Name of Client(Promoters)
• Location of Project (also include
District/ State)
• Project Cost
• Project Details (Descriptions)
• Date of Work Order issued
• Date of Completion of Project
• Documents Submitted
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
45
• Work Order
• Client Certificate/
Completion Certificate
YES/NO
YES/NO
[Note: Repeat above data for each project]
• The experience of undertaking an Industrial Park Project as Consultant/Project
Management Consultant (PMC), in similar Infrastructure development Projects for
Industrial Parks in petrochemical and/or pharmaceutical sector.
• Name of Client(Promoters)
• Location of Project (also include
District/ State)
• Project Cost
• Project Details (Descriptions)
• Project Implementation Status
(Descriptions)
• Date of Work Order issued
• Date of Completion of
Project/Scheduled Date of Completion
• Documents Submitted
• Work Order
• Copy of Final Approval issued by
concerned authority.
• Client Certificate/ Completion
Certificate
YES/NO
YES/NO
YES/NO
[Note: Repeat above data for each project]
• Key Professional staff proposed to be dedicated for the project:
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
46
1. Team Leader
(i) Qualification
(ii) Experience
(Year-wise, Organization-wise, Assignment-
wise) with special reference to similar
Project)
(iii) CV Submitted YES/NO
2. Chief Architect
(i) Qualification
(ii) Experience
(Year-wise, Organization-wise, Assignment
wise.)
(iii) CV Submitted YES/NO
3. Market Analyst/ Industry Analyst Expert
(i)Qualification
(ii) Experience
(Year-wise, Organization-wise, Assignment
wise)
(iii) CV Submitted YES/NO
4. Finance Expert
(i)Qualification
(ii) Experience
(Year-wise, Organization-wise, Assignment
wise)
(iii) CV Submitted YES/NO
5.Civil Engineer
(i)Qualification
(ii) Experience
(Year-wise, Organization-wise, Assignment
wise)
(iii) CV Submitted YES/NO
6.Urban Planner
(i)Qualification
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
47
(ii) Experience
(Year-wise, Organization-wise, Assignment
wise)
(iii) CV Submitted YES/NO
7.Structural Engineer
(i)Qualification
(ii) Experience
(Year-wise, Organization-wise, Assignment
wise)
(iii) CV Submitted YES/NO
8.Environmental Specialist
(i)Qualification
(ii) Experience
(Year-wise, Organization-wise, Assignment
wise)
(iii) CV Submitted YES/NO
[Note: Repeat above data for additional personnel]
Experience in undertaking assignments/Projects undertaken for Govt. of India /
State Governments / PSUs with a project cost of 180 crores and above.
Name of Client(Promoters)
• Location of Project (also include
District/ State)
• Project Cost
• Project Details (Descriptions)
• Date of Work Order issued
• Date of Completion of Project
• Documents Submitted
• Work Order
YES/NO
YES/NO
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
48
• Client Certificate/Completion
Certificate
• Office Infrastructure in Kerala
(i) Existing office locations with
contact details
(ii) No. of Staff
(iii) Hierarchy
• Quality Management Certifications
Type of Quality
Management
Certification
Certificating
Body
Certification
validity
From … To …
Copy
Enclosed
1. YES/NO
2. YES/NO
3. YES/NO
• Green Certifications
Type of Certification Certificating
Body
Project details Copy
Enclosed
1. YES/NO
2. YES/NO
3. YES/NO
• Scope of Work of Consortium Partners (An Agreement between the Consortium
members also to be enclosed)
Name of
Consortium
Members
Status Scope of
Work
Remarks
Lead Partner
Consortium
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
49
Partner 1
Consortium
Partner2
Name of the organization Signed by
Seal of the organization Designation
Date:
II. FINANCIAL BID FORMAT
A. Name of the organization :
Address with contact details :
B.
Quoted Amount
Rs.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
50
(Including all taxes)
(In words)
No subjective conditions will be accepted in the price bid.
Name of the organization Signed by
Seal of the organization Designation
Date:
ANNEXURE C
FORMAT FOR POWER POINT PRESENTATION.
Presentation should include these mandatory details in the slide without fail.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
51
INTRODUCTION
METHODOLOGY – Including Schematic Layout.
WORKPLAN - Including Project Schedules
DEPLOYMENT OF PROPOSED TEAM
Note: Total number of slides to be restricted to 10. Time allowed max 20 minutes.
ANNEXURE D
DRAFT AGREEMENT
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
52
This Agreement is made and entered on the ….day of ……. Two thousand and
Seventeen at THIRUVANANTHAPURAM .
BETWEEN
KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION
(KINFRA), a body corporate duly constituted under the Kerala Industrial
Infrastructure Development Act 1993, having its principal office at “KINFRA House‟,
T.C.31/2312, Sasthamangalam, Thiruvananthapuram-695010, represented by its
Managing Director,
………………………………………………………………………………………………………………………………………
………………………………………………………………(hereinafter called the KINFRA, which
expression shall, unless repugnant to the context, be deemed to include its
successors and permitted assigns) OF THE ONE PART.
AND
M/s…………….., having its registered office at ………………………..dulyauthorised and
represented by its ………………..……………………..,(hereinafter called the “Consultant”
which expression shall, unless repugnant to the context, be deemed to include its
successors and permitted assigns) OF THE OTHER PART.
WHEREAS KINFRA being the nodal agency for Industrial Infrastructure development
for the state of Kerala, got approval to establish a Petrochemical Park in
approximately 450 acres of land atAmbalamughal, in Ernakulam District, Kerala. The
project is intendedto create an Industrial Park with all infrastructure facilities exclusive
for the Petrochemical Industry.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
53
WHEREAS KINFRA has invited Request for Proposal (RFP) from reputed Consulting
Firm meeting the eligibility criteria for selection of a Consultant for preparation of
DPR and marketing 30 % of allottable land in the Park
WHEREAS after evaluation of the various Technical and Financial Bids, the bid
submitted by the Consultant is found to be more responsive and Consultant has
been selected as the successful bidder to be appointed as Consultant for the
preparation of Detailed Project Report (DPR) and marketing of the project of the
Petrochemical Park as per scope of services detailed in the RFP.
WHEREAS KINFRA has issued the work order No…………………dated…………………………
to the Consultant awarding the contract for the preparation of Detailed Project Report
(DPR) and marketing of the proposed Petrochemical Industrial Park Project as per the
TOR for a total Consultancy fee of Rs……………………………….inclusive of all taxes and
duties District
1.NOW IT IS HEREBY AGREED AS FOLLOWS:
a) The Consultant shall render their services to the Petrochemical Park Project with
respect to technical, commercial and financial aspects of the Project, in
accordance with the Terms of Reference and Deliverables described in Annexure1.
b) The following documents shall form part of this agreement:
1. RFP document
2. Terms of Reference & Deliverables issued by KINFRA
3 Financial Quote submitted by the Consultant.
4 Clarifications given during the pre-bid meeting
5. Any corrigendum issued by KINFRA
3. 6 . WorkOrder No.………………… dated…………..issued by KINFRA.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
54
c) All the terms and conditions contained in KINFRA’sRequestFor proposal as well as
work order shall be binding on the consultant.
d) Schedule of payment
The Consultant shall be paid the consultancy fees, based on the following
payment schedule:
20% as initial payment on execution of agreement against Bank Guarantee for
equivalent amount from a Nationalised bank. This BG is initially for a period of
24 months. This BG will be released after the final payment on submission of
Performance BG for an amount equivalent to 10% of total value of the
consultancy charge and valid for 12 months
10% on submission of masterplan, preliminary reports and preliminary
drawings and on approval by KINFRA .
10% on submission and approval of engineering designs, drawings, plans,
detailed estimates.
15% on submission of the final DPR and acceptance by KINFRA .
10% on approval of the DPR by KIIFB.
10% on submission of all Bid documents for Tender purpose by the
Consultant and acceptance of the same by KINFRA.
10% on allotment of 15% of the allottable land by the marketing effort of the
Consultant.
15% on allotment of remaining 15% of the allotable land by the marketing
efforts by the Consultant
10% of the quoted amount will be given as incentive on allotment of every
additional 10% of the land within 24 months by the marketing efforts of the
Consultant.
Note: All payments shall be subject to “Tax Deduction at Source” (TDS) and such
other statutory deductions as may be applicable from time to time.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
55
e) The Consultant in consultation with KINFRA, shall prepare a detailed Time
Schedule for the execution of the Project, to achieve the overall target date of
completion of the Project. Final Time Schedule shall be prepared within seven
days of the signing of this Agreement. This will be binding on both parties.
f) If the Consultant fails to adhere to the time schedule or the extended time, which
may be granted by KINFRA, in its sole discretion, KINFRA shall be entitled to
terminate this agreement and entrust the work to some other Consultant and in
that case, the Consultant shall be entitled to fees or compensation only up to the
stage of work carried out by him and approved by KINFRA. In the event of
Consultant being not in a position to fulfill the scope of works as mentioned in
Annexure-1 in such a way that the implementation of the Petrochemical Park
project cannot be carried out as per the time schedule, KINFRA will be free to get
the same carried out by other agencies at the risk and cost of the Consultant, and
in that event KINFRA shall have the right to terminate the Consultant Contract
without payment to the Consultant.
This agreement is deemed to have come into effect from ………………(date of
acceptance of work order). The agreement shall remain in force for a period of 24
months from the effective date of agreement or till actual date of completion of
work including marketing of allottableland including any extra items or excess
quantity whichever is later.
KINFRA has the right to terminate the contract at any time if the performance of
the Consultant is found to be not satisfactory by KINFRA. In that event the
consultant is eligible for payment only for the work accepted/completed/services
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
56
rendered by the consultant and approved by KINFRA up to the date of
termination.
2. Contact Person
For coordinating with KINFRA in connection with this assignment the following
persons shall be the contact person and their instruction shall be binding on the
Consultant.
1)……………………… (Name,Designation& Address)
2)……………………… (Name,Designation& Address)
3. Project Team
a) Key professionals with requisite qualifications and experience as below
shall be deployed in the project.
S. No. Position Educational Qualifications
Length of Professional Experience
1 Team Leader Relevant Degree in Urban Planning / Civil Engineering / Mechanical Engineering/ Electrical Engineering/Chemical Engineering
More than 20 years
2 Chief Architect Degree in Architecture More than 15 years
3 Market Analyst/ Industry Analyst Expert
MBA or equivalent More than 10 years
4 Civil Engineer B. Tech (Civil Engineering)
More than 08 years
5 Urban Planner Relevant Post Graduate Degree in Urban Planning / Design
More than 08 years
6 Structural Engineer M. Tech (Structures) More than 08 years
7 Finance Expert CA/CFA/CMA or equivalent
More than 10 years
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
57
8 Environmental Specialist Relevant Post Graduate degree in Environmental Engineering / Planning
More than 08 years
b) These professionals may be retained throughout the project period and
may be replaced only with prior concurrence of KINFRA. If KINFRA requires
that any of the above professionals may be replaced for deficiency in
performance or on account of indiscipline, the same may be effected by
the Consultantat the earliest.
c) The Consultantmay deploy required personnel viz. Mechanical Engineer,
Electrical Engineer, Chemical Engineer, Instrumental Engineer, ETP experts,
Financial Manager etc. as required from time to time. Consultant may also
outsource highly specialized work with the prior approval of KINFRA only.
4. SUB-CONTRACTING & SUB-CONSULTANT
The Consultant shall not subcontract whole of the work. However they may
subcontract any part of the work after duly notifying and obtaining prior
approval from KINFRA.
The Consultant shall indicate the name of sub- consultants if any for any
services with their organization details, qualification and experience of the
main personnel and shall obtain prior approval of KINFRA before their
engagement for the consultancy. Such Sub consultant approved by KINFRA
shall be associated from the preliminary drawing stage to the final design
work. However, the consultant shall be fully responsible for the correctness
and accuracy of the designs prepared by sub-consultants and shall indemnify
KINFRA for damage or loss caused due to any negligence of sub-
consultant(s). The copy of the agreement between sub-consultant and the
consultant shall be submitted to KINFRA
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
58
5. LIQUIDATED DAMAGES
In the event of a delay in completion of work as per the completion
Schedule for which the consultant is responsible, the consultant shall pay
Liquidated Damages to KINFRA at the rateof half percent (0.5%) per week of
delay, subject to a maximum of ten percent (10%) of the consultancy fees.
Such Liquidated Damages shall be deemed to be a genuine pre-estimate of
the foreseeable damages incurred by KINFRA due to delay and shall be
KINFRA's sole recourse for late performance by the consultant under the
agreement.
6. Termination of Agreement
6.1 The Agreement herein may be terminated at any time on one month’s notice
on either side. In the event of termination of the Agreement by KINFRA, the
Consultant shall not be entitled to any compensation or damage by reason of
such termination, but only to the fees for the services actually rendered up to
the time of such termination.
6.2 If the Consultant shall close his business or become incapacitated, from acting
as such Consultant as aforesaid, or if this agreement is terminated in mutually
agreed terms, KINFRA may make use of all documents prepared by the
Consultant after payment for the same as provided herein.
7. Force Majeure:
War, invasion, revolution, riots, sabotage, lockouts, strikes, work shut-down
imposed by Government Acts or legislature or other authorities, stoppage in
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
59
supply of materials, fuel or electricity, breakdowns of machinery, act of God,
epidemics, fires, earthquakes, floods, explosions, accidents, sea navigation
blockades or any other acts or events whatsoever which are beyond
reasonable
control and which shall directly or indirectly prevent completion of the project
within the time specified in the agreement, will be considered Force Majeure.
The Consultant shall be granted necessary extension of time to cover the delay
as caused by Force Majeure without any financial repercussions
8. All disputes arising out of or in any way connected with this Agreement shall
be deemed to have arisen in Kerala and only Courts in Thiruvananthapuram
shall have the Jurisdiction to determine the same.
IN WITNESS WHEREOF the parties hereto set their hands on the date and year first
above written.
Signed and delivered for and on
behalf of the KINFRA (Kerala
Industrial Infrastructure
Development Corporation)
Signed and delivered for and on
behalf of the Consultant
In the presence of
Witness:
In the presence of
Witness:
1.
1.
2. 2.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
60
Annexure 1
Terms of Reference and Deliverables
• The Consultant shall be entrusted with preparation of Detailed Project Report (DPR)
and marketing of the project. The DPR should be prepared according to the guidelines
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
61
of Kerala Industrial Infrastructure Fund Board (KIIFB); the components of DPR is given
as Annexure A.
• The Consultant should prepare legible layout of the proposed site, carry out site
analysis for elements like soil analysis, surveyed site plan and site soil particulars
including spot levels/contours, flood history, on-site features etc. for realistic cost
estimates of land development and construction.
• The Consultant is responsible for entire architectural component of the project work.
The Consultant should also provide the details regarding the common facilities and
common technical infrastructure required with estimated investments therein. This
would include the developing of the Master Plan along with sectional drawings and
building plan with legends giving clear picture /title of drawings and other relevant
details. This would also include detailed engineering and design including preparation
of detailed cost estimates for various project components/facilities envisaged in the
Petrochemical Park Project. The cost estimates shall be according to the latest CPWD
rates; wherever it is not available, market rates to be considered. The cost estimates for
plant and machinery shall be backed by quotations from reputed equipment and
machinery suppliers in line with scheme requirements.
• The above clause shall be broadly divided as follows:
• Master Plan: To be based on the broad concept design and cost in
consultation with KINFRA
• Preliminary Drawings and estimate: Rates to be calculated based on Delhi
Plinth Area rates
• Detailed Drawings and estimate: Latest Delhi schedule of rates to be
followed. Wherever it is not available, market rates to be considered.
• The Consultant shall prepare all relevant documents related to statutory approvals for
the Petrochemical Park Project.
• The consultant shall prepare and submit all Bid documents required for tender
purpose.
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
62
• The Consultant shall work out the implementation schedule with milestones for the
project.
• The Consultant shall abide by all the clauses in the Agreement to be entered in to with
KINFRA .The draft agreement is attached as Annexure D.
• Ten copies of all the deliverables are to be submitted along with the soft copy.
• Consultant shall, on their own (If approved agency) or through another approved
Agency, carry out Environment Impact Assessment (EIA). The Consultant shall co-
ordinate with the Agency for timely completion of the EIA and also follow up with the
appropriate authorities for getting clearance. The cost towards EIA shall also be
included in the financial quote.
• The structural design submitted by the Consultant will be proof checked if necessary
by KINFRA through a third party .If these designs are acceptable and needs no
correction/modification as required in the relevant BIS codes/KMBR, the cost of proof
checking shall be borne by KINFRA. In case correction/modifications are required in
the design and drawing the entire charges for proof checking shall be borne by the
Consultant.
• The consultant shall prepare and submit all bid documents required for the selection
of contractors for the implementation of the project.
• The Consultant shall ensure marketing of 30% of the allottable land to industrial units
DELIVERABLES:
1. Detailed Project Report
The report should be prepared with all the components mentioned in Annexure A.
2. Master Plan shall include the following:
• Site analysis Report for elements like soil analysis,surveyed site plan and site soil
particulars including spot levels/contours, flood history, on-site features etc. for
realistic cost estimates of land development and construction
RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM
63
• Layout incorporating the individual components in surveyed map
• Preliminary Drawings
• Preliminary Estimates
3. Detailed Estimate including the following:
• Detailed Drawings
• Detailed Estimates including BoQs for all components of the work including
electrical, Air conditioning, fire-fighting and Environmental engineering
requirements. This will include structural drawings for civil and drawings and
designs for electrical, fire-fighting and water supply and sanitary installations works
as mentioned.
• Structural Drawings and Designs for all components of the work
4. Financial Planning Report for the project in accordance with requirements.
5. Submission of all Bid documents required for tender purpose.
6. Submission of all relevant documents related to statutory approvals
Submission of implementation schedule as per the overall plan.
Note: Clause Deliverables shall be read in conjunction with clause Terms of Reference