KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION (A Statutory Body of Government of Kerala REQUEST FOR PROPOSAL (RFP) FOR SELECTION OF A CONSULTANTFOR PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR PETROCHEMICAL INDUSTRIALPARK , AT AMBALAMUGAL, KOCHI KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION (A Statutory Body of Government of Kerala) KINFRA Corporate Head Office, KINFRA House, TC 31/2312, Sasthamangalam P.O, Thiruvananthapuram, Kerala, India - 695010 |Tel: 0471-2726585 | Fax: 0471-2724773 | Web: www.kinfra.org |

Transcript of KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT...

Page 1: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT

CORPORATION (A Statutory Body of Government of Kerala

REQUEST FOR PROPOSAL (RFP)

FOR SELECTION OF A CONSULTANTFOR PREPARATION OF

DETAILED PROJECT REPORT (DPR) FOR PETROCHEMICAL

INDUSTRIALPARK , AT AMBALAMUGAL, KOCHI

KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION

(A Statutory Body of Government of Kerala)

KINFRA Corporate Head Office, KINFRA House, TC 31/2312, Sasthamangalam P.O, Thiruvananthapuram, Kerala, India -

695010

|Tel: 0471-2726585 | Fax: 0471-2724773 | Web: www.kinfra.org |

Page 2: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

2

CONTENTS

1 Introduction and background 06

2 Invitation for Bidding 06

3 About the Project 08

4 Terms of Reference 09

5 Deliverables 11

6 Directives to Bidders 12

7 Evaluation of proposals and process of selection 19

8 Formats of Technical Bid and Financial bid 27

9 Completion schedule 29

10 Annexure 31

Page 3: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

3

DISCLAIMER

• This RFP is not an agreement and is neither an offer nor invitation by Client

(KINFRA) to the prospective applicant (Bidder) or any other person. The purpose of

this RFP is to provide interested applicants with information that may be useful in

the formulation of proposal pursuant to this RFP. The information is not intended

to be exhaustive. Bidders are required to make their own inquiries and satisfy

themselves regarding the completeness and reliability of the information and not to

rely solely on the information in this document.

• Neither KINFRA nor their employees, consultants, advisors or agencies make any

representation or warranty as to the accuracy, adequacy, correctness,

completeness or reliability of the RFP and any assessment, assumption, statement

or information contained therein or deemed to form part of this RFP. Each

prospective applicant should conduct its own investigations and analysis and check

the accuracy, adequacy, correctness, completeness or reliability of the information

in this RFP document and obtain independent advice from appropriate source

before submission of the proposal against this RFP.

• KINFRA may, in its absolute discretion but without being under any obligation to do

so, update, amend or supplement the information, assessment or assumptions

contained in this RFP.

• Neither KINFRA nor their employees, consultants, advisors or agencies will have any

liability to any prospective bidder or any other person under the law of contract, for

any loss, expense or damage which may arise from or be incurred or suffered in

connection with anything contained in this RFP document.

• KINFRA reserves the right to reject any or all of the proposals submitted in response

to this RFP document at any stage without assigning any reason whatsoever.

KINFRA also reserves the right to hold, withdraw or cancel the process at any stage

under intimation to the applicants who submit the proposal against this RFP.

Page 4: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

4

• KINFRA reserves the right to modify or amend or add to any or all of the provisions

of this RFP document or cancel the present invitation and call for fresh invitations.

• Neither KINFRA nor their employees, consultants, advisors or agencies will have any

liability in case of non-receipt of any correspondence from them to the applicants

due to postal delays.

• The applicable laws for the purpose are the laws of INDIA. Courts of Kerala will have

the jurisdiction concerning or arising out of this RFP document.

• The applicants are expected to know the relevant rules and regulations of the

respective local authorities concerning the site, master plan and the construction

works.

Page 5: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

5

DEFINITIONS

• Application/Bid shall mean the response to this RFP with all documents as

specified.

• Client shall mean KINFRA, its authorized agencies and assignees.

• Applicant(s)/Bidder(s) shall mean all Companies/Firms who respond against this

RFP.

• KINFRA shall mean Kerala Industrial Infrastructure Development Corporation, a

statutory body formed by the Government of Kerala (GoK), represented by its

Managing Director which expression unless it be repugnant to the context or

meaning thereof, deemed to mean and include its successors and assignees.

• Consultant shall have the same meaning as successful bidder and with whom the

contract agreement would be signed.

• Consortium means an association of not more than three companies/Firms which

is treated as single entity.

• LOA (Letter of Award) shall mean the letter issued by KINFRA to the successful

bidderinviting him to sign the contract agreement.

• Contract Agreement shall mean the agreement to be signed between the

Consultant and KINFRA for the execution of the project.

• Site shall mean the place where the location of the Petrochemical Park for which

the services as mentioned under the scope of work for the project are to be carried

out.

• Bid Evaluation Committee (BEC) shall mean a team of Technical/Financial/Legal or

any other expert constituted by KINFRA for evaluation of documents /presentations

submitted by the applicants in response to the RFP.

• The Project means development of Petrochemical Park with all enabling facilities.

• The Marketingofallottable land means Confirmed allotment.Confirmed allotment

meansallottee remits 10 % of the lease premium as EMD proportionate to the land

allotted to them and also remitting minimum 50 % of the lease premium as down

payment & executing the license agreement with KINFRA.

Page 6: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

6

1. INTRODUCTION AND BACKGROUND

1.1 Kerala Industrial Infrastructure Development Corporation (KINFRA) is a statutory body

formed by the Government of Kerala in 1993, by an Act of State Legislature for

facilitating the development of industrial infrastructure in the State. KINFRA has

played a pioneer role in developing industrial infrastructure in the State of Kerala.

1.2 KINFRA has a very successful track record in setting up 22 industrial parks across Kerala

for facilitating development of the industry in the State.

1.3 KINFRA has taken the initiative of promoting the concept of ‘Theme Based Parks’ since

its inception in 1993. After understanding the needs of a particular industry, KINFRA

identifies common needs and accordingly provide common facilities to promote the

concept of ‘shared infrastructure’ as a facilitating measure to attract investors of that

particular industry. Theme Based Parks already commissioned by KINFRA include

Industrial Parks for Garments, Entertainment, Footwear, Exports based industry,

Biotechnology, Food processing and SME industrial sector etc.

1.4 KINFRA promotes a proactive approach to environmental protection and Pollution-

free ecosystem in all their parks.

1.5 KINFRA also provides exclusive single window clearance facility for units in its Parks for

obtaining regulatory licenses and clearances.

2. INVITATION FOR BIDDING

2.1 KINFRA intends to select a Consultant through a transparent, competitive bidding

process and invites Technical and Financial Bids from reputed consultants in

accordance with this “Request for Proposal” to prepare Detailed Project Report (DPR)

and marketing of 30% of the allottable land in the Park..

2.2 The document can be downloaded from our website at www.kinfra.org. A non-

refundable Bid Document fee ofRs.15000/- + tax (Fifteen Thousand + tax ) should be

enclosed with the application (Technical Bid) by DD, in favour of The Managing

Director, KINFRA, payable at Trivandrum, in a cover super scribed “ Bid Document Fee

Page 7: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

7

for Petrochemical Park, Kochi”. Applications not accompanied with Bid Document fees

will be summarily rejected.

2.4 The Bidders have to submit their Technical Bid and Financial Bid in the prescribed

format as per this RFP. Cost of preparation of bids and related expenses has to be

borne by the Bidder. The bidders also will not be eligible for reimbursement of any

travel expenses for attending meetings, for making presentation or any other purposes.

2.5 The Bidder shall also furnish an Earnest Money Deposit (EMD) of Rupees Five Lakhs

only (Rs:5,00,000/-) by way of Demand Draft drawn in favour of Managing Director,

KINFRA payable at Trivandrum along with the Technical Bid in a cover

superscribed“Earnest Money Deposit”.

2.6 The Technical Bid and Financial Bid in the prescribed formats along with

supporting documents and the EMD should be submitted to Managing Director,

KINFRA KINFRA House, 31/2312, Sasthamangalam, Thiruvananthapuram-695010,

Kerala, Tel 0471 2726585, Fax 0471 2724773 Email: [email protected] per the schedule

given below. Bids not in the format as prescribed in this RFP document and not

accompanied by EMD will be summarily rejected.

2.7 An agreement (Annexure D) will be executed with the successful bidder to proceed

with the engagement of Consultant

2.8 The Bidders shall be deemed to have conducted a due diligence exercise and satisfied

themselves with respect to all aspects of the project, including site visit, when they

submit the bids. Interested parties shall visit and inspect the site at their own expense.

2.9 Correspondence in response to this RFP as well as related queries must be addressed to

Managing Director, KINFRA, KINFRA House, 31/2312, Sasthamangalam,

Thiruvananthapuram-695010, Kerala, Tel 0471 2726585, Fax 0471 2724773 Email:

[email protected]

Page 8: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

8

3. ABOUT THE PROJECT

• KINFRA intends to develop a Petrochemical Park of international standards at

Ambalamughal, in Ernakulam District Kerala. The project is intended to create an

Industrial Park with all modern facilities exclusive for the Petrochemical Industry.

• The Petrochemical Park is proposed to be established in approximately 450 acres

of land in FACT premises at Ambalamughal, in Kochi to be transferred to KINFRA.

This land already has, near to it, a large refinery, fertiliser and chemical factories,

LNG Terminal & Gas Pipeline Network being established, a Bulk Terminal and

International Container Transhipment Terminal (ICTT). The proposal assumes

significance in view of the expansion proposal of BPCL, nearness to the Port and

Natural Gas infrastructure at the location.

• The Industrial units in the Park will be provided with all infrastructure facilities. The

infrastructure facilities in the proposed Petrochemical Park includes dedicated

power, continuous water supply, roads, plots for establishing industries and offers

plug and play arrangement for easy start-up of Industrial units at minimum cost and

time.

• Infrastructural components proposed for the Petrochemical Park include the

following components

CATEGORY

DETAILS Common Infrastructure Facilities • Internal Roads, culverts &

drainage • Water supply and

distribution including water treatment plant.

• Dedicated Sub-station & Power distribution System

• Street lighting

• Telecom & communication systems

• Sewerage network

Page 9: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

9

• Common Effluent Treatment Plant (CETP) for Industrial Wastewater treatment;

• Rainwater harvesting

• Greenery

Social Amenities • Canteen • Clinic

• Recreational facilities

• Bank / ATM

• Logistics movement

support

• KINFRA now intends to select a Consultant for the DPR preparation and marketing

of the project as per the “Terms of Reference” given below.

3.6ESTIMATED PROJECT COST

The estimated cost of the project is Rs.450 Crores.

4. TERMS OF REFERENCE

• The Consultant shall be entrusted with preparation of Detailed Project Report (DPR)

and marketing of the project. The DPR should be prepared according to the guidelines

of Kerala Industrial Infrastructure Fund Board (KIIFB); the components of DPR is given

as Annexure A.

• The Consultant should prepare legible layout of the proposed site, carry out site

analysis for elements like soil analysis, surveyed site plan and site soil particulars

including spot levels/contours, flood history, on-site features etc. for realistic cost

estimates of land development and construction.

• The Consultant is responsible for entire architectural component of the project work.

The Consultant should also provide the details regarding the common facilities and

common technical infrastructure required with estimated investments therein. This

Page 10: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

10

would include the developing of the Master Plan along with sectional drawings and

building plan with legends giving clear picture /title of drawings and other relevant

details. This would also include detailed engineering and design including preparation

of detailed cost estimates for various project components/facilities envisaged in the

Petrochemical Park Project. The cost estimates shall be according to the latest CPWD

rates;wherever it is not available, market rates to be considered.The cost estimates for

plant and machinery shall be backed by quotations from reputed equipment and

machinery suppliers in line with scheme requirements.

• The above clause shall be broadly divided as follows:

• Master Plan: To be based on the broad concept design and cost in

consultation with KINFRA

• Preliminary Drawings and estimate: Rates to be calculated based on Delhi

Plinth Area rates

• Detailed Drawings and estimate: Latest Delhi schedule of rates to be

followed. Wherever it is not available, market rates to be considered.

• The Consultant shall prepare all relevant documents related to statutory approvals for

the Project.

• The consultant shall prepare and submit all Bid documents required for tender

purpose.

• The Consultant shall work out the implementation schedule with milestones for the

project.

• The Consultant shall abide by all the clauses in the Agreement to be entered in to with

KINFRA .The draft agreement is attached as Annexure D.

• Ten copies of DPR and all the deliverables are to be submitted along with the soft

copy.

• Consultant shall,on their own (If approved agency) or through another approved

Agency,carry out Environment Impact Assessment (EIA). The Consultant shall co-

ordinate with the Agency for timely completion of the EIA and also follow up with the

Page 11: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

11

appropriate authorities for getting clearance. The cost towards EIAshall also be

included in the financial quote.

• The structural design submitted by the Consultant will be proof checked if necessary

by KINFRA through a third party .If these designs are acceptable and needs no

correction/modification as required in the relevant BIS codes/KMBR, the cost of proof

checking shall be borne by KINFRA. In case correction/modifications are required in

the design and drawing the entire charges for proof checking shall be borne by the

Consultant.

• The consultant shall prepareand submit allbid documentsrequired for the selection of

contractors for the implementation of the project.

• The Consultant shall ensure marketing of 30% of the allottable land to industrial units.

All costs relating to marketing shall be borne by the Consultant

5. DELIVERABLES:

5.1 Detailed Project Report

DPR should be prepared with all the components mentioned in Annexure A.

5.2 Master Plan shall include the following:

• Site analysis Report for elements like soil analysis,surveyed site plan and site soil

particulars including spot levels/contours, flood history, on-site features etc. for

realistic cost estimates of land development and construction

• Layout incorporating the individual components in surveyed map

• Preliminary Drawings

• Preliminary Estimates

5.3 Detailed Estimate including the following:

• Detailed Drawings

• Detailed Estimates including BoQs for all components of the work including

electrical, Air conditioning, fire-fighting and Environmental engineering

Page 12: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

12

requirements. This will include structural drawings forcivil and drawings and

designs for electrical, fire-fighting and water supply and sanitary installations works

as mentioned.

• Structural Drawings and Designs for all components of the work

5.4Financial Planning Report for the project in accordance with requirements.

5.5 Submission of all Bid documents required for tender purpose.

5.6Submission of all relevant documents related to statutory approvals

5.7Submission of implementation schedule as per the overall plan.

Note: Clause 5 Deliverables shall be read in conjunction with clause 4 Terms of Reference

6. DIRECTIVES TO BIDDERS FOR THE SUBMISSION OF RFP

6.1 PRE-BID MEETING

6.1.1 In order to clarify any queries and discuss the issues with respect to the Project, a pre-

bid meeting shall be held with the bidders as per the schedule given below, at the

conference hall of KINFRA Head office, Sasthamangalam, Trivandrum-695010

6.2 ENQUIRIES CONCERNING THE RFP

6.2.1 All enquiries should be submitted on the following address in writing, by letter or e-

mail or facsimile transmission:

ADDRESS: Managing Director,

KINFRA,

KINFRA house, 31/2312,

Sasthamangalam,

Thiruvananthapuram- 695010,

Kerala

Tel: 0471 2726585

Fax: 0471 2724773

Email:[email protected].

Page 13: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

13

Note: All the communication from KINFRA will be through email only. Any

corrigendum/addendum /Clarification to the RFP will be published in the website of KINFRA

only.

6.3 VALIDITY OF BID

Each bid shall indicate that it will remain valid for a period not less than 180 days

from the due date of the submission of the bid (Bid due date). KINFRA reserves the right to

reject any bid, which does not meet this bid validity requirement.

6.4 TENTATIVE SCHEDULE FOR BIDDING PROCEDURE

The tentative schedule of the bidding procedure is as follows. The schedule is

subjected to change at the discretion of KINFRA

SL. No. Milestone DATE

1 Release of Bid 28th September 2017

2 Receipt of Queries if any 9thOctober 2017

3 Pre- Bid Meeting 13rdOctober 2017

4 Submission of Bid 23rdOctober2017

5 Technical Bid opening 23rdOctober 2017

6 Technical Presentation by

prequalified bidders.

(Tentative date)

3rd November 2017

7 Opening of financial bid.

(Tentative date)

6th November 2017

6.5 SUBMISSION OF BID

The Technical Bid and Financial Bid should be submitted by the bidders, along with

supporting documents, EMD and the Bid Document fee to Managing Director, KINFRA on

or before due date, at the address provided in the RFP document. Bids submitted by

facsimile or E-Mail will not be accepted.

6.6 EARNEST MONEY DEPOSIT

Page 14: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

14

6.6.1 The bidder must submit an interest free Earnest Money Deposit (EMD) of Rs.

5,00,000.00(Rupees Five Lakhs only) by way of Demand Draft (DD) drawn in favour of

Managing Director, KINFRA payable at Trivandrum along with the Technical bid in a

cover super scribed “Earnest Money Deposit”. The bids not accompanied by EMD will

be summarily rejected.

6.6.2 The EMD of all unsuccessful bidders will be refunded within a period of thirty (30) days

from the date of awarding work to the successful bidder. The EMD of any bidder,

whose bid is rejected on account of being non-responsive or non-reasonable in

accordance with the RFP, will be refunded within a period of thirty (30) days from the

date of intimating the rejection of bid by KINFRA to the bidder.

6.7 FORMAT AND SIGNING OF BIDS

6.7.1 The Technical Bids and Financial Bids are to be submitted as per the prescribed

formats in Annexure B. The proposal shall be typed and printed in indelible ink and

shall be signed by the Bidder or a person duly authorized to bind the applicant

organization to the contract. All pages of the proposal including all Photostat copies

shall be attested by the person signing the proposal. Any interlineations, erasures or

overwriting shall be valid only if it is attested by the person signing the proposal.

6.7.2 The intending firms shall also submit the list of such projects, where, due to any disputes

litigation/arbitration was invoked and/or the consultancy services were

abandoned/suspended by the Consultant(s). Suppression of any information in this regard

may lead to disqualification of the Applicant(s) concerned, if such information comes to the

notice of KINFRA. Incomplete applications will be summarily rejected. Applicants should give

an undertaking certifying that the firm or its Associates / Subsidiaries has not been

blacklisted or debarred by any Central/State Governments/Govt Departments/ Govt

Bodies/PSU’s.

6.7.3 The cost of preparation of bids and related expenses has to be borne by the Bidder.

The bidders will not be eligible for reimbursement of any travel expenses for

Page 15: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

15

attending pre bid meeting and othermeetings for making presentation or any other

purposes.

6.7.4 Any addendum/corrigendum/clarification to this RFP document shall only be uploaded

on the website of KINFRA and may not be communicated otherwise. Prospective

bidders are therefore advised to visit KINFRA website and get updated on the latest

status.

6.8 SEALING AND MARKING OF BIDS

6.8.1 The bidder would provide all the information as per this RFP, and KINFRA would

evaluate only the bids received in the required format. The Technical Bid and

Financial Bid should be separately submitted in sealed envelopes, super scribed

“Technical Bid” and “Financial Bid” respectively in separate envelopes. In the

envelope super scribed ‘Technical Bid’ should contain Pre-qualification Criteria and

Technical Evaluation Criteria in two separate sealed covers, and the Bidder should

enclose the envelope containing the EMD and Bid Document Fee in this envelope.

Both these envelopes (envelope super scribed ‘Technical Bid’ and envelope super

scribed Financial Bid’) should be enclosed in another sealed envelope super scribed

“Selection of Consultant for Petrochemical Park at Kochi”.

6.8.2 The envelope shall be addressed to:

ADDRESS: The

Managing Director,

KINFRA, KINFRA House, 31/2312

Sasthamangalam, Thiruvananthapuram-695010

Kerala,India.

Tel No: 0471 2726585

6.8.3 KINFRA assumes no responsibility for the misplacement or premature opening of the

bids submitted, if the Sealing and Marking is not as per the requirement. KINFRA will

not be responsible for any postal delays or delay in transit for submitting the Bids.

Page 16: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

16

6.9 RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS

Notwithstanding anything contained in this RFP, KINFRA reserves the right to accept or

reject any Bid/ all Bids and to annul the bidding process and reject all bids, at any time

prior to the signing of the agreement without assigning any reason and without incurring

any liability to the rejected Bidder/ Bidders or any obligation to inform the affected

Bidder/ Bidders of the grounds for rejection.

6.10 SUCCESSFUL BIDDER

6.10.1 The successful bidder shall be selected based on the evaluation and scoring of the bid

and presentation.

6.10.2 The work will be awarded to the successful bidder and theselected bidder would be

required to execute the agreement with KINFRA within 15 days from award of work.

6.11 DEFAULT AND FORFEITURE OF EMD

6.11.1 The EMD will be forfeited under the following circumstances:

If the successful bidder fails to execute the agreement in prescribed time.

If the bidder withdraws his offer during the Bid validity period

If the successful bidder fails to furnish the Bank guarantee / performance

guarantee with in time stipulated in work order / letter of intent.

6.12 DEFINITION OF TERMS & PAYMENT TERMS

6.12.1 Definition of “Completion of work”: It is defined as completion of all the work as

mentioned in the terms of reference and the marketing of 30% of the allottable land

to industrial units and approval by KINFRA of the Completion Report submitted by

the Consultant

Page 17: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

17

6.12.2 The Payment Schedule will be as follows –

20% as initial payment on execution of agreement against Bank Guarantee for

equivalent amount from a Nationalised bank. This BG is initially for a period of 24

months. This BG will be released after the final payment on submission of

Performance BG for an amount equivalent to 10% of total value of the consultancy

charge and valid for 12 months

10% on submission of masterplan, preliminary reports and preliminary drawings and

on approval by KINFRA .

10% on submission and approval of engineering designs, drawings, plans, detailed

estimates.

15% on submission of the final DPR and acceptance by KINFRA .

10% on approval of the DPR by KIIFB.

10% on submission of all Bid documents for Tender purpose by the Consultant and

acceptance of the same by KINFRA.

10% on allotment of 15% of the allottable land by the marketing effort of the

Consultant.

15% on allotment of remaining 15% of the allotable land by the marketing efforts by

the Consultant

10% of the quoted amount will be given as incentive on allotment of every

additional 10% of the land within 24 months by the marketing efforts of the

Consultant.

Note: All payments shall be subject to “Tax Deduction at Source” (TDS) and

such other statutory deductions as may be applicable from time to time.

6.13 LIQUIDATED DAMAGES

6.13.1 In the event of a delay in completion of work as per the completion Schedule for

which the consultant is responsible, the consultant shall pay Liquidated Damages to

KINFRA at the rateof half percent (0.5%) per week of delay, subject to a maximum

of ten percent (10%) of the consultancy fees.

Page 18: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

18

• Such Liquidated Damages shall be deemed to be a genuine pre-estimate of the

foreseeable damages incurred by KINFRA due to delay and shall be KINFRA's sole

recourse for late performance by the consultant under the agreement.

6.14 Conflict of Interest

6.14.1 KINFRA requires that consultants should provide professional, objective and

impartial advice and at all times hold the client’s interest paramount, strictly avoid

conflicts with other Assignment/jobs or their own corporate interests and act

without any consideration for future work. The consultant and any of their

affiliates shall be considered to have a conflict of interest and shall not be hired

under any of the circumstances given below: (a) Conflicting activities or assignment

i.e. providing goods or works or assignment other than consulting assignment (b)

Conflicting relationship i.e. business/relationship with a member of client’s staff

involved in the job. (c) The consultants shall be required to observe the highest

standard of ethics during rendering of professional services.

6.15 Fraud and Corruption

6.15.1 KINFRA requires that the bidders against this RFP shall observe the highest

standard of ethics and shall not indulge in corrupt , fraudulent and collusive

practices which would result in rejection of bids and cancellation of award of

contract. In pursuit of this policy, the following are defined:

6.15.2 Corrupt practice means the offering, giving, receiving or soliciting, directly or

indirectly, of anything of value to influence the action of a public official in the

bidding process or in contract execution.

6.15.3 Fraudulent practice means a misrepresentation or omission of facts in order to

influence the bidding process or the execution of contract.

6.15.4 Collusive practice means a scheme or arrangement between two or more bidders,

with or without the knowledge of the client/KINFRA, designed to establish bid

Page 19: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

19

prices at artificial, non-competitive levels and Coercive practice means harming or

threatening to harm, directly or indirectly, persons or their property to influence

their participation in the bidding process or affect the execution of contract.

• SUB-CONTRACTING & SUB-CONSULTANT

6.16.1 The Consultant shall not subcontract whole of the work. However they may

subcontract any part of the work after duly notifying and obtaining prior approval

from KINFRA.

6.16.2 The Consultant shall indicate the name of sub- consultants if any for any services

with their organization details, qualification and experience of the main personnel

and shall obtain prior approval of KINFRA before their engagement for the

consultancy. Such Sub consultant approved by KINFRA shall be associated from

the preliminary drawing stage to the final design work. However, the consultant

shall be fully responsible for the correctness and accuracy of the designs prepared

by sub-consultants and shall indemnify KINFRA for damage or loss caused due to

any negligence of sub-consultant(s). The copy of the agreement between sub-

consultant and the consultant shall be submitted to KINFRA.

7. EVALUATION OF PROPOSALS AND PROCESS OF SELECTION.

7.1 The bidder shall submit the Technical Bid and Financial Bid for evaluation. The

prequalified bidders will be invited for the presentation of their proposal before the

Selection Committee.

7.2 PRE-QUALIFICATION CRITERIA

• Experience in providing consultancy services for a minimum period of 7 years in

similar projects or assignments.

• Experience as Consultant in the preparation of DPR in at least one fully implemented

Industrial Park Project/ similar project with project cost of Rs.360 Crore and above.

OR

Page 20: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

20

Experience as Consultant in the preparation of DPR in at least two fully implemented

Industrial Park Project/ similar project with project cost of Rs.270 Crore.

OR

Experience as Consultant in the preparation of DPR in at least three fully

implemented Industrial Park Project/ similar project with project cost of Rs.180

Crore.

Note: In the case of Consortium(maximum 3 members), Lead partner should have

this experience. [Signed, dated and sealed copies of work orders and the work

completion certificate/client certificate shall be submitted. Projects mentioned

without supporting documents will not be considered]

• The bidder/Lead partner should have experience as consultant in completing a

government project either state or central government or PSUs with a project cost of

180 crores and above.

• The sole bidder/ lead partner of the bidding consortium should have annual Profit in

each of the preceding 3 years starting from 2014-2015 onwards. [The Bidder

shall provide copies of Audited Statement of Accounts and Balance Sheets. In case

audited balance sheet is not available for the year 2016-2017, Chartered Accountant

certified balance sheet shall be provided].

• The sole bidder/ lead partner of the bidding consortium should have positive net-

worth in the preceding 3 years. [The details of annual turnover and annual profits

may be separately provided. Copies of PAN card, Income Tax Returns related

documents; Service Tax returns filed shall also be enclosed]

Net worth shall be calculated as below:

Net worth = Share Capital + Reserves & Surplus - Miscellaneous expenditure to the

extent not written off

OR

Net worth = Total Assets - External Liabilities

Page 21: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

21

• Consultant or its Associates / Subsidiaries should not have been debarred/blacklisted

by any Central/State Governments/Govt Departments/ Govt Bodies/PSU’s. *An

undertaking in Company letter head, signed by the Authorised signatory in this

regard should be submitted. In the case of Consortium, all entities should submit this

undertaking]

EVALUATION CRITERIA

The Technical bids of Bidders will be evaluated based on

7.3.1 BIDDER’S EXPERIENCE AS A PROJECT CONSULTANT

• Experience in providing consultancy services for a minimum period of 7 years and

above in doing similar projects or assignments.

• Experience as Consultant in the preparation of DPR in at least one fully implemented

Industrial Park Project/ similar project with project cost of Rs.360 Crore and above.

OR

Experience as Consultant in the preparation of DPR in at least two fully implemented

Industrial Park Project/ similar project with project cost of Rs.270 Crore.

OR

Experience as Consultant in the preparation of DPR in at least three fully

implemented Industrial Park Project/ similar project with project cost of Rs.180

Crore.

Note: In the case of Consortium (maximum 3 members), Lead partner should have

this experience. [Signed, dated and sealed copies of work orders and the work

completion certificate/client certificate shall be submitted. Projects mentioned

without supporting documents will not be considered]

Page 22: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

22

• Experience as PMC/consultant in the preparation of DPR in fully implemented

Industrial Park/similar projects with an area more than 100 acres.

• The experience of undertaking an Industrial Park Project as Consultant/Project

Management Consultant(PMC), in similar Infrastructure development Projects for

Industrial Parks in petrochemical and/or pharmaceutical sector will be an added

advantage

7.3.2 KEY PERSONNEL

Conditions of Eligibility for Key Personnel: Each of the Key Personnel must fulfil the

Conditions of Eligibility as specified below:

S. No. Position Educational Qualifications

Length of Professional Experience

1 Team Leader Relevant Degree in Urban Planning / Civil Engineering / Mechanical Engineering/ Electrical Engineering/Chemical Engineering

More than 20 years

2 Chief Architect Degree in Architecture More than 15 years

3 Market Analyst/ Industry Analyst Expert

MBA or equivalent More than 10 years

4 Civil Engineer B. Tech (Civil Engineering)

More than 08 years

5 Urban Planner Relevant Post Graduate Degree in Urban Planning / Design

More than 08 years

6 Structural Engineer M. Tech (Structures) More than 08 years

7 Finance Expert CA/CFA/CMA or equivalent

More than 10 years

8 Environmental Specialist Relevant Post Graduate degree in

More than 08 years

Page 23: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

23

Environmental Engineering / Planning

7.3.3 The bidder/Lead partner should have experienceas consultant in completing a

government project either state or central govt or PSUs. with a project cost of 180

crores and above.

7.3.4 Whether Bidder has existing office facilities located in Kerala.

7.3.5 Whether Bidder has attained Quality Management System Certification (ISO).

7.3.6 Whether the firm has experience in designing as per Green Building norms

7.3.7 Technical Presentation on Proposed “Methodology and Work Plan” to be adopted by

the Bidder for, accomplishment of the assigned task, to be made by the prequalified

Bidder before the Selection Committee.

7.3.8 The technical evaluation, applying criteria mentioned above and corresponding

points rating are listed as below:

SI No: Evaluation Criteria Maximum Marks

1 Experience in providing consultancy services for a

minimum period of 7 years and above in doing similar

projects or assignments.

Experience up to 7 years : 4 marks

Experience above 7 years up to 10 years : 5marks

Experience above 10 years up to 15years : 6 marks

Experience above 15 years : 7 marks

7

Page 24: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

24

2. In providing consultancy service for design and DPR

preparation of large scale industrial Park/similar

projects .

• 1 project with project cost of Rs.360Cr-12 marks

• 2 projects with project cost of Rs.270Cr-12 marks

• 3 projects with project cost of Rs.180Cr-12 marks

For each additional project in the above three

categories, a maximum of 6 marks shall be given as

follows.

Each project of cost more than Rs.360 crores : 3

marks each

Each project of cost Rs.270- 360crores:2 marks each

Each project of cost Rs.180 – 270 crores : 1 mark

each

18

3. Experience as Consultant/PMC in the preparation of DPR

in fully implemented Industrial Park/ /similar Industrial

Projects in an area of100 acres and above.

• 2 or more projects-10

• One project-5

10

4. The experience of undertaking an Industrial Park

Project as Consultant/Project Management

Consultant(PMC), in similar Infrastructure development

Projects for Industrial Parks in petrochemical and

pharmaceutical sector.

• one project – 10 Marks

10

5. Key personnel

1.Team Leader -04

• 20 years of experience -3 Mark

20

Page 25: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

25

For each of the additional 5 years of experience 0.5

marks will be given limited to a maximum of one mark.

2. Chief Architect -03

• 15 years of experience -2 Marks

For each of the additional 5 years of experience 0.5

marks will be given limited to a maximum of one mark.

3. Market Analyst/ Industry Analyst Expert -03

• 10 years of experience -2 Marks

For each of the additional 5 years of experience 0.5

marks will be given limited to a maximum of one mark

4. Finance Expert -03

• 10 years of experience -2 Marks

For each of the additional 5 years of experience 0.5

marks will be given limited to a maximum of one

mark.5.Civil Engineer -02

• 8 years of experience -1 Marks

For each of the additional 3 years of experience 0.5

marks will be given limited to a maximum of one mark

6. Urban Planner -02

• 8 years of experience -1 Marks

For each of the additional 3 years of experience 0.5

marks will be given limited to a maximum of one mark

7. Structural Engineer-02

• 8 years of experience -1 Marks

For each of the additional 3 years of experience 0.5

marks will be given limited to a maximum of one mark

8.Environmental Specialist-01

• 8 years of experience -0.5 Marks

• For each of the additional 2 years of experience

0.5 marks will be given.

6. Assignments/Projects undertaken for Govt. of India

/ State Governments / PSUs with a project cost of 180

04

Page 26: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

26

crores and above.

7. Office facilities in Kerala 01

8. Quality Management System Certification (ISO) 02

9. Knowledge and Experience in developing and executing

‘Green’ parks/institutions/industrial areas as per IGBC

guidelines

03

10. Presentation on “Methodology and Work Plan” to be

adopted and deployment of ‘Project Team’.

• Methodology – 10 Marks.

• Work Plan – 10 Marks.

• Deployment of manpower – 5 Marks.

25

TOTAL 100

Note: Cancelled/failed/not completed projects will not be considered for the evaluation.

7.3.9 The total technical score (TS) would be an arithmetic sum of scores obtained by the

bidder for each of prescribed parameters. The total technical score would include 75

marks based on documents submitted by the bidder showing conformance to the

parameters shown above and 25 marks based on presentation made by the

prequalified bidder before the selection committee. Based on the Technical Score

(TS) bidder will be shortlisted for the next stage.

7.3.10 The bidders are requested to quote the amount in Indian Rupees for undertaking the

assignment.

7.3.11 Following methodology is used for arriving at the Financial Score (FS)

FS = LF/FB X100

Where LF = Lowest Financial Bid Amount

FB = Financial Bid Amount for which FS is to be evaluated.

7.3.12 Final evaluation of combined technical and financial bid shall be based on the “Final

Weighted Score”.

Page 27: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

27

7.3.13 In order to arrive at the “Final Weighted Score”, a weightage of 80% will be assigned

for the Technical Score (marks/points scored in technical bid evaluation) and

weightage of 20% will be assigned for Financial Score.

The “Final Weighted Score” will be as follows:

S= (0.8xTS) + (0.2xFS)

Where S= Final Weighted Score,TS= Technical Score,FS=

Financial Score

7.3.14 The bidder scoring the highest “Final Weighted Score” shall be awarded the project.

7.3.15 KINFRA however reserves the right to reject any or all bids received, without

assigning any reasons and without any liability to KINFRA.

8. FORMAT OF TECHNICAL BID AND FINANCIAL BID (As per Annexure B)

THE TECHNICAL BID SHALL INCLUDE:

8.1 Pre-Qualification details as per enclosed Format.

8.2 The Technical Bid should have a covering letter which provides information on the

firm/company interested in taking up consultancy for Petrochemical Park, Kochi.

8.3 The bidder shall provide all necessary documents like MoU / AoA and completion

certificate from the Client with total cost of each project on the experience in

providing consultancy services for a minimum period of 7 years and above in doing

similar projects or assignments.

8.4 The Bidder shall provide specific information on experience of the organization in

providing consultancy services, particularly for DPR preparation of large projects,

which have been fully implemented. Signed, dated and sealed copies of work orders

and the work completion certificate/client certificate shall be submitted. Projects

mentioned without supporting documents will not be considered.

Page 28: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

28

8.5 The Bidder shall provide specific information on experience as Consultant/PMC in

Industrial Park/Industrial Estate/Industrial Projects completed (fully implemented),

in an area of 100 acres or more as evidence of the organization’s ability to

successfully conceptualize, implement and complete large projects in Industrial

Infrastructure development including DPR preparation. Signed, dated and sealed

copies of work orders and the work completion certificate/client certificate shall be

submitted. Projects mentioned without supporting documents will not be

considered.

8.6 The Bidder shall provide information on projects undertaken as Consultant/PMC in

similar Infrastructure development Projects for Industrial Parks in petrochemical and

pharmaceutical sector. The assignments may be in the nature of consultancy projects

for pre-feasibility reports, detailed project reports or similar activities. Copy of work

orders/completion certificate from the client to be submitted.

8.6 The Bidder shall provide details of existing local offices in Kerala, if any. The details

such as contact address details, number of staff, and office hierarchy structure may

be provided.

8.7 The Bidder shall provide details of certifications of Quality Management System

(ISO), attained by them. Copy of the certificates to be enclosed showing validity

dates.

8.8 The Bidder shall provide details of Experience in developing and executing ‘Green’

parks/institutions/industrial areas as per IGBC guidelines. Relevant Documents as

proof to be submitted.

8.9 In the case of Consortium, scope of work of each consortium member to be clearly

mentioned.

8.10 The Bidder shall make a presentation on ‘Methodology and Work Plan’ as well as the

‘Deployment of Proposed Team’ earmarked for this assignment. The presentation on

Methodology and Work Plan shall include various aspects of Detailed Estimate

Page 29: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

29

preparation as well as market survey, risk analysis, cost benefit analysis etc. The

presentation should illustrate the proposed methodology to be adopted by the

Bidder and should cover all aspects under ‘terms of reference ‘.

THE FINANCIAL BID SHALL INCLUDE:

8.13 The Bidder should quote in the Financial Bid theconsultancy fees in Indian Rupees.

The Financial Bid should have the Total Price inclusive of all taxes.

8.14 No subjective condition will be accepted in the Financial Bid.

8.15 The formats for Technical Bid and Financial Bid are provided at Annexure B. The

format in which presentations are to be made is given in Annexure C. The Bidders

will strictly adhere to the presentation formats provided and number of slides for

presentation shall not exceed 10 numbers. Time allowed for presentation is

maximum 20 minutes.

9. COMPLETION SCHEDULE

9.1 The “Completion Schedule” in brief for completion of this assignment with indicative

dates is given below.

Award of work to PMC- D1

Submission of masterplan,

preliminary report by consultant

for approval-D2

D1+45 days

Submission of engineering

designs, drawings, plans,

detailed estimates by

consultant.-D3

D2+15 days

Submission of final DPR by D1+90 days

Page 30: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

30

consultant-D4

Submission of Bid document-D5 D1+105 days

Marketing of 15% of the

allottable land by consultant-D6

D1+540 days

Marketing of remaining 15% of

the allottable land by consultant-

D7

D1+720 days

Page 31: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

31

ANNEXURE A

DETAILED PROJECT REPORT

FOR

THE DEVELOPMENT OF PETROCHEMICAL PARK AT KOCHI

TABLE OF CONTENTS

SALIENT FEATURES (as per attached format)

CHAPTERS:

Executive Summary:

• This section shall contain brief of all relevant details discussed in the following

chapters.

INTRODUCTION

• This section must provide a general introduction of the project being submitted.

• General introduction shall include write up on: location of the petrochemical park,

general description and historical background of the project, need for the project,

etc.

• Aims and objectives of the project shall also be briefed in the section.

STATUS FEASIBILITY STUDIES

• Description of any feasibility study conducted earlier and their outcome shall be

discussed in this section.

Page 32: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

32

REQUIREMENT/ DEMAND ANALYSIS

• This section should present the specific problem(s) or issue(s) faced by

stakeholders like citizens, businesses or governments that would be addressed by

means of provision of improved services through the proposed project.

• In this section, the rationale behind the project proposed shall be described with

clear focus on the existing condition and how it will help in improving the

situation and bring benefits to the stakeholders.

• The rationale could be broad based and supplemented with facts and figures.

Information based on objective research, not subjective impressions, should be

provided to justify the need or problem. The rationale should be written in a way

that would lead to objectives.

• Need of petrochemical park in the identified area should be explained in this

section. Detailed market study to accompany the demand analysis and potential

to attract customers to be evaluated in proper.

FUNCTIONAL DESIGN

• This section should present an analysis of different options available to achieve

the objective and the reasons for selecting the proposed option should be

substantiated.

• The functional design of the project is mainly achieved through field study and

documentation using existing information and specifications from various

standards.

• Area quantification of the requirements should be mentioned in the report; also

the methodology adopted in arriving at the total area should be clearly specified.

• The location of the petrochemical park depends on several factors like the

availability of land area and raw materials, facilities for transportation, availability

Page 33: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

33

and adequacy of electricity and water, existence of a growing marketing potential

etc.

• History of functioning of existing/nearby industrial park in the region, if any shall

be considered.

• The infrastructure shall be planned as to get the most economical design and at

the same time satisfy specific requirements, if any.

• The design of the infrastructure shall be considered as one which results in

minimum construction cost with respect to the actual site conditions like

topographical features, geotechnical features etc.

• The general layout of the petrochemical park shall be planned as per the site

conditions and the requirements of facilities to be provided.

• The layout of different plot sizes along with the infrastructures being provided

shall be prepared as per the general requirement and at the same time, the plots

shall be flexible for purchase.

• The project proposed shall satisfy all the rules and regulations laid down in the

respective codes and manuals.

ENGINEERING DESIGN

• This section should elaborate the technology choices, structural aspects and

evaluation of the technology option, as well as the basis for the technology for the

proposed project.

• A detailed layout of the industrial park area shall be prepared in a master plan

manner showing the allocation of different plots, internal and external

infrastructures, if any .etc

• Designs of Standard Design Factories (SDF) shall be supplemented with

Page 34: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

34

• New innovations like green building concept may be incorporated in the design of

the buildings.

FINANCIAL ESTIMATES & COST PROJECTIONS

• This section should focus on the cost estimates, budget for the project, means of

financing and phasing of expenditure.

• Cost estimates have to be worked out on the basis of detailed bill of quantities

(with detailed measurements of length, breadth, and depth / height for each

item), using the current Schedule of Rates of the State Government (PRICE) or

relevant SoR as applicable.

• Applicable taxes, contingencies, investigation charges including any O&M cost for

a specific period shall be clearly specified.

• Lump sum provisions for land acquisition etc. shall be explained in detail and

justified.

REVENUE STREAMS

• Options for cost recovery, if any, should be explored

• Innovative ideas for additional revenue generation may be indicated.

• Sensitivity analysis from the revenue streams to be incorporated

COST BENEFIT ANALYSIS& INVESTMENT CRITERIA

• Cost Benefit Analysis (CBA) is a technique whereby the costs of and benefits from

a scheme are quantified over a selected time horizon and evaluated by a common

yardstick.

• Financial and economic cost benefit analysis of the project should be undertaken

wherever such returns are quantifiable.

Page 35: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

35

• Cost Benefit Ratio (CBR - benefit to cost ratio), EIRR (Economic Internal Rate of

Return) etc. shall be worked out in detail with all supporting primary and

secondary data.

• The project cash flow projections for the life cycle along with underlying

assumptions have to be presented.

ENVIRONMENTAL & SUSTAINABILITY ASPECTS

• An Environmental Management Plan (EMP) is to be developed explaining the

possible environmental issues which may arise during the construction and

operation of the infrastructure and associated facilities depending upon the size

of the project.

• Environmental impact assessment study if mandatory and measures identified to

mitigate the adverse impact, if any shall be conducted and documented in detail.

• Issues relating to land acquisition, diversion of forest land, wildlife clearances,

rehabilitation and resettlement should be addressed in this section.

• Inclusion of international best practices in sustainable infrastructure management

including green building concept, potential low carbon, low energy, zero pollution

etc. are desirable.

RISK ASSESSMENT AND MITIGATION MEASURES

• For those projects which involve large capital outlay and various issues relating to

land acquisition, environmental aspects, a detailed and systematic risk analysis

may be resorted to.

• Identification and assessment of implementations risks which can lead to time

overrun, cost escalation, scope reduction etc. is the primary stage in risk

assessment.

Page 36: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

36

• Risk analysis could include legal/contractual risks, environmental risks, revenue

risks, project management risks, regulatory risks etc.

• The mitigation plans including risk avoidance, risk transfer, and risk elimination

are to be well analysed and documented.

• For complex projects with multiple risk profiles, numerical modelling and

simulation may be adopted.

PROJECT MANAGEMENT ORGANISATION

• Responsibilities of different agencies for project management of the said project

should be elaborated. The organization structure at various levels, human

resource requirements, as well as monitoring arrangements should be clearly

spelt out.

• Management strategy for the institutional structures and mechanisms would be

well chartered for ensuring effective project management.

• The involvement of external consultant if any shall be documented

CONTRACT MANAGEMENT STRATEGY

• Contracting methodology whether item rate, lump sum, design and execute, EPC

etc. must be specified in detail for the execution of the project.

• The system followed in the bidding document and manuals of reference etc. like

PWD/CPWD/ FIDIC shall be explained.

• Any variation proposed from the current practices acceptable under government

of Kerala (Arbitration, escalation etc.) in the system due to any specific technical

aspects associated with the project need to be explained with justification.

• Any contract clause which may likely to lead to additional financial liability shall be

identified and reported with suggestions to overcome such issues.

Page 37: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

37

IMPLEMENTATION SCHEDULE & WBS

• The time bound work schedule is an important part of every project because it

helps in better handling of projects in planning, implementation etc.

• This section should indicate the proposed zero date of commencement and also

provide a Bar chart / Project Schedule, wherever relevant.

• Phasing of project activities, proposed contract packages and schedule of

implementation for each phase.

• Identify critical dependencies in the project and expected timelines for

completion of key milestones and associated process indicators for the same.

• The DPR should provide a time-bound action plan including tendering,

appointment of contractors, construction schedule, quality assurance & quality

control and post-construction activities, including project delivery

STATUTORY CLEARANCES

• This section should elaborate the statutory clearances to be obtained from the

various authorities.

• Statutory approvals as per bye laws, master plan, fire safety norms,

environmental clearance etc. as applicable for the project are to be taken.

QUALITY MANAGEMENT PLAN

• The DPR shall include information relating to the institution to be engaged in the

quality assurance & quality control of the project execution.

• Methodology to be adopted to ensure the quality of construction should be

clearly mentioned in the report.

• Quality management plan including the internal inspection and testing procedure

shall be documented.

Page 38: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

38

• If third party quality control mechanism is adopted, the structure of the same

shall be specified in detail.

OPERATIONS & MAINTENANCE PLAN

• The DPR shall incorporate/include information relating to the institution to be

engaged in the O&M of the created infrastructure asset/enhanced infrastructure

assets.

• Brief description/analysis of the key issues and obstacles in regard to O&M

(including billing/collection issues) and proposed countermeasures to overcome

them for the project should be contained.

• Requirement of funds for operation and maintenance of assets should also be

included in the report.

ANNEXURES

• MARKET STUDY DOCUMENT

• ARCHITECTURAL MASTER PLAN

• TOPOGRAPHY DRAWINGS & GEOTECHNICAL INVESTIGATION REPORTS

• DETAILED LAYOUT OF PETROCHEMICAL PARK

• DETAILED ESTIMATE

• DESIGN FOR SDFs and DETAILED ESTIMATE

• COPIES OF STATUTORY APPROVALS OBTAINED

SALIENT FEATURES

• Title of the project

Page 39: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

39

• Details of project location

• District

• Taluk

• Corporation/Municipality/Panchayath

• Assembly Constituency

• Implementing agency/SPV

• DPR prepared by

• Project outlay

• Budget provision

• Budget speech reference

• Administrative sanction

• Present status of existing parks, if any in

project location

• Need for the project

• Details of industrial park

• Area of land required

• Infrastructures proposed

• Other details

• Details of investigations/surveys conducted

• Total estimated cost and item wise cost

break up and details of Schedule of Rates

Whether detailed estimate attached?

• Details of revenue streams

• Details of Cost Benefit Analysis (CBR value)

• Details of project risks

• Details of project management organisation

strategy

• Details of contract management strategy

• Details of Project Implementation Schedule

(PIS) & Work Breakdown Schedule (WBS) -

Proposed duration to complete the project

• Details of statutory clearances

• Quality control infrastructure and

Mechanism

Page 40: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

40

• Operations & Maintenance (O&M)

arrangements of the project after

Completion

• Details of attached drawings

• Other attachments

ANNEXURE B

I. PRE-QUALIFICATION FORMAT

Experience in providing consultancy services for a minimum period of 7 years and

above in doing similar projects or assignments.

SI No. Parameter Details

1 Year of establishment

2 Status of Firm (Proprietorship

/Partnership/Any other)

3 Details of establishment as consultancy firm

4 Empanelment with Govt. Organizations

(mention names along with copies of

empanelment letters)

5 Name,Designation,Academic Qualification,

Experience of Head of the organization.

6 Address and phone numbers of Head/Key

Personnel

• Experience as Consultant in the preparation of DPR in at least one fully implemented

Industrial Park Project/similar projects with project cost of Rs.360 Crore and above OR

2 projects of Cost Rs.270-360crores OR 3 projects of cost Rs 180-270 crores.

Name of Client(Promoters)

• Location of Project (also include

Page 41: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

41

District/ State)

• Project Cost

• Project Details (Descriptions)

• Date of Work Order issued

• Date of Completion of Project

• Documents Submitted

• Work Order

• Client Certificate/Completion

Certificate

YES/NO

YES/NO

Experience in undertaking assignments/Projects undertaken for Govt. of India / State

Governments / PSUs with a project cost of 180 crores and above.

Name of Client(Promoters)

• Location of Project (also include

District/ State)

• Project Cost

• Project Details (Descriptions)

• Date of Work Order issued

• Date of Completion of Project

• Documents Submitted

• Work Order

• Client Certificate/Completion

Certificate

YES/NO

YES/NO

• Financial Details

Year Annual

Turnover

Annual Profit Net Worth Copy Enclosed

2014-15 YES/NO

2015-16 YES/NO

2016-17 YES/NO

Page 42: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

42

Note: Net worth to be calculated as defined in the Pre-Qualification Criteria clause and

the above statement to be certified by a Chartered Accountant and

countersigned by Authorised signatory.

• Undertaking on whether the Firm or its Associates / Subsidiaries is debarred /

blacklisted by any Central/State Governments/Govt Departments/ Govt

Bodies/PSU’s or Not

Certificate as per the below draft to be signed by the Authorised Signatory and to be

provided in the Company Letter Head by all Consortium Partners.

“This is to certify that <Company Name> and its Associates / Subsidiaries has not been

debarred / black listed by any Central / State Governments / Government departments /

Government bodies / PSUs”

Page 43: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

43

I. TECHNICAL BID FORMAT

Note: In case of Consortium the following details shall be furnished by each member of

the consortium.

• Name of the organization :

Address with contact details :

Experience in providing consultancy services for a minimum period of 7 years and

above in doing similar projects or assignments.

SI No. Parameter Details

1 Year of establishment

2 Status of Firm (Proprietorship

/Partnership/Any other)

3 Details of establishment as consultancy firm

4 Empanelment with Govt. Organizations

(mention names along with copies of

empanelment letters)

Page 44: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

44

5 Name, Designation, Academic Qualification,

Experience of Head of the organization.

6 Address and phone numbers of Head/Key

Personnel

• Experience as Consultant in the preparation of DPR in at least one fully

implemented Industrial Park Project/similar projects with project cost of Rs.360

Crore and above OR 2 projects of Cost Rs.270-360crores OR 3 projects of cost Rs

180-270 crores.

• Name of Client(Promoters)

• Location of Project (also include

• District/ State)

• Project Cost

• Project Details (Descriptions)

• Date of Work Order issued

• Date of Completion of Project

• Documents Submitted

• Work Order

• Client Certificate/

Completion Certificate

YES/NO

YES/NO

[Note: Repeat above data for each project]

Experience as Consultant/PMC in the preparation of DPR in fully implemented

Industrial Park/ /similar Industrial Projects in an area of 100 acres and above.

Name of Client(Promoters)

• Location of Project (also include

District/ State)

• Project Cost

• Project Details (Descriptions)

• Date of Work Order issued

• Date of Completion of Project

• Documents Submitted

Page 45: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

45

• Work Order

• Client Certificate/

Completion Certificate

YES/NO

YES/NO

[Note: Repeat above data for each project]

• The experience of undertaking an Industrial Park Project as Consultant/Project

Management Consultant (PMC), in similar Infrastructure development Projects for

Industrial Parks in petrochemical and/or pharmaceutical sector.

• Name of Client(Promoters)

• Location of Project (also include

District/ State)

• Project Cost

• Project Details (Descriptions)

• Project Implementation Status

(Descriptions)

• Date of Work Order issued

• Date of Completion of

Project/Scheduled Date of Completion

• Documents Submitted

• Work Order

• Copy of Final Approval issued by

concerned authority.

• Client Certificate/ Completion

Certificate

YES/NO

YES/NO

YES/NO

[Note: Repeat above data for each project]

• Key Professional staff proposed to be dedicated for the project:

Page 46: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

46

1. Team Leader

(i) Qualification

(ii) Experience

(Year-wise, Organization-wise, Assignment-

wise) with special reference to similar

Project)

(iii) CV Submitted YES/NO

2. Chief Architect

(i) Qualification

(ii) Experience

(Year-wise, Organization-wise, Assignment

wise.)

(iii) CV Submitted YES/NO

3. Market Analyst/ Industry Analyst Expert

(i)Qualification

(ii) Experience

(Year-wise, Organization-wise, Assignment

wise)

(iii) CV Submitted YES/NO

4. Finance Expert

(i)Qualification

(ii) Experience

(Year-wise, Organization-wise, Assignment

wise)

(iii) CV Submitted YES/NO

5.Civil Engineer

(i)Qualification

(ii) Experience

(Year-wise, Organization-wise, Assignment

wise)

(iii) CV Submitted YES/NO

6.Urban Planner

(i)Qualification

Page 47: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

47

(ii) Experience

(Year-wise, Organization-wise, Assignment

wise)

(iii) CV Submitted YES/NO

7.Structural Engineer

(i)Qualification

(ii) Experience

(Year-wise, Organization-wise, Assignment

wise)

(iii) CV Submitted YES/NO

8.Environmental Specialist

(i)Qualification

(ii) Experience

(Year-wise, Organization-wise, Assignment

wise)

(iii) CV Submitted YES/NO

[Note: Repeat above data for additional personnel]

Experience in undertaking assignments/Projects undertaken for Govt. of India /

State Governments / PSUs with a project cost of 180 crores and above.

Name of Client(Promoters)

• Location of Project (also include

District/ State)

• Project Cost

• Project Details (Descriptions)

• Date of Work Order issued

• Date of Completion of Project

• Documents Submitted

• Work Order

YES/NO

YES/NO

Page 48: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

48

• Client Certificate/Completion

Certificate

• Office Infrastructure in Kerala

(i) Existing office locations with

contact details

(ii) No. of Staff

(iii) Hierarchy

• Quality Management Certifications

Type of Quality

Management

Certification

Certificating

Body

Certification

validity

From … To …

Copy

Enclosed

1. YES/NO

2. YES/NO

3. YES/NO

• Green Certifications

Type of Certification Certificating

Body

Project details Copy

Enclosed

1. YES/NO

2. YES/NO

3. YES/NO

• Scope of Work of Consortium Partners (An Agreement between the Consortium

members also to be enclosed)

Name of

Consortium

Members

Status Scope of

Work

Remarks

Lead Partner

Consortium

Page 49: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

49

Partner 1

Consortium

Partner2

Name of the organization Signed by

Seal of the organization Designation

Date:

II. FINANCIAL BID FORMAT

A. Name of the organization :

Address with contact details :

B.

Quoted Amount

Rs.

Page 50: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

50

(Including all taxes)

(In words)

No subjective conditions will be accepted in the price bid.

Name of the organization Signed by

Seal of the organization Designation

Date:

ANNEXURE C

FORMAT FOR POWER POINT PRESENTATION.

Presentation should include these mandatory details in the slide without fail.

Page 51: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

51

INTRODUCTION

METHODOLOGY – Including Schematic Layout.

WORKPLAN - Including Project Schedules

DEPLOYMENT OF PROPOSED TEAM

Note: Total number of slides to be restricted to 10. Time allowed max 20 minutes.

ANNEXURE D

DRAFT AGREEMENT

Page 52: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

52

This Agreement is made and entered on the ….day of ……. Two thousand and

Seventeen at THIRUVANANTHAPURAM .

BETWEEN

KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION

(KINFRA), a body corporate duly constituted under the Kerala Industrial

Infrastructure Development Act 1993, having its principal office at “KINFRA House‟,

T.C.31/2312, Sasthamangalam, Thiruvananthapuram-695010, represented by its

Managing Director,

………………………………………………………………………………………………………………………………………

………………………………………………………………(hereinafter called the KINFRA, which

expression shall, unless repugnant to the context, be deemed to include its

successors and permitted assigns) OF THE ONE PART.

AND

M/s…………….., having its registered office at ………………………..dulyauthorised and

represented by its ………………..……………………..,(hereinafter called the “Consultant”

which expression shall, unless repugnant to the context, be deemed to include its

successors and permitted assigns) OF THE OTHER PART.

WHEREAS KINFRA being the nodal agency for Industrial Infrastructure development

for the state of Kerala, got approval to establish a Petrochemical Park in

approximately 450 acres of land atAmbalamughal, in Ernakulam District, Kerala. The

project is intendedto create an Industrial Park with all infrastructure facilities exclusive

for the Petrochemical Industry.

Page 53: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

53

WHEREAS KINFRA has invited Request for Proposal (RFP) from reputed Consulting

Firm meeting the eligibility criteria for selection of a Consultant for preparation of

DPR and marketing 30 % of allottable land in the Park

WHEREAS after evaluation of the various Technical and Financial Bids, the bid

submitted by the Consultant is found to be more responsive and Consultant has

been selected as the successful bidder to be appointed as Consultant for the

preparation of Detailed Project Report (DPR) and marketing of the project of the

Petrochemical Park as per scope of services detailed in the RFP.

WHEREAS KINFRA has issued the work order No…………………dated…………………………

to the Consultant awarding the contract for the preparation of Detailed Project Report

(DPR) and marketing of the proposed Petrochemical Industrial Park Project as per the

TOR for a total Consultancy fee of Rs……………………………….inclusive of all taxes and

duties District

1.NOW IT IS HEREBY AGREED AS FOLLOWS:

a) The Consultant shall render their services to the Petrochemical Park Project with

respect to technical, commercial and financial aspects of the Project, in

accordance with the Terms of Reference and Deliverables described in Annexure1.

b) The following documents shall form part of this agreement:

1. RFP document

2. Terms of Reference & Deliverables issued by KINFRA

3 Financial Quote submitted by the Consultant.

4 Clarifications given during the pre-bid meeting

5. Any corrigendum issued by KINFRA

3. 6 . WorkOrder No.………………… dated…………..issued by KINFRA.

Page 54: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

54

c) All the terms and conditions contained in KINFRA’sRequestFor proposal as well as

work order shall be binding on the consultant.

d) Schedule of payment

The Consultant shall be paid the consultancy fees, based on the following

payment schedule:

20% as initial payment on execution of agreement against Bank Guarantee for

equivalent amount from a Nationalised bank. This BG is initially for a period of

24 months. This BG will be released after the final payment on submission of

Performance BG for an amount equivalent to 10% of total value of the

consultancy charge and valid for 12 months

10% on submission of masterplan, preliminary reports and preliminary

drawings and on approval by KINFRA .

10% on submission and approval of engineering designs, drawings, plans,

detailed estimates.

15% on submission of the final DPR and acceptance by KINFRA .

10% on approval of the DPR by KIIFB.

10% on submission of all Bid documents for Tender purpose by the

Consultant and acceptance of the same by KINFRA.

10% on allotment of 15% of the allottable land by the marketing effort of the

Consultant.

15% on allotment of remaining 15% of the allotable land by the marketing

efforts by the Consultant

10% of the quoted amount will be given as incentive on allotment of every

additional 10% of the land within 24 months by the marketing efforts of the

Consultant.

Note: All payments shall be subject to “Tax Deduction at Source” (TDS) and such

other statutory deductions as may be applicable from time to time.

Page 55: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

55

e) The Consultant in consultation with KINFRA, shall prepare a detailed Time

Schedule for the execution of the Project, to achieve the overall target date of

completion of the Project. Final Time Schedule shall be prepared within seven

days of the signing of this Agreement. This will be binding on both parties.

f) If the Consultant fails to adhere to the time schedule or the extended time, which

may be granted by KINFRA, in its sole discretion, KINFRA shall be entitled to

terminate this agreement and entrust the work to some other Consultant and in

that case, the Consultant shall be entitled to fees or compensation only up to the

stage of work carried out by him and approved by KINFRA. In the event of

Consultant being not in a position to fulfill the scope of works as mentioned in

Annexure-1 in such a way that the implementation of the Petrochemical Park

project cannot be carried out as per the time schedule, KINFRA will be free to get

the same carried out by other agencies at the risk and cost of the Consultant, and

in that event KINFRA shall have the right to terminate the Consultant Contract

without payment to the Consultant.

This agreement is deemed to have come into effect from ………………(date of

acceptance of work order). The agreement shall remain in force for a period of 24

months from the effective date of agreement or till actual date of completion of

work including marketing of allottableland including any extra items or excess

quantity whichever is later.

KINFRA has the right to terminate the contract at any time if the performance of

the Consultant is found to be not satisfactory by KINFRA. In that event the

consultant is eligible for payment only for the work accepted/completed/services

Page 56: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

56

rendered by the consultant and approved by KINFRA up to the date of

termination.

2. Contact Person

For coordinating with KINFRA in connection with this assignment the following

persons shall be the contact person and their instruction shall be binding on the

Consultant.

1)……………………… (Name,Designation& Address)

2)……………………… (Name,Designation& Address)

3. Project Team

a) Key professionals with requisite qualifications and experience as below

shall be deployed in the project.

S. No. Position Educational Qualifications

Length of Professional Experience

1 Team Leader Relevant Degree in Urban Planning / Civil Engineering / Mechanical Engineering/ Electrical Engineering/Chemical Engineering

More than 20 years

2 Chief Architect Degree in Architecture More than 15 years

3 Market Analyst/ Industry Analyst Expert

MBA or equivalent More than 10 years

4 Civil Engineer B. Tech (Civil Engineering)

More than 08 years

5 Urban Planner Relevant Post Graduate Degree in Urban Planning / Design

More than 08 years

6 Structural Engineer M. Tech (Structures) More than 08 years

7 Finance Expert CA/CFA/CMA or equivalent

More than 10 years

Page 57: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

57

8 Environmental Specialist Relevant Post Graduate degree in Environmental Engineering / Planning

More than 08 years

b) These professionals may be retained throughout the project period and

may be replaced only with prior concurrence of KINFRA. If KINFRA requires

that any of the above professionals may be replaced for deficiency in

performance or on account of indiscipline, the same may be effected by

the Consultantat the earliest.

c) The Consultantmay deploy required personnel viz. Mechanical Engineer,

Electrical Engineer, Chemical Engineer, Instrumental Engineer, ETP experts,

Financial Manager etc. as required from time to time. Consultant may also

outsource highly specialized work with the prior approval of KINFRA only.

4. SUB-CONTRACTING & SUB-CONSULTANT

The Consultant shall not subcontract whole of the work. However they may

subcontract any part of the work after duly notifying and obtaining prior

approval from KINFRA.

The Consultant shall indicate the name of sub- consultants if any for any

services with their organization details, qualification and experience of the

main personnel and shall obtain prior approval of KINFRA before their

engagement for the consultancy. Such Sub consultant approved by KINFRA

shall be associated from the preliminary drawing stage to the final design

work. However, the consultant shall be fully responsible for the correctness

and accuracy of the designs prepared by sub-consultants and shall indemnify

KINFRA for damage or loss caused due to any negligence of sub-

consultant(s). The copy of the agreement between sub-consultant and the

consultant shall be submitted to KINFRA

Page 58: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

58

5. LIQUIDATED DAMAGES

In the event of a delay in completion of work as per the completion

Schedule for which the consultant is responsible, the consultant shall pay

Liquidated Damages to KINFRA at the rateof half percent (0.5%) per week of

delay, subject to a maximum of ten percent (10%) of the consultancy fees.

Such Liquidated Damages shall be deemed to be a genuine pre-estimate of

the foreseeable damages incurred by KINFRA due to delay and shall be

KINFRA's sole recourse for late performance by the consultant under the

agreement.

6. Termination of Agreement

6.1 The Agreement herein may be terminated at any time on one month’s notice

on either side. In the event of termination of the Agreement by KINFRA, the

Consultant shall not be entitled to any compensation or damage by reason of

such termination, but only to the fees for the services actually rendered up to

the time of such termination.

6.2 If the Consultant shall close his business or become incapacitated, from acting

as such Consultant as aforesaid, or if this agreement is terminated in mutually

agreed terms, KINFRA may make use of all documents prepared by the

Consultant after payment for the same as provided herein.

7. Force Majeure:

War, invasion, revolution, riots, sabotage, lockouts, strikes, work shut-down

imposed by Government Acts or legislature or other authorities, stoppage in

Page 59: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

59

supply of materials, fuel or electricity, breakdowns of machinery, act of God,

epidemics, fires, earthquakes, floods, explosions, accidents, sea navigation

blockades or any other acts or events whatsoever which are beyond

reasonable

control and which shall directly or indirectly prevent completion of the project

within the time specified in the agreement, will be considered Force Majeure.

The Consultant shall be granted necessary extension of time to cover the delay

as caused by Force Majeure without any financial repercussions

8. All disputes arising out of or in any way connected with this Agreement shall

be deemed to have arisen in Kerala and only Courts in Thiruvananthapuram

shall have the Jurisdiction to determine the same.

IN WITNESS WHEREOF the parties hereto set their hands on the date and year first

above written.

Signed and delivered for and on

behalf of the KINFRA (Kerala

Industrial Infrastructure

Development Corporation)

Signed and delivered for and on

behalf of the Consultant

In the presence of

Witness:

In the presence of

Witness:

1.

1.

2. 2.

Page 60: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

60

Annexure 1

Terms of Reference and Deliverables

• The Consultant shall be entrusted with preparation of Detailed Project Report (DPR)

and marketing of the project. The DPR should be prepared according to the guidelines

Page 61: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

61

of Kerala Industrial Infrastructure Fund Board (KIIFB); the components of DPR is given

as Annexure A.

• The Consultant should prepare legible layout of the proposed site, carry out site

analysis for elements like soil analysis, surveyed site plan and site soil particulars

including spot levels/contours, flood history, on-site features etc. for realistic cost

estimates of land development and construction.

• The Consultant is responsible for entire architectural component of the project work.

The Consultant should also provide the details regarding the common facilities and

common technical infrastructure required with estimated investments therein. This

would include the developing of the Master Plan along with sectional drawings and

building plan with legends giving clear picture /title of drawings and other relevant

details. This would also include detailed engineering and design including preparation

of detailed cost estimates for various project components/facilities envisaged in the

Petrochemical Park Project. The cost estimates shall be according to the latest CPWD

rates; wherever it is not available, market rates to be considered. The cost estimates for

plant and machinery shall be backed by quotations from reputed equipment and

machinery suppliers in line with scheme requirements.

• The above clause shall be broadly divided as follows:

• Master Plan: To be based on the broad concept design and cost in

consultation with KINFRA

• Preliminary Drawings and estimate: Rates to be calculated based on Delhi

Plinth Area rates

• Detailed Drawings and estimate: Latest Delhi schedule of rates to be

followed. Wherever it is not available, market rates to be considered.

• The Consultant shall prepare all relevant documents related to statutory approvals for

the Petrochemical Park Project.

• The consultant shall prepare and submit all Bid documents required for tender

purpose.

Page 62: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

62

• The Consultant shall work out the implementation schedule with milestones for the

project.

• The Consultant shall abide by all the clauses in the Agreement to be entered in to with

KINFRA .The draft agreement is attached as Annexure D.

• Ten copies of all the deliverables are to be submitted along with the soft copy.

• Consultant shall, on their own (If approved agency) or through another approved

Agency, carry out Environment Impact Assessment (EIA). The Consultant shall co-

ordinate with the Agency for timely completion of the EIA and also follow up with the

appropriate authorities for getting clearance. The cost towards EIA shall also be

included in the financial quote.

• The structural design submitted by the Consultant will be proof checked if necessary

by KINFRA through a third party .If these designs are acceptable and needs no

correction/modification as required in the relevant BIS codes/KMBR, the cost of proof

checking shall be borne by KINFRA. In case correction/modifications are required in

the design and drawing the entire charges for proof checking shall be borne by the

Consultant.

• The consultant shall prepare and submit all bid documents required for the selection

of contractors for the implementation of the project.

• The Consultant shall ensure marketing of 30% of the allottable land to industrial units

DELIVERABLES:

1. Detailed Project Report

The report should be prepared with all the components mentioned in Annexure A.

2. Master Plan shall include the following:

• Site analysis Report for elements like soil analysis,surveyed site plan and site soil

particulars including spot levels/contours, flood history, on-site features etc. for

realistic cost estimates of land development and construction

Page 63: KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATIONkinfra.org/wp-content/uploads/2013/04/RFP-Petrochemical_Park.pdf · kerala industrial infrastructure development corporation

RFP FOR PETROCHEMICAL INDUSTRIAL PARK AT AMBALAMUGHAL,ERNAKULAM

63

• Layout incorporating the individual components in surveyed map

• Preliminary Drawings

• Preliminary Estimates

3. Detailed Estimate including the following:

• Detailed Drawings

• Detailed Estimates including BoQs for all components of the work including

electrical, Air conditioning, fire-fighting and Environmental engineering

requirements. This will include structural drawings for civil and drawings and

designs for electrical, fire-fighting and water supply and sanitary installations works

as mentioned.

• Structural Drawings and Designs for all components of the work

4. Financial Planning Report for the project in accordance with requirements.

5. Submission of all Bid documents required for tender purpose.

6. Submission of all relevant documents related to statutory approvals

Submission of implementation schedule as per the overall plan.

Note: Clause Deliverables shall be read in conjunction with clause Terms of Reference